HomeMy WebLinkAboutARB201700057 Review Comments 2019-07-29 y,
Margaret Maliszewski
From: Erin Root <erinintrevado@gmail.com>
Sent: Monday,July 29, 2019 2:44 PM
To: Margaret Maliszewski
Subject: Re:ARB-2017-57:Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor
Amendment
Hi Margaret,
the schedule is correct. On the plan,the symbol is repeated in other places.
Best,
Erin
On Fri,Jul 19, 2019 at 9:21 AM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote:
Erin,
In your revised plan I see 31 Big Bluestem and 14 Switchgrass, but the schedule shows 28 Big Bluestem and 16
Switchgrass. Can you please double-check these?
Thanks.
Margaret
From: Margaret Maliszewski
Sent:Thursday,July 18, 2019 5:03 PM
To: Erin Root<erinintrevadoCa@gmail.com>
Subject: RE:ARB-2017-57:Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor Amendment
He'll need to update his plan with your revisions. But wait to hear from us to make sure there are no other revisions
required.
{ From: Erin Root<erinintrevado@gmail.com>
Sent:Thursday,July 18, 2019 5:02 PM
To: Margaret Maliszewski<MMaliszewski@albemarle.org>
Cc:Wesley Carter<wescarterbob@gmail.com>
Subject: Re: ARB-2017-57: Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor Amendment
Great! Thank you! It looks as though Tim did not apply the changes I made to the plan.What do we do about this?
Erin
1
On Thu,Jul 18, 2019 at 5:00 PM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote:
I Thanks, Erin. I received it.
From: Erin Root<erinintrevado@gmail.com>
Sent:Thursday,July 18, 2019 4:08 PM
To: Margaret Maliszewski<MMaliszewski@albemarle.org>
Cc:Wesley Carter<wescarterbob@gmail.com>
Subject: Re:ARB-2017-57:Albemarle Countertop;SDP-2018-63: Hydraulic Road LLC Minor Amendment
Margaret,
I'm going to send it to you via WeTransfer.
Will you confirm that you've received it?
Best,
Erin
On Thu,Jul 18, 2019 at 9:30 AM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote:
f Erin, I am able to open the plant schedule attachment, but the site plan document link is not working for me.
} From: Erin Root<erinintrevado@gmail.com>
Sent:Tuesday,July 16, 2019 3:54 PM
s ; To: Margaret Maliszewski<MMaliszewski@albemarle.org>
Cc:Tim Miller<meridianwbe@gmail.com>; Christopher Perez<cperez@albemarle.org>; Wesley Carter
<wescarterbob@gmail.com>
I ' Subject: Re: ARB-2017-57:Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor Amendment
Margaret,
2019_7_16_ACC Site Plan_1"=10'_pg 2.pdf
t i
2
A
11 I've made changes to both documents. Please review to make sure I've done so correctly.
Thank you,
i 4
Erin
On Thu, May 30, 2019 at 2:57 PM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote:
\ Erin,
j # j I'm confused by your questions.The plant schedule identifies the required planting size and quantity.The schedule
I I must correspond to the drawing. If the drawing size or scale do not allow you to illustrate each individual plant,you
could employ a drawing convention that uses one symbol to indicate a particular quantity of one plant in a
particular location.Since the plan limits you to a required planting size,the quantity represented by the symbol
would not need to change. If you use a symbol to indicate more than one plant(for example, one cross-hatched
circle represents 20 sedge together in one location)then you will need to identify on the plan the quantity that each
symbol represents(in this example, 20 sedge).
� 3
Margaret
From: Erin Root<erinintrevado@gmail.com>
Sent:Thursday, May 30, 2019 10:37 AM
To: Margaret Maliszewski<MMaliszewski@albemarle.org>
Cc:Tim Miller<meridianwbe@gmail.com>; Christopher Perez<cperez@albemarle.org>; Wesley Carter
•
i # <wescarterbob@gmail.com>
Subject: Re:ARB-2017-57: Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor Amendment
3 ,
Hi Margaret,
Regarding#2.Yes,the symbols are intended to depict several plants, as the amount depends on current sourcing
size. Can the note say this or does it need to say something specific?
Best,
Erin
I
On Tue, May 28, 2019 at 10:45 AM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote:
iI
I Tim,
' l
# I ► .
3 .
I have reviewed the site plan submitted by Meridian Planning Group with revision date of 5/7/19. I have the
following comments:
1. My emailed comments from May 3 requested that a note be added to the plan indicating that the new
monument sign and sign lighting are shown only for information and are not approved with the site plan; a
separate sign application is required.This note was not added to the plan, but it is needed.
2. The plant quantities in the plant schedule do not appear to correspond directly with the plant symbols
drawn on the plan. Please explain these discrepancies/revise the landscape plan accordingly. (The
rendering of the landscape plan makes it difficult to read and to distinguish the various plant symbols. I
realize this may be contributing to the apparent inaccuracies.Alsb, if a single symbol is intended to
represent multiple plants,this will need to be noted on the plan/in the schedule.)
a. 60 white heath aster noted in schedule; 13 drawn on plan
b. 10 poppy mallow noted in schedule; 23 drawn on plan
c. 100 Pennsylvania sedge noted in schedule; 16 drawn on plan
d. 26 Big bluestem noted in schedule; 31 drawn on plan
e. 63 Little bluestem noted in schedule; 36 drawn on plan
f. 11 switchgrass noted in schedule; 14 drawn on plan
g. 6 Ginkgo noted in schedule; 8 drawn on plan
Thanks.
Margaret
Margaret Maliszewski,Chief of Planning/Resource Management
1 Albemarle County Department of Community Development
401 McIntire Road
Charlottesville,VA 22902
434-296-5832 x3276
mmaliszewski@albemarle.org
Erin Intrevado Root
4
I WHIL Innovations Post-doctcnoi Fellow 2014
Master of Landscape Architecture 2013
Master of Architecture 2011
University of Virginia
!!, Erin Intrevado Root
WHIL Innovations Post-doctoral Fellow 2014
Master of Landscape Architecture 2013
Master of Architecture 2011
University of Virginia
Erin Intrevado Root
WHIL Innovations Post-doctoral Fellow 2014
Master of Landscape Architecture 2013
Master of Architecture 2011
University of Virginia
Erin Intrevado Root
WHIL Innovations Post-doctoral Fellow 2014
Master of Landscape Architecture 2013
Master of Architecture 2011
5
s
University of Virginia
Erin Intrevado Root
WHIL Innovations Post-doctoral Fellow 2014
Master of Landscape Architecture 2013
Master of Architecture 2011
University of Virginia
6