Loading...
HomeMy WebLinkAboutARB201700057 Review Comments 2019-05-28 Margaret Maliszewski _ From: Margaret Maliszewski Sent: Tuesday, May 28, 2019 10:45 AM To: ,Tim Miller Cc: Erin Root; Christopher Perez Subject: ARB-2017-57:Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor Amendment Tim, I have reviewed the site plan submitted by Meridian Planning Group with revision date of 5/7/19. I have the following comments: 1. My emailed comments from May 3 requested that a note be added to the plan indicating that the new monument sign and sign lighting are shown only for information and are not approved with the site plan; a separate sign application is required.This note was not added to the plan, but it is needed. 2. The plant quantities in the plant schedule do not appear to correspond directly with the plant symbols drawn on the plan. Please explain these discrepancies/revise the landscape plan accordingly. (The rendering of the landscape plan makes it difficult to read and to distinguish the various plant symbols. I realize this may be contributing to the apparent inaccuracies.Also, if a single symbol is intended to represent multiple plants,this will need to be noted on the plan/in the schedule.) a. 60 white heath aster noted in schedule; 13 drawn on plan b. 10 poppy mallow noted in schedule; 23 drawn on plan c. 100 Pennsylvania sedge noted in schedule; 16 drawn on plan d. 26 Big bluestem noted in schedule; 31 drawn on plan e. 63 Little bluestem noted in schedule; 36 drawh on plan f. 11 switchgrass noted in schedule; 14 drawn on plan g. 6 Ginkgo noted in schedule; 8 drawn on plan Thanks. Margaret Margaret Maliszewski,Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org 1