Request for Pre -construction Meeting and Grading Permit
from Albemarle County — V5MP
a�
�IRG1�P
Approved Plan Number: WPO-
Approved Plan Name:
(Plans must be approved prior to a pre -construction meeting.)
(Bonds must be approved and posted prior to a pre -construction meeting or permit.)
Responsible Land Disturber:
Print Name: (,i Vi✓1 tdVU,,4
State Certification Number:
Address 2 (Q 6'11 _tc t''
City OW V- 10 '4C S j t I le State Zip
Daytime Phone) 1'67- 3 26 E-mail C4V 10 Mt4y+(nbO ^(A'W1
Primary Contractor:
Print N
Address 210 t AYl fen 1 '""'F✓
City
UY''vICks
State Zip lzg02
Daytime Phone (434) Eke - E-mail
Permit Issuance and First Year Maintenance Fees (Request must include payment):
Total acres proposed to be disturbed is contained on the approved plan and application:
VSMP:
Acres to be disturbed
Fee Due at Grading Permit
Less than 1
$63.80
1 and less than 5
$594.00
5 and less than 10
$748.00
10 and less than 50
$990.00
50 and less than 100
$1,342.00
100 and more
$2,112.00
Annual Maintenance Fees [Section 17-208 of the Albemarle County Code] — Annual maintenance fees will be assessed in
March of every year this permit is active. Fees cannot be prorated after the first year of permit issuance.
7/1/14, Revised: 8/29/14, 8/28/19 Page 1 of 3
Person(s) to attend the Pre -construction Meeting:
Names
or print)
Firm
WAVhh ADrpl. Lem
v_wvfinkc'oh.Cowl
�?y g5inc,.Owl
The second part of the application fee is required to be paid with this request. This fee amount is;
FOR OFFICE USE ONLY Permit Issued Date
By who?
7/1/14, Revised: 8/29/14, 8/28/19 Page 2 of 3
Information for Permit applicants;
9-Month Permanent Stabilization Deadline:
Code Sec. 17-808 Duty to stabilize denuded areas with permanent vegetation within nine months after
commencing land disturbing activity
A. When permanent vegetation required. The owner shall install on all denuded areas on the site within nine (9)
months after the date the land disturbing activity commenced, except for areas that the administrator
determines are necessary parts of the construction that are subject to an active building permit and areas where
erosion is prevented by a non -erosive surface, including, but not limited to, the following surfaces: (i)
roadways and sidewalks covered by gravel, asphalt pavement, or concrete; (ii) trails or paths covered by
gravel, stone dust, or mulch; (iii) buildings and other permanent structures; and such other surfaces that the
administrator determines would adequately provide a permanent barrier to erosion.
(see code 17-808 for information about possible extensions)
Notice to Comply and Permit Revoked for Overdue Fees
Late fees will incur interest, and enforcement actions per code section 17-210.
(1) Owners with late payments of fees required by 17-207C6 will be issued a Notice to Comply (NTC). The notice
gives 7 days to make payments.
(2) At the end of the NTC time period, the permit will be revoked, and a Stop Work Order will be issued for
working without a current permit.
Disturbed Area Reductions
Acreage for the purpose of fee computations will be the entire permitted acreage. This is the disturbed acreage on
approved plans. If fees are to be reduced, an application for plan amendment must be made, and areas reduced by
changes in limits of disturbance and appropriate plan changes. Such amendments must be approved prior to the fee
due date. Amendments to remove disturbed areas can only be approved when such areas are completely stabilized and
all erosion control measures (including traps and basins) removed.
Refunds
The County does not have a refund program. Fees will not be refunded based on completion within the year. Fees will
not be pro -rated at payment, other than the first year VSMP fee as indicated in code section 17-209B.
Re -inspection Fees
Re -Inspection Fees will be charged for inspections following a Notice to Comply or a Stop Work Order. Fees are $250
per inspection, or as given in code sections 17-207 and 17-208.