COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,Room 227
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
VESCP Permit plan review
Project title: Liberty Hall Agricultural Pond-VESCP
Project file number: WP02018-00043
Plan preparer: Ecosystem Services-Kip Mumaw[kip@ecosystemservices.us]
Owner or rep.: Liberty Farm Holdings-Grey McLean []
Plan received date: 6-6-18
Date of comments: 7-25-18
Reviewers: Geoff Elsie
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VESCP authority to
act on any VESCP permit by issuing a project approval or denial. This project is approved. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VESCP application content requirements can
be found in County Code section 17-401.
A. Pollution Prevention Plan(PPP)
The PPP content requirements-can be found in County Code section 17-404.
1. Provide Minimal as required per County Code. Provided.
B. Erosion and Sediment Control Plan(ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an
ESCP. This plan is approved,and the reasons are provided in the comments below. The
erosion control plan content requirements can be found in County Code section 17-402.
• Provide Owner contact phone number and email. Per State and Local regulations,
owner must be notified of any corrections that need to be made and any enforcement
actions taken. Plans are conditionally approved pending missing information is
provided. Provided on cover page.
The VESCP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re-submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
Engineering Review Comments
Page 2 of 2
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms,which will need to be completed by the owner
and submitted along with cash,certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
After bonding and agreements are complete,the County can hold a pre-construction conference.
Applicants will need to complete the request for a pre-construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber,and the fee
remaining to be paid. This will be checked by county staff, and upon approval,a pre-construction
conference will be scheduled with the County inspector. At the pre-construction conference, should
everything proceed satisfactorily,a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarie.org/deptforms.asp?department=cdengwpo
Please submit 2 additional copies of the plan and missing
contact information for final approval stamp.