Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201800059 Water Data Sheet 2018-01-07
WATER DATA SHEET • Date 1/7/2018 (1) Project Name University of Virginia Foundation Tennis Facility (2) Project Location Boar's Head Resort (3) Consultants Dewberry Engineers, Inc (4) Sources ACSA Hydrant test (5) Design Population (6) Hydraulic Capacity (7) Pipe Material DI (8) Pipe Diameter (Inches) Length (Feet) 4" • 6" 8„ I7 10" . 12" (9) - Fire Hydrant Assemblies o _ (Number) (10) Valves: (A) Gate 3 (Number) (B) Air Relief (Number) (11) Fittings: (A) Cross I (Number) (B) Tee (Number) (C) 90° Ell 1 (Number) (D) 45° Bend (Number) (E) 22'/Z Bend • (Number) • (F) Reducer (Number) (G) Blow-off Assemblies (- (Number) (12) Minimum pressure at critical water meter 23 (20 psi required) • Authority Provide: Booster Station Storage Reservoir • A-1