HomeMy WebLinkAboutARB201900025 Checklist ,
�4Et1li Architectural Review Board
'` Concept Plan/Advisory Review Checklist for Completeness
SOPE—Fc D
(8)collated copies of all information unless otherwise indicated.
A. Written description of the proposal
Provide a general description of all proposed work.
xplain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Sketch plan showing the following (drawn to the scale of 1"=20', clearly legible and folded):
(ocation(s) of proposed building(s) on the site.
(Schematic layout of parking, travelways, and other improvements.
U2�ocation of existing and proposed tree lines. Individually identify trees of 6-inch caliper or greater.
❑ fisting and proposed topography and conceptual grading drawn with contour intervals of 5-feet or
less, and with sufficient offsite topography to describe prominent and pertinent off-site features and
phy 'cal characteristics, but in no case less than 50-feet outside of the site.
• heet number, total number of sheets, date of the drawings, date and description of the latest
revision, and contact information for the firm preparing the drawings in the title block on all drawings.
C. Appearance of the proposed building(s)
ow a representation of the appearance of the proposed building(s). This may include architectural
elevations, perspective sketches, or photos of the proposed building(s). These documents should
pro ' e a basic understanding of:
❑ The size, form and scale of the building.
he architectural style of the building.
f ❑--The proposed building materials and color(s).
D. Additional material
]yrd-vide labeled, color, 8-%" x 11" photographs of the site as seen from both directions on the
Entrance Corridor.
PILSignatures
1