Loading...
HomeMy WebLinkAboutARB201900027 Correspondence 2019-03-11 Margaret Maliszewski From: Margaret Maliszewski Sent: Monday, March 11, 2019 11:18 AM To: 'rj@signdoctor.biz' Subject: ARB-2019-27:T Mobile sign Good morning, RJ. I have reviewed the above-noted`sign application. The following revisions are requested to make the proposal consistent with the Entrance Corridor Sign Guidelines and the approved Comprehensive Sign Plan for this shopping center. 1. Revise the sign drawings to change the trim cap color from white to black. 2. Include the following note on the sign drawings: The level of illumination provided by the LED lights will not exceed the illumination produced by a,single stroke of 30 milliamp (ma)neon. 3. Please revise the"Raceway painted to match building"note to read, "Raceway to match the wall surface to which it is attached." Please respond by email within 15 days of the date of this letter indicating whether you will or will not proceed with these revisions.Your decision to make the revisions will suspend the 60-day review period associated with your original submittal. If you choose to complete the revisions, please email the revised drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your application.Failure to respond to this letter shall be presumed to be a request to proceed to action on the application without further revisions. If you have any questions about this action,please contact me as soon as possible. Thanks. Margaret Margaret Maliszewski, Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org 1