Loading...
HomeMy WebLinkAboutSDP201600058 Review Comments 2019-04-18 i \ w MERIDIAN PLAN:NiINc;CROUP, LLC Engineering • Surveying • Planning 440 Premier Circle,Suite 200 Charlottesville,VA 22901 April 18, 2019 Phone:434-882-0121 www.meridianwhc.com Paty Saternye • Senior Planner County of Albemarle 401 McIntire Road Charlottesville, VA 22902 • • RE: SPA201600058 DALY'S RENT ALL—MAJOR AMENDMENT Paty, The following are responses to the comments in your letter dated October 29,2019. Plans and response letters have been submitted directly to each of the departments. PLANNING DIVISION—Paty Saternye 7. [32.5.2(a)]Revise the setback information to include the side and rear minimum and maximum setback requirements.Rev. 1: Comment not addressed. The side and rear setbacks still to not appear to be included in the building setback information on the cover sheet.Revise the building setback information to include minimum and maximum setbacks for the side and rear lot lines when abutting commercial or industrial districts. Rev.2: Comment not yet fully addressed.Address the following: a) Show the setback information as it is specified in the County Code(18-4.20). This would include: • Front-Minimum(Building): 10 feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the right-of-way. • Front-Minimum (Parking and Loading): 10 feet from any public street right-of-way. • Front-Maximum(Building): 30 feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the right-of-way, • Side and Rear-Minimum(Primary Structure-if abutting lot is zoned commercial or industrial): None(However building must be constructed and separated in accordance with the current Building Code.) • Side and Rear-Maximum: None b) Remove the lines and labels for the side and rear setback from the site plan sheets.As specified above, there is no side or rear minimum setback requirement when adjacent to other commercial zones.There are only building construction and separation requirements. If you wish for the side and rear"separation" lines to remain they should not be labeled as "setback" but as "building separation". ✓ C-001: BUILDING &PARKING SETBACKS HAVE BEEN REVISED ✓ C-100: SIDE&REAR SETBACK LINES HAVE BEEN REMOVED 18. [32.5.2(k)&32.6.2(e)] Revise the label for the New 20'Drainage Easement to include that the easement is "Public".Rev. 1: Comment not addressed. Revise the label for the New 20'Drainage Easement on the north side of the parcel to include that the easement is "Public". Rev.2: Comment not yet fully addressed.Address the following: a) Show the existing "PUBLIC" easement as "Public", and include the deed book and page number for the easement label,on the existing conditions sheet(C-101). Page 1 b) If an easement for the drainage pipe crossing the property,from the public drainage easement outfall, exists revise the existing conditions(C-101)sheet to show the easement and dimension its width include the deed book and page number for the easement in.the easement label. ✓ C-101: EASEMENT LABELS HAVE BEEN ADDED. ✓ C-101: THERE IS NO EASEMENT FOR THE EXISTING PIPE ACROSS THE PROPERTY. 19. [32.5.2(k)&32.6.2(e)l Submit an easement and a deed of easement and plat for the relocated 20'Public Drainage Easement for review. County Attorney's approval will be required prior to approval of the Major Site Plan Amendment. Rev. 1: Comment not addressed. Submit an easement and a deed of easement and plat for the relocated 20'Public Drainage Easement for review. County Attorney's approval will be required prior to approval of the Major Site Plan Amendment. Rev.2: Comment not yet addressed. Submit an easement.plat and a deed of easement for the relocated 20' Public Drainage Easement for review. County Attorney's approval will be required prior to approval of the Maior Site Plan Amendment. Attached please see a template for this deed of easement. ✓ AN EASEMENT PLAT AND DEED SHALL BE SUBMITTED UNDER SEPARATE COVER. 20. [32.5.2(k)&32.6.2(e)l Submit a deed of easement for the proposed Storm Water Management Basin SWM-I and its outfall pipe. County Attorney's approval will be required prior to approval of the Major Site Plan Amendment. Rev. 1: Comment not addressed. Submit a deed of easement for the proposed Storm Water Management Basin SWM-I and its outfall pipe. County Attorney's approval will be required prior to approval of the Major Site Plan Amendment. Rev. 2: Comment not vet addressed. Submit an easement plat and a deed of easement for the Storm Water Management Basin and 20'Public Drainage Easement for review.County Attorney's approval will be required prior to approval of the Maior Site Plan Amendment. Engineering will forward the template for the deed of easement for this plat. ✓ AN EASEMENT PLAT AND DEED SHALL BE SUBMITTED UNDER SEPARATE COVER. 25. r32 -5 2(„) .v. 32 ti 2(v)l-rhe„lan s„eci fes that there will be no outdoor lighting. If there are to be any b b information f r a outdoor lighti„g Rev 1• Com„.ent„ot fully addressed A dd a th f 11 a)The light fixtures are not shown in the same location on the Lighting Plan as they are on the other plan sheets.Ensure that all sheets show them in the same location.Rev.2:Comment addressed. b) There appears to be an "F 2" light fixture but not an "F 1". Update the lighting plan so that if there is only one "F" light fixture it is numbered'I F I" Rev.2: Comment addressed. c) Provide information on the size of the light pole and base of"F2-2" or relocate light fixture. On the Lighting Plan sheet fixture "F2-2"has been located in, or adjacent to,the 2'overhand area for vehicles in 16'deep parking spaces. The pole for the light fixture, and the base if not flush to the ground, cannot be located within the 2'of parking overhand. Rev.2: Comment not yet fully addressed.Address the following: 1. Provide the overhang area(dashed outline)on all 16'deep parking spaces. The both sets of the eight 16'spaces in the middle-of the existing parking lot do not show the dashed line area specifying the 2'overhang.Ensure that all signage and light poles do not impact the 2'deep parking overhang area. If there is exactly 4'from face of curb to face of curb between those parking areas the poles for the handicapped signage may block part of the overhangs on one side or the other. The 2'overhand areas must be totally clear of obstructions on both sides. ii. Dimension the face of curb to face of curb distance between the two 16'deep parking areas in the middle of the existing parking area. Ensure that there is not only sufficient parking overhang area for both of the parking bays but also sufficient area for all signaqe poles and light poles. Page 2 111. Ensure that the grading at the base of the modified CG-2 curbing, between the two bays of 16'parking spaces,allows: a. Sufficient room for the 2'overhang for lower of the two parking bays. b. Sufficient space for the light poles and handicapped signage. ✓ C-201: DIMENSIONS SHOWING 4.5' FROM FACE OF CURB TO FACE CURB HAS BEEN ADDED. THAT LEAVES 0.5' FOR SIGNS. THE LIGHT POLE HAS BEEN MOVED OVER SO IT IS NOT IN THE OVERHANG. THE MODIFIED CG-2 IS THERE TO ALLOW FOR OVERHANG ON THE LOWER PARKING SPACES. d) Confirm that the light fixtures will not be tilted. Rev. 2: Comment not addressed. Comment response letter stated a note was added to sheet C-203 (Landscaping Plan).No not appears to be either on sheet C203 or sheet C-204(Lighting Plan). Address the comment. Add the note to the Lighting Plan sheet(C-204). ✓ C-204: SEE NOTE 6. 33. [ a) center,in this case, is from the Entrance Corridor Guidelines.For the EC guideline it also specifies Revise the landscaping plan top .ide large shade trees along the st,-eets Rev 7•_ Comment addressed. b) If the hatched area on sheet C-203 is meant to represent the required parking lot planting areas then either provide a label or legend specifying that. Provide plantings within the parking lot planting spaces as required in 32.7.9.6.Rev. 1: Comment not fully addressed.Provide additional landscaping in areas that are to meet the 5%requirement. There are two "Landscape areas" of significant size that • show only one tree proposed. Rev.2: Comment not fully addressed.Planting Area#6 appears to be on top of anew parking space. When the loading space was moved the proposed curb lines were adjusted to remove the previously proposed loading space and to create a new parking space.Planting area#6 appears to not have been updated with the changes. Revise the planting area and plant locations to no longer conflict with the . parking space. ✓ C-203: PLANTING AREA 6 HAS BEEN REVISED. C) Provide the required parking lot trees. Trees utilized to meet the parking lot tree requirement must be large or medium shade trees and be located adjacent to parking spaces. Rev. I: Comment not fully addressed.As specified in 32.7.9.6(a), areas of shrubs required by section 32.7.9.5(e)shall be counted toward the minimum area of parking area landscaping.Therefore,the area of landscaping that is for the parking space screening cannot be used to meet the 5%area requirement in 32.7.9.6(a), Revise the landscaping plan so that the 5% landscaping area does not include landscaping required in either 32.7.9.5(d)or(e). Rev.2: Comment not fully addressed.There appears to be a residual label for what was a Blackqum Tree near the center of the front of the existing building and near the Pignut Hickory tree. Remove this residual/extra label. ✓ C-203: THE LABEL HAS BEEN DELETED. e) Comment addressed. Page 3 • fl Provide screening for the stormwater detention pond(32.7.9.7).Rev. 1: Comment not fully addressed. Screening fences are required to be 6' in height. Revise the site plan to provide a 6' screening fence for the stormwater pond. Rev. 2: Comment not yet fully addressed. On sheet C-205, in the "Wood Fence Detail" the 72" dimension for the height of the fence also states "Storage Area". However,the screening fence is also to be utilized around the Stormwater Management Area.Either revise that dimension or make a general note specifying in the detail that it will be utilized in both areas. V C-205: NOTE HAS BEEN REVISED. g) comments-requested,Rev, —emment-addressed, 1) REV. 1 : [NEW COMMENT]Revise the landscaping plan to provide at least 2 112 inch caliper trees along the roads. Since this parcel is in the Entrance Corridor(EC)landscaping requirement must meet the EC minimums.Rev.2: Comment addressed. j) REV.I: [NE w COMMENTI Landscaping of parking areas within the Entrance Corridor requires largo trees that are 2} b Y Y lantin. Devise the l^ d Y b P�1 t'�-��`TreT- - 2}12 inch caliper ~a trees Y 1^ ge--shade-trsse fair t at t t th b 1 t t, `i t Rev.2: Comment addressed. k) REV. 1 : [NEW COMMENT Revise the Landscape Schedule to correct the typographical error in plan name. "iles crenata" should be"ilex crenata". Rev.2: Comment addressed. I) REV.2: [NEW COMMENTI Revise the Landscape plan to show the shrubs that were part of the previously approved site plan and are to remain.It appears that there are shrubs along the side of the existing building that are shown in that site plan and have not been included in this site plan. ✓ C-203: EXISTING SHRUBS HAVE BEEN ADDED. 35. [Comment] If any off-site easements are required,they must be approved and recorded prior to Site Plan approval.Proposed grades are shown to the edge of the property and the new drainage pipe for off-site stormwater is located 3'off of the property line.The Albemarle County Design Standard Manual,on page 22 (8.c.)states when off-site easements are required.Rev. 1: Comment not yet fully addressed. It is recommended with the proposed grading extending to the property line and 1'high modified CG-2 being proposed within two feet of the property that off-site easement be acquired. Rev.2: Comment not yet addressed. It is recommended with the proposed grading extending to the property line and 1'high modified CG-2 beinq proposed within two feet of the property that off-site easement be acquired. ✓ COMMENT NOTED. OWNER DOES NOT FEEL AN EASEMENT IS NECESSARY. 36. [Comment] The major site plan amendment will not be approved until the WPO plan is submitted and approved.Rev. 1: Comment not fully addressed.The major site plan amendment will not be approved until the WPO plan is approved. Rev.2: Comment not yet fully addressed. See engineering comments.The maior site plan amendment will not be approved until the WPO plan is approved. ✓ COMMENT NOTED. 38. [Comment]The major site plan amendment will not be approved until Engineering,Inspections,E911,VDH, ARB,ACSA,VDOT,Fire Rescue and Zoning grant their approval. See the attached comments for these reviewers.Any outstanding review comments will be forwarded to you when they have been received.Rev. 1: Comment not fully addressed. See the attached comments from the reviewers. Rev.2: Comment not fully addressed. See the attached comments from the reviewers. ✓ COMMENT NOTED. 40. [NEW COMMENT: 32.5.1(c), 32.5.2(1) &52.6.2(g)] UPDATE: Show the sewer easement for the sewer line just north of the north property line.A portion of that easement is within the subject parcel.Ensure that any items not allowed within a utility easement are not within the easement's area. Rev. 1; Comment not fully addressed. Deedbook 425 page 143 appears to show a 10' wide easement centered on the existing sewer line, which is a Page 4 9 fr smaller easement than usual. However,the sewer line seems to be less than 5' from the property line. If this is correct then the sewer line easement should be shown in the site plan because it would extend slightly into the property. Either show this easement or provide information on why it is not actually within the property. Rev. 2: Comment not yet fully addressed. Although the easement lines have been revised, internal to the site. to show only at 10' wide sewer easement the label has not yet been updated and still specifies a 20' wide existing sewer easement. Update the label. ✓ C-101: LABEL HAS BEEN REVISED. Page 5 ENGINEERING—EMILY COX 1. WPO Plan must be submitted and approved before final site plan can be approved. ✓ COMMENT NOTED. 2. Please ensure the professional seal is signed and dated. ✓ SEAL IS SIGNED AND DATED. 3. Topography should at least be visually field verified within in the last year. ✓ C-001: NOTED HAS BEEN ADDED TO SITE DATA. 4. Provide top and bottom elevations of the retaining wall. ✓ C-202: TOP AND BOTTOM ELEVATIONS HAVE BEEN ADDED. 5. Ensure deed book and page are shown for all existing easements(Right-of-way, sanitary,etc). ✓ ALL KNOWN EASEMENTS ARE SHOWN WOTH DEED BOOK AND PAGE. 6. Label the easement around the stormwater facility as, "SWM facility easement". ✓ C-202: LABEL HAS BEEN REVISED. 7. Ensure there is adequate travelway in front of the loading area(show dimension). ✓ C-201: LOADING HAS BEEN RELOCATED 8. Parking areas shall not exceed 5%grade anywhere in any direction. Southern parking area exceeds this slope. ✓ C-202: GRADING HAS BEEN REVISED Page 6 dtl r ARB—MARGARET MALISZEWSKI 1. Visibility of all equipment from Rt.29 must be eliminated. a. A note on C201 within the footprint of the proposed building states that equipment shall be screened to prevent visibility form Rt. 20, and equipment is illustrated behind the proposed building. No screening details have been provided.If rooftop equipment is proposed,the design of the screening will be extremely important. Screening must have an integrated appearance with the building. ✓ C-201: EQUIPMENT WILL BE MOUNTED ON GRADE. NO EQUIPMENT IS TO BE MOUNTED ON THE ROOF. b. Revise the equipment screening note to read: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." ✓ C-201: SEE SITE PLAN NOTE 1 2. To meet Entrance Corridor requirements, light levels should not exceed 20 fc. Please revise the plan accordingly. ✓ C-204: LIGHTING PLAN HAS BEEN REVISED. Additional Comments from ARB Review letter dated April 17,2019. Owner will address comments 1,2, &3. 4. Light levels exceed the guidelines recommendations. Revise the lighting plan to limit footcandles to a maximum of 20. ✓ C-204: THE PHOTMETRIC PLAN HAS BEEN REVISED. 5. Guidelines require that lights have the appearance of white light with a warm soft glow. Please revise the lighfrig spec from 5000k to either 3000K or 4000K. ✓ C-204: THE LIGHT FIXTURE HAS BEEN REVISED 6. Taxus Cuspidata is not a native plant. It is recommended that it be replaced with a locally native plant. If Taxus Cuspidata is retained,revise the plant schedule to include the proposed cultivar. ✓ C-203: THE SHRUB HAS BEEN REPLACED WITH NATIVE SHRUBS. 7. For improved plant health, it is recommended that the number of proposed trees and shrubs be limited to 25%of the total proposed for that plant type. For example,24 trees are proposed and it is recommended that 3 of the 9 American Beech be replaced with an alternate tree(25%of 24=6 trees). Similarly,a single shrub species(Ilex Crenata) is proposed; introducing additional shrub species would be appropriate. ✓ C-203:3 OF THE T-2 TREES HAVE BEEN REPLECED WITH T-6 TREES. Page 7 ACSA—RICHARD NELSON 1. Remove Shrubbery around water meter for maintenance access. ✓ C-203: SHRUBS HAVE BEEN REMOVED. 2. Confirm if the toilets are flush tank or flush valve. A I-inch water meter will be required for flush tanks, and a 1 _5-inch water meter will be required for flush valve. V C-204: NOTE HAS BEEN ADDED TO DETAIL 3. ALL TOILETS SHALL BE FLUSH TANKS. Please let me know if you need any additional information. Sincerely, Timothy Miller,P.E., L.S. Principal 16 Olt 040 Page 8