HomeMy WebLinkAboutWPO201800007 Bond Estimates 2018-07-05Rivanna Village - Amendment 1 and Phase 2
WPO file number: WP0201800007
V(ll
Erosion and Sediment Control Bond Estimate
Item Item
Number
stableation (PS, TS)
silt fence (SF)
safety fence (SAF)
clean water diversion (CWD)
diversion (DV, FD, RWD)
temporary slope drain (TSD)
pipe length
0 ft
pipe diameter
0 in
earthwork for trap/basin
ST-383
height of dam at toe
a 45 ft
cut at high side
6 ft
height of fill at face
�l'. 3.5 It
cut at face
2,6 ft
length of dam
475ft
length of cut
462ft
top width
6 ft
width of cut
15 ft
length of spillway
27 ft
_. ..
width of spillway
17 ft
earthwork for trap/basin
ST_GS1
height of dam at toe
2 ft
cut at high side
6 ft
height of fill at face
2 It
cut at face
4 ft
length of dam
36 ft
length of cut
36,5 ft
tap width
0 it
width of cut
44 ft
length of spillway
39 it
width of spillway
30 n
earthwork for trap/basin
ST-181
height of dam at toe
25 ft
cut at high side
3 If
height of fill at face
2 ft
cut at face
4 ft
length of dam
38 ft
length of cut
70,4 ft
top width
4 ft
width of cut
66 ft
length of spillway
29 ft
width of spillway
17 ft
earthwork for trap/basin
ST-JS1a
height of dam at toe
2 ft
cut at high side
10 ft
height of fill at face
4 5 it
cut at face
1.5 ft
length of dam
100.E ft
length of cut
122 ft
top width
17 ft
width of cut
24 It
length of spillway
26 ft
width of spillway
$ 83 ft
earthwork for trap/basin
ST-JS2b
height of dam at toe
2 ft
cut at high side
a ft
height of fill at face
4.ft
cut at face
2 ft
length of dam
108.8 ft
length of cut
134.25 ft
top width
3. ft
width of cut
38 ft
7/3/2018
No. Unit
Unit Cost Cost
(installed)
.56.33 acres
_..,. $174.99000
144709 ft
$65,118.87
0.0 It
$0.00
1W ft
.. $23,993,71
7363 ft
... $95,977.31
$0.00
$13.00 $2,457.00
$50.00 $1,320.00
$13.00 $4,758.00
$50,00 $3,365.00
$13.00 $16,107,00
$50.00 $1,415.00
$13,00 $11583,00
$50.00 $660.00
7/5/2018
Rivanna Village - Amendment 1 and Phase 2
WPO file number: WP0201800007
Erosion and Sediment Control Bond Estimate
Item Item
Number
length of spillway
20.8 ft
width of spillway
6 ft
earthwork for trap/basin
ST-JS3
height of dam at toe
2 ft
cut at high side
height of fill at face
Is ft
cut at face
t ft
length of dam
76 ft
length of cut
84A It
top width
6 ft
width of cut
1-t ft
length of spillway
16.0 ft
.. ..,
width of spillway
21 ft
,.
earthwork for trap/basin
STJS4
height of dam at toe
2.6 ft
cut at high side
$ ft
height of fill at face
2 ft
cut at face
4 It
length of dam
30 it
length of out
4&T It
top width
,. 3 it
width of cut
68 ft
length of spillway
it
width of spillway
ft
earthwork for trap/basin
STJ55b
height of dam at toeWitft
cut at high side
': 'IV ft
height of fill at fatecutatface
;4;ftdamlength
of
width
ft
length of cuttop
+6;-'.
it
width of cut
12 ft
length of spillway
- 1e.36 ft
width of spillway
:22 R
earthwork for trap/basin
ST-H1
height of dam at toe
6 ft
cut at high side
e ft
height of fill at face
1.6 ft
out at face
4 5 ft
length of dam
:.721 ft
length of cut
148 ft
top width
_ 3 ft
width of cut
19 It
length of spillway
39 ft
width of spillway
163 ft
earthwork for traplbasin
S611
height of dam at toe
36it
cut at high side
95ft
height of fill at face
5.5 it
cut at face
2.5 ft
length of dam
76 It
length of cut
61 ft
top width
8 ft
width of cut
68. ft
7/3/2018
No. -Unit Unit Cost Cost
(installed)
$13.00 $14,976.00
$50.00 $480.00
$13.00 $8,112.00
$50.00 $1.135.00
$13.00 $8,723.00
$50.00 $1,940.00
$13.00 $3,653,00
$50.00 $1.160.00
$13.00 $14.105,00
$50.00 $1.830.00
7/5/2018
Rivanna Village - Amendment 1 and Phase 2
WPO file number: WP0201800007
Erosion and Sediment Control Bond Estimate
Item Item
Number
7/3/2018
No. Unit Unit Cost Cost
(installed)
length of spillway
24.3ft
_.. ._
$13.00
$13.247,00
width of spillway
.15.5,It
..
$5000
$1,085.00
structures for basin
riser height
to ft
riser diameter
36 in
_
$700.00
barrel length
Sp ft
base plate or fdn
p'
$200.00
$0
barrel diameter
24in
$2,500.00
barrel collars
tl
$200.00
so
baffle length
0 ft
$50.00
s0
earthwork forirap/basin
S812
height of dam at toe
6 ft
cut at high side
88 ft
height of fill at face
66ft
cut at face
aft
length of dam
0 ft
length of cut
p ft
top width
8 ft
width of cut -
116 ft
length of spillway
38 ft
..
$13.00
$0.00
width of spillway
32 ft
$50.00
$3,495.00
structures for basin
riser height
0 It
riser diameter
0 in
$0.00
barrel length
0 ft
base plate or fdn
0
$200.00
$0
barrel diameter
0 in
$0.00
barrel collars
0
$200.00
$0
baffle length
0 If
$50.00
$0
silt fence inlet protection (IP)
Q
stone inlet protection lip)
$0.00
outlet protection (OP)
length
27 ft
width
16 ft
T3
27
$14,600.00
channel (SCC, matted)
length
0 ft
width
0 ft
$52,488.00
check dam
depth in channel
U ft
channel width
0 ff
0
$0.00
$0 00
construction entrance (CE)
wash rack
$0 .00
paved construction entrance
0
0.00
rip -rap, placed
depth
G ft
length
D.D ft
.4
$14,000.00
width
00
$o.Do
survey and layout (price per 0.1 mi.)
acres
6833
traps and basins
12
$35,165.00
mobilization
vehicle steam crossing
7.0 as
$2,500.00
$21,00D.00
cost sum
$618,638,89
contingency
$61,863.89
Total
$680,510
7/5/2018
Rivanna Village - Amendment 1 and Phase 2
7/3f2016
WPO file number: WP0201800007
Stormwater Management Plan Bond Estimate
Item Item
No. Unit it Cost
Cost
Number
(installed)
knglh of spllMaY
6b fl
..
$13.00
S3,042.00
MCIi f splbvay
22 fl
S50.00
$3,350A0
structures (a basin
nearheght
e$ ft
rlsardiemder
m In
-
55.0
Cartelen9th
9B fl
vasepateafen
0:
$2D0.00
$D
Carel damekr
to
$1,120.00
barral collars
0
$200.00
$D
bete length
e it
$50.00
E0
earthwoM for trsplbasln
SMP J5
height of Clem at his
7 It
CO et high side
4 R
height orfi$ at face
2 ft
cut at face
9 It
length of Clem
79 If
length of cot
4 ft
top width
e It
width of cut
S6R
length of spllhsay
24 ft
$13.00
$2,704.00
width of.pilWy
9-fl
$Saw
$620.DD
simdures for basin
riser height
e fl
riser diameter
0 in
$0.00
bend length
a 0
base plate or fdn
9
$200 w
$g
banal diameter
a in
$0 0D
banal.11—
d
$20000
$0
baffle length
9 ft
$50,00
$0
band diameter
ein
$000
bend canam
a
$200.00
$D
baffle length
a it$5()w
so
aanhwork for trepbadn
3MP Hi
heightof,amattce
aft
cut at high m*
0ft
(earthwork in E$C Ound)
heght Cf fill at face
a R
cut at face
0 ft
length of dam
41 1
length of cut
e R
topwdth
0R
width of cut
9ft
length of aplkvay
a k
.....
$13.00
$0.00
wdihof.PittwMy
eft
b50Do
$000
alrudures for basin
riser height
19 R
serdomet.
de in
$700.00
barrellenglh
arft
base pate orfdn
a
$200,00
$0
Cartel diameer
to in
.,
$1,480,00
band colars
0
S200.00
$0
be le length
O it
$0
earthwork for Irop/basin
emp li
height of dam at ice
0 a
cut at high side
a ft
-t pond
height of fill d face
0 If
W at face
0 it
(eaMwark in ESC bond)
length of Clem
OR
length of Cut
Oft
top width
0 ft
wAdth of cut
0 If
length of spillway
Oft
_ ...
$1300
Woo
Width of spillway
9 fl
ssD.00
a0.a0
r«
sirucmres basin
rise, height
11 it
riser dometen
04 in
sow
barrel length
42 it
base pate or tart
a
$zDD.00
$ p
barrel diameter
eb in
$000
loerrel clam
0
$200.00
$0
baffle length
0 ft
5500)
$D
eerthwork lcr trap/basin
aMP I2J13
hegM of dam at Ice
0 ft
cut at high side
e R
7/5/2018
Rivanna Village - Amendment 1 and Phase 2
7/3/2018
WPO file number: WP0201800007
Stormwater Management Plan Bond Estimate
Item Item
No. Unit
Unti
cost
Number
ins( talledl
-
permSnemdiversionaditch
0 R
$1300
$B.00
atemardmanhaaframeeop(notmlep
0ea
111
$0.00
dromlet«gate
as
$3,500.00
$0.00
manhole sliuclure(per R. lee)
Oft
$450.00
$000
pipe, rop, and (15 to 48") OA in of0
ES-1.2
0 EC-1
OA ft
E0.00
$0.00
pretreatment stone (R57s) 0.0 in it
i ft L
as ft W
0.0 tan
$34.00
$0.00
aggregate Was ar drainage some 00 in it
00 ft L
Oa ft W
300 0 tan
E35-00
$10,500.00
(bioFilter stones wmNneo', including M85 and R575)
eadhvwk for taprbasm
BMP G1 height of dam Stine
8ft
cutathighside
$ft
height of fill at face
R ft
cutat/ace
0 ft
length of dam
1144 n
Ieri ih of cut
tl3 ft
tol idth
12ft
w .f cut
qR ft
lenglhofspillway
9R
... ..
$13.00
$12,88200
width of spill-y
t515. R
$50.00
$2,360.00
Structures far perm
riser height
6 ft
serdiamater
30 in
Ess0.00
barrelienglh
so
base plate orfdhe
$200.00
$0
doi diameter
tp In
-
$2000.00
part collars
s
$200.00
$0
game length
0 ft
$50.00
$0
eannw«kfartreproasm
BMP G2 height of dam W tue
2 ft
cW at high side
2 ft
height of fill at face
1 ft
aR at face
1 ft
length of dam
$ ft
length of cW
25 ft
top width
6 a
width of cut
!I9 ft
length of spilM1vay
31 ft
- - -
$13.00
$1,755.00
width of spl"
29 ft
$50,00
E2,315.00
sWCWres for basin
near height
7.6 ft
doer di.-
36. in
$525.00
bonnet length
0 4
base plate or (on
,o
s200.00
$0
barrel diameter
o in
$0.00
barrel dollars
0
$2p,00
$0
eanhwork f, trepmasin
baffle length
O R
$50.00
$0
BMP G3 height of dam at ice
0 a
cut at high side
0 ft
(eanhtmrk In ESC bor4 height of Final lace
0 ft
cW at face
0 ft
length or dam
0 ft
length clout
0 ft
tap width
a ft
w th or cut
0 fl
leigth of spillway
0 R
.... ..
$13.00
E0.00
width of spillway
6 R
$50.00
E0.00
slruIXureS for basin
ser height
to ft
riser diameter
36 in
$7length
barrel length
M ft
base ple ar Ran
0
$20000
so $0
barrel diameter
is in
$1,920.00
barrel colt..
0
$200.00
$0
�rthwork for Mai
baffle length
& ft
$50.00
S0
BMP A hegM of dam at toe
e a
cut at high side
6 R
height of fill at face
2 ft
cut at face
0 ft
length of dam
$left
length ofcW
LOft
tap width
Ofl
widh of cut
3C.ft
7/5/2018
Rivanna Village • Amendment 1 and Phase 2
WPO file number: WPO201800007
Stormwater Management Plan Bond Estimate
Item Item
Number
(earlin-1, in ESC bond) height of fill at face
length of Can
toil
structures fo, basin
length of spill, ay
width of.01l
riser height
doer diameter
panel length
Cartel diameter
e R out at face
0 R ength of cut
0R width of cut
If
0R
05If
36 in
im R base plate or ftln
is in
panel Cola,
baffle length
swages (wet and grass)
trees
(storm water)
all
seedlings
bees
(mggalion)
shrubs
seedlings
umerdrein (LF)
demucWng
bloater soil mix ICY)
trash rack/ anti codex devices
maintenance access road (LF)
np*ap, Placed
depth
2 it
length
BMP of
vndth
too
(I-)
ril placed
depth
2 a
length
BMP G2
well,
w0
(Ions)
rWrap. Placed
depth
2R
length
BMP G3
width
100
(tons)
ril placed
depth
2 R
length
BMPJ1
width
100
(tars)
rip -rep, placed
depth
2 fl
length
BMP J2
Weth
120
(tars)
rip -no. placed
depth
2 R
length
BMP J3
width
too
(tons)
rip -rap, placed
depth
2 R
ell
BMP J5
width
t0o
(tons)
rip,mp, placed
depth
2 R
length
BMP HI
width
100
(tons)
np-rap, placed
depth
2 n
length
BMP 12113
width
100
(tons)
rvey and layout(price per 0.1 mL)
acres
ifi_33
basins
mobilisation
as4 uilt drawings (par facility)
matenals testing (per facility)
compaction testing (per dam)
stream restaatimn
manufactured facilities (attach mi nufachnera
a coldWIl Vic, as abase)
7WO10
No. Unit Unit Cost Cost
(installed)
0.R
0R
$13.00
$0.00
$50.00
$000
$595.w
0
$200.00
s0
$4,000.00
0
$200.00
$0
0 R
$50.00
so
3 as
$3,000.00
$9,000,00
46 ea
$275.00
$12.650.00
470 ea
s5aoo
$8,500.00
0.
$5.00
$0.00
91 ee
_ $2750o
$25,025.00
$50.OD
$4,600.00
0 as
$5.00
$0.00
510 R
$5.00
$2.550.00
4 ea
$2,500,00
$10.000.00
2144 cy
$45.00
$96,480.00
21 R
$1,500.00
$Q=00
❑ R
$50,00
$0.00
52.0 R
79.5
$60.00
14,770.00
3t13 R
93
EE0.00
$5,58000
40.OR
60
$60.00
$3,600.00
320 R
48.75
$w.00
$2.92500
17.0 1
30.6
$60.00
$1,835.00
34:0 R
51
$60.00
$3,05000
110 R
16.5
$60.00
$990.00
a0R
79.5
$6000
$4,770.00
360 R
54
$6000
$3,240.00
2
$30,165.00
$2,50000
13 as
$2,ODO.00
sm'wo00
If ea
$2.ODD.00
$16,000.00
'1 as
$3,000.00
$3,000op
3701
$497.40
$184,038.00
$0.00
walaum
asss,ie20o
cardingerl
$55.528.20
Total $610,820
7/512018