Loading...
HomeMy WebLinkAboutARB201900053 Checklist 2019-06-12 (lizlic' . Provide the $129 ARB review fee. (Include a note with the check indicating that the payment is for ARB-2019-53.) pitt fch -''2 Provide details on the proposed illumination of the freestanding sign. a„e/tret/C./ "la id JP v-If the monument sign is LED illuminated, include the following note on the monument sign drawing:The level of illumination provided by the LED lights will not exceed the illumination produced by a single stroke of 30 milliamp (ma) neon. f Indicate the depth of the freestanding sign. e 67 A �d�.C�''�r%�b �d 62 ..E-�� l,5 y-The landscape plan that has been provided does not match the landscaping on site, and it does not appear that all the plants in the vicinity of the existing monument sign can remain with the removal of the existing sign and installation of a new sign. Please decide what plants will be removed and what landscaping will be provided at the base of the sign, and submit a plan that details this. Landscaping is required at the base of the freestanding sign sufficient to integrate the sign into the overall development. . .4 oxw�I�-��� l e G� Gt� C f (�U ?. '. f �: c