HomeMy WebLinkAboutARB201900053 Correspondence 2019-05-22 Margaret Maliszewski
From: Margaret Maliszewski
Sent: Wednesday, May 22, 2019 2:42 PM °
To: Brion @ American Made Signs
Subject: RE:ARB-2019-53: Price Hyundai signs
Brion,
Jeff Baker forwarded me a copy of the drawings that you emailed him on May 13.There is still information missing from
the submittal that is required for review.
1. Provide the$129 ARB review fee. (Include a note with the check indicating that the payment is for ARB-2019-
53.)
2. Provide details on the proposed illumination of the freestanding sign.
a. If the monument sign is LED illuminated, include the following note on the monument sign drawing:The level of
illumination provided by the LED lights will not exceed the illumination produced by a single stroke of 30 milliamp (ma)
neon.
3. Indicate the depth of the freestanding sign.
4. The landscape plan that has been provided does not match the landscaping on site, and it does not appear that
all the plants in the.vicinity of the existing monument sign can remain with the removal of the existing sign and
installation of a new sign. Please decide what plants will be removed and what landscaping will be provided at the base
of the sign, and submit a plan that details this. Landscaping is required at the base of the freestanding sign sufficient to
integrate the sign into the overall development.
Thanks. .
Margaret
Original Message
From: Brion @ American Made Signs<brion@americanmadesigns.com>
Sent:Wednesday, May 08, 2019 2:48 PM
To: Margaret Maliszewski<MMaliszewski@albemarle.org>
Subject: Re:ARB-2019-53: Price Hyundai signs
Margaret,
I just forwarded this over to AGI for the revisions.Thank you
Brion Draper
American Made Signs LLC
407 Earhart Street,Suite B
Charlottesville,VA 22903
(434) 971-7446
(434) 971-1346
https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.AmericanMadeSigns.com&c=E,1,LtURQeuhjD966s_IgA61N
gINk6sdM5k_SrDNMK1kom8vgEffSiXCez2HZxZ2n2dXyr-sjtSW3p41j7UeelhJ4yBvWIk8g4pGCjyG8_wH-_uvok,&typo=1
"A True American Company"
V3 Certified -Veteran Friendly Company
1
• -4
Visa, Mastercard, Discover, and American Express** Accepted.
eVA Registered - DMBE Registered -SwaM Certified - BBB Accredited
*Please review proofs and look for spelling mistakes.We cannot be held responsible for any mistakes in the proof or
completed signage. •
*All artwork we created that is given to another sign company will be charged a$99 artwork fee to you.
*There may be an artwork or site survey charge for your order.
> Brion,
> I have reviewed your application for the Price Hyundai signs.The
>following items were missing from your submittal and are required for
>review:
> 1. The$129 ARB review fee. (Include a note with the check
>indicating that the payment is for ARB-2019-53.)
> 2. Indication on the sign drawings of the proposed color for the
> Hyundai letters and graphics (faces and returns) using a standard
>color identification system (preferably Pantone).Samples are required
>if Pantone equivalents are not available.
> 3. Identification on the sign drawings of the materials and colors
> (using a standard color identification system, preferably Pantone)for
>the freestanding sign. Samples are required if Pantone equivalents are
> not available.
> 4. Indication on the sign drawings that the backgrounds of the
>freestanding sign are opaque.
> 5. A site plan showing the location of the proposed freestanding sign.
> 6. A landscape plan showing landscaping at the base of the
>freestanding sign sufficient to integrate the sign into the overall development.
> 7. Details on the proposed illumination of the freestanding sign.
> 8. Provision of the standard LED note on the wall sign and
>freestanding sign drawings:The level of illumination provided by the
> LED lights will not exceed the illumination produced by a single
>stroke of 30 milliamp
> (ma) neon.
> Please let me know by email within 15 days of the date of this message
>whether you will or will not proceed with these revisions.Your
>decision to make the revisions will suspend the 60-day review period
>associated with your original submittal. If you choose to complete the
>revisions, please email the revised drawings to me. If you choose not
>to proceed with these revisions,staff will be unable to approve your
>application. Failure to respond to this letter shall be presumed to be
>a request to proceed to action on the application without further revisions.
> If you have any questions about this action, please contact me as soon
>as possible.
>Thanks.
> Margaret •
2
>
>
> Margaret Maliszewski, Chief of Planning/Resource Management Albemarle
>County Department of Community Development
>401 McIntire Road
>Charlottesville,VA 22902
>434-296-5832 x3276
> mmaliszewski@albemarle.org
•
Brion Draper
American Made Signs LLC
407 Earhart Street, Suite B
Charlottesville,VA 22903
(434)971-7446
(434) 971-1346
https://linkprotect.cudasvc.com/url?a=https%3a%2f•%2fwww.AmericanMadeSigns.com&c=E,l,trfiyfzaQU RPdOZ5gaLoln
9TGoUXXxC_d4Ltd0ntEH524P7-OZnyWvaK91jo411sCXG3lfrRtlnlca5GH3OZ4g7KFgELt6bA-vFv5flGpdg0Xw„&typo=l
"A True American Company"
V3 Certified -Veteran Friendly Company
Visa, Mastercard, Discover, and American Express** Accepted.
eVA Registered - DMBE Registered -SwaM Certified - BBB Accredited
*Please review proofs and look for spelling mistakes.We cannot be held responsible for any mistakes in the proof or
completed signage.
*All artwork we created that is given to another sign company will be charged a$99 artwork fee to you.
*There may be an artwork or site survey charge for your order.
•
•