Loading...
HomeMy WebLinkAboutZMA201900003 Study 2019-10-07 (2)EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 MIN TO: JUSTIN SHIMP, P.E. FROM: BILL WUENSCH, P.E., PTOE; WEI HE ORGANIZATION: SHIMP ENGINEERING DATE: AUGUST 09, 2019 PHONE NUMBER: SENDER'S REFERENCE NUMBER: RE: ROYAL FERN DEVELOPMENT TRAFFIC IMPACT YOUR REFERENCE NUMBER: ANALYSIS SUPPLEMENT UPDATE ❑ URGENT X FOR YOUR USE ❑ PLEASE COMMENT ❑ PLEASE REPLY ❑ PLEASE RECYCLE Background The purpose of this memorandum is to provide a supplement to the original Royal Fern Development Traffic Impact Analysis (EPR prepared on March 18th, 2019) to perform a traffic analysis for an additional scenario of the Restricted Crossing U-Turn Intersection (RCUT) configuration at the intersection of 5th Street Ext./Wahoo Way and the intersection of 5th Street Ext./Old Lynchburg Road as Albemarle County requested. In this memorandum, the study intersections include the intersection of 5th Street Ext./Wahoo Way, the intersection of 5th Street Ext./Old Lynchburg Road, and the new median opening on 5th Street Ext., west of the intersection of 5th Street Ext./Old Lynchburg Road, to accommodate the u-turns of the original southbound left turn and through movements. This memorandum examined the traffic volume changes based on the RCUT configuration at the intersection of 5th Street Ext./Wahoo Way and the intersection of 5th Street Ext./Old Lynchburg Road and analyzed the traffic operations in the additional RCUT Scenario. Restricted Crossing U-Turn Intersection (RCUT) Configuration In the additional RCUT Scenario, both side street movements at the intersection of 5th Street Ext./Wahoo Way and the intersection of 5th Street Ext./Old Lynchburg Road begin with a right turn, then the original side street left -turn and through vehicles make a u-turn at a dedicated downstream median openings to complete the desired movements. The graphic below illustrates an example of the RCUT intersection configuration. 1 EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Pedestrians use marked crosswalks to safely cross the irnersection *1 To make a left turn from the side street to the major street, turn Fight onto the major street, make a u-turrk and cominue straight -: + From the major street, navigate the intersection like at a corwentional intersection Traffic Volumes in RCUT Scenario -39,) Depending on their level of corrrfort, cydists may navigate the intersection using vehicle or pedestrian paths ♦ To continue straight on the side street, turn right onto the major street, make a u-tum, and turn right onto the side street S• `-------- - - - - - # I o turn right from the side street, turn right lice at a corwntianal intersection T Based on the RCUT configuration at the intersection of 5th Street Ext./Wahoo Way and the intersection of 5th Street Ext./Old Lynchburg Road, the 2024 build traffic volumes, obtained from the original report and as illustrated in Figure 1, were rerouted resulting the 2024 build (RCUT Scenario) traffic volumes, which were illustrated in Figure 2. Traffic Operations in RCUT Scenario The traffic operations analysis for RCUT Scenario was completed with the traffic volumes illustrated in Figure 2 using Synch ro/SimTraffic 9.2, a computer -based traffic operations model that replicates procedures from the Highway Capacity Manual (HCM) (Transportation Research Board, 2000 and 2010). Based on the preliminary engineering evaluation, all movements at the study intersections, except the westbound u-turn movement at the new median opening, might work well in the RCUT Scenario with all three intersections designed as stop controlled. Therefore, this memorandum analyzed two options in the RCUT Scenario designing the new median opening as stop controlled and signalized. In both options, the intersection of 5th Street Ext./Wahoo Way and the intersection of 5th Street Ext./Old Lynchburg Road were designed as stop controlled. Option 1— Stop Controlled New Median Opening Synch ro/SimTraffic 9.2 was used to analyze the RCUT Scenario Option 1 traffic operations. The level of service, delay, and queue results are summarized in Table 1 below and included in Appendix A (HCM Reports and SimTraffic Delay and Queue Reports). 2 EPRpc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Table 1 RCUT Scenario Option 1 Traffic Operation Results (what is reported as EB is the movement we tvaically think of beine Southbound) Intersection Approach Movement AM PM LOS Delay Queue LOS Delay Queue 1. 5th Ext and Wahoo Way (Stop Controlled) 5th EB EBU/L* A 3.2 30 A 7.9 30 EBT A 0 0 A 0 0 5th WB WBT A 0 0 A 0 0 WBR A 0 2 A 0 7 Wahoo Way SB SBR B 10.4 53 B 13.6 72 Overall A 0.4 A 0.7 3. 5th Ext and Old Lynchburg Rd (Stop Controlled) 5th EB EBL A 9.6 94 B 11.6 76 EBT A 0 0 A 0 0 EBR A 0 0 A 0 0 5th WB WBU/L* B 10.6 89 A 4.8 46 WBT A 0 5 A 0 0 WBR A 0 32 A 0 27 County NB NBR B 13.4 28 B 11.4 60 Old Lynchburg SIB SBR B 13.7 164 C 19.5 168 Overall A 3.2 A 3.7 99. 5th Ext Median Opening (Stop Controlled) 5th EB EBT A 0 0 A 0 0 5th WB WBU* IF51.5 525 A 6.9 161 WBT A 0 251 A 0 0 Overall B 12.3 A 1.3 * It should be noted that due to the limitation of HCM methodology, level of service and delay cannot be reported with HCM methodology for stop controlled u-turn movements, and thus SimTraffic delays were used for all stop controlled u-turn movements. As shown in Table 1, in RCUT Scenario Option 1 designing all three intersections as stop controlled, all movements at the study intersections, except the westbound u-turn movement at the new median opening, will work well. The westbound u-turn movement at the new median opening will operate at LOS F with 51.5 seconds delay and 525 feet maximum queue; and also, the vehicles weaving to westbound u-turn movement will interfere the westbound through movement and result in slow traffic on the westbound through movement (the slow traffic, if slower than 10 ft/s, were recognized as queue in SimTraffic). Note that this analysis assumed full buildout traffic of the Southwood development and all other currently planned and/or committed projects in the area. By comparison, per a separate traffic analysis memo provided previously, the u-turn movement south of Old Lynchburg Road functions well without a signal if not considering the Southwood traffic. 3 EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Option 2 — Signalized New Median Opening Synch ro/SimTraffic 9.2 was used to analyze the RCUT Scenario Option 2 traffic operations. The level of service, delay, and queue results are summarized in Table 2 below and included in Appendix B (HCM Reports and SimTraffic Delay and Queue Reports). Table 2 RCUT Scenario Option 2 Traffic Operation Results Intersection Approach Movement AM PM LOS Delay Queue LOS Delay Queue 1. 5th Ext and Wahoo Way (Stop Controlled) 5th EB EBU/L* A 2.8 31 A 7.1 33 EBT A 0 0 A 0 0 5th WB WBT A 0 0 A 0 0 WBR A 0 0 A 0 2 Wahoo Way SB SBR B 10.4 58 B 13.6 73 Overall A 0.4 A 0.7 3. 5th Ext and Old Lynchburg Rd (Stop Controlled) 5th EB EBL A 9.6 105 B 11.6 85 EBT A 0 0 A 0 0 EBR A 0 0 A 0 0 5th WB WBU/L* B 11 83 A 5.2 54 WBT A 0 1 A 0 0 WBR A 0 34 A 0 27 County NB NBR B 13.4 33 B 11.4 66 Old Lynchburg SB SBR B 13.7 169 C 19.5 185 Overall A 3.2 A 3.7 99. 5th Ext Median Open (Signalized) 5th EB EBT B 11.7 265 A 9.8 201 5th WB WBU C 32.2 284 C 23.6 227 WBT A 0 0 A 0 0 Overall B 14.4 A 7.6 * It should be noted that, due to the limitation of HCM methodology, level of service and delay cannot be reported with HCM methodology for stop controlled u-turn movements, and thus SimTraffic delays were used for all stop controlled u-turn movements. As shown in Table 2, in RCUT Scenario Option 2 designing the new median opening as signalized and the other two intersections as stop controlled, all movements at the study intersections will work well. However, it should be noted that, while the westbound u-turn movement at the new median opening will operate better than in Option 1 at LOS C with 32.2 seconds delay and 284 feet maximum queue, the eastbound through movement, operating at LOS A with no delay and no queue in Option 1, will operate at LOS B with 11.7 seconds delay and 265 maximum queue. See the previous statement about the Southwood traffic causing the need for the traffic signal for the U-turn movement south of Old Lynchburg Road. 4 EPRpc EPR, P,C. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Findings and Conclusions Based on the analvsis in this memorandum, the findings and the conclusions are as followings — • In RCUT Scenario, both the intersection of 5th Street Ext./Wahoo Way and the intersection of 5th Street Ext./Old Lynchburg Road will operate well designed as stop controlled. • In RCUT Scenario, while designed as stop controlled, the new median opening will have its westbound u-turn movement operating at LOS F with 51.5 seconds delay and 525 feet maximum queue and interfering the westbound through movement which will result in slow traffic on the westbound through movement; while designed as signalized, the new median opening will operate well with the westbound u-turn movement operating better than in Option 1 at LOS C with 32.2 seconds delay and 284 feet maximum queue, however, the eastbound through movement, operating at LOS A with no delay and no queue in Option 1, will operate at LOS B with 11.7 seconds delay and 265 maximum queue. • The southbound U-turn movement south of Old Lynchburg Road will require a traffic signal to work well once the Southwood development comes online. New Scenario Supplement Update As requested by VDOT, an additional supplement update was prepared to perform a traffic analysis for a new scenario of the Restricted Crossing U-Turn Intersection (RCUT) configuration at the intersection of 5th Street Ext./Old Lynchburg Road only. In this scenario, the intersection of 5th Street Ext./Wahoo Way was assumed as right in and right out only intersection. In the update, the study intersection includes the intersection of 5th Street Ext./Old Lynchburg Road only. This update examined the traffic volume changes based on the new configuration and analyzed the traffic operations at the intersection of 5th Street Ext./Old Lynchburg Road. This update also examined and updated the right turn lane warrant at the intersection of Old Lynchburg Road/Site 1 west entrance due to the right turn movement volume changes at the intersection of Old Lynchburg Road/Site 1 west entrance. Traffic Volumes in New Scenario Based on the new configuration, the 2024 build (RCUT Scenario) traffic volumes, which were illustrated in Figure 2, were rerouted resulting the 2024 build (New Scenario) traffic volumes, which were illustrated in Figure 3. Traffic Operations in New Scenario 5 EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 The traffic operations analysis for New Scenario was completed with the traffic volumes illustrated in Figure 3 using Synch ro/SimTraffic 9.2, a computer -based traffic operations model that replicates procedures from the Highway Capacity Manual (HCM) (Transportation Research Board, 2000 and 2010). Based on the preliminary engineering evaluation, all movements at the study intersection of 5th Street Ext./Old Lynchburg Road will operate well in the New Scenario with the intersections designed as stop controlled. Therefore, this update analyzed in the New Scenario considering the intersection of 5th Street Ext./Old Lynchburg as stop controlled. Synch ro/SimTraffic 9.2 was used to analyze the New Scenario traffic operations. The level of service, delay, and queue results are summarized in Table 3 below and included in Appendix C (HCM Reports and SimTraffic Delay and Queue Reports). Table 3 New Scenario Traffic Operation Results Intersection Approach Movement AM PM LOS Delay Queue LOS Delay Queue 3. 5th Ext and Old Lynchburg Rd (Stop Controlled) 5th EB EBL A 9.7 106 B 11.7 85 EBT A 0 0 A 0 0 EBR A 0 1 A 0 1 5th WB WBU/L* B 10.7 89 A 4.8 56 WBT A 0 45 A 0 0 WBR A 0 38 A 0 22 County NB NBR B 13.2 25 B 11.3 61 Old Lynchburg SB SBR B 13.7 176 C 19.5 166 Overall A 3.3 A 3.8 * It should be noted that, due to the limitation of HCM methodology, level of service and delay cannot be reported with HCM methodology for stop controlled u-turn movements, and thus SimTraffic delays were used for all stop controlled u-turn movements. As shown in Table 3, in New Scenario designing the intersection of 5th Street Ext./Old Lynchburg as stop controlled and the intersection of 5th Street Ext./Wahoo Way as right in and right out only, all movements at the intersection of 5th Street Ext./Old Lynchburg will operate well and with negligible changes compared to the results in the RCUT Scenario designing both intersections (i.e. including the RCUT at Wahoo Way) as RCUT and stop controlled intersections. Turn Lane Warrant Update at the Intersection of Old Lynchburg Road/Site 1 West Entrance Turn lane warrant was examined and updated for the right turn at the intersection of Old Lynchburg Road/Site 1 west entrance due to the right turn movement volume changes. The turn lane warrant forms per VDOT Roadway Design Manual are provided in Appendix D. The turn lane warrant analysis results are summarized in Table 4. 0 EPRpc EPR, PAC. "ENGINEERING S� PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Table 4 Turn Lane Warrant Results Intersection Movement AM PM Old Lynchburg Road/Site 1 West Entrance Northbound Right Turn Right Turn Taper Required Right Turn Taper Required Based on the analysis results in Table 4, the turn lane warrant result for the right turn at the intersection of Old Lynchburg Road/Site 1 is Right Turn Taper Required, the same as in the original traffic study. End of Memorandum Attachment — Figure 1— 2024 Build Peak Hour Volumes Figure 2 — 2024 Build (RCUT) Peak Hour Volumes Figure 3 — 2024 Build (New Scenario) Peak Hour Volumes Appendix A RCUT Scenario Option 1 HCM Reports and SimTraffic Delay and Queue Reports Appendix B RCUT Scenario Option 2 HCM Reports and SimTraffic Delay and Queue Reports Appendix C New Scenario HCM Reports and SimTraffic Delay and Queue Reports Appendix D Turn Lane Warrant Forms 7 Figure 12024 Build Peak Hour Volumes Site2 Entrance 2 Site2 Entrance 1 Old Lynchburg Rd Old Lynchburg Rd v o R 34(12) N a0 6(16) o NN 8(24) 00 — N �— 53(153) -% �— 59(169) 7 6 � 5 4 Site1 Entrance Country Green Rd j4 Country Green Rd Country Green Rd k 10007)0(0) (56) 125(66) 77(24) 3 o 68(58) N : co M V co Il- N co LO i CD � 307(441) CO 256(700) ,k NCO47(5) * A) kk, 5th St. Ext t� 107(55) . , Old Lynchburg R 3 � 770(431) !acq r 4(1) ooM �4h v 1 L �• — rJ % +- r er F 2 r r .r 4 6 _ r Wahoo Way � 7 3 00 7 ` Site1 Entrance Z a ' 39(68) S S It ao LO— f 5 Wahoo Way r • _ �n v A) � 56(105) � 469(882) 5th St. Ext1 16(8) t _ _ 1120(780) --► I XX(XX) A r i Figure 2 2024 Build (RCUT) Peak Hour Volumes Site2 Entrance 2 Site2 Entrance 1 Old Lynchburg Rd Old Lynchburg Rd v o 34(12) N a0 6(16) o 8(24) 00 — °' N �— 53(153) -% �— 59(169) 7 6 � 5 4 Site1 Entrance Country Green Rd j4 Country Green Rd Country Green Rd k 10007)0(0) (56) 125(66) 77(24) 3 o 68(58) N : co M V co Il- N co ' 307(441) i OD 256(701) ,�^ 47(5) co •k v I� 48(44) * A)�►5th St. Ext Old Lyn 3 � 107(55) 1133(736) 5(2) M ■ l45 J 1 I:r L �• — J { F ' - . F 2 r r .r No 5 1 4 r Wahoo Way � 7 3 00 7 ` Site1 Entrance 2 fr � 39(68)LO v ao f 5 Wahoo Way -283(783) 99 �364(306) °o 56(105) A 469(882) Old Lynchburg Rd 99 5th5th Stxt 1 881(487) 0(1) lI 16(8) 1168(824) � XX(XX) AM(PM) Figure 3 2024 Build (New Scenario) Peak Hour Volumes Site2 Entrance 2 Site2 Ent]GreenRd Old Lynchburg Rd Old Lynchburg Rd v o 34(12) N a0 6(16) o 800 - °' N �— 53(153) -% - — 5 7 6 5 4 Site1 Entrance Country Green Rd Country ountry Green Rd -14 0(0) k 10007)(56) 125(66) 77(24) -14 C> o 68(58) N v M co W N V co I— N M ' 307(441) i OD 256(701) co ,�^ 47(5) co •k )v I� 48(44) * I' �►5th St. Ext Old Lyn 3 — 123(63) 1117(728) r 5(2) co ■ �4h v 1 L �• — J ti +- { Lq F F 2 r r .r 4 r Wahoo Way 3 00 7 ` 1 4 Site1 Entrance 2 a o(o) � • r 39(68) LO v ao f 5 Wahoo Way -4-283(783) 99 �364(306) °o 56(105) _ A 469(883) Old Lynchburg Rd 99 5th5th St. 1 881(487) - a - 1168(825) XX(XX) AM(PM) EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 Appendices EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Appendix A RCUT Scenario Option 1 HCM Reports and SimTraffic Delay and Queue Reports RCUT Scenario Option 1 HCM Reports and SimTraffic Delay and Queue Reports HCM 2010 TWSC 1: 5th Street & Wahoo Way 05/29/2019 Intersection Int Delay, s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations tt tt r r Traffic Vol, veh/h 16 1168 469 56 0 66 Future Vol, veh/h 16 1168 469 56 0 66 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None None Storage Length 300 - 425 0 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 3 -3 - 5 - Peak Hour Factor 96 96 96 96 96 96 Heavy Vehicles, % 0 2 5 23 0 0 Mvmt Flow 17 1217 489 58 0 69 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 547 0 0 245 Stage 1 - - - - Stage 2 - - - - Critical Hdwy 4.1 - - 7.4 Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy 2.2 - - 3.3 Pot Cap-1 Maneuver 1033 - - 0 736 Stage 1 - - - 0 - Stage 2 - - - 0 - Platoon blocked, % - - Mov Cap-1 Maneuver 1033 - - 736 Mov Cap-2 Maneuver - - - - Stage 1 - - - Stage 2 - - - Approach EB WB SB HCM Control Delay, s 0.1 0 10.4 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1033 - - 736 HCM Lane V/C Ratio 0.016 - - 0.093 HCM Control Delay (s) 8.5 - 10.4 HCM Lane LOS A - B HCM 95th %tile Q(veh) 0 - - 0.3 Royal Fern Development Traffic Analysis 2024 RCUT AM Synchro 9 Report EPR Page 1 RCUT Scenario Option 1 HCM Reports and SimTraffic Delay and Queue Reports HCM 2010 TWSC 3: 5th Street & Old Lynchburg Road 05/29/2019 Intersection Int Delay, s/veh 3.6 Movement EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations ) tt r tt r r r Traffic Vol, veh/h 107 1133 5 48 47 256 307 0 0 3 0 0 391 Future Vol, veh/h 107 1133 5 48 47 256 307 0 0 3 0 0 391 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 295 120 325 380 - - 0 Veh in Median Storage, # - 0 - - 0 - 0 - 0 - Grade, % - 2 - - -2 - 1 - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 11 2 0 2 0 11 4 0 0 0 2 0 18 Mvmt Flow 116 1232 5 52 51 278 334 0 0 3 0 0 425 Major/Minor Majorl Major2 Minorl Minor2 Conflicting Flow All 612 0 0 1232 1237 0 0 - 616 - 139 Stage 1 - - - - - - - - - - - Stage 2 - - - - - - - - - Critical Hdwy 4.32 - 6.44 4.1 - - 7 - 7.26 Critical Hdwy Stg 1 - - - - - - - - - Critical Hdwy Stg 2 - - - - - - - - - Follow-up Hdwy 2.31 - 2.52 2.2 - - 3.3 - 3.48 Pot Cap-1 Maneuver 904 - 235 570 - 0 0 431 0 0 835 Stage 1 - - - - 0 0 - 0 0 - Stage 2 - - - - - 0 0 - 0 0 - Platoon blocked, % - - Mov Cap-1 Maneuver 904 - 329 329 - - - 431 - - 835 Mov Cap-2 Maneuver - - - - - - - Stage 1 - - - - - Stage 2 - - - - - Approach EB WB NB SIB HCM Control Delay, s 0.8 3 13.4 13.7 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 431 904 - 329 - 835 HCM Lane V/C Ratio 0.008 0.129 - 0.314 - 0.509 HCM Control Delay (s) 13.4 9.6 20.8 - 13.7 HCM Lane LOS B A C - B HCM 95th %tile Q(veh) 0 0.4 - 1.3 - 2.9 Royal Fern Development Traffic Analysis 2024 RCUT AM Synchro 9 Report EPR Page 2 RCUT Scenario Option 1 HCM Reports and SimTraffic Delay and Queue Reports HCM Unsignalized Intersection Capacity Analysis 99: 5th Street 05/29/2019 --I- q 4--- Movement EBT EBR WBU WBL WBT NBL NBR Lane Configurations tt A tt Traffic Volume (veh/h) 881 0 364 0 283 0 0 Future Volume (Veh/h) 881 0 364 0 283 0 0 Sign Control Free Free Stop Grade 0% -2% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 958 0 0 0 308 0 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked 0.00 vC, conflicting volume 0 958 1112 479 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 0 958 1112 479 tC, single (s) 0.0 4.1 6.8 6.9 tC, 2 stage (s) tF (s) 0.0 2.2 3.5 3.3 p0 queue free % 0 100 100 100 cM capacity (veh/h) 0 714 203 533 Direction, Lane # EB 1 EB 2 WB 1 WB 2 WB 3 Volume Total 479 479 154 154 0 Volume Left 0 0 0 0 0 Volume Right 0 0 0 0 0 cSH 1700 1700 1700 1700 1700 Volume to Capacity 0.28 0.28 0.09 0.09 0.00 Queue Length 95th (ft) 0 0 0 0 0 Control Delay (s) 0.0 0.0 0.0 0.0 0.0 Lane LOS Approach Delay (s) 0.0 0.0 Approach LOS Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 51.2% ICU Level of Service A Analysis Period (min) 15 Royal Fern Development Traffic Analysis 2024 RCUT AM Synchro 9 Report EPR Page 3 RCUT Scenario Option 1 HCM Reports and SimTraffic Delay and Queue Reports SimTraffic Performance Report 2024 RCUT AM 05/29/2019 1: 5th Street & Wahoo Way Performance by lane Lane EB EB EB WB WB WB SIB All Movements Served UL T T T T R R Denied DelNeh (s) 0.2 Total Del/Veh (s) 3.2 0.6 0.5 0.3 0.5 0.1 3.8 0.7 3: 5th Street & Old Lynchburg Road Performance by lane Lane EB EB EB EB WB WB WB WB NB SIB All Movements Served L T T R UL T T R R R Denied DelNeh (s) 0.2 Total Del/Veh (s) 7.2 1.3 1.1 0.0 10.6 1.5 8.4 0.7 9.8 5.6 2.7 99: 5th Street Performance by lane Lane EB EB WB WB WB All Movements Served T T U T T Denied Del/Veh (s) 0.1 Total Del/Veh (s) 1.3 1.2 51.5 3.3 0.6 12.7 Total Zone Performance Denied Del/Veh (s) 0.6 Total DelNeh (s) 214.0 Royal Fern Development Traffic Analysis SimTraffic Report EPR Page 1 RCUT Scenario Option 1 HCM Reports and SimTraffic Delay and Queue Reports Queuing and Blocking Report 2024 RCUT AM 05/29/2019 Intersection: 1: 5th Street & Wahoo Way Movement EB WB SB Directions Served UL R R Maximum Queue (ft) 30 2 53 Average Queue (ft) 6 0 26 95th Queue (ft) 25 2 45 Link Distance (ft) 190 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 300 425 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: 5th Street & Old Lynchburg Road Movement EB WB WB WB NB SB Directions Served L UL T R R R Maximum Queue (ft) 94 89 5 32 28 164 Average Queue (ft) 34 33 0 3 2 85 95th Queue (ft) 72 64 3 16 15 145 Link Distance (ft) 764 540 205 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 295 325 380 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 99: 5th Street Movement WB WB WB Directions Served U T T Maximum Queue (ft) 525 251 184 Average Queue (ft) 197 24 10 95th Queue (ft) 468 208 134 Link Distance (ft) 908 908 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 800 Storage Blk Time (%) 0 0 Queuing Penalty (veh) 0 0 Zone Summary Zone wide Queuing Penalty: 0 Royal Fern Development Traffic Analysis SimTraffic Report EPR Page 1 RCUT Scenario Option 1 HCM Reports and SimTraffic Delay and Queue Reports HCM 2010 TWSC 1: 5th Street & Wahoo Way 05/29/2019 Intersection Int Delay, s/veh 0.7 Movement EBU EBL EBT WBT WBR SBL SBR Lane Configurations tt tt r r Traffic Vol, veh/h 1 8 824 882 105 0 95 Future Vol, veh/h 1 8 824 882 105 0 95 Conflicting Peds, #/hr 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Stop Stop RT Channelized - None None None Storage Length 300 - 425 0 Veh in Median Storage, # 0 0 - 0 - Grade, % 3 -3 - 5 - Peak Hour Factor 92 96 96 96 96 96 96 Heavy Vehicles, % 2 0 1 1 2 0 0 Mvmt Flow 1 8 858 919 109 0 99 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 919 1028 0 0 460 Stage 1 - - - - - Stage 2 - - - - - Critical Hdwy 6.44 4.1 - - 7.4 Critical Hdwy Stg 1 - - - - - Critical Hdwy Stg 2 - - - - - Follow-up Hdwy 2.52 2.2 - - 3.3 Pot Cap-1 Maneuver 374 683 - - 0 519 Stage 1 - - - - 0 - Stage 2 - - - - 0 - Platoon blocked, % - - Mov Cap-1 Maneuver 598 598 - - 519 Mov Cap-2 Maneuver - - - - - Stage 1 - - - Stage 2 - - - Approach EB WB SIB HCM Control Delay, s 0.1 0 13.6 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 598 - - 519 HCM Lane V/C Ratio 0.016 - - 0.191 HCM Control Delay (s) 11.1 - 13.6 HCM Lane LOS B - B HCM 95th %tile Q(veh) 0 - - 0.7 Royal Fern Development Traffic Analysis 2024 RCUT PM Synchro 9 Report EPR Page 1 RCUT Scenario Option 1 HCM Reports and SimTraffic Delay and Queue Reports HCM 2010 TWSC 3: 5th Street & Old Lynchburg Road 05/29/2019 Intersection Int Delay, s/veh 3.9 Movement EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations ) tt r tt r r r Traffic Vol, veh/h 55 736 2 44 5 701 441 0 0 53 0 0 388 Future Vol, veh/h 55 736 2 44 5 701 441 0 0 53 0 0 388 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 295 120 325 380 - - 0 Veh in Median Storage, # - 0 - - 0 - 0 - 0 - Grade, % - 2 - - -2 - 1 - 0 - Peak Hour Factor 97 97 97 92 97 97 97 97 97 97 97 97 97 Heavy Vehicles, % 0 1 0 2 0 1 0 0 0 0 1 0 0 Mvmt Flow 57 759 2 48 5 723 455 0 0 55 0 0 400 Major/Minor Majorl Major2 Minorl Minor2 Conflicting Flow All 1178 0 0 759 761 0 0 - 380 362 Stage 1 - - - - - - - - - - - Stage 2 - - - - - - - - - Critical Hdwy 4.1 - 6.44 4.1 - - 7 - 6.9 Critical Hdwy Stg 1 - - - - - - - - - Critical Hdwy Stg 2 - - - - - - - - - Follow-up Hdwy 2.2 - 2.52 2.2 - - 3.3 - 3.3 Pot Cap-1 Maneuver 600 - 474 860 - 0 0 617 0 0 641 Stage 1 - - - - 0 0 - 0 0 - Stage 2 - - - - - 0 0 - 0 0 - Platoon blocked, % - - Mov Cap-1 Maneuver 600 - 455 455 - - - 617 - - 641 Mov Cap-2 Maneuver - - - - - - - Stage 1 - - - - - Stage 2 - - - - - Approach EB WB NB SIB HCM Control Delay, s 0.8 0.6 11.4 19.5 HCM LOS B C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 617 600 - 455 - 641 HCM Lane V/C Ratio 0.089 0.095 - 0.116 - 0.624 HCM Control Delay (s) 11.4 11.6 14 - 19.5 HCM Lane LOS B B B - C HCM 95th %tile Q(veh) 0.3 0.3 - 0.4 - 4.4 Royal Fern Development Traffic Analysis 2024 RCUT PM Synchro 9 Report EPR Page 2 RCUT Scenario Option 1 HCM Reports and SimTraffic Delay and Queue Reports HCM Unsignalized Intersection Capacity Analysis 99: 5th Street 05/29/2019 --I- q 4--- Movement EBT EBR WBU WBL WBT NBL NBR Lane Configurations tt A tt Traffic Volume (veh/h) 487 0 306 0 783 0 0 Future Volume (Veh/h) 487 0 306 0 783 0 0 Sign Control Free Free Stop Grade 0% -2% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 529 0 0 0 851 0 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked 0.00 vC, conflicting volume 0 529 954 264 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 0 529 954 264 tC, single (s) 0.0 4.1 6.8 6.9 tC, 2 stage (s) tF (s) 0.0 2.2 3.5 3.3 p0 queue free % 0 100 100 100 cM capacity (veh/h) 0 1034 257 734 Direction, Lane # EB 1 EB 2 WB 1 WB 2 WB 3 Volume Total 264 264 426 426 0 Volume Left 0 0 0 0 0 Volume Right 0 0 0 0 0 cSH 1700 1700 1700 1700 1700 Volume to Capacity 0.16 0.16 0.25 0.25 0.00 Queue Length 95th (ft) 0 0 0 0 0 Control Delay (s) 0.0 0.0 0.0 0.0 0.0 Lane LOS Approach Delay (s) 0.0 0.0 Approach LOS Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 37.1 % ICU Level of Service A Analysis Period (min) 15 Royal Fern Development Traffic Analysis 2024 RCUT PM Synchro 9 Report EPR Page 3 RCUT Scenario Option 1 HCM Reports and SimTraffic Delay and Queue Reports SimTraffic Performance Report 2024 RCUT PM 05/29/2019 1: 5th Street & Wahoo Way Performance by lane Lane EB EB EB WB WB WB SIB All Movements Served UL T T T T R R Denied DelNeh (s) 0.3 Total Del/Veh (s) 7.9 0.4 0.4 0.4 0.9 0.1 5.8 0.8 3: 5th Street & Old Lynchburg Road Performance by lane Lane EB EB EB EB WB WB WB WB NB SIB All Movements Served L T T R UL T T R R R Denied DelNeh (s) 0.2 Total Del/Veh (s) 15.9 0.7 0.9 0.0 4.8 1.3 4.8 1.0 6.2 8.1 2.9 99: 5th Street Performance by lane Lane EB EB WB WB WB All Movements Served T T U T T Denied Del/Veh (s) 0.0 Total Del/Veh (s) 0.8 0.9 6.9 1.2 0.6 2.0 Total Zone Performance Denied Del/Veh (s) 0.6 Total DelNeh (s) 164.0 Royal Fern Development Traffic Analysis SimTraffic Report EPR Page 1 RCUT Scenario Option 1 HCM Reports and SimTraffic Delay and Queue Reports Queuing and Blocking Report 2024 RCUT PM Intersection: 1: 5th Street & Wahoo Way Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB WB SB UL R R 30 7 72 5 0 30 22 4 53 300 425 Intersection: 3: 5th Street & Old Lynchburg Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB WB WB NB SB L UL R R R 76 46 27 60 168 24 15 3 28 74 53 35 15 52 132 540 205 0 0 295 325 380 Intersection: 99: 5th Street Movement WB Directions Served U Maximum Queue (ft) 161 Average Queue (ft) 64 95th Queue (ft) 115 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 600 Storage Blk Time (%) Queuing Penalty (veh) Zone Summary Zone wide Queuing Penalty: 0 05/29/2019 Royal Fern Development Traffic Analysis SimTraffic Report EPR Page 1 EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Appendix B RCUT Scenario Option 2 HCM Reports and SimTraffic Delay and Queue Reports RCUT Scenario Option 2 HCM Reports and SimTraffic Delay and Queue Reports HCM 2010 TWSC 1: 5th Street & Wahoo Way 05/29/2019 Intersection Int Delay, s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations tt tt r r Traffic Vol, veh/h 16 1168 469 56 0 66 Future Vol, veh/h 16 1168 469 56 0 66 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None None Storage Length 300 - 425 0 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 3 -3 - 5 - Peak Hour Factor 96 96 96 96 96 96 Heavy Vehicles, % 0 2 5 23 0 0 Mvmt Flow 17 1217 489 58 0 69 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 547 0 0 245 Stage 1 - - - - Stage 2 - - - - Critical Hdwy 4.1 - - 7.4 Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy 2.2 - - 3.3 Pot Cap-1 Maneuver 1033 - - 0 736 Stage 1 - - - 0 - Stage 2 - - - 0 - Platoon blocked, % - - Mov Cap-1 Maneuver 1033 - - 736 Mov Cap-2 Maneuver - - - - Stage 1 - - - Stage 2 - - - Approach EB WB SB HCM Control Delay, s 0.1 0 10.4 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1033 - - 736 HCM Lane V/C Ratio 0.016 - - 0.093 HCM Control Delay (s) 8.5 - 10.4 HCM Lane LOS A - B HCM 95th %tile Q(veh) 0 - - 0.3 Royal Fern Development Traffic Analysis 2024 RCUT AM —Signalized 99 Synchro 9 Report EPR Page 1 RCUT Scenario Option 2 HCM Reports and SimTraffic Delay and Queue Reports HCM 2010 TWSC 3: 5th Street & Old Lynchburg Road 05/29/2019 Intersection Int Delay, s/veh 3.6 Movement EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations ) tt r tt r r r Traffic Vol, veh/h 107 1133 5 48 47 256 307 0 0 3 0 0 391 Future Vol, veh/h 107 1133 5 48 47 256 307 0 0 3 0 0 391 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 295 120 325 380 - - 0 Veh in Median Storage, # - 0 - - 0 - 0 - 0 - Grade, % - 2 - - -2 - 1 - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 11 2 0 2 0 11 4 0 0 0 2 0 18 Mvmt Flow 116 1232 5 52 51 278 334 0 0 3 0 0 425 Major/Minor Majorl Major2 Minorl Minor2 Conflicting Flow All 612 0 0 1232 1237 0 0 - 616 - 139 Stage 1 - - - - - - - - - - - Stage 2 - - - - - - - - - Critical Hdwy 4.32 - 6.44 4.1 - - 7 - 7.26 Critical Hdwy Stg 1 - - - - - - - - - Critical Hdwy Stg 2 - - - - - - - - - Follow-up Hdwy 2.31 - 2.52 2.2 - - 3.3 - 3.48 Pot Cap-1 Maneuver 904 - 235 570 - 0 0 431 0 0 835 Stage 1 - - - - 0 0 - 0 0 - Stage 2 - - - - - 0 0 - 0 0 - Platoon blocked, % - - Mov Cap-1 Maneuver 904 - 329 329 - - - 431 - - 835 Mov Cap-2 Maneuver - - - - - - - Stage 1 - - - - - Stage 2 - - - - - Approach EB WB NB SIB HCM Control Delay, s 0.8 3 13.4 13.7 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 431 904 - 329 - 835 HCM Lane V/C Ratio 0.008 0.129 - 0.314 - 0.509 HCM Control Delay (s) 13.4 9.6 20.8 - 13.7 HCM Lane LOS B A C - B HCM 95th %tile Q(veh) 0 0.4 - 1.3 - 2.9 Royal Fern Development Traffic Analysis 2024 RCUT AM —Signalized 99 Synchro 9 Report EPR Page 2 RCUT Scenario Option 2 HCM Reports and SimTraffic Delay and Queue Reports HCM Signalized Intersection Capacity Analysis 99: 5th Street 05/29/2019 --I- q 4--- Movement EBT EBR WBU WBL WBT NBL NBR Lane Configurations tt A tt Traffic Volume (vph) 881 0 364 0 283 0 0 Future Volume (vph) 881 0 364 0 283 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Grade (%) 0% -2% 0% Total Lost time (s) 6.0 6.0 6.0 Lane Util. Factor 0.95 1.00 0.95 Frt 1.00 1.00 1.00 Flt Protected 1.00 0.95 1.00 Satd. Flow (prot) 3539 1787 3575 Flt Permitted 1.00 0.95 1.00 Satd. Flow (perm) 3539 1787 3575 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 958 0 396 0 308 0 0 RTOR Reduction (vph) 0 0 0 0 0 0 0 Lane Group Flow (vph) 958 0 396 0 308 0 0 Turn Type NA Prot NA Protected Phases 1 2 12 Permitted Phases Actuated Green, G (s) 45.3 23.8 81.1 Effective Green, g (s) 45.3 23.8 81.1 Actuated g/C Ratio 0.56 0.29 1.00 Clearance Time (s) 6.0 6.0 Vehicle Extension (s) 3.0 3.0 Lane Grp Cap (vph) 1976 524 3575 v/s Ratio Prot c0.27 c0.22 0.09 v/s Ratio Perm v/c Ratio 0.48 0.76 0.09 Uniform Delay, d1 10.8 26.0 0.0 Progression Factor 1.00 1.00 1.00 Incremental Delay, d2 0.9 6.1 0.0 Delay (s) 11.7 32.2 0.0 Level of Service B C A Approach Delay (s) 11.7 18.1 0.0 Approach LOS B B A Intersection Summary HCM 2000 Control Delay 14.4 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.58 Actuated Cycle Length (s) 81.1 Sum of lost time (s) 12.0 Intersection Capacity Utilization 54.5% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group Royal Fern Development Traffic Analysis 2024 RCUT AM -Signalized 99 Synchro 9 Report EPR Page 3 RCUT Scenario Option 2 HCM Reports and SimTraffic Delay and Queue Reports SimTraffic Performance Report 2024 RCUT AM_Signalized 99 05/29/2019 1: 5th Street & Wahoo Way Performance by lane Lane EB EB EB WB WB WB SIB All Movements Served UL T T T T R R Denied DelNeh (s) 0.2 Total Del/Veh (s) 2.8 0.7 0.8 0.3 0.5 0.1 3.8 0.8 3: 5th Street & Old Lynchburg Road Performance by lane Lane EB EB EB EB WB WB WB WB NB SIB All Movements Served L T T R UL T T R R R Denied DelNeh (s) 0.2 Total Del/Veh (s) 6.9 4.1 2.5 0.0 11.0 1.5 8.4 0.7 15.1 5.5 3.7 99: 5th Street Performance by lane Lane EB EB WB WB WB All Movements Served T T U T T Denied Del/Veh (s) 0.1 Total Del/Veh (s) 14.7 10.1 26.1 1.5 0.5 13.2 Total Zone Performance Denied Del/Veh (s) 0.6 Total DelNeh (s) 241.2 Royal Fern Development Traffic Analysis SimTraffic Report EPR Page 1 RCUT Scenario Option 2 HCM Reports and SimTraffic Delay and Queue Reports Queuing and Blocking Report 2024 RCUT AM_Signalized 99 05/29/2019 Intersection: 1: 5th Street & Wahoo Way Movement EB SB Directions Served UL R Maximum Queue (ft) 31 58 Average Queue (ft) 6 26 95th Queue (ft) 24 47 Link Distance (ft) 190 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 300 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: 5th Street & Old Lvnchbura Road Movement EB WB WB WB NB SB Directions Served L UL T R R R Maximum Queue (ft) 105 83 1 34 33 169 Average Queue (ft) 31 33 0 4 3 85 95th Queue (ft) 70 64 1 17 18 146 Link Distance (ft) 764 540 205 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 295 325 380 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 99: 5th Street Movement EB EB WB Directions Served T T U Maximum Queue (ft) 265 252 284 Average Queue (ft) 152 98 160 95th Queue (ft) 243 206 246 Link Distance (ft) 785 785 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 800 Storage Blk Time (%) Queuing Penalty (veh) Zone Summary Zone wide Queuing Penalty: 0 Royal Fern Development Traffic Analysis SimTraffic Report EPR Page 1 RCUT Scenario Option 2 HCM Reports and SimTraffic Delay and Queue Reports HCM 2010 TWSC 1: 5th Street & Wahoo Way 05/29/2019 Intersection Int Delay, s/veh 0.7 Movement EBU EBL EBT WBT WBR SBL SBR Lane Configurations tt tt r r Traffic Vol, veh/h 1 8 824 882 105 0 95 Future Vol, veh/h 1 8 824 882 105 0 95 Conflicting Peds, #/hr 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Stop Stop RT Channelized - None None None Storage Length 300 - 425 0 Veh in Median Storage, # 0 0 - 0 - Grade, % 3 -3 - 5 - Peak Hour Factor 92 96 96 96 96 96 96 Heavy Vehicles, % 2 0 1 1 2 0 0 Mvmt Flow 1 8 858 919 109 0 99 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 919 1028 0 0 460 Stage 1 - - - - - Stage 2 - - - - - Critical Hdwy 6.44 4.1 - - 7.4 Critical Hdwy Stg 1 - - - - - Critical Hdwy Stg 2 - - - - - Follow-up Hdwy 2.52 2.2 - - 3.3 Pot Cap-1 Maneuver 374 683 - - 0 519 Stage 1 - - - - 0 - Stage 2 - - - - 0 - Platoon blocked, % - - Mov Cap-1 Maneuver 598 598 - - 519 Mov Cap-2 Maneuver - - - - - Stage 1 - - - Stage 2 - - - Approach EB WB SIB HCM Control Delay, s 0.1 0 13.6 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 598 - - 519 HCM Lane V/C Ratio 0.016 - - 0.191 HCM Control Delay (s) 11.1 - 13.6 HCM Lane LOS B - B HCM 95th %tile Q(veh) 0 - - 0.7 Royal Fern Development Traffic Analysis 2024 RCUT PM —Signalized 99 Synchro 9 Report EPR Page 1 RCUT Scenario Option 2 HCM Reports and SimTraffic Delay and Queue Reports HCM 2010 TWSC 3: 5th Street & Old Lynchburg Road 05/29/2019 Intersection Int Delay, s/veh 3.9 Movement EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations ) tt r tt r r r Traffic Vol, veh/h 55 736 2 44 5 701 441 0 0 53 0 0 388 Future Vol, veh/h 55 736 2 44 5 701 441 0 0 53 0 0 388 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 295 120 325 380 - - 0 Veh in Median Storage, # - 0 - - 0 - 0 - 0 - Grade, % - 2 - - -2 - 1 - 0 - Peak Hour Factor 97 97 97 92 97 97 97 97 97 97 97 97 97 Heavy Vehicles, % 0 1 0 2 0 1 0 0 0 0 1 0 0 Mvmt Flow 57 759 2 48 5 723 455 0 0 55 0 0 400 Major/Minor Majorl Major2 Minorl Minor2 Conflicting Flow All 1178 0 0 759 761 0 0 - 380 362 Stage 1 - - - - - - - - - - - Stage 2 - - - - - - - - - Critical Hdwy 4.1 - 6.44 4.1 - - 7 - 6.9 Critical Hdwy Stg 1 - - - - - - - - - Critical Hdwy Stg 2 - - - - - - - - - Follow-up Hdwy 2.2 - 2.52 2.2 - - 3.3 - 3.3 Pot Cap-1 Maneuver 600 - 474 860 - 0 0 617 0 0 641 Stage 1 - - - - 0 0 - 0 0 - Stage 2 - - - - - 0 0 - 0 0 - Platoon blocked, % - - Mov Cap-1 Maneuver 600 - 455 455 - - - 617 - - 641 Mov Cap-2 Maneuver - - - - - - - Stage 1 - - - - - Stage 2 - - - - - Approach EB WB NB SIB HCM Control Delay, s 0.8 0.6 11.4 19.5 HCM LOS B C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 617 600 - 455 - 641 HCM Lane V/C Ratio 0.089 0.095 - 0.116 - 0.624 HCM Control Delay (s) 11.4 11.6 14 - 19.5 HCM Lane LOS B B B - C HCM 95th %tile Q(veh) 0.3 0.3 - 0.4 - 4.4 Royal Fern Development Traffic Analysis 2024 RCUT PM —Signalized 99 Synchro 9 Report EPR Page 2 RCUT Scenario Option 2 HCM Reports and SimTraffic Delay and Queue Reports HCM Signalized Intersection Capacity Analysis 99: 5th Street 05/29/2019 --I- q 4--- Movement EBT EBR WBU WBL WBT NBL NBR Lane Configurations tt A tt Traffic Volume (vph) 487 0 306 0 783 0 0 Future Volume (vph) 487 0 306 0 783 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Grade (%) 0% -2% 0% Total Lost time (s) 6.0 6.0 6.0 Lane Util. Factor 0.95 1.00 0.95 Frt 1.00 1.00 1.00 Flt Protected 1.00 0.95 1.00 Satd. Flow (prot) 3539 1787 3575 Flt Permitted 1.00 0.95 1.00 Satd. Flow (perm) 3539 1787 3575 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 529 0 333 0 851 0 0 RTOR Reduction (vph) 0 0 0 0 0 0 0 Lane Group Flow (vph) 529 0 333 0 851 0 0 Turn Type NA Prot NA Protected Phases 1 2 12 Permitted Phases Actuated Green, G (s) 38.3 22.0 72.3 Effective Green, g (s) 38.3 22.0 72.3 Actuated g/C Ratio 0.53 0.30 1.00 Clearance Time (s) 6.0 6.0 Vehicle Extension (s) 3.0 3.0 Lane Grp Cap (vph) 1874 543 3575 v/s Ratio Prot c0.15 c0.19 0.24 v/s Ratio Perm v/c Ratio 0.28 0.61 0.24 Uniform Delay, d1 9.4 21.5 0.0 Progression Factor 1.00 1.00 1.00 Incremental Delay, d2 0.4 2.1 0.0 Delay (s) 9.8 23.6 0.0 Level of Service A C A Approach Delay (s) 9.8 6.7 0.0 Approach LOS A A A Intersection Summary HCM 2000 Control Delay 7.6 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.40 Actuated Cycle Length (s) 72.3 Sum of lost time (s) 12.0 Intersection Capacity Utilization 40.4% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group Royal Fern Development Traffic Analysis 2024 RCUT PM -Signalized 99 Synchro 9 Report EPR Page 3 RCUT Scenario Option 2 HCM Reports and SimTraffic Delay and Queue Reports SimTraffic Performance Report 2024 RCUT PM_Signalized 99 05/29/2019 1: 5th Street & Wahoo Way Performance by lane Lane EB EB EB WB WB WB SIB All Movements Served UL T T T T R R Denied DelNeh (s) 0.3 Total Del/Veh (s) 7.1 0.4 0.5 0.5 0.9 0.1 6.2 0.9 3: 5th Street & Old Lynchburg Road Performance by lane Lane EB EB EB EB WB WB WB WB NB SIB All Movements Served L T T R UL T T R R R Denied DelNeh (s) 0.2 Total Del/Veh (s) 18.6 2.7 1.7 0.0 5.2 1.3 4.9 1.0 6.9 8.9 3.6 99: 5th Street Performance by lane Lane EB EB WB WB WB All Movements Served T T U T T Denied Del/Veh (s) 0.0 Total Del/Veh (s) 12.5 9.1 20.6 1.4 0.7 8.1 Total Zone Performance Denied Del/Veh (s) 0.6 Total DelNeh (s) 303.2 Royal Fern Development Traffic Analysis SimTraffic Report EPR Page 1 RCUT Scenario Option 2 HCM Reports and SimTraffic Delay and Queue Reports Queuing and Blocking Report 2024 RCUT PM_Signalized 99 05/29/2019 Intersection: 1: 5th Street & Wahoo Way Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB WB SB UL R R 33 2 73 6 0 32 24 2 55 300 425 Intersection: 3: 5th Street & Old Lvnchbura Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB WB WB NB SB L UL R R R 85 54 27 66 185 26 15 3 30 79 60 39 15 54 143 540 205 0 0 295 325 380 Intersection: 99: 5th Street Movement EB EB WB Directions Served T T U Maximum Queue (ft) 201 156 227 Average Queue (ft) 97 39 129 95th Queue (ft) 166 105 200 Link Distance (ft) 781 781 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 600 Storage Blk Time (%) Queuing Penalty (veh) Zone Summary Zone wide Queuing Penalty: 0 Royal Fern Development Traffic Analysis SimTraffic Report EPR Page 1 EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Appendix C New Scenario HCM Reports and SimTraffic Delay and Queue Reports HCM Unsignalized Intersection Capacity Analysis 3: 5th Street & Old Lynchburg Road 08/09/2019 (F, 'r 4--- 14* Movement EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations tt r I tt r r Traffic Volume (veh/h) 123 1117 5 48 47 256 307 0 0 3 0 0 Future Volume (Veh/h) 123 1117 5 48 47 256 307 0 0 3 0 0 Sign Control Free Free Stop Stop Grade 2% -2% 1 % 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 134 1214 5 0 51 278 334 0 0 3 0 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked 0.00 vC, conflicting volume 612 0 1219 2148 2196 607 1258 1867 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 612 0 1219 2148 2196 607 1258 1867 tC, single (s) 4.3 0.0 4.1 7.5 6.5 6.9 7.5 6.5 tC, 2 stage (s) tF (s) 2.3 0.0 2.2 3.5 4.0 3.3 3.5 4.0 p0 queue free % 85 0 91 100 100 99 100 100 cM capacity (veh/h) 904 0 579 11 35 444 105 57 Direction, Lane # EB 1 EB 2 EB 3 EB 4 WB 1 WB 2 WB 3 WB 4 NB 1 SB 1 Volume Total 134 607 607 5 51 139 139 334 3 425 Volume Left 134 0 0 0 51 0 0 0 0 0 Volume Right 0 0 0 5 0 0 0 334 3 425 cSH 904 1700 1700 1700 579 1700 1700 1700 444 835 Volume to Capacity 0.15 0.36 0.36 0.00 0.09 0.08 0.08 0.20 0.01 0.51 Queue Length 95th (ft) 13 0 0 0 7 0 0 0 1 73 Control Delay (s) 9.7 0.0 0.0 0.0 11.8 0.0 0.0 0.0 13.2 13.7 Lane LOS A B B B Approach Delay (s) 1.0 0.9 13.2 13.7 Approach LOS B B Intersection Summary Average Delay 3.2 Intersection Capacity Utilization 49.5% ICU Level of Service A Analysis Period (min) 15 Royal Fern Development Traffic Analysis 2024 New Scenario AM Synchro 9 Report EPR Page 3 HCM Unsignalized Intersection Capacity Analysis 3: 5th Street & Old Lynchburg Road 08/09/2019 4/ Movement SBR Lane Configurations r Traffic Volume (veh/h) 391 Future Volume (Veh/h) 391 Sign Control Grade Peak Hour Factor 0.92 Hourly flow rate (vph) 425 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 139 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 139 tC, single (s) 7.3 tC, 2 stage (s) tF (s) 3.5 p0 queue free % 49 cM capacity (veh/h) 835 Direction, Lane # Royal Fern Development Traffic Analysis 2024 New Scenario AM Synchro 9 Report EPR Page 4 SimTraffic Performance Report 2024 New Scenario AM 08/09/2019 3: 5th Street & Old Lynchburg Road Performance by lane Lane EB EB EB EB WB WB WB WB NB SIB All Movements Served L T T R UL T T R R R Denied Del/Veh (s) 0.4 Total Del/Veh (s) 7.2 1.5 1.2 0.0 10.7 2.2 8.2 0.7 8.0 6.7 3.0 Royal Fern Development Traffic Analysis SimTraffic Report EPR Page 1 Queuing and Blocking Report 2024 New Scenario AM 08/09/2019 Intersection: 3: 5th Street & Old Lynchburg Road Movement EB EB WB WB WB WB NB SB Directions Served L R UL T T R R R Maximum Queue (ft) 106 1 89 45 30 38 25 176 Average Queue (ft) 38 0 32 2 1 4 2 88 95th Queue (ft) 80 1 64 32 23 18 15 153 Link Distance (ft) 764 764 540 205 Upstream Blk Time (%) 1 Queuing Penalty (veh) 1 Storage Bay Dist (ft) 295 120 325 380 Storage Blk Time (%) Queuing Penalty (veh) Royal Fern Development Traffic Analysis SimTraffic Report EPR Page 1 HCM Unsignalized Intersection Capacity Analysis 3: 5th Street & Old Lynchburg Road 08/09/2019 (F, 'r 4--- 14* Movement EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations tt r I tt r r Traffic Volume (veh/h) 63 728 2 44 5 701 441 0 0 53 0 0 Future Volume (Veh/h) 63 728 2 44 5 701 441 0 0 53 0 0 Sign Control Free Free Stop Stop Grade 2% -2% 1 % 0% Peak Hour Factor 0.97 0.97 0.97 0.92 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Hourly flow rate (vph) 65 751 2 0 5 723 455 0 0 55 0 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked 0.00 vC, conflicting volume 1178 0 753 1652 2069 376 1294 1616 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 1178 0 753 1652 2069 376 1294 1616 tC, single (s) 4.1 0.0 4.1 7.5 6.5 6.9 7.5 6.5 tC, 2 stage (s) tF (s) 2.2 0.0 2.2 3.5 4.0 3.3 3.5 4.0 p0 queue free % 89 0 99 100 100 91 100 100 cM capacity (veh/h) 600 0 866 23 49 628 101 93 Direction, Lane # EB 1 EB 2 EB 3 EB 4 WB 1 WB 2 WB 3 WB 4 NB 1 SB 1 Volume Total 65 376 376 2 5 362 362 455 55 400 Volume Left 65 0 0 0 5 0 0 0 0 0 Volume Right 0 0 0 2 0 0 0 455 55 400 cSH 600 1700 1700 1700 866 1700 1700 1700 628 641 Volume to Capacity 0.11 0.22 0.22 0.00 0.01 0.21 0.21 0.27 0.09 0.62 Queue Length 95th (ft) 9 0 0 0 0 0 0 0 7 109 Control Delay (s) 11.7 0.0 0.0 0.0 9.2 0.0 0.0 0.0 11.3 19.5 Lane LOS B A B C Approach Delay (s) 0.9 0.0 11.3 19.5 Approach LOS B C Intersection Summary Average Delay 3.8 Intersection Capacity Utilization 50.1 % ICU Level of Service A Analysis Period (min) 15 Royal Fern Development Traffic Analysis 2024 New Scenario PM Synchro 9 Report EPR Page 3 HCM Unsignalized Intersection Capacity Analysis 3: 5th Street & Old Lynchburg Road 08/09/2019 4/ Movement SBR Lane Configurations r Traffic Volume (veh/h) 388 Future Volume (Veh/h) 388 Sign Control Grade Peak Hour Factor 0.97 Hourly flow rate (vph) 400 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 362 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 362 tC, single (s) 6.9 tC, 2 stage (s) tF (s) 3.3 p0 queue free % 38 cM capacity (veh/h) 641 Direction, Lane # Royal Fern Development Traffic Analysis 2024 New Scenario PM Synchro 9 Report EPR Page 4 SimTraffic Performance Report 2024 New Scenario PM 08/09/2019 3: 5th Street & Old Lynchburg Road Performance by lane Lane EB EB EB EB WB WB WB WB NB SIB All Movements Served L T T R UL T T R R R Denied Del/Veh (s) 0.2 Total Del/Veh (s) 15.4 0.7 0.9 0.1 4.8 1.3 4.5 1.0 6.1 8.3 2.9 Royal Fern Development Traffic Analysis SimTraffic Report EPR Page 1 Queuing and Blocking Report 2024 New Scenario PM 08/09/2019 Intersection: 3: 5th Street & Old Lynchburg Road Movement EB EB WB WB NB SB Directions Served L R UL R R R Maximum Queue (ft) 85 1 56 22 61 166 Average Queue (ft) 26 0 16 3 28 74 95th Queue (ft) 58 1 40 14 52 133 Link Distance (ft) 540 205 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 295 120 325 380 Storage Blk Time (%) Queuing Penalty (veh) Royal Fern Development Traffic Analysis SimTraffic Report EPR Page 1 EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 Appendix D Turn Lane Warrant Forms Warrant for Right -Turn Storage Lanes on Two -Lane Highway Project: Royal Fern Development Intersection: Site 1 West Entrance/Old Lynchburg Road Approach Direction: NorthBound Peak Hour: AM PHV Approach Total: 429 vph PHV Right Turns: 51 vph Conclusion: Right Turn Taper Required 120 100 v r w 80 LU U_ 2 LU 7 c 60 a Ir D x 0 40 y x a 20 100 200 300 400 Soo 600 700 PHV APPROACH TOTAL, VEHICLES PER HOUR Warrant for Right -Turn Storage Lanes on Two -Lane Highway Project: Royal Fern Development Intersection: Site 1 West Entrance/Old Lynchburg Road Approach Direction: NorthBound Peak Hour: PM PHV Approach Total: 504 vph PHV Right Turns: 21 vph Conclusion: Right Turn Taper Required 120 100 v r w 80 LU U_ 2 LU 7 c 60 a Ir D x 0 40 y x a 20 100 200 300 400 Soo 600 700 PHV APPROACH TOTAL, VEHICLES PER HOUR