HomeMy WebLinkAboutWPO201900058 Erosion Control Plan & Stormwater Management Plan 2019-10-08-A.
SEH
Building a Better World
for All of Us'
Engineers I Architects I Planners I Scientists
SEH No. RIVAN 148734
September 30, 2019
I hereby certify that this report was prepared by me or under my direct supervision, and
that I am a duly Licensed Professional Engineer under the laws of the State of Virginia.
Miles B. Jensen, P.E.
Date: 9/30/2019 License No.: 0402051131
Reviewed By: Maria Tiegs Date: 9/30/2019
Short Elliott Hendrickson Inc.
3535 Vadnais Center Drive
St. Paul, MN 55110-3507
651.490.2000
SEH
SEH
Building a Better World
for All of Us"
Contents
Certification Page
Contents
1 Project Overview.........................................................1
2 site Description...........................................................1
2.1
Drainage.................................................................................................1
2.2
Disturbance............................................................................................1
2.3
Soils........................................................................................................1
2.4
Adjacent Areas.......................................................................................2
2.5
Steep Slopes Overlay.............................................................................2
3 Erosion Control Plan ................................................... 3
3.1 Temporary Measures.............................................................................3
3.2 Stabilization............................................................................................4
3.3 Erosion Control Sequence......................................................................5
3.4 Maintenance and Sediment Disposal.....................................................6
4 stornwater Management Plan ................................... 6
4.1 Water Quality Requirements (9VAC25-870-63. Water quality design
criteria requirements.).............................................................................6
4.2 Water Quantity Requirements (9VAC25-870-66. Water quantity.) .........7
list of Tables
Table 1 — Site Surface Conditions..............................................................................7
SEH is a registered trademark of Short Elliott Hendrickson Inc.
EROSION CONTROL PLAN & STORMWATER MANAGEMENT PLAN RIVAN 148734
COntentS (continued)
List of Appendic m
Drainage Area Maps
Water Quality Calculations
Flood Insurance Study
BMP Design
Granular Activated Carbon Contractor Facilities at the South Rivanna Water
Treatment Plant Erosion Control Plan and Stormwater Management Plan
EROSION CONTROL PLAN & STORMWATER MANAGEMENT PLAN RIVAN 148734
Erosion Control Plan & Stomurater
Management Plan
South 17vanrra WIP Improvemerrts
Prepared for Povarm Water and Se+tie- PUthoriry
1 Project Overview
The Rivanna Water and Sewer Authority (RWSA) is proposing to expand and improve their
existing South Rivanna Water Treatment Plant (SRWTP). This work includes adding an
administration building, and alum building, liquid lime building, and additional parking south of the
floc/se basins. The sludge and recycle pumping vault will be replaced and the filter building
expanded. Replacing old utilities and installing new utilities will result in the replacing of
sidewalks and bituminous drives.
In 2014, RWSA added the GAC facility and other improvement to the SRWTP. At this time a
bioretention basin was constructed for stormwater compliance with Virginia Stormwater
Management Program (VSMP). As part of the evaluation for compliance with VSMP regulations,
the proposed site was looked at as a common development with the 2014 work. For the
additional work at the site, five Filterra bioretention systems are proposed along the north drive.
2 Site Description
2.1 Drainage
The west half of the site is located in the South Fork Rivanna Water Supply Watershed, and the
east half of the site is located in the South Fork Rivanna Watershed. Drainage from the site is to
the northeast and northwest.
2.2 I Disturbance
The proposed work will disturb approximately 2.29 acres.
2.3 Sals
The site is made up of three soil types. Soils have been identified and classed by the Natural
Resources Conservation Service (NRCS). For the stormwater evaluations, all soil were assumed
type D soils.
RIVAN 148734
Page 1
91-Urban Land
The urban land complex, a variable drained series, exists predominantly on interfluves and
typically have a depth to water table of 10 inches. Urban land complex soils originate from
residuum weathered from granite and gneiss. Slopes range from 0 to 25 percent.
65-Pacolet Sandy Loam
The Pacelot series soils, a somewhat well -drained series, exist predominantly on interfluves and
typically have a depth to the water table greater than 80 inches. Pacelot series soils originate
from residuum weathered from granite and gneiss. Slopes range from 2 to 15 percent.
47-Louisberg Sandy Loam
The Louisberg series soils, a well -drained series, exist predominantly in hillslopes and typically
have a depth to water table greater than 80 inches. Louisberg series soils originate from
residuum weathered from granite and gneiss. Slopes range from 15 to 25 percent.
2.4 Adjacent Areas
The parcel shares its northern, eastern, and western boundaries with South Fork Rivanna River
Reservoir. To the south, the property is adjacent to a VDOT right of way. All minimum yard
requirements are met for this parcel along its boundaries. The property is sloped toward South
Fork Rivanna River Creek and because there are no properties between the Creek and the
Treatment Plant, no offsite stormwater issues are expected as a result of this project.
2.5 Steep Slopes Overlay
Steep slopes — preserved exist on the site. From Albemarle County Code, preserved slopes, by
right:
30.7.4.b.1.f Distribution facilities. Water, sewer, energy, and communications distribution
facilities. To the extent that distribution facilities are established on preserved slopes, the
preserved slopes should be preserved to the maximum extent practicable consistent with the
intent and purpose of this overlay district,
Steep slopes — managed exist on the site. From Albemarle County Code, managed slopes:
30.7.4.a. I By right. The uses permitted by right in the underlying district shall be permitted by
right on managed slopes.
Impact to steep slopes — managed have been minimized to the construction of the administration
building, and connecting into existing utilities. There are no proposed impacted to steep slopes
— preserved.
There are no critical slopes on site.
EROSION CONTROL PLAN & STORMWATER MANAGEMENT PLAN RIVAN 148734
Page 2
3 � Erosion Control Ran
The erosion and sediment control devices and measures have been designed and placed in
accordance with the Virginia Erosion and Sediment Control Handbook (VESCH), Third Edition,
1992.
3.1 i Temporary Measures
Temporary measures are used to limit erosion and contain sediment within areas denude of
vegetation.
3.1.1 Construction Entrance (CE)
A temporary stone construction entrance shall be used to prevent tracking of material from
construction vehicles off of the site. The construction entrance shall be constructed in
accordance with plate 3.02-1 of the VESCH and meet construction specifications of Std. & Spec.
3.02 of the VESCH. Maintenance of the construction entrance shall be in accordance with Std.
and Spec. 3.02 of the VESCH. See E&S plan sheet of the SWPPP for placement location.
3.1.2 I Silt Fence (SF)
Silt fence shall be use to prevent sediment from leaving the site. Silt fence shall be constructed
in accordance with plate 3.05-2 of the VESCH. Installation, construction specification, and
maintenance of the silt fence shall meet Std. & Spec. 3.05 of the VESCH. See E&S plan sheet of
the SWPPP for placement location.
3.1.3 Storm Drain Inlet Protection(I P)
Storm drain inlet protection shall be used to prevent sediment from entering the stormsewer
system. Inlet protection shall be installed according to plates 3.07-3 and 3.07-8 of the VESCH.
All construction and maintenance requirements of Std. & Spec. 3.07 shall be met. See E&S plan
for placement location.
3.1.4 Tree Preservation & Protection (TP)
Tree protection fence shall be used to protect existing groves of trees. The tree protection fence
shall be constructed and maintained in accordance with the Tree Protection Fence standard
detail on the E&S Detail plan sheet of the SWPPP. See the E&S plan sheet of the SWPPP for
placement location.
3.1.5 ' Culvert Inlet Protection (CIP)
Culvert inlet protection shall be used to prevent sediment from entering the stormsewer system.
Inlet protection shall be installed according to plates 3.08-1 of the VESCH. All construction and
maintenance requirements of Std. & Spec. 3.08 shall be met. See E&S plan for placement
location.
EROSION CONTROL PLAN & STORMWATER MANAGEMENT PLAN RIVAN 148734
Page 3
3.2 Stabilization
3.2.1 Temporary Stabilization
Temporary stabilization shall be obtained by temporary seeding (TS), mulching (MU), and Soil
Stabilization Blankets & Matting (B/M). Temporary seeding shall performed in accordance with
Std. & Spec. 3.31 of the VESCH, and temporary mulching shall be performed in accordance with
Std. & Spec. 3.35. Soil stabilization blankets & matting shall be in accordance with St. & Spec.
3.36 VESCH. Temporary seeding and mulching shall be used on any disturbed area that shall
not be worked for more than 14 days.
3.2.2 Permanent Stabilization
Permanent stabilization shall be obtained by permanent seeding (PS) and soil stabilization
blanket & matting (B/M). Permanent seeding shall be in accordance with Std. & Spec 3.32.
Treatment 1 soil stabilization blanket meeting Std. & Spec 3.36 shall be used over the permanent
seeding. Placement of the soil stabilization blanket shall be in accordance with standard plates
3.36-1 and 3.36-2.
3.2.3 Seeding
Seeding shall conform to the following:
Minimum Minimum Maximum
Seed Purity Germination Weed Seed
Type (%) (%) (%)
Kentucky 31 Tall Fescue 97 85 0.50
Perennial Ryegrass 98 90 0.50
Kentucky Bluegrass 97 85 0.50
Annual Ryegrass 97 90 0.50
Weeping Lovegrass 98 87 0.50
German Millet 98 85 0.50
Cereal (Winter) Rye 98 85 0.50
Redtop 94 80 0.50
EROSION CONTROL PLAN & STORMWATER MANAGEMENT PLAN RIVAN 148734
Page 4
3.3
Seeding mixtures to be used on the projected as follows:
Permanent Seeding
Temporary Winter
Seeding
Temporary Spring
Seeding
Temporary Summer
Seeding
180 Kentucky 31 5 Perennial 5 Kentucky
#/acre Tall Fescue #/acre Ryegrass #/acre Bluegrass
575 Annual
#/acre Ryegrass
75 Annual
#/acre Ryegrass
75 German
#/acre Millet
Erosion Control Sequence
.............................._..........................................
75 Cereal
#/acre (Winter) Rye
1. No demolition, construction or land disturbance activities may begin until all perimeter
erosion control measures have been installed as per Contract Drawings. Perimeter
control devices include, silt fence, temporary stone construction entrance and tree
protection fence. If clearing is required for installation of a particular measure, all other
measures shown shall be installed first; clearing of the land necessary may then proceed.
2. Once all measures have been installed, the site shall be cleared and grubbed as
necessary within the limits of disturbance as per the Contract Drawings. Efforts shall be
made to minimize the amount of cleared area exposed at any given time.
3. Once clearing and grubbing is complete, any necessary topsoil stripping may begin.
Topsoil shall be stockpiled on site in the stockpile areas per the Contract Drawings. The
stockpile shall receive such temporary seeding measures as may be required. Any soil
take offsite shall be stockpiled at locations with all required permits. If offsite location
does not have all required permits, the contractor is responsible for obtaining all required
permits.
4. Demolition, earthwork and construction operations may begin once topsoil has been
removed and stockpiled.
5. Once perimeter erosion control measures are in place, construction activities for the may
begin.
6. All pipes shall be installed in accordance with standard construction techniques. Only the
length of trench in which pipe can be installed in one day's time shall be open at any
time, with spoil material placed on the uphill side of the trench. Piping shall be capped at
the end of each day's work to prevent sediment from entering. The trench shall be
backfilled at the end of each day's work and the disturbed area seeded and mulched
within seven (7) days of backfill.
7. All inlets shall have inlet protection installed immediately after installation.
EROSION CONTROL PLAN & STORMWATER MANAGEMENT PLAN RIVAN 148734
Page 5
8. Temporary soil stabilization shall be applied within seven (7) days to denude areas that
may not be at final grade but will remain dormant for longer than fourteen (14) days,
except for that portion of the site on which work will be continuous beyond fourteen (14)
days.
9. Upon completion of final grading, permanent seeding, mulching and fertilization
measures shall be employed on all disturbed areas. Permanent soil stabilization shall be
applied within seven (7) days after final grade is reached on any portion of the site. All
remaining erosion control measures shall remain in place until the entire site has been
stabilized.
10. Once permanent stabilization has occurred, temporary sediment control measures shall
be removed. Any areas disturbed by the removal of these measures shall be returned as
closely as possible to original condition and seeded, mulched and fertilize
3.4 i Maintenance and Sediment Disposal
All sediment and erosion control measures shall be inspected upon installation, at least once
every fourteen (14) days and within 48 hours following any runoff -producing rainfall event.
Repairs to, or replacement of, measures shall occur immediately if necessary and accumulated
sediment removed as needed.
Sediment shall be removed from all erosion control measures when the sediment storage volume
of the measure has become 50% full. All removed sediment shall be disposed of in an approved
manner at the stockpile location or a location to be designated by the Engineer or Owner. Steps
shall be taken at the disposal site to insure that further sediment transport does not occur.
All disturbed areas shall be permanently seeded as soon as possible, but in no case later than
seven (7) calendar days after construction activities are complete. Areas shall be seeded,
fertilized and mulched in accordance with the seeing schedule above.
4 ' from-mter Management Plan
This stormwater management plan (SMP) has been prepared in accordance with the Virginia
Code of Ordnances. The SMP addresses water quality and water quantity requirements for the
construction improvement project South Rivanna Water Treatment Plant Expansion and
Improvement (SRWTP). Drainage area maps are located in Appendix A.
4.1 Water Quality Requirements (9VAC25-870-63. Water quality
design criteria requirements)
Virginia Runoff Reduction Method Spreadsheet (VRRMS) version 3 was utilized to meet water
quality requirements outlined in section 9VAC25-870-63 of Virginia Code.
In 2014, RWSA permitted stormwater compliance for improvement at the SRWTP. At that time,
compliance with water quality standards was permitted for the entire site. With the additional
improvements at the SRWTP, the site disturbance overlaps the 2014 project by 0.82 acres.
Because of the overlapping disturbance, this SMP evaluates the project as a common
development with the 2014 project and combines the changes from the 2014 project with the
proposed 2019 project. Pre and post surface conditions are summarized in the table below.
EROSION CONTROL PLAN & STORMWATER MANAGEMENT PLAN RIVAN 148734
Page 6
Table 1— Site Surface Conditions
The total phosphorous reduction required is 1.73 Ibs/yr. The existing bioretention basin achieves
0.89 Ib/yr reduction with proposed conditions, and the proposed Filterra bioretention systems
achieve a total of 0.84 lb/yr. Total reduction. 1.73 Ibs/yr. The Site Summary Page from the
VRRMS is attached in Appendix B.
With the 2014 project, 0.08 Ib/yr of nutrient credit was required to meet Virginia regulations for
stormwater quality. With the proposed Filterra bioretention systems the nutrient credit is no
longer needed.
4.2 Water Quantity Requirements (9VAC25-870-66. Water quantity.)
The SRWTP is adjacent to South Fork Rivanna River Reservoir, therefore the site lies adjacent to
the flood plain. For both 9VAC25-870-66B & C, the limits of analysis is to a point where the site's
contributing drainage area is less than or equal to 1.0% of the total watershed area. According to
the Albemarle County, VA Flood Insurance Study revised on April 2, 2014 (attached in Appendix
C), the total contributing drainage area to the point of analysis in South Fork Rivanna River is
approximately 268 mil, much greater than the parcel area of 12.59 acres (0.020 mi2). Because
the drainage from the site is insignificant to the drainage area, further water quantity analysis was
not performed. This approach is similar to what was taken with the 2014 project attached.
EROSION CONTROL PLAN & STORMWATER MANAGEMENT PLAN RIVAN 148734
Page 7
General Vicinity Map
South Rivanna WTP
`ers
South Rivanna WTP r
Rio
l Mil
l
s
643
-
is
�Ld
1.
5
_"cam
__— H541
c
f�
8 P.3
652
S62 ' "I PIN
Source: Albemarle County GIS (not to scale)
USDA United States
Department of
Agriculture
N RCS
Natural
Resources
Conservation
Service
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
Albemarle
County, Virginia
September 27, 2019
Preface
Soil surveys contain information that affects land use planning in survey areas.
They highlight soil limitations that affect various land uses and provide information
about the properties of the soils in the survey areas. Soil surveys are designed for
many different users, including farmers, ranchers, foresters, agronomists, urban
planners, community officials, engineers, developers, builders, and home buyers.
Also, conservationists, teachers, students, and specialists in recreation, waste
disposal, and pollution control can use the surveys to help them understand,
protect, or enhance the environment.
Various land use regulations of Federal, State, and local governments may impose
special restrictions on land use or land treatment. Soil surveys identify soil
properties that are used in making various land use or land treatment decisions.
The information is intended to help the land users identify and reduce the effects of
soil limitations on various land uses. The landowner or user is responsible for
identifying and complying with existing laws and regulations.
Although soil survey information can be used for general farm, local, and wider area
planning, onsite investigation is needed to supplement this information in some
cases. Examples include soil quality assessments (http://www.nres.usda.gov/wps/
portal/nres/main/soils/health/) and certain conservation and engineering
applications. For more detailed information, contact your local USDA Service Center
(https://offices.sc.egov.usda.gov/locator/app?agency=nres) or your NRCS State Soil
Scientist (http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/?
cid=nres142p2_053951).
Great differences in soil properties can occur within short distances. Some soils are
seasonally wet or subject to flooding. Some are too unstable to be used as a
foundation for buildings or roads. Clayey or wet soils are poorly suited to use as
septic tank absorption fields. A high water table makes a soil poorly suited to
basements or underground installations.
The National Cooperative Soil Survey is a joint effort of the United States
Department of Agriculture and other Federal agencies, State agencies including the
Agricultural Experiment Stations, and local agencies. The Natural Resources
Conservation Service (NRCS) has leadership for the Federal part of the National
Cooperative Soil Survey.
Information about soils is updated periodically. Updated information is available
through the NRCS Web Soil Survey, the site for official soil survey information.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its
programs and activities on the basis of race, color, national origin, age, disability,
and where applicable, sex, marital status, familial status, parental status, religion,
sexual orientation, genetic information, political beliefs, reprisal, or because all or a
part of an individual's income is derived from any public assistance program. (Not
all prohibited bases apply to all programs.) Persons with disabilities who require
2
alternative means for communication of program information (Braille, large print,
audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice
and TDD). To file a complaint of discrimination, write to USDA, Director, Office of
Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or
call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity
provider and employer.
3
Contents
Preface.................................................................................................................... 2
SoilMap..................................................................................................................
5
SoilMap................................................................................................................6
Legend..................................................................................................................7
MapUnit Legend..................................................................................................
8
MapUnit Descriptions..........................................................................................
8
Albemarle County, Virginia..............................................................................10
2713—Elioak loam, 2 to 7 percent slopes ....................................................
10
27C—Elioak loam, 7 to 15 percent slopes ..................................................
11
27D—Elioak loam, 15 to 25 percent slopes ................................................
12
47C—Philomont sandy loam, 7 to 15 percent slopes .................................
13
47D—Philomont sandy loam, 15 to 25 percent slopes ...............................
14
65B—Pacolet sandy loam, 2 to 7 percent slopes........................................15
65C—Pacolet sandy loam, 7 to 15 percent slopes .....................................
16
91—Urban land...........................................................................................
17
94C—Toast sandy loam, 7 to 15 percent slopes.........................................17
W—Water....................................................................................................18
References............................................................................................................
20
4
Soil Map
The soil map section includes the soil map for the defined area of interest, a list of
soil map units on the map and extent of each map unit, and cartographic symbols
displayed on the map. Also presented are various metadata about data used to
produce the map, and a description of each soil map unit.
5
0 721M
38° 612" N
38' 63" N
721820 721860 721900 721940 721980 722020
3
t`V
N Map Scale: 1:2,080 if printed on A landscape (11" x 8.5') sheet.
N Meters
Y 0 30 60 120 180
,NA\ fit
0 100 200 400 600
Map projection: Web Mercator Corm coordinates: WGS84 Edge tics: UTM Zone 17N WGS84
6
Custom Soil Resource Report
Soil Map
721860 721900 721940 721980 722020 722060
722100 722140 722180 722220
722060 722100 722140 722180 722220
N
722260
38° 6 12" N
v
0
0
a
v
38° 6' 3" N
v
722260
3
MAP LEGEND
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
r>,r
Soil Map Unit Lines
0
Soil Map Unit Points
Special
Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
'
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
-L71
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
r
Severely Eroded Spot
'z
Sinkhole
�;..
Slide or Slip
oa
Sodic Spot
Custom Soil Resource Report
MAP INFORMATION
Spoil Area
The soil surveys that comprise your AOI were mapped at
1:15,800.
Stony Spot
Very Stony Spot
Warning: Soil Map may not be valid at this scale.
Wet Spot
Enlargement of maps beyond the scale of mapping can cause
p
Other
misunderstanding of the detail of mapping and accuracy of soil
.�
Special Line Features
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
Water Features
scale.
Streams and Canals
Transportation
Please rely on the bar scale on each map sheet for map
Rails
measurements.
.�,.r
Interstate Highways
Source of Map: Natural Resources Conservation Service
US Routes
Web Soil Survey LIRL:
Coordinate System: Web Mercator (EPSG:3857)
Major Roads
Local Roads
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
Background
distance and area. A projection that preserves area, such as the
Aerial Photography
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Albemarle County, Virginia
Survey Area Data: Version 13, Sep 17, 2019
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: May 20, 2019—Aug
1. 2019
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
7
Custom Soil Resource Report
Map Unit Legend
Map Unit Symbol
Map Unit Name
Acres in AOI
Percent of AOI
27B
Elioak loam, 2 to 7 percent
slopes
0.6
3.0%
27C
Elioak loam, 7 to 15 percent
slopes
0.0
0.0%
27D
Elioak loam, 15 to 25 percent
slopes
1.5
7.5%
47C
Philomont sandy loam, 7 to 15
percent slopes
0.0
0.2%
47D
Philomont sandy loam, 15 to 25
percent slopes
1.8
8.9%
65B
Pacolet sandy loam, 2 to 7
percent slopes
3.1
15.3%
65C
Pacolet sandy loam, 7 to 15
percent slopes
6.9
34.4%
91
Urban land
5.9
29.7%
94C
Toast sandy loam, 7 to 15
percent slopes
0.2
0.8%
W
Water
0.0
0.1 %
Totals for Area of Interest
20.0
100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the
soils or miscellaneous areas in the survey area. The map unit descriptions, along
with the maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more
major kinds of soil or miscellaneous areas. A map unit is identified and named
according to the taxonomic classification of the dominant soils. Within a taxonomic
class there are precisely defined limits for the properties of the soils. On the
landscape, however, the soils are natural phenomena, and they have the
characteristic variability of all natural phenomena. Thus, the range of some
observed properties may extend beyond the limits defined for a taxonomic class.
Areas of soils of a single taxonomic class rarely, if ever, can be mapped without
including areas of other taxonomic classes. Consequently, every map unit is made
up of the soils or miscellaneous areas for which it is named and some minor
components that belong to taxonomic classes other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the
map unit, and thus they do not affect use and management. These are called
noncontrasting, or similar, components. They may or may not be mentioned in a
particular map unit description. Other minor components, however, have properties
and behavioral characteristics divergent enough to affect use or to require different
management. These are called contrasting, or dissimilar, components. They
0
Custom Soil Resource Report
generally are in small areas and could not be mapped separately because of the
scale used. Some small areas of strongly contrasting soils or miscellaneous areas
are identified by a special symbol on the maps. If included in the database for a
given area, the contrasting minor components are identified in the map unit
descriptions along with some characteristics of each. A few areas of minor
components may not have been observed, and consequently they are not
mentioned in the descriptions, especially where the pattern was so complex that it
was impractical to make enough observations to identify all the soils and
miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the
usefulness or accuracy of the data. The objective of mapping is not to delineate
pure taxonomic classes but rather to separate the landscape into landforms or
landform segments that have similar use and management requirements. The
delineation of such segments on the map provides sufficient information for the
development of resource plans. If intensive use of small areas is planned, however,
onsite investigation is needed to define and locate the soils and miscellaneous
areas.
An identifying symbol precedes the map unit name in the map unit descriptions.
Each description includes general facts about the unit and gives important soil
properties and qualities.
Soils that have profiles that are almost alike make up a soil series. Except for
differences in texture of the surface layer, all the soils of a series have major
horizons that are similar in composition, thickness, and arrangement.
Soils of one series can differ in texture of the surface layer, slope, stoniness,
salinity, degree of erosion, and other characteristics that affect their use. On the
basis of such differences, a soil series is divided into soil phases. Most of the areas
shown on the detailed soil maps are phases of soil series. The name of a soil phase
commonly indicates a feature that affects use or management. For example, Alpha
silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.
Some map units are made up of two or more major soils or miscellaneous areas.
These map units are complexes, associations, or undifferentiated groups.
A complex consists of two or more soils or miscellaneous areas in such an intricate
pattern or in such small areas that they cannot be shown separately on the maps.
The pattern and proportion of the soils or miscellaneous areas are somewhat similar
in all areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example.
An association is made up of two or more geographically associated soils or
miscellaneous areas that are shown as one unit on the maps. Because of present
or anticipated uses of the map units in the survey area, it was not considered
practical or necessary to map the soils or miscellaneous areas separately. The
pattern and relative proportion of the soils or miscellaneous areas are somewhat
similar. Alpha -Beta association, 0 to 2 percent slopes, is an example.
An undifferentiated group is made up of two or more soils or miscellaneous areas
that could be mapped individually but are mapped as one unit because similar
interpretations can be made for use and management. The pattern and proportion
of the soils or miscellaneous areas in a mapped area are not uniform. An area can
be made up of only one of the major soils or miscellaneous areas, or it can be made
up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.
Some surveys include miscellaneous areas. Such areas have little or no soil
material and support little or no vegetation. Rock outcrop is an example.
0
Custom Soil Resource Report
Albemarle County, Virginia
2713—Elioak loam, 2 to 7 percent slopes
Map Unit Setting
National map unit symbol: kb8y
Mean annual precipitation: 25 to 65 inches
Mean annual air temperature: 54 to 59 degrees F
Frost -free period: 195 to 231 days
Farmland classification: All areas are prime farmland
Map Unit Composition
Elioak and similar soils: 80 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Elioak
Setting
Landform: Hillslopes
Landform position (two-dimensional): Summit
Landform position (three-dimensional): Interfluve
Down -slope shape: Convex
Across -slope shape: Convex
Parent material: Residuum weathered from mica schist
Typical profile
H1 - 0 to 8 inches: loam
H2 - 8 to 39 inches: silty clay
H3 - 39 to 79 inches: silt loam
Properties and qualities
Slope: 2 to 7 percent
Depth to restrictive feature: More than 80 inches
Natural drainage class: Well drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to
high (0.20 to 1.98 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Moderate (about 6.6 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 2e
Hydrologic Soil Group: B
Hydric soil rating: No
10
Custom Soil Resource Report
27C—Elioak loam, 7 to 15 percent slopes
Map Unit Setting
National map unit symbol: kb8z
Mean annual precipitation: 25 to 65 inches
Mean annual air temperature: 54 to 59 degrees F
Frost -free period: 195 to 231 days
Farmland classification: Farmland of statewide importance
Map Unit Composition
Elioak and similar soils: 80 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Elioak
Setting
Landform: Hillslopes
Landform position (two-dimensional): Summit
Landform position (three-dimensional): Interfluve
Down -slope shape: Convex
Across -slope shape: Convex
Parent material: Residuum weathered from mica schist
Typical profile
H1 - 0 to 8 inches: loam
H2 - 8 to 39 inches: silty clay
H3 - 39 to 79 inches: silt loam
Properties and qualities
Slope: 7 to 15 percent
Depth to restrictive feature: More than 80 inches
Natural drainage class: Well drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to
high (0.20 to 1.98 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Moderate (about 6.6 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 3e
Hydrologic Soil Group: B
Hydric soil rating: No
11
Custom Soil Resource Report
27D—Elioak loam, 15 to 25 percent slopes
Map Unit Setting
National map unit symbol: kb90
Mean annual precipitation: 25 to 65 inches
Mean annual air temperature: 54 to 59 degrees F
Frost -free period: 195 to 231 days
Farmland classification: Farmland of statewide importance
Map Unit Composition
Elioak and similar soils: 80 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Elioak
Setting
Landform: Hillslopes
Landform position (two-dimensional): Summit
Landform position (three-dimensional): Interfluve
Down -slope shape: Convex
Across -slope shape: Convex
Parent material: Residuum weathered from mica schist
Typical profile
H1 - 0 to 8 inches: loam
H2 - 8 to 39 inches: silty clay
H3 - 39 to 79 inches: silt loam
Properties and qualities
Slope: 15 to 25 percent
Depth to restrictive feature: More than 80 inches
Natural drainage class: Well drained
Runoff class: High
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to
high (0.20 to 1.98 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Moderate (about 6.6 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4e
Hydrologic Soil Group: B
Hydric soil rating: No
12
Custom Soil Resource Report
47C—Philomont sandy loam, 7 to 15 percent slopes
Map Unit Setting
National map unit symbol: 2v7j9
Elevation: 360 to 1,540 feet
Mean annual precipitation: 25 to 65 inches
Mean annual air temperature: 54 to 59 degrees F
Frost -free period: 195 to 231 days
Farmland classification: Not prime farmland
Map Unit Composition
Philomont and similar soils: 75 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Philomont
Setting
Landform: Hillslopes
Landform position (two-dimensional): Summit
Landform position (three-dimensional): Interfluve
Down -slope shape: Convex
Across -slope shape: Convex
Parent material: Residuum weathered from granite and gneiss
Typical profile
Ap - 0 to 5 inches: sandy loam
Bt - 5 to 79 inches: sandy loam
Properties and qualities
Slope: 7 to 15 percent
Depth to restrictive feature: More than 80 inches
Natural drainage class: Well drained
Runoff class: Low
Capacity of the most limiting layer to transmit water (Ksat): High to very high (5.95
to 19.98 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Moderate (about 6.6 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 6e
Hydrologic Soil Group: A
Hydric soil rating: No
13
Custom Soil Resource Report
47D—Philomont sandy loam, 15 to 25 percent slopes
Map Unit Setting
National map unit symbol: 2v7jb
Elevation: 360 to 1,540 feet
Mean annual precipitation: 25 to 65 inches
Mean annual air temperature: 54 to 59 degrees F
Frost -free period: 195 to 231 days
Farmland classification: Not prime farmland
Map Unit Composition
Philomont and similar soils: 75 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Philomont
Setting
Landform: Hillslopes
Landform position (two-dimensional): Summit
Landform position (three-dimensional): Interfluve
Down -slope shape: Convex
Across -slope shape: Convex
Parent material: Residuum weathered from granite and gneiss
Typical profile
Ap - 0 to 5 inches: sandy loam
Bt - 5 to 79 inches: sandy loam
Properties and qualities
Slope: 15 to 25 percent
Depth to restrictive feature: More than 80 inches
Natural drainage class: Well drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water (Ksat): High to very high (5.95
to 19.98 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Moderate (about 6.6 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 7e
Hydrologic Soil Group: A
Hydric soil rating: No
14
Custom Soil Resource Report
6513—Pacolet sandy loam, 2 to 7 percent slopes
Map Unit Setting
National map unit symbol: kbd7
Mean annual precipitation: 25 to 65 inches
Mean annual air temperature: 54 to 59 degrees F
Frost -free period: 195 to 231 days
Farmland classification: All areas are prime farmland
Map Unit Composition
Pacolet and similar soils: 80 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Pacolet
Setting
Landform: Interfluves
Landform position (two-dimensional): Summit
Landform position (three-dimensional): Interfluve
Down -slope shape: Convex
Across -slope shape: Convex
Parent material: Residuum weathered from granite and gneiss
Typical profile
H1 - 0 to 6 inches: sandy loam
H2 - 6 to 32 inches: clay
H3 - 32 to 79 inches: sandy clay loam
Properties and qualities
Slope: 2 to 7 percent
Depth to restrictive feature: More than 80 inches
Natural drainage class: Well drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to
high (0.57 to 1.98 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Moderate (about 7.6 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 2e
Hydrologic Soil Group: B
Hydric soil rating: No
15
Custom Soil Resource Report
65C—Pacolet sandy loam, 7 to 15 percent slopes
Map Unit Setting
National map unit symbol: kbd8
Mean annual precipitation: 25 to 65 inches
Mean annual air temperature: 54 to 59 degrees F
Frost -free period: 195 to 231 days
Farmland classification: Farmland of statewide importance
Map Unit Composition
Pacolet and similar soils: 80 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Pacolet
Setting
Landform: Interfluves
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Nose slope
Down -slope shape: Convex
Across -slope shape: Convex
Parent material: Residuum weathered from granite and gneiss
Typical profile
H1 - 0 to 6 inches: sandy loam
H2 - 6 to 32 inches: clay
H3 - 32 to 79 inches: sandy clay loam
Properties and qualities
Slope: 7 to 15 percent
Depth to restrictive feature: More than 80 inches
Natural drainage class: Well drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to
high (0.57 to 1.98 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Moderate (about 7.6 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4e
Hydrologic Soil Group: B
Hydric soil rating: No
16
Custom Soil Resource Report
91—Urban land
Map Unit Setting
National map unit symbol: kbg5
Mean annual precipitation: 25 to 65 inches
Mean annual air temperature: 54 to 59 degrees F
Frost -free period: 195 to 231 days
Farmland classification: Not prime farmland
Map Unit Composition
Urban land: 85 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Urban Land
Setting
Landform: Interfluves
Landform position (two-dimensional): Summit
Landform position (three-dimensional): Interfluve
Down -slope shape: Linear
Across -slope shape: Linear
Parent material: Residuum weathered from granite and gneiss
Typical profile
H1 - 0 to 6 inches: variable
H2 - 6 to 79 inches: variable
Properties and qualities
Slope: 0 to 25 percent
Depth to restrictive feature: 10 inches to densic material
Runoff class: Medium
Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00
to 13.04 in/hr)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 8s
Hydric soil rating: No
94C—Toast sandy loam, 7 to 15 percent slopes
Map Unit Setting
National map unit symbol: 2v7k9
Elevation: 360 to 1,540 feet
Mean annual precipitation: 25 to 65 inches
Mean annual air temperature: 54 to 59 degrees F
Frost -free period: 195 to 231 days
17
Custom Soil Resource Report
Farmland classification: Farmland of statewide importance
Map Unit Composition
Toast and similar soils: 90 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Toast
Setting
Landform: Interfluves
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Interfluve
Down -slope shape: Convex
Across -slope shape: Convex
Parent material: Residuum weathered from granite and gneiss
Typical profile
Ap - 0 to 7 inches: sandy loam
BA - 7 to 11 inches: sandy clay loam
Bt - 11 to 30 inches: clay
C - 30 to 60 inches: sandy clay loam
Properties and qualities
Slope: 7 to 15 percent
Depth to restrictive feature: More than 80 inches
Natural drainage class: Well drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to
high (0.57 to 1.98 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Moderate (about 8.0 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4e
Hydrologic Soil Group: B
Hydric soil rating: No
W—Water
Map Unit Setting
National map unit symbol: kbgk
Mean annual precipitation: 25 to 65 inches
Mean annual air temperature: 54 to 59 degrees F
Frost -free period: 195 to 231 days
Farmland classification: Not prime farmland
Map Unit Composition
Water: 100 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
18
Custom Soil Resource Report
19
References
American Association of State Highway and Transportation Officials (AASHTO).
2004. Standard specifications for transportation materials and methods of sampling
and testing. 24th edition.
American Society for Testing and Materials (ASTM). 2005. Standard classification of
soils for engineering purposes. ASTM Standard D2487-00.
Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of
wetlands and deep -water habitats of the United States. U.S. Fish and Wildlife
Service FWS/OBS-79/31.
Federal Register. July 13, 1994. Changes in hydric soils of the United States.
Federal Register. September 18, 2002. Hydric soils of the United States.
Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric
soils in the United States.
National Research Council. 1995. Wetlands: Characteristics and boundaries.
Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service.
U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/
nres/detail/national/soils/?cid=nres142p2_054262
Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for
making and interpreting soil surveys. 2nd edition. Natural Resources Conservation
Service, U.S. Department of Agriculture Handbook 436. http://
www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577
Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of
Agriculture, Natural Resources Conservation Service. http://
www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053580
Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and
Delaware Department of Natural Resources and Environmental Control, Wetlands
Section.
United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of
Engineers wetlands delineation manual. Waterways Experiment Station Technical
Report Y-87-1.
United States Department of Agriculture, Natural Resources Conservation Service.
National forestry manual. http://www.nres.usda.gov/wps/portal/nres/detail/soils/
home/?cid=nres142p2_053374
United States Department of Agriculture, Natural Resources Conservation Service.
National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/
detail/national/landuse/rangepasture/?cid=stelprdb1043084
20
Custom Soil Resource Report
United States Department of Agriculture, Natural Resources Conservation Service.
National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/
nres/detail/soils/scientists/?cid=nres142p2_054242
United States Department of Agriculture, Natural Resources Conservation Service.
2006. Land resource regions and major land resource areas of the United States,
the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook
296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/?
cid=nres142p2_053624
United States Department of Agriculture, Soil Conservation Service. 1961. Land
capability classification. U.S. Department of Agriculture Handbook 210. http://
www.nres.usda.gov/Internet/FSE_DOCUMENTS/nresl42p2_052290.pdf
21
a 4
o �
o o
SITE DATA J/� / / / / /�\ __ ^� NOTES:
OWNER: E: WATER &SEWER AUTHORITY
PROPERTY SIZE 22ACRES
-== ``` ------ --� 1. ACTUAL SITE CONDITIONS MAY DIFFER FROM THE CONTRACT DRAWINGS. CONTRACTOR SHALL
PROPERTYADDRESS: 2383 WOODBURN ROAD —/ % / .�`-, / / // / / / /� - - ���-____----------_- _�- _ I CONTACT THE ENGINEER OF ANY DISCREPANCY.
CHARLOTTESVILLE, VA 22901 ----/ / / / //// // // '-- _-----_�— — — — — — — — — — — — — — 2. PRIOR TO EXCAVATION WORK, THE CONTRACTOR SHALL DETERMINE IF ANY CONFLICTS OR
PROPERTY INFO: TAX MAP45-686 --_\ INTERFERENCES BETWEEN EXISTING AND NEW UTILITIES EXIST. IF A CONFLICT EXISTS, THE
IDS 768-277(COUNTY) ---�/ / / / / / , '{�_— --_--/ ��------__ ---ma y. CONTRACTOR SHALL BRING IT TO THE ATTENTION OF THE ENGINEER TO DETERMINE HOW TO
EASEMENT: DB 267-66 ----_ / / / / / / /� �� \-------------:---
/ / / / / / / /-fir ���-_--_-_--' �� \ -- -- \ \ PROCEED.
PARCELID 045000000068BO _ \\\---------- �\
ZONING: RURAL AREA - // / / / / /' //%�- ��'�- — -/ i� �� \ \----------_ - \ \ \\ \ 3. CONTRACTOR SHALL HAVE A LICENSED SURVEYOR REPLACE EXISTING SURVEY MONUMENTS
STATE: VIRGINIA '� �___��\ \�\•\\i\ IF DAMAGED DURING CONSTRUCTION ACTIVITIES.
MAGISTERIAL DISTRICT: WHITE HALL DISTRICT - - _ - _ �' / / /�// / / - _ _ _ _ _ _ _ /l / / ^ - \ �� \ 4. DAMAGE TO THE EXISTING FACILITIES, THAT ARE NOT TO BE REMOVED, SHALL BE REPAIRED
----� / �\\\\ � \\\ TO THE ORIGINAL OR BETTER CONDITION AS DETERMINED BY THE ENGINEER, AT NO
WATERSHED: SOUTH FORKRIVANNARIVER- LOWERCHESAPEAKE _
-' / /i�� iiii' � �:' ADDITIONAL COST.
ENGINEER: SHORT ELLIOTT HENDRICKSON INC. - - --' 5. ALL DEMOLISHED MATERIAL SHALL BECOME PROPERTY OF THE CONTRACTOR AND DISPOSED
/ \
3535 VADNAIS CENTER DRIVE
------ OF OFF SITE AT A PERMITTED FACILITY.
sT PAUL, MN 55110 6. CONTRACTOR SHALL REMOVE AND REPLACE ANY DAMAGED PAVEMENT AT NO ADDITIONAL
SURVEYOR: DRAPER ADEN ASSOCIATES 46----- i//%. / - -- -_ _ - \\ — ------ -� \\\ COST. WHERE NEW PAVEMENT JOINS EXISTING PAVEMENT, CONTRACTOR SHALL SAWCUTAND
-
700HARRISSTREET, SUITE E----pRpiAARp{` _ �`= __\�\���� ��� TREAT EDGES, AS SPECIFIED.
•
CHARELOTTESVILLE, VA 22902 ��^" - - - �- _ - --_ \\ \ \\ ��;7. CONTRACTOR SHALL PROVIDE EXCAVATION SUPPORT, AS REQUIRED, DURING CONSTRUCTION
- - - - / // � � / / i • '
(434)295-0700 TO MAINTAIN THE INTEGRITY OF EXISTING UTILITIES, ROADS, AND STRUCTURES. EXCAVATION
�//ice/ i h� / /---- - ■ ■ ■. ■ >. •- �` - -- _ `--� �� \� \� ��\� SUPPORT SHALL BE DESIGNED BY ENGINEER REGISTERED IN VA, AND SUBMITTED TO
DATUM: HORIZ: NAD-83 i // / // i / \ \ \
VERT: NAD-88 / //// °�� ■--\\\�\\\ \;Z?' ENGINEER FOR APPROVAL
/ • • \ ` \ \\ `8. CONTRACTOR TO COORDINATE WITH RIVANNA WATER & SEWER AUTHORITY STAFF ABOUT THE
/ I I l / /' /' /• / / / / i/ //' ' /, i�////�/ /� .o0a•oo 1/111/III/1111111,1 • •
<IIIIIII�IIIIIIIIIIIIIIIIIo1`I��o�o'gl11a'q,o,q:o•.4 ••1 • �.;���"•/' REMOVAL AND REROUTING OF THE BACKWASH LINES.
l I i � ♦ e♦ O, O, a, O♦ :On 4, O, O♦ O, O, tr, tr•.ti :• •., � _ -\- _ -._ ,,
�- / / / / / / / / // � /// // /,/// / // ♦ oeo•ooa•ooG•ooa•000•oao•000•000•oaG•oba•o / �,,`�� � � ___� -
--1 / / / / / / / / / / // � / //,/i//i, j /j ♦ o o� o� 4� a� o ar o� o� 4� o� o� a� 1 �- -- - � \ �\ \ �\ \ \\\ \ \ \Jl I I ,
/ / / / / / / i / / / / oa•traa•4ee• ee•soo•000•000•odo•odd•°oo•ooa•bo4•oo0•000•aoo•otr+••�•h :••�•tr • \ \, \
/ / / / / ,/ / // /i /i / // /i�1 ro,gro,q,o,q. ,a.a♦gro,¢ro,gro♦qro,qro,q o,grova•a,q:tr�,.: tr,q:s•..;:4, • • >�� \ � ! \\ \ \ \ I
` oa•000•000•000a•eeo•000•000.04o•ooa•000 ■■ aaa-44 a•G•,•:-°4o-•ab4• •� \ \ \ �i
■ ■ ■ a �:.; .; � � I 1, 1
.e>�.o-,e.y:.�st,�7 a.o.o.a♦e•o,q.o,gro.o.o,q ♦ ■ .q: o•.tr,:•,q,o,q:a,grO.q • � I \ \ I I
_ / / / / / / / / // // /j/// / ♦ o•00 O��a'a �aa•aaa•ao/►+�4l-�soo•000•a04•oo0.000 ♦ ■ •' ,•h 44•¢Oq•004.000.000• ♦ I /\ I I /' I I
' i� / // / / / / / / / / i//,/// (i,/ ♦ ,gro,s.e♦e. A, e♦Ore.e. e,gro,q. a, q. o.gro,q♦ ♦ _ a,q:4rgro,,pra ♦q. a.gro, ♦• / \ I I I
�' �' / / / / / / / / /Ilf /// / oa•aoo• o•oao•000•000•000•000•000•o �r.,�-\ ■ d1►1 •�o•000•000•aob•000•000• � IJ� / - I I ',,/ I',
/ / / / / / / / / 1 \ (/ / / ♦ .q:o,q o, q, o, q:o,gro, q, o, q. o,q.o, ■ - -- 111. ♦¢.o, q: ¢, q:o. q.a, q: � �•� _, � / / I
i' i�� / / / / / / \ 1 ( // ♦ •}4.Otr 00.000.040.044.404.000.O d4 ` � � a44 �904.004• � � / I � 1 I `
�� / / / / / / , / / I 1\1\ /// ,q:a, � ,a.o.b:d♦o,tr:a,q,a, q.a, ■ '-\-- , 1111111 ,,. ,a� .a,a,o.o,q.e,q:. �♦ \ '\ \
-� __� / / / / / / / / / 1 \I I711/ �♦ o. .oa e� °� - 1 �� 1 1 °'�q °' °` 1
/' _ / /� / G �t � 400.000.000•¢da• qo•o ■ `__�,-' ♦ � � a roa•oa4•oao•e ♦• --\\_ \�
-� •tr4o•■ � j-j �■ ♦ -_ - 1 _ I ♦ � •aeo•000•eee•P'o ♦ __\�\�
_—�— // /' // // ///' / /// /�///%/%/// }/ 4 �i� a.gr4 — � � ,��-_ —_` �� �_, ,i �, rO,grO, V ai4♦O ♦ __� \\
�II,III111111�'Y /� - ,le•�=_ •?a�4 • t HYPOCHLORITE ■ �,_\\\ �� , - ��,. \ .\.\-\\ 01eOM°e 4ie:e,° �1 />\�\
// / // // / // '////i �ii� ♦ -7 r_ __ a G-o4 ■ - ■--\_\'l- ♦ ����,��,, -�\\ \ \ \\�.. `� �♦ 'ii'Feee•o \ 1-\
''I / ////////////7 //////////// ♦ •A00.O e� a I!®uWbo - otrao FACILITY '■ ..y —,'�\\` �\ \�.,���-'sue\I� i 1111\(\ ♦.� _ ♦♦ t
_��'/////,/�/ / ii///j%iiiiG d q.o,q a p.�� p q ■ a (i4� i IJ✓I—, qq 1
,,, ,� // / / / , /���/iii /+ v. ♦ 4 0 •}44•aao•4o Cad }•a • ■1■1■1.1!! *�I ■ i ■ ■ � ■ ■ ■ � j ? i II'I I I111\\\\ � .■ sa s9a /I I'.
- �� / ,/// // �//i//�//,`// r. ♦ .4 :a•h;,.4 b.a•.:. J ♦ : I I I \ 1 \I\ \♦; ►�ee / /
■ ■ ■ ■ 111111111`� • ♦ ■ \ CLARIFIERSIs
■ oee•e
'0'4+ 111�1111111 ♦ I" GAC ■ '.� "•�-�- 1�y is (10)
°4 tr` FILTER FACILITY . Iol \ ee• ■
/ /' / / // / /, ♦ / o < _ A ■ M I �,j�o ■. SLUDGE AND
+4d4•
// / J / / /i//iii/i �- ♦ . � �/ BUILDING : -.'y�" � _y x (05) , ■ ■ ■ ■. � I I I I •�. i%��/J a RECYCLE
/// ////�/ // ///////� ��-` // - ♦/�- _ a (04) y / i e• PUMPING
/ // / // / / 0 1 / \ * I 1 4 1 IL 1= ° a ♦ ',/ VAULT
EQUALIZATIONif
C�
/ / - / � _ � - /- -, a r BASIN / i r, 1 ��� ?�' ■ ■ / ,
/ //�///////'// / 1 /// / J // (`i ♦ -' T \\ = 1 -_��- -- // 9Al1 CLARIFIERS
/ / // / / )l _ ■ _ _ 11 1 r VI�y E / I%
1 � I a� ', // � A A A 1 1 �, V A I I ' 1I � ♦� , l ll
/ //'r///4/ ///// 1 1 0° a' 4�1�1;\ , 4, \ \\\\ \ \>1/III II'I � ,��•,;I„/
CHLORINE
CONTACT \ \ \ \ \ 1 + I I 1 III 1111► / III II / / I I �iV A / s v I 111 111111� ♦, ////
I I II l A A TANK / 1
I I I 11111111 1 I 1 I I \ FLOC/SEDL '':, j \I�I� \ \I (06) \ \\ \\ \ \ \ \ , \ .
I I IIIIII I 1 I i \ \\ BASINS '' - _ 3/ \\ -a78\ \\\ 1111111,11111,1
I I IIIIIII I I \ I �1, 1 \ a \ 11,I111111,,,,,
C
I I I I IIIIII I j I I I V A (03) L, � �� �
I II \ \ 1.1 \111„1,�111 \ R\\\\Ilyil.�
�A�1 _�I
jj 111,111111 I
I INII�II�II I I l\ \ \ {. 11►I1,,,,,{�1 ti/s`\ 1 \rl�\ Irl I I I li /
IIIIIIIII p13 \ \\ \\ I fI /I I (11II(jIIII1I,II1II.IIIIII1IIII1I.II1I.II 1I I I / \ \ \ A \ \\ \ \ V \ \ \ A \ \ \ \ ��I aao•o4 4q:a,4:d,Gq.G. tr,:•}.c.,•Ga.o oo°• ao,ooqo•oo:o 4°0"i,4 �'1��iI,� 1��,�1
11,11�111!,■j11■,G1■•T11■����1�:�a1 tr, �■ ■■ ) _ _ _-....--_..._ \wl f\_=A�1I S '�\ lss -y 1I " \{I ' \\\tV�\ 1�1 1I1 rt1 \AIV�I1
as
q IY1Ii1I111 I � 1I 111111111111I111I 11111\1I11\I I 1\ I1 \ IIII\I I/ ,\ /( / l I/ jlI/l/l�jIl I l ilII 1 I II 11
I
I II l
I1
/
Precondition Map -Proposed Work
Wooded - 0.14 ac
Open Space - 0.00 ac
OGrass - 1.25 ac
4•trtr4tr4
Impervious - 0.89 ac
■ ■ 0 as Site Boundaries - 2.28 ac
\I\ 1�110 WI�.1.1 / / //// / / / / I / ALBEMARLE COUNTY
MANAGED STEEP
-I ■ ♦ ■ ■�ll l�ll SLOPES (TYP.)
Y40.O a ■'.■ �.
Precondition Map - Overlap Work
Wooded - 0.00 ac
®Open Space - 0.00 ac
OGrass - 0.50 ac
¢°°%°*.°• Impervious - 0.32 ac
:1111111110
;,,,,,,,,,:GAC Boundaries - 0.82 ac
�
Q
O
U
Z
N
Z
5
L
U
U
J
LU
�
o
10!�
O
CL
//1
Q z >-
W ~
Q w 01
0
a
x
z
r
x sL Q
25
>
>
ON w
Z
Z
z J
O
<Q Cd
Od W ~
W
0�3
aCc
Q yaj Q
> c z
LU
~ z
W �
m j
m
Q
�
03�
SHEET
Cl
f
/
i
- - - i // // �� _ �� _ - - , �\ p Via• Njannor
a
----- -- / / �/ �� = ■ t■#t _\��� RivannaN
d 4 \e.!-r aa'vav'ooti�oy�'L°iM �,^ ,yip/ / / / / / / � _er A
- - //// /� ' ■ � _- ♦ -�/\\�� - - ---- `� \ �- �\\ � �.. Sew
Tay, Me
'-J I// / / x � /a p /a'� a� a�°j db d1/ ti' -- '-_--� ------ / /// //� �/� / ��\��� � \�\ _ � \\ � �� Zone
-.444�
� T - -
044•ooi�o
_�� �� .r I ( / / / / / / / / / �-� ��� i--- /i i'tia•d�b�'dPdSu:, /moo/ e,q, R�,q, � o, -_`� - _ __- _ � �-� � �\� � � �`
Tbu9��d'6'e•peo•
•000.000• 4 O.600.04 -=i-
) / / / / / / / / / / /� /'� / � � / //// � /// / evoe000a44h000eeevoo4oP OS ao ° 11111111/ }• • --- ��� �� �-<'\'������y�y���_ � _ \
e U ��_ �"�-J II / / / / / / / / / / // / / �� IIII/ � // / /,q,o, 'o : I//1111,1 .� ��� � �� ---_- � \'('> �w`�••�
_ / / - / /' / // / // / / 4.e' a•404.440.00P•000.000•
0 0 -- _- - .I I / / / / / / //�// // //i/////i / // ♦ .p.o,q.a,q.o,q.o,e,O,prP.4,e,gro, '\ - ��-� �\ �\ ALBEMARLE`
/ \
I / /
ALBEMARLE / / / // // / / /♦ O.000.400.400.400.000.000.000.000.000.000.000.0 _ � � � COUNTY
_J / / / / / / / / i Or0 pro, 4,prO,prO,prO,pr0,pr0,pr O,pr4, rO,pr O,pr 4,prb,prO,p.O,pr
COUNTY / / / - •aoo•ooa•000 aa•000•000•a4o•000•aoo•o - - - oa•000•000•soo•000•oo - MANAGED
MANAGED / / / / /j/i /i / // // .pr4,q.e,gr4,q,� ro,q,o,q,o.p,o,gre,pro -•f :O,prOlprO,grO,O,o,gr , \ )�
--- / / / / // / f ■ STEEP L I l \
•OPO.000.00 P•4P0.O 000.404•POP•009.0 O• - - •OPO.OPO.000.000.000•
STEEP SLOPES
SLOPES / / / / 1 / /i //f/// oo•aoo•ooa•ao •000• o• oo•o o• o •a a•oo y •aoo•aoo•000•000•000• I 1 II'
/'_ ---- i /i'l / / / / / D!' ,pr P, p,4 ♦pa ,p, O qr , ,O p O, , ,p v T J ro, p,O,p rO,prO,pra, )
i
�- __--- �' �// / / � / / / / / / / lI \/// i // 000•oe _ •o o •e e•ee •ooe oo � -__ Ir oo•000•000•000•oo / / I '/ I
/ // // / / / / /// 11 / / •44 o ee•oa oo•o , �. -
\��
), � ♦♦1►la IIII
/ / / / / ! 1 \1 // -� 000•o �• •000 000•
_ / / �/ I/II 1 _ a6 I o•o 0a0•0a4• i
��� � -, / / / / / // /i%/�/%f °:• � .q, qro, i _ - �_� - __ '- 4.. �p o,q,o, I I�� ♦ q:e,prb, p.o
_ �- _- � a ° . � . _ - •a40• _ � 4+ 4P+ 4�+aa0•°OQ•' 1_ ♦ � -09.444.904•q 04• -\ �
,/' /�- �-- �// // // IIII / IIII/ /// i/�/�%/// .? ►►►►ti i �k"C` _'----- ,q,P ■ - '� / ro a: ♦°♦a ALUId:P, p: �� -� ,, ♦ � \ ,p:a,gra,4ra,q ro, _�.`�
��i/a/►►1►►►►►► / _ o �fi g y?► 4Cp18J� -� ♦♦ `\ ` /
�,��- O.00 9 O,;,pl4 bOO4 \ ♦ \ O.0444000000000
_ a._ a a:[[D01111 4: _ __-\ or °r
HYPOCHLORITE ♦♦ \
_ / / / / / _ P 400• aa•cat 40.Oaa+o c_ \ 7R a•Qa4•ooa
/ - y
/ _ / / / / / / / /�i/✓i/ // 4 T a a, Li J) e, ,.\ \\\ \ \ e, a,
/ - __/ / / / / / / //i/i//// / ♦' t `O` FACILITY °` °` °` °` 1. ♦♦ \\- \\\ \\' ♦ a ar
/ / o•oo •Qoo•444•bba• 1� \ \ \ \� ,• abb•4 I 1
/�� /� ��� ____ // IIII / /`// / i j/i///%/// ♦ qM@r r ■ o,q.a,r l\� ♦♦ � 11 I-\ \ � * __ _ � Q,o,b I s�ma;a.
// -_- //// /////� // /// // �✓ °+. or '�N .q (07) q. ♦ I / •f o•apao• \/ I "�"�...,r
oae•>.al � Y'
/ /ii / ♦ III 1 / I t.Wur
/ - �� / // / / / ////i/ii/// / ♦ B� R14. y �♦ I it l a oa
i / / / / //i/j/ /// bbP•aob•aaa• qb oob 1 A1a1^/ \ ♦ �. , / .�
// �� -�� -/ / / / / / //i////// v � _ ,o,q:btq prb, �,q, ■►■►■►�f lr!►7 �-■ ■ Iw!,�
/ / � /� _��� / / / / / //i ///ii �s^ ♦ - ¢ '� , � ♦•'7-� � ""kki I 1 \ t ♦ .T o004 / I
/ /' / / / // / i/jj%///i// ♦ : A: ■�->F-■-■ � ♦ .■ ° CLARIFIERS 1 0 4
/ �� /////�/i�� // '/// jj////j/// ♦ a4 ##, 11►►►►Iti * SLUDGE AND •v
/ ��/// / / ///i��// r /...: ■ GAC
its still
FILTER +,('v FACILITY ■ ft■ l0 11`\ (10) 4 : Oo ■ RECYCLE =u
�\ �n °' PUMPING
/ / / / / / IIII/ /ij//� •4 q:;P;}},4Qy.P••�G BUILDING \ - a (05) ■ #i-■## 1 I I :� o, * VAULT
BLOWER _ I, 4:4. 4r 04 �\j I
s (11)
// IIII'�� i/ 1 i ice% *D �-`: qo 4��7.�e, q • I ,h 5EQUALIZATION
/ / / / / / % / ) aro, a•9.. - -_ \ 1 I//\ . BASIN
\ 6(09�N
CLARIFIERS
\ I
I I I 1 j / / / // / / // /)/�/ /// �� / l �� / l / / _ \ r1 '' ___ ♦ // �\ \ \ \ \ -=i FI 111 ♦♦♦♦♦♦ A /I
/lull i i / � � 1 I0 ��� 1v ''R v � � � �_/a v v v v v v .� `v > //r/IIIIII ♦♦`♦♦ I ///,
I ( I I I 1 1 f CHLORINE \/ ems\ \ \ \ \ \ 1 1+ I III 1 1111 1 ►►►► ♦♦: / ////
\ 1 1 I I 1�1 ♦►►►1
/ v A A 1 II I111 ♦►
CONTACT �\ / Q/ \\ \ \\\\ \ 1 \ � � 1 , I i I I i I I I I ♦♦♦♦►1►►1►11►1, f I �)f
TANK \ 1/ ♦/ /
l l l f I I I I I IIIIIII I I I A FLOC/SEDij (06)
I I I I I I I I I I I I I�IIII11 / I I I A A\ BASINS I�,A, �� -47a►1►1►1►11►►►►11►► ♦ �/
I I I I I I I II II I v (03 y. a ��'!' A 1►111►►►11►►� / j /
I ( I I I I I I I I IIIIII I I I v v ) / I►,11►►►►►IIII►►►►►►1 �
illlllllll I I I \\ \\ \\ li'lig►►►►►1►►►►►►►►►►►1 \ \\\\ a \ \t \\" \ I L V// I
I I I I I I I I I IIIIIII I I t \ \ } 11►►�►►1 v vvY' A C4J I F- j/ I I
I I I I 1 1 I I I III I III I 3, I \\ \ \ � ►►►11►►►►►►►► i \1 ! �•, ���� \ 1,� I I I I I III � / 1 I I
I I I I II I I I I i Illllillllll /d \ \ \\ \\} ff■♦f w�wl IVI1111111111 \\\\//�/ I I)
I I I II I I \ \ \ ' ♦� 1 \11j111 // 11
I I II \ e. e� e04.040.000• I •a 4-}-4 I � 17t,�1V t 1 1� //
�1 I I I I I I I I I IIIIIIIII \ \ \ \ i +ore_ e• ,gro,gro �� i� :4,4`16 _-�-'--_� I �tfl \\j11 II IIII\ Il lJl I I
/ II II \ \ \ ' r or ♦ � \ \ \ tlltl I'l l
�t 1 /) I I I I I I ) (IIIIIII \ \ \ o•o o•oo 00 •o o ao 000•000•000•aoo �� DEWATERING
f II �+ o qr .qr ,q q o, r,q o,grP,q,o.gro.pro qro,
/ III ll \ \ o• go• o 0 0• o•o•oo 0 0• oo•eoo•000•000•000• o•000•000•000•000• BUILDING \\ lI 11
o
\ I / I I I II # as oo {a•oa4 0o aoa• o aoo•000•aoo•oao•a04•oo0•oo�•ovo•000•oo4•a4o•a94•ao (12
\ I I j I I I I I I I II III I ♦ ■ ■#�■ °`° e•o o' oo•000°eao°`°`°`°O�POO�P0940PO�OOP�000�Oe0�P8 A4a�P40�004�000�00P�0 ) ■fil l�)�/ / I j
�,I I I I I I I I I II III (IIII �--■-■"� pr O,prO, rO,pr4+qro, , ,qro, rO,prO,pr O,prO,pr O,prO,grO, p,,o< rO, p, O, p, O, p, O,pr4, t r t■
1 I I I I II 11 ° o, 040000000000Q0000 04•00 000-049•ooa 000•000•o00•004•000•0o aoo•440•000•0.,
I 1 11111 \ O� ,p, pr pr p, pr qr pro, pro, pra,gr O, pr ,prO,pr0,q r0,pr ,p, O,p, Q,qr O,pr
\ \ 1 I I I! \ ob 000• a•aoo•000•000•000•eoo•eoo• ao•aoo•aoo•obb•000•000•a o•bPo•4 � � •o e•o 0•4 0•0 oo•ooe•o � /// I /
- \ I 1 1 I I I I I \ q, ,o.gra.gr9,pro,q,o,q,o. r ,gro,p,o.4rb,gra,4rb,4ro,q:4,, i �i o.q 4.q 4,q O,q o.q,o,q.o,q,o ■-�# ll!ll li
__ �- I J / jJ •040• 4.000.400.004• •000.000.4 P4.000.4aa•44a•oa4.O I O.O O.O O.O 4.004•a44.000•a40•a44• ■�-� ,//
'�---_ I •p, a. p. pr ,prO, q.O,p rO,pra, p,.O +p,4•. n:4•. ' ": j, - O,p o,q O,p 4,prO,p,O,p 4 .:� /f-1-"I-7---_
/
_- �"' _ ) e•6ao•ooa•oeo•aoo•ooP•aoo•000•aPo•000•op i/ � � -` � ,_ � �� o•o 0•4 0•0 0•0 1 }-(-f=1/ ) I )
ELEC11f�ICAL
I I 1 t Qo•o�yo4+o�a9•ooe•`oo•eio•e - - / _ %� _ BUILDING-_s»%���- 'iii%%�/• / // // / / / l l l l
(13)
0
17-TI l l l
I
--���
orFormerlY
_
w ° /\ \\ \ Nov / ... /
\ \ \ Commonwealth of Virginia,
w NOTES \ ANC Section
p \ 'DOT Right o5 W-6
1. AL Post Condition Map -Proposed Work C I, Post Condition Map -Overlap Work Tax Map45-68D7 /
z MA L 6. TEN Zoned:HA R15
' UL
2. UN Wooded - 0.00 ac THE TIEN Wooded - 0.00 ac HAT
SU ID SHA
z w 3 RE ®Open Space - 0.00 ac PEA ®Open Space - 0.00 ac 436.
TES
4 4. TH AP 3.36
y D51 LI
ST OGrass - 1.02 ac {H 8 DIIS OGrass - 0.40 ac
FIL >HALL 9. ARE HASE
z m BE o,gro,pr 10F ?4?o?o°Q?
5. TE 40.444.4 Impervious - 1.26 ac R 10. DIVI ®Impervious - 0.42 ac
M m PIF W. 11. THIE VED
TH UNE �nlnlnl� A� E & S CONTROL PLAN
CC �■ ED 12. INS 'HE V so 0 0o so
o FO , , ,,Site Boundaries - 2.28 ac ,IN WQ 7►11111111YGAC Boundaries - 0.82 ac
CC 13. REF_,, scale 1s feet
F_ ,, . .... ,. _ .. .. .. ,.,. _ _.. _, ..__, ...... ........: OR
a OUTLET OF THE TEMPORARY SLOPE DRAIN SHALL BE 10' FROM THE MODIFIED MUD TRAP PHASING OF PROJECT.
y N x
Qz o_ao
0
>a0�k
Paz
1,=
i
�
Z
O
U
Z
N
Z
5
L
U
U
LU
0!�
O
CL
//1
Q z F
W
QWO
a
z
2
r
,= Q
C9
>
Oy w
Z
Z_
z J
zQFC
O
W ~
W
0�3
aCc
Q yaj Q
> c z
LU
'- z
W
in
m
Q
m F >
03�
SHEET
C4
0
a 4
e �
o o
to
��,'�//•/'-//\/Ii�/I/III �/I I 1 �vN'I cI �' ' 'Il�/I�I / �� _�i�\ 1 1II-/ _.- //-I� �Il I�I- _�I! -/// I - 1 /I l -//I /I�-I -/ '_ �I�;I�-I/ ^ I /�/I-ryi// _I-/- _I /-�/ I��-/��I� 'II�IIiII ry� I _ /1-- I �_-I - (�/ 1%/ �1 l =_ J- II 1II- I-i I I1j_I �I / pgyJ //I p1'iI _ I �/�i/ II-I�Il�I / I//I� I I j 1It- II/ � Ip I �/I _/// �/ -� 1-II'II/I .-/ I1 C/'I// II�II`/ _// /I--�/0'_1- //p�///`/ I//1�0II -•/-�/I _�l II- //p-/ I/ � �'// / /h'\�(//--� �/// �/ -�//-pI/I�I /I 1 ^Iv/I III /I I./I// i/ /_-I'�j •'-/ /�' //l I /i/.//,_q`J-/'-L �/-/I/�I// II I / I I I 1 I I /III / - ,/II 1/ 5`- //II ��/ //b�/ // / / I /I /_/ / /II/IIp I/ I I-- II �/ // I///jI /////�/ //// -/�- //pI / IIII /I / I I I / I/�I� I / II / /--_/// //1//G/_ -III/I-! /�l1-/II I�/�/ /II/lI-�/ I-/,/ICJ1`I1/'II/ -'IIII11/// IIII'�/II/I//III /11I/_I�/IIII p/�I // IIII//lII11/'�1/„iII/ - IIS 1/ /II//II/j1I// /�1//II///IlII/III//��/1//I1/ �/ I/IIIlI/ /II/I/I/II I1 I/ 1I I////II/I p////// II/ Il II/,//1// y//I //0/ //
I/ /III/I/1 / I //I //I///�/ �/I ///////// ,//%d/// / / // -/ /I,/// / /5/ /Ig///// ///I// / a // /// / /A�// //// //�////// /// //Z 3/d//// //bi/ // // / /////////i i/ i/ / ///;/// / /i///// //// ///j / / I/I//I////A // // ////A / /////1// // /////,/i// j///i/I�lce // I /; / /I//////// 0.%/1\ ////A/ / //l ///ry/ / // i /\/// / ///tI/II ///I / /1 /�\// / / 1/ / /%/ l/ I // //\/ / \ /// �/ ///// // /// \A \ �// /I I// / I 3/1 1 /v/ I// v�// � //'//./ //v_////,iv'/// /_/ \/// //\/� I/j�//�V/�//I//�o,'/•% 1 \// - / //\ i// / �/ ' /`///\ i\/i_/ / j _/// / /////I/\I /I///v/1\�i�i\ /// ///i/V/// � ///v\///_//\/ \/ ///i/-//A\ / /////�/ i� /Ii/ / �\\i///// / \\ /,/'/// // j/\/\// ce�/i\/ /\Jam�i /`/\•v/// /- //A�///-/�//A,�j\v/ /� v///-/A/J/ i ' /i\''/( S�-!i�4i/, 1 ///` ///�//I////iei �iI/ _//-/ //\1-/T�// / '��I\/ '/ .////// \/-//�i\��//// !///_�1/ //-I1//� /I/�/lj_/_ ////\i/ '/_//�///- ///1///I/ 6////_/////� /.I/_ ///j .-/I/� './/,��. fim//-///••/-/m, / -///f/// //-/�_'�/_-i/./- /i�/ � -'�/_ �-_ �./�//-/ -/i4�/// /- /4/'//-/� ce 7i�-/% / // �i//p//%4-;-i ;/_///,A/a./i�♦R/-Av /i /a/-�p/_ // //o%:ai/ / i/j/ i/(-//�.+A qi/-i./-�/ /oi♦//-i/�///o/l/i �/� /%�o�/./p///�'"o//,/ ////�/i// ,^`�/oo- /µ.//�/i�ai/Ii.o�i.//ayaa/d//•i✓`//aa/a,�,�// 5//�iyaa/•'g�//
�/e/Ori/,a,///-//i°./.'/ /doOoaa./ce•/F/-/-%/ka//� ,a/a�.I;I/_/e1 '.' / / %�1�aaaq i I "•,'� ,. i0a/a�aI//e0aa/ii••0oaaO,,,P/'/i"0�aqeeqiao.••'O.o/"%I.,s,o�o,aii./ T 6/ qOqogoo'o/-••�/'/0s�a.O,,,,,+�i/ii>I�-eeeqaapyi�t.�ce- u'009/e,o,��% +r BQqe�o0aa0t�••s �.t1`1_u000-_M`0.0,■.d:=._ »qNpaaoo•-••_.o--�■-to■,o•,,a.♦_•a.0q- ••N4oa.0ag0-`i0oo--- q.-�11o0♦dr,o,a/\'_�sLqo0q.I • c\-I9o\ ,0:..,:b 0000y_.- •04s,o..__qp0qo.�I4o.0.4s-y- a!Poaag.-
0ram..,'--�4-q�_Oy-IR�• �R\_ ,,*oLw ,.-. -.`P.• /•�-_,♦_Oo-.1,a., _.- rteoo♦.•• --�o,a.a,♦Pay�••._,-IIY�o-\- �■` - y_\.�,aO000■■■•I,'I
�o 1.,a,�• ��Il 1o�o•`-10♦��1II �ryIvO I °�1c°'Ia,1I) 1I / I a� II\� Io1 �'--hQ�•i�l�=�\I1�1oepA1I�,o1 �-II /Il_ -�/-g-a�o��h-/i�i_,-o\o�-,\I
I/ a,a,a,;j, l l/\' l\Qyaayaa' �•••A, \�_oao,_,.,o,P/\E - / A o�oo0000yo V.•A-_ Ii oa/,a/o,,,,I- \�■�/■Vyboyo■\\••�\�/- ��oo�\-',o.�,Pa\ -\\\co400�aaaa\•�-�\�\�\\o\\�bo.,.e�♦\\-F\yoy�l\\�•_ { -- \��o,a:b�a_ `�-o-�aa0000_-••_ �'-_aoo ...,aai.=- q1aeaay••--oa�,e,,a,a-_- -!aOyo�ooaP•-_oao,.oa.,a�- ---aaaayav_••� ��o,,•.aA-�I_ Q-=pp-eoqao�--=o-,..•o�__-'\-yeya-•- -_aaI ,,o•a: •_--\oqayaaao•-•--, ooao-�.o:,c.,o+'♦=���1ooao.yaa�.••}-♦1-� ��-,�oyoo♦,,o.o,a�P♦���,�aP°aaoao•♦4_ooaa+t,,aa��>•
1(��ooa4a:yt••••1�E-aPooJo�paP,o•)I-oallo4aQo-�•,-_+-o�ao♦ _.,a.a,a�-\ \\'_"♦aoaoaayaPy \•�•-\�\� 0oc�\,o�,a.,a\�-I �I"� qo0ayaaa/\•••_\�� /j�e0a\�\,o/.0,a�I/v 1 ��\�\\oo6 .•am•�\,\\\\'�0a \�\a+\\\\l\\\\\ \�0o�\ •�I �\\\o\a�0, �X-\\\\ \_�/��.\000V \.�' \\�A
\
O����,♦1I \
v\\ \ �-���ogq\ \�\\1•S\♦\ �0,\�,��\ �\ �I\1\♦I 000\. \.\\\\�\ \_0�,a\ vI\_ , �A \\o0q-•V.\\I��.�I o\0\,1\ \M�� \\voo\- -.\s�0\ \\,o,„�\\II1\�s1- .0qors��•1 , , 1 p♦\o\0,,iac�-` .y�I I\000+�II-) '��
1v,o•_1_� �\��qo•11_c�\1_o�",oI11
; +I1`♦I�\\_ y`\I y 1\�L\goS� V\- 1•
-aZao1II•\I1/oIlo,,,�\-III/-= 1°e`�1I /IW`11_)o1.1/1 ./�11II y1
11oqI`II 1�•I I111IoI-11o,\II 1�I 1 U1(/III1 y\1I1"/I1� II^ •/I
IlI1a-I,1� �IIII_11 1I_/-o�oe1/1I•Il_) � _I//-�l
o.
1/_=i .,o•l
!\_ooy•\/l /
/ ♦_ % o\ /,a.I /qaoo•/ /♦ �o=e,/-,/i�///-
aqace•/■-I-CT-o,/a,so1/ L-�/ /=-o/oe. ■•A--
/ /I -/a / a,R�;/'♦-I/yao� •
a_a,�//♦ ,- �
,•C1�//�,o_�o,.O/
✓/••_/ � //�Jr/ �aI .o.,//it10�i�I;`qoo�\//
•//1 \/
\J/(Iyoyail•.m/(
I l/
J/oo�ol/�•�L/\ -Ioa`j
,o
IIv
I
t/IV-1
ooI I
\•I IIIIA/
1j
II
\
�
s I 1
\
s'
/1
Ia
a
)
�\.N%
y.
m
oaw•.
m"...:
o.�,„s�M
wer A
wa'
r- - - - Ranna' - - - - - - - - - - - - - -
-- --«aM�._a.are�'aauie
a
Zone` .444.a.-
4.
lALBEMARLE�
ALBEMARLE COUNTY
-- - - - - / COUNTY MANAGED
_ _ __----- MANAGED
0-o'-STEEP
STEEPSLOPES
SLOPES ,o1 ✓
a e
ALU1V-
MFE2,
y.a ���•■f CLARIFIERSi■SLUDGE AND
CD
RECYCLE
FILTER PUMPING
BUILDINGr I IVAULT
FILTER (04)BLOWER
PAD BUILDING ♦ EQUALIZATION �
17 04 BASIN
#41F A IFIERS
\�(10)
� l//Il
jsECHLORIN
CONTACT
TANK
FLOC/SED Information on(O6)
BASINS
3) \draina a area A can(0be found in GAC
permit attache,
------
IGENERATOR ♦1lllII ( 6) ------I
Ij'I
♦ 1
/ I,♦DEWATERING
BUILDING - I I(12) F
vwr
w.
.�
Irl Jl /l11
xc
---- _ i
__ _ - ELECTRICAL
1 \ \ -----\ / S= BUILDING
(13)
l
NOTES
1. AL BMP Drainage Area Maps
MA
HA
L
2. UN Wooded
THE
SU
ID
SE
3. RE ®Open Space
4. TH
AP
D51
OGrass
ST
FIL
1H
>HAL
5. BE
TE
°�°�°�°�
oa•aoo•a
Impervious
R
PIF
W.
THcc ■■■■■
FO y ■ ■ ■ ■ 7Boundaries
EN
CC
OUTLET OF THE TEMPORARY SLOPE DRAIN SHALL BE 10' FROM THE
MODIFIED MUD TRAP
L
cot
Drainage Area - Grass - Impervious - Total
6.
TE(v
MUL
A - 0.92 ac - 0.61 ac - 1.53 ac
EN
PE,'
B-0.16ac-0.09ac-0.25ac
7.
STA
PLA
C - 0.07 ac - 0.05 ac - 0.12 ac
8.
SILI
D - 0.05 ac - 0.28 ac - 0.33 ac
9.
ARE
E1- 0.09 ac - 0.16 ac - 0.25 ac
10.
1 OF
DIVI
E2 - 0.10 ac - 0.07 ac - 0.17 ac
11.
THI!
LINE_
12.
INS) ALLA I IUN OF I HIJ LING I H OF F lPt IS INCLUUtU IN I At t5ASt t31U HUK I IUN Ur I Fit
WORK,
13.
REFER TO SPECIFICATION SECTION 01 12 16 WORK SEQUENCE, SHEETS XXX - XXXX FOR
PHASING OF PROJECT.
Now or Formerly
Of Vir inia,
Commonht oif Way Section
VDOT RIB 45-68D7
Tax Map
Zoned:R15
4_�30E & OS CONTROL PLAN
30
scale 15 feet
a z o _ " o
z z o
0
>a0xk
W
�
Q�
O
Z
N
Z
C
O
w�
0!�
O
CL
//1
Q z >-
Z W
Q W O
Z
2
r
0 Q
d
>
=)
>
ON w
Z
Z_
Z J
O
< Cd
OS Y1 ~
W
0�3
a
7 z
tll
1, F Z
00
a
CO >
03�
z
w
3 0
z hz
z Q
Q Z
Q J
O �
N Z
Op
O wU
SHEET
C4
Virginia Runoff Reduction Method Worksheet
DEQ Virginia Runoff Reduction Method Re -Development Compliance Spreadsheet - Version 3.0
BMP Design Specifications List: 2013 Draft Stds & Specs
Site Summary
Project Title: 5 WTP Rivanna
Date: 43701 Total Rainfall (in): 43
Total Disturbed Acreage: 2.29
Site Land Cover Summary
Pre-ReDevelopment Land Cover (acres)
A soils
B Soils
C Soils
D Soils
Totals
% of Total
Forest/Open (acres)
0.00
0.00
0.00
0.14
0.14
5
Managed Turf (acres)
0.00
0.00
0.00
2.11
2.11
71
Impervious Cover (acres)
0.00
0.00
0.00
0.74
0.74
25
2.99
100
Post-ReDevelopment Land Cover (acres)
A soils
B Soils
C Soils
D Soils
Totals
% of Total
Forest/Open (acres)
0.00
0.00
0.00
0.00
0.00
0
Managed Turf (acres)
0.00
0.00
0.00
1.55
1.55
52
Impervious Cover (acres)
0.00
0.00
0.00
1.44
1.44
48
2.99
100
Site Tv and Land Cover Nutrient Loads
Final Post -Development
Post-
Post-
Adjusted Pre -
No= (Post-ReDevelopment
ReDevelopment
Development
ReDevelopment
Impervious)
& New Im P )
(New Impervious)
Site Rv 0.59
0.48
0.95
0.48
Treatment Volume (ft) 6,372
3,959
2,414
3,959
TP Load (lb/yr) 4.00
2.49
1.52
2.49
Total TP Load Reduction Required (lb/yr) 1.73 0.50 1.23
Final Post -Development Load
(Post-ReDevelopment & New Impervious)
Pre-
ReDevelopment
TN Load (Ib/yr) 28.64
20.20
Pre-
ReDevelopment
Final Post -Development
Post-ReDevelopment TP
TP Load per acre
TP Load per acre
Load per acre
(lb/acre/yr)
(lb/acre/yr)
(lb/acre/yr)
1.09
1.34
1.09
Summary Print
Virginia Runoff Reduction Method Worksheet
----------------------------------
Site Compliance Summary
Maximum % Reduction Required Below 20%
Pre-ReDevelopment Load
Total Runoff Volume Reduction (ft)
1,385
Total TP Load Reduction Achieved (Ib/yr)
1.73
Total TN Load Reduction Achieved (lb/yr)
6.32
Remaining Post Development TP Load
(lb/yr)
2.27
Remaining TP Load Reduction (lb/yr)
Required
0.00
**No further TIP load reduction required
Summary Print
Virginia Runoff Reduction Method Worksheet
Drainage Area Summary
D.A. A
D.A. B
D.A. C
D.A. D
D.A. E
Total
Forest/Open (acres)
0.00
0.00
0.00
0.00
0.00
0.00
Managed Turf (acres)
0.92
0.16
0.07
0.05
0.19
1.39
Impervious Cover (acres)
0.61
0.09
0.05
0.28
0.23
1.26
Total Area (acres)
1.53
0.25
0.12
0.33
0.42
2.65
Drainage Area Compliance Summary
D.A. A
D.A. B
D.A. C
D.A. D
D.A. E
Total
TP Load Reduced (lb/yr)
0.89
0.14
0.07
0.32
0.30
1.73
TN Load Reduced (lb/yr)
6.32
0.00
0.00
0.00
0.00
6.32
Summary Print
Virginia Runoff Reduction Method Worksheet
Runoff Volume and CN Calculations
1-year storm i 2-year storm I 10-year storm i
(Target Rainfall Event (in) i 0.00 i 0.00 1 0.00 i
Drainage Areas
RV & CN
Drainage Area A
Drainage Area B
Drainage Area C
Drainage Area D
Drainage Area E
CN
87
86
88
95
90
RR (ft3)
1,385
0
0
0
0
1-year return period
RV wo RR (ws-in)
0.00
0.00
0.00
0.00
0.00
RV w RR (ws-in)
0.00
0.00
0.00
0.00
0.00
CN adjusted
100
100
100
100
100
2-year return period
RV wo RR (ws-in)
0.00
0.00
0.00
0.00
0.00
RV w RR (ws-in)
0.00
0.00
0.00
0.00
0.00
CN adjusted
100
100
100
100
100
10-year return period
RV wo RR (ws-in)
0.00
0.00
0.00
0.00
0.00
RV w RR (ws-in)
0.00
0.00
0.00
0.00
0.00
CN adjusted
100
100
100
100
100
Summary Print
Appendix C
Flood Insurance Study
Relevant Pages of the Albemarle County Flood Insurance Study
H&S Project No. 32135-011 South Rivanna Water Treatment Plant
Site Plan
FLOOD
INSURANCE -
STUDY '4Q:1,
Albemarle County
ALBEMARLE COUNTY,
VIRGINIA
AND INCORPORATED AREAS
AND THE INDEPENDENT
CITY OF CHARLOTTESVILLE
COMMUNRY NAME COMMUNITY NUMBER
ALBEMARLE COUNTY
(UNINCORPORATED AREAS) 510006
CHARLOTTESVILLE, CITY OF 510033
(INDEPENDENT CITY)
SCOTTSVILLE, TOWN OF 510007
�QAer Revised: April 2, 2014
Federal Emergency Management Agency
tANn sect FLOOD INSURANCE STUDY NUMBER
51003CV000B
TABLE 3 - SUMMARY OF DISCHARGES - continued
FLOODING SOURCE
DRAINAGE AREA
PEAK DISCHARGES
(cfs)
AND LOCATION
(sg. miles)
10-YEAR 50-YEAR
100-YEAR 500-YEAR
NORTH FORK MEADOW
CREEK
At confluence with
Meadow Creek
0.9
450
800
1,100
1,700
NORTH FORK
RIVANNA RIVER
At confluence with
Rivanna River
178
17,700
31,900
39,700
62,700
At mouth
176
14,300
29,900
36,000
73,400
Upstream of Preddy
Creek
122
14,100
24,700
30,000
47,200
POWELL CREEK
At mouth
3.8
1,070
1,880
2,340
3,740
POWELLS CREEK
At confluence with
Lickinghole Creek
3.88
920
1,480
1,630
2,300
Upstream study limits
3.08
740
1,170
1,350
1,980
RIVANNA RIVER
Downstream study limits
568
35,900
71,900
93,000
157,400
Upstream of Buck Island
Creek
530
35,100
67,500
86,500
146,000
Upstream of Moores Creek
472
32,800
62,200
80,000
134,000
ROCK CREEK
At confluence with Moores
Creek
1.9
1,200
2,000
2,600
4,100
At confluence of 5t'
Street Creek
0.9
650
1,100
1,500
2,200
SLABTOWN BRANCH
At confluence with
Lickinghole Creek
1.21
600
1,060
1,240
1,820
Upstream study limits
0.11
70
120
150
210
SOUTH FORK
RIVANNA RIVER
At mouth
268
19,700
42,200
53,400
106,000
15
Prepared By
Date of Calculations
Client
Project Name
Description
Reviewer
Date Reviewed
Maria Tiegs
i
SEH
9/25/2019 Building a Better worlc
for All of Us'
RSWA
South Rivanna WTP Expansion & Improvements
Silt Fence
Fence
Area Drained
Fence Number
Length (ft)
(ac)
Area/100 ft
< 0.25 ac / 100 ft?
1
95
0.23
0.24
yes
2
134
0.09
0.07
yes
3
1175
2.85
0.24
yes
Silt Fence 1 of 2
Prepared By
Date of Calculations
Client
Project Name
Description
Reviewer
Date Reviewed
Maria Tiegs
i
SEH
9/25/2019 Building a Better work
for All of Us'
RSWA
South Rivanna WTP Expansion & Improvements
Filterra Sizing
Fence Number
Rv
Filter Size
B
443
cf
6x6
C
236
cf
46
D
1011
cf
7x13
E1
619
cf
6x10
E2
345
cf
4x8
Table 1. Filterra Sizina based on the Virainia SWM Handbook. Julv 2013.
System Size
(fk)
Treatment Flow Rate
at 140"/hr
(Cfs)
Maximum Impervious
Drainage Area When
Fully Ponded (CN=100)
(ac
Max WQv Based
on the VRRM
Spreadsheet
Cf
Outlet
Pipe Size
4x6 / 6x4
0.08
0.087
300
4" PVC
4x8 ! 8x4
0.1
0.116
400
4" PVC
6x6
0.12
0.13
448
4" PVC
6x8 / 8x6
0,16
0.174
600
4" PVC
6x10 f 10x6
0.19
0.217
748
6" PVC
6x12 f 12x6
0.23
026
1 897
6" PVC
7x13 / 13x7
0.29
0.329
1 1,135
1 6" PVC
Notes;
1. Boxes are standard depth from rim to outlet: 3.54' for Standard Offline, 4.0' far Internal Bypass Curb.
Contact Contech for information on Internal Bypass - Pipe systems.
2. A standard PVC pipe coupling is cast into the wall for easy connection to discharge piping
3. Dimensions shown are internal.
4. Contact Contech for site specific sizing or other box size options.
Rev. 09/20/2016
Filterra Sizing 2 of 2
• •' •
Granular Activated Carbon Contractor Facilities at the South Rivanna Water Treatment Plant
Erosion Contrd Plan and Storrrmoter Management Plan
IVANNA
WATER &SEWER AUTHORITY
Granular Activated Carbon Contactor Facilities at the
South Rivanna Water Treatment Plant
Erosion Control Plan and Stormwater Management Plan
Including Erosion Control Narrative and Calculations, Stormwater Analysis, and
Related Specifications
Submitted to: County of Albemarle
November 2014
�rrrrr,i
Lic. 0.0 .5376
n �
'SfD,M1JAZ., �'
HAZEN AND SAWYER
Environmental Engineers & Scientists
4011 WestChase Boulevard, Suite 500
Raleigh, NC 27607
NARRATIVE REPORT
INTRODUCTION
The Rivanna Water and Sewer Authority (RWSA) is proposing upgrades to one of their existing
water treatment plant (WTP) facilities to meet recent US EPA regulations addressing
disinfectants and disinfection byproducts (DBPs) and microbial pathogens. The WTP is located
north of the City of Charlottesville. The South Rivanna Water Treatment Plant sources water
from the South Fork Rivanna River Reservoir. To meet DBP regulations, new carbon
contactors containing granular activated carbon (GAC) will be added to the plant between the
processes of filtration and primary disinfection. Construction of these improvements is
anticipated to be completed by June 2017.
The South Rivanna WTP resides within the jurisdiction of Albemarle County, and all necessary
permits will be coordinated with the County. All proposed construction will take place within the
South Rivanna WTP property; no construction will occur outside of the property boundaries.
The disturbed area for these improvements is approximately 1.53 acres. Any excess and
unsuitable soil will be stockpiled onsite by the contractor with the option of unsuitable material to
be disposed of in an approved location with all required permits to be acquired by the
contractor.
Erosion and sediment control measures will be used to limit erosion and contain sediment from
the construction and cleared areas prior to the establishment of vegetation.
SOILS
Three soil types exist on site where proposed improvements are to take place. These soils have
been identified and classed by the Natural Resources Conservation Service (NRCS), and are
detailed below. The project is located almost entirely within the "Urban Land" soil group, and
thus a hydrologic soil group "D" was assumed for all calculations.
91 — Urban Land
The urban land complex, a variable drained series, exists predominantly on interfluves and
typically have a depth to water table of 10 inches. Urban land complex soils originate from
residuum weathered from granite and gneiss. Slopes range from 0 to 25 percent.
65 — Pacolet Sandy Loam
The Pacelot series soils, a somewhat well -drained series, exist predominantly on interfluves and
typically have a depth to the water table greater than 80 inches. Pacelot series soils originate
from residuum weathered from granite and gneiss. Slopes range from 2 to 15 percent.
47 — Louisberg Sandy Loam
The Louisberg series soils, a well -drained series, exist predominantly in hillslopes and typically
have a depth to water table greater than 80 inches. Louisberg series soils originate from
residuum weathered from granite and gneiss. Slopes range from 15 to 25 percent.
ADJACENT AREAS
The parcel shares its northern, eastern, and western boundaries with South Fork Rivanna River
Reservoir. To the south, the property is adjacent to a VDOT right of way. All minimum yard
requirements are met for this parcel along its boundaries. The property is sloped toward South
Fork Rivanna River Creek and because there are no properties between the Creek and the
Treatment Plant, no offsite stormwater issues are expected as a result of this project.
EROSION AND SEDIMENT CONTROL MEASURES
A majority of the erosion and sediment control devices and measures have been designed and
placed in accordance with the Virginia Erosion and Sediment Control Handbook (VESCH), Third
Edition, 1992.
Temporary measures will be used to limit erosion and contain sediment from cleared areas prior
to the establishment of vegetation. Once construction, including all structural measures, is
complete and permanent vegetative cover has been established, these measures may be
removed with approval from the engineer. Vegetative cover for disturbed areas will consist of
grasses as recommended by the Virginia Erosion and Sediment Control Handbook. See the
Plans and Specification Section 02910 — Final Grading and Landscaping for the proposed
Seeding schedule, attached.
The temporary measures proposed for this improvement include silt fence, construction
entrances, inlet erosion control, and temporary seeding measures as required. The above
devices will filter sediment from runoff to prevent sediment from being deposited off -site, while
the temporary seeding will limit erosion during construction activities. Permanent measures
proposed include permanent seeding and rip rap outlet protection. See Specification Section
02276 — Erosion and Sedimentation Control and Section 02910 — Final Grading and
Landscaping for further details on these temporary and permanent measures.
Temporary Stabilization
A majority of the temporary sediment and erosion control measures were designed and chosen
based on criteria from the Virginia Erosion and Sediment Control Handbook (VESCH).
Stabilization construction entrances/exits and silt fence are designed in accordance with the
guidelines established in VESCH Sections 3.02 and 3.05. Temporary Paved Construction
Entrance shall be per the guidelines of the Albemarle County design manual and detail provided
in the contract drawings.
Storm drain inlets will be protected with in -grate sediment filters. These were selected due to
their high efficiency and ease of maintenance. Also, due to their location below the grate in the
inlet itself, they do not provide an obstruction to vehicle traffic, a matter of importance to this
particular project as many of the grates are in travel lanes.
Perimeter sediment trapping measures will include silt fence and modified mud traps. A
variance has been included with this submittal to request the usage of modified mud traps as
perimeter protection for site work.
Temporary seeding measures were chosen as per the recommendations of VESCH Section
3.31. Temporary rolled erosion control mat was designed in accordance with the procedures
outlined in Section 3.36.
Permanent Stabilization
Upon completion of the project, permanent vegetative plantings will be used to achieve
stabilization of the site. All temporary erosion and sediment control measures will be removed
once the site has been stabilized. All permanent vegetative plantings conform to those
specified in the VESCH Section 3.32. See Specification Section 02910 — Final Grading and
Landscaping, attached, for the proposed seeding schedule.
Erosion Control Sequence
1. The county inspector must be notified one week prior to the pre -construction conference,
one week prior to the commencement of land disturbing activities, and one week prior to the
final inspection.
2. All erosion and sediment control measures will be constructed and maintained according to
minimum standards and specifications of the Virginia Erosion and Sediment Control
Handbook and VA Regulations VR625-02-00 Erosion and Sediment Control Regulations.
3. All erosion and sediment control measures are to be placed prior to or as the first step in
clearing.
4. A copy of the approved erosion and sediment control plan shall be maintained on the site at
all times.
5. Prior to commencing land disturbing activities in areas other than indicated on these plans
(including, but not limited to, off -site borrow or waste areas), the contractor shall submit a
supplementary erosion control plan to the owner for review and approval by the County of
Albemarle. The contractor is responsible for obtaining an approved VSMP plan or permits
for all borrow and/or waste areas.
6. The contractor is responsible for installation of any additional erosion control measures
necessary to prevent erosion and sedimentation as determined by the plan approving
authority.
7. All disturbed areas are to drain to approved sediment control measure at all times during
land disturbing activities and during site development until final stabilization is achieved.
8. During dewatering operations, water will be pumped into an approved filtering device.
9. The contractor shall inspect all erosion control measures periodically and after each runoff -
producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of
the erosion control devices shall be made immediately.
10. All fill material to be taken from an approved, designated borrow area.
11. All waste material shall be taken to an approved and permitted waste area. Earth fill shall
be inert materials only, free of roots, stumps, wood, rubbish, and other debris.
12. Borrow or waste areas are to be reclaimed within 7 days of completion per zoning ordinance
section 5.1.28.
13. All inert material shall be transported in compliance with Section 13-301 of the Code of
Albemarle.
14. Borrow, fill or waste activity shall be conducted in a safe manner that maintains lateral
support, in order to minimize any hazard to persons, physical damage to adjacent land and
improvements, and damage to any public street because of slides, sinking, or collapse.
15. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at
75lb/acres, and in the months of September to February to consist of 50/50 of annual
ryegrass and cereal winter rye, or in march and April to consist of annual rye, or may
through august to consist of German millet. Straw mulch is to be applied to 80lbs/100sf.
Alternatives are subject to approval by the county erosion control inspector.
16. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch.
Agricultural grade limestone shall be applied at 90lbs/1000sf, incorporated into the top 4-6
inches of soil. Fertilizer shall be applied at 1000lbs/acres and consist of a 10-20-10 nutrient
mix. Permanent seeding shall be applied at 180lbs/acres and consist of 95% Kentucky 31
or tall fescue and 0-5% perennial ryegrass or Kentucky bluegrass. Straw mulch is to be
applied at 80lb/100sf. Alternatives are subject to approval by the county erosion control
inspector.
17. Maintenance: all measures are to be inspected weekly and after each rainfall. Any damage
or clogging to structural measures is to be repaired immediately. Silt traps are to be cleaned
when 50% of the wet storage volume is filled with sediment. All seeded areas are to be
reseeded when necessary to achieve a good stand of grass. Silt fence and diversion dykes
which are collecting sediment to half their height must be cleaned and repaired immediately.
18. All temporary erosion and sediment control
final site stabilization, when measures are
county erosion control inspector.
measures are to be removed within 30 days of
no longer needed, subject to approval by the
19. This plan shall be void if the owner does not obtain a permit within 1 year of the date of
approval. (Water Protection Ordinance Section 17-424.)
20. Permanent vegetation shall be installed on all denuded areas within nine (9) months after
the date of land disturbing activity commenced. (Water Protection Ordinance Section 17-
808A)
Maintenance and Sediment Disposal
All sediment and erosion control measures shall be inspected upon installation, at least once
every fourteen (14) days and within 48 hours following any runoff -producing rainfall event.
Repairs to, or replacement of, measures shall occur immediately if necessary and accumulated
sediment removed as needed.
Sediment shall be removed from all erosion control measures when the sediment storage
volume of the measure has become 50% full. All removed sediment shall be disposed of in an
approved manner at the stockpile location or a location to be designated by the Engineer or
Owner. Steps shall be taken at the disposal site to insure that further sediment transport does
not occur.
All disturbed areas shall be permanently seeded as soon as possible, but in no case later than
seven (7) calendar days after construction activities are complete. Areas shall be seeded,
fertilized and mulched in accordance with the Seeding schedule in Section 02910 — Final
Grading and Landscaping, of the Specifications.
STORMWATER ANALYSIS
Introduction
This stormwater analysis has been prepared in response to the South Rivanna WTP
improvements. The material provided in this analysis evaluates how the proposed project will
affect stormwater runoff and nutrient export from the site. All material provided in this analysis
has been prepared and is presented in general accordance with the guidelines outlined in the
Albemarle County Water Protection Ordinance.
This analysis focuses on both stormwater quantity and quality. The area of the study consists of
the parcel area, a combination of grassed areas, wooded area, roadway, and structures. The
property ultimately drains to South Fork Rivanna River Reservoir, bordering the northern,
eastern, and western boundaries of the property.
The proposed South Rivanna WTP improvements will be constructed in an area of the site
which currently consists of open grassed area. The improvement plan includes the construction
of several new structures as well as additional asphalt pavement to access these new facilities.
As a result, an increase in overall runoff is anticipated. A Level 2 Bioretention Cell will be
installed to capture and treat a majority of the stormwater runoff from the new impervious area
and some of the existing impervious and grassed areas. The proposed BMP will be located and
sized to provide treatment for the project improvements.
Methodologies and Procedures
The primary task of this stormwater analysis is to determine the degree of stormwater treatment
required for the proposed project for quantity, quality and adequacy. The extent of this analysis
accounted for the following factors: the location of the project site, the size of the site respective
to the total watershed, and the degree of proposed development.
10-year Peak Flow Rate (Quantity)
To determine if quantity control should be considered, we considered the location and situation
of the site. The South Rivanna WTP is adjacent to South Fork Rivanna River Reservoir;
therefore, the site lies adjacent to the flood plain. According paragraph F of section 17-314 of
the Albemarle County Water Protection Ordinance,
"Land development or a portion of land development where the land is
adjacent to a floodplain, and the owner has demonstrated to the reasonable
satisfaction of the program authority that off -site improvements or other
provisions for the disposition of surface water runoff would equally or better
serve the public interest and safety, and that such method of disposition
would not adversely affect downstream properties or stream channels."
shall be exempt from controlling the peak rate and velocity of runoff.
Channel Protection (VA Minimum Standard 19, 9VAC25-870-66)
Minimum Standard 19 states that,
"Properties and waterways downstream from development sites shall be
protected from sediment deposition, erosion and damage due to increase in
volume, velocity and peak flow rate of stormwater runoff for the stated
frequency storm of 24-hour duration" In order to comply with these
standards all concentrated stormwater runoff leaving the site needed to be
discharged into adequate sized channels and stormwater pipes. "
MS-19 states that channel adequacy may be verified by proving that,
"total drainage area to the point of analysis within the channel is one
hundred times greater than the contributing drainage area of the project in
question"
According to the Albemarle County, VA Flood Insurance Study revised on April 2, 2014
(attached in Appendix III), the total contributing drainage area to the point of analysis in South
Fork Rivanna River is approximately 268 mil, much greater than the parcel area of 12.59 acres
(0.020 mi2).
According to Minimum Standard 19, channel adequacy shall by verified by:
"Pipes and storm sewer systems shall be analyzed by the use of a ten-year
storm to verify that stormwater will be contained within the pipe or system."
The proposed development for this project drains mostly to an existing storm sewer network. In
an effort to comply with minimum standard 19, this network had to be analyzed for containment
of flow. The pipe network was input into HydraFlow StormSewers to model conditions before
and after development from this project.
It was determined that the 10-year storm will be fully captured within the current pipe network.
Pipe network data are provided in the MS-19 Compliance Calculations sections of Appendix IV
of this report.
Water Quality Concerns
Pre -development and post -development land cover are entered into the Virginia Runoff
Reduction Method (VA RRM) Worksheet to calculate the required phosphorus removal at the
South Rivanna WTP site. According to the VA RRM Spreadsheet, the required removal rate of
phosphorus for the proposed development is 0.95 lb/yr.
Proposed Stormwater Measures
Due to a limited construction area, limited available space, and existing roadways onsite, a
Level 2 Bioretention Cell was chosen to treat and reduce runoff. Because of the high efficiency
of bioretention cells to treat and infiltrate stormwater, it was not necessary or practical to send
the entire post -construction drainage area to the BMP. However, the drainage area to the BMP
contains 67% of the new impervious area. The BMP was evaluated in the VA RRM
Spreadsheet to determine whether it received and treated enough stormwater pollutant to reach
the target removal of 0.95 Ib/yr of phosphorus. It was determined that the bioretention cell
removes 0.87 Ib/yr of phosphorus, falling 0.08 Ib/yr under compliance.
According to § 62.1-44.19:18 of the Code of Virginia, a permittee may acquire phorphorus credit
from permitted facilities within the same tributary of the Chesapeake Bay Watershed. As a
result of overtreating stormwater runoff at the North Rivanna Water Treatment Plant, excess
nutrient credit of 0.23 lb/year was achieved by RWSA. As these two projects are within the
same tributary (James River), a portion of this nutrient credit will be used toward compliance at
the South Rivanna WTP. Applying 0.08 Ib/yr of this nutrient credit to the South Rivanna WTP,
compliance with Virginia regulations for stormwater quality is achieved, with an excess nutrient
credit of 0.15 Ib/yr for future development at either WTP.
VA RRM and bioretention sizing worksheets are included in Appendix C; details are included in
the Contract Drawings.
Conclusion
The proposed site, which is located adjacent to the floodplain, is exempt from controlling the
peak rate and velocity of runoff for the project based on the exemptions listed in Albemarle
County's Water Protection Ordinance. However, a stormwater analysis of the project's pipe
network was evaluated to ensure adequacy based on the compliance of Minimum Standards
19. No change in the existing pipe network is necessary to meet the requirements of Minimum
Standard 19. All stormwater analysis calculations can be found in Appendix IV of this report.
Using the VA RRM Spreadsheet, it was determined the site is required to reduce post -
construction storm pollutant export by 0.95 Ibs, requiring a bioretention cell to reduce and treat
stormwater runoff. The bioretention cell, along with previously acquired nutrient credit at the
North Rivanna WTP, will meet requirements by removing 0.95 Ibs of total phosphorus.
Under these proposed conditions for the management/treatment of stormwater runoff, the South
Rivanna WTP improvement is under compliance of all applicable performance standards and
requirements
CRITICAL SLOPES
Critical slopes, as defined by the County of Albemarle, are areas of topographic inclines that
exceed a 25% slope. By definition, if these slopes exist naturally, no disturbance or impact are
to be made to these slopes without approval by the County. Though critical slopes are present
on this site, critical slopes are proposed to be built upon during this project.
Appendices
Appendix I — Maps (FIRM, Vicinity, Soils)
Appendix II — Erosion Control Calculations
Appendix III — Stormwater Analysis Calculations
Appendix IV — Specifications
Section 02050
— Demolition
Section 02100
— Clearing, Grubbing, and Site Preparation
Section 02140
— Dewatering
Section 02200
— Earthwork
Section 02207
— Aggregate Materials
Section 02274
— Geotextiles
Section 02276
— Erosion and Sedimentation Control
Section 02500
— Surface Restoration
Section 02510
— Paving and Surfacing
Section 02604
— Utility Structures
Section 02710
— Storm Drains and Roof Drains
Section 02712
— Foundation Drainage Systems
Section 02831
— Steel Fencing
Section 02910
— Final Grading and Landscaping
Appendix I
Maps
(FIRM, Vicinity, Soils)
5
Albemarle County
MAP SCALE 1 ° = 10001
o� J
Unincorporated Areas
500 0 1000 2000
FEET
��
510006
UP
�a
o�
a
PANEL 0280D
gftNT c°
South Rivanna
°" �qcF
WTP Site
-�
FIRM
o
FLOOD INSURANCE RATE MAP
} ARWICK SOUTH FORK
®
ALBEMARLE COUNTY, VIRGINIA
PL RIVANNA RIVER
ZONE
°
AND INCORPORATED AREAS
DAM
AND THE INDEPENDENT CITY
ZONE X
366
OF CHARLOTTESVILLE
ZONE X g
PANEL 280 OF 575
90 � t �
•"�`�ZONE
(SEE MAP INDEX FOR FIRM PANEL LAYOUT)
XCONTAINS:
COMMUNITY NUMBER PANEL SUFFIX
ALBEMAflLG COUNTY 510006 0280 D
ZONE X
390
ZONE X H L z
LOCHRIDGE ZONE X �
�
z
Notice to User: The Map Number shown below should be used
when placing map orders; the Community Number shown
above should be used on insurance applications for the subject
community.
_f
nQ '� 9'
}
��
k �'
g0` 3
IN
ZONE X r x
TOti
rT
AR MAP NUMBER
51003CO280D
r
SEMINOLE� ONE X�
a'
®
o '' EFFECTIVE DATE
TRL
CHEROKE CT
F�yT
�LgNOS��° FEBRUARY 4, 2005
�qQ
R s
ZONE X Q
�P
o�P P� DR
Federal Emergency Management Agency
E �
This is an official copy of a portion of the above referenced flood map. It
was extracted using F-MIT On -Line. This map does not reflect changes
y
C 2
ZONE X
or amendments which may have been made subsequent to the date on the
'
360
title block. For the latest product information about National Flood Insurance
Q
= O
Program flood maps check the FEMA Flood Map Store at www. msc.fema.gov
General Vicinity Map
South Rivanna WTP GAC Updates
Rivanna Water and Sewer Authority
SOUTH RIVANNA WTP
I HiIN
45141
'(5'
47, hmng
658
F1 0 —1r]
1015
LD F1 0-0-31
4r.,
Rakntree
In,11erre.5s
Rite
Brapp.hlands
Mon[VUH.
RaFtejhrook
-Oak Terrace,
KnnIIwnnI
Stonehenge.
P', 1,e,rk
BiTdwDod Gulf Course
Wildwood
Darden Towe Park
RpIlair
SOURCE: GOOGLE MAPS
f fAZE.N.,. ffiD SNMIR
EnvirDnmentall Engineers & Scientists
NOT TO SCALE
3
mPEI
721710
38' 6 16" N
N
N
a
O
l0
N
N
N
d
381 6 4" N 1
v 721710 721770 721830 721890 721950 722010
3
i�
Map Scale: 1:2,600 if printed on A landscape (11" x 85') sheet
Meters
N 0 35 70 140 210
Few
0 100 200 400 600
Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84
USDA Natural Resources Web Soil Survey
Conservation Service National Cooperative Soil Survey
Soil Map —Albemarle County, Virginia
721770 721830 721890 721950 722010
722070 722130 722190
722070 722130 722190
3
N
722250
38' 616" N
v
O
N
M
38° 6 4" N
722250
3
N
3/3/2014
Page 1 of 3
MAP LEGEND
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
w-:0 Soil Map Unit Lines
0
Soil Map Unit Points
Special
Point Features
Ju,'j
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
aJ
Lava Flow
a(
Marsh or swamp
Mine or Quarry
06
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
oa
Sodic Spot
Soil Map —Albemarle County, Virginia
MAP INFORMATION
Spoil Area
The soil surveys that comprise your AOI were mapped at 1:15,800.
Stony Spot
Warning: Soil Map may not be valid at this scale.
Very Stony Spot
Enlargement of maps beyond the scale of mapping can cause
Wet Spot
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
Other
soils that could have been shown at a more detailed scale.
«=
Special Line Features
Please rely on the bar scale on each map sheet for map
Water Features
measurements.
Streams and Canals
Source of Map: Natural Resources Conservation Service
Transportation
Web Soil Survey LIRL: http://websoilsurvey.nres.usda.gov
t++
Rails
Coordinate System: Web Mercator (EPSG:3857)
.,
Interstate Highways
Maps from the Web Soil Survey are based on the Web Mercator
US Routes
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Major Roads
Albers equal-area conic projection, should be used if more accurate
calculations of distance or area are required.
Local Roads
This product is generated from the USDA-NRCS certified data as of
Background
the version date(s) listed below.
®
Aerial Photography
Soil Survey Area: Albemarle County, Virginia
Survey Area Data: Version 10, Dec 11, 2013
Soil map units are labeled (as space allows) for map scales 1:50,000
or larger.
Date(s) aerial images were photographed: May 10, 2010—Jun 4,
2011
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
USDA Natural Resources Web Soil Survey 3/3/2014
lilm Conservation Service National Cooperative Soil Survey Page 2 of 3
Soil Map —Albemarle County, Virginia
Map Unit Legend
Albemarle County, Virginia (VA003)
Map Unit Symbol
Map Unit Name
Acres in AOI
Percent of AOI
47C
Louisburg sandy loam, 7 to 15
percent slopes
1.4
6.2%
47D
Louisburg sandy loam, 15 to 25
percent slopes
7.2
31.5%
65B
Pacolet sandy loam, 2 to 7
percent slopes
0.4
1.6%
65C
Pacolet sandy loam, 7 to 15
percent slopes
5.6
24.6%
91
Urban land
5.8
25.4%
94C
Wedowee sandy loam, 7 to 15
percent slopes
0.4
1.7%
W
Water
2.1
9.0%
Totals for Area of Interest
23.0
100.0%
USDA Natural Resources Web Soil Survey 3/3/2014
Conservation Service National Cooperative Soil Survey Page 3 of 3
Appendix II
Erosion Control Calculations
H&S Project No. 32135-011 South Rivanna Water Treatment Plant
Site Plan
Silt Fence Calculations
H&S Project No. 32135-011 South Rivanna Water Treatment Plant
Site Plan
SOUTH RIVANNA WTP GAC UPGRADES 8/8/2014
HAZEN AND SAWYER EROSION CONTROL BY: BTE CHK.
Environmental Engineers &Scientists
SILT FENCE CALCULATIONS JOB NO. 32135-011
Objective: Determine if silt fence will contain sediment generated.
References
Procedure:
(1) Virginia Erosion and Sediment Control Handbook, Section 3.05.
As required by Reference 1, ensure that area drained by silt fence is no
greater than 1/4 acre per 100 feet of fencing.
Fence
Area
Area drained
Fence
Length
Drained
/ 100' fence
OK?
Number
(ft)
(ac)
length (ac/ft)
1
90
0.13
0.14
OK
2
175
0.25
0.14
OK
3
102
0.06
0.06
OK
4
115
0.10
0.09
OK
5
51
0.04
0.08
OK
Page 1 of 1
Channel Lining Calculations
H&S Project No. 32135-011 South Rivanna Water Treatment Plant
Site Plan
Channel Calculations - Western Channel
Project: Western Wake - Effluent Pump Station
Client: Western Wake Partners
Location: Apex, NC
Objective: Design channel to convey flow in a non erosive manner
References: (1) North Carolina Erosion and Sediment Control Planning and Design Manual
(2) Elements of Urban Stormwater Design, H.R. Malcom.
Procedure: Use procedures outlined in the above reference. Rational Method will be used
to calculate flows. Normal depth will be calculated using Mannings Equation and
water velocity will be calculated using the principle of continuity (Q = VA)
Channels will be designed to carry flow generated by the 10-Year storm event using
maximum slope.
Calculations: Poet -Developed �►
Rational Method: Q = C * I * A
Where
Q = Flow (cfs)
C = Runoff Coefficient
I = Rainfall Intensity (in/hr)
A = Drainage Area (ac)
Find C value in Reference 2
Find Intensity for 10-year event in Reference 2
C = 0.41
1= 6.64
Drainage area (A) (ac) = 0.66
Q (cfs) = 1.8
Check channel for adequate depth and for need for armoring
ime 2.5 ft/s as maximum allowable velocity for bare e;
4.5 ft/s as maximum allowable velocity for grass lined
Design channel lining using tractive force procedure
ulations will be done using Manning's Equation to find normal depth
Continuity (Q=V*A) to find velocity.
Q (cfs) = 1.8
S_ (eft) = 0.06
B (ft) = 0
Channel cross section
Calculate normal depth and velocity with bare earth as lining
From Ref. 2, n = 0.02
Flow (cfs) = 1.8
normal depth (ft) = 0.3
velocity (ft/s) = 5.35
Since velocity is greater than the 2.5 ft/s limit for bare earth,
TEMPORARY OR PERMANENT LINING WILL BE REQUIRED
Calculate normal depth and velocity with grass as lining
From Ref. 2, n = 0.03
Flow (cfs) = 1.8
normal depth (ft) = 0.4
velocity (ft/s) = 3.95
Since velocity is greater than 2.5 ft/s but less than 4.5 ft/s,
TEMPORARY LINING IS REQUIRED
3ioretention Channel
From product manual, n = 0.019
Flow (cfs) = 1.8
normal depth (ft) = 0.3
velocity (ft/s) = 5.56
late shear stress
stress (lb/ft) = (62.4 Ib/ft) . (normal depth) " (slope)
shear stress (Ib/ft2 )= 1.23
Use temporary lining with a minimum shear stress
shear stress (Ib/ft2) = 2.00
Lining Type
Straw w/ Net - RECM
Coconut Fiber - RECM
Polypropylene Mat - TRM
Polypropylene Mat - TRM
Manufaturer and Model
North American Green - S150
North American Green - C125
North American Green - P300
North American Green - P550
1 n value interpolated for normal depth of 1.0 ft
Max Permissible Shear
Unvegetated
Vegetated
'n' 1
Ibs/ft2
Ibs/ft2
0.044
1.75
N/A
0.019
2.25
N/A
0.029
3.00
8.00
0.031
4.00
14.00
Max Velocity
Unvegetated
Vegetated
ft/s
ft/s
6.00
N/A
10.00
N/A
9.00
16.00
12.50
25.00
3ioretention Channel
Appendix III
Stormwater Analysis
H&S Project No. 32135-011 South Rivanna Water Treatment Plant
Site Plan
Virginia Reduction Method Spreadsheet
H&S Project No. 32135-011 South Rivanna Water Treatment Plant
Site Plan
Virginia Runoff Reduction Method Worksheet
Virginia Runoff Reduction Method ReDevelopment Worksheet - v2.8 - June 2014
Site Data Summary
Total Rainfall = 43 inches
Site Land Cover Summary
A Soils I B Soils I C Soils I D Soils Total % of Total
Forest (acres)
1 0.001
0.001
0.001
0.001
0.001
0.00
Turf (acres)
0.001
0.001
0.001
0.921
0.92
60.13
Impervious (acres)
0.001
0.001
0.001
0.611
0.611
39.87
i 1.531 100.001
Site Rv
0.53
Post Development Treatment Volume (ft)
2938
Post Development TP Load (lb/yr)
1.85
Post Development TN Load (lb/yr)
13.21
Total TP Load Reduction Required (lb/yr)
0.95
Total Runoff Volume Reduction (ft)
1231
Total TP Load Reduction Achieved (lb/yr)
0.87
Total TN Load Reduction Achieved (lb/yr)
6.36
Adjusted Post Development TP Load (lb/yr)
0.98
Remaining Phosphorous Load Reduction (Lb/yr) Required
0.08
Drainage Area Summary
D.A. A
D.A. B
D.A. C
D.A. D
D.A. E
Total
Forest (acres)
0.00
0.00
0.00
0.00
0.00
0.00
Turf (acres)
0.29
0.00
0.00
0.0101
0.00
0.29
Impervious (acres)
0.37
0.00
0.00
0.001
0.00
0.37
0.66
Drainage Area Compliance Summary
D.A. A
I D.A. B
I D.A. C
I D.A. D
I D.A. E
I Total
TP Load Red. (lb/y
1 0.871
0.001
0.001
0.001
0,001
0.87
TN Load Red. (lb/yr)
1 6.361
0.001
0.001
0.001
0.001
6.35
Summary Print
Virginia Runoff Reduction Method Worksheet
Drainage Area A Summary
Land Cover Summary
A Soils
I B Soils
I C Soils
I D Soils
I Total
I % of Total
Forest (acres)
0.001
0.001
0.001
0.001
0.001
0.00
Turf (acres)
0.001
0.001
0.001
0.291
0.291
43.94
Impervious (acres)
0.001
0.001
0.001
0.371
0.371
56.06
BMP Selections
1 0.66�
Practice
Credit Area (acres)
Downstream
Practice
6.b. Bioretention #2 (Spec #9)
Impervious:
0.37
Turf (Pervious):
0.29
Total Impervious Cover Treated (acres)
0.37
Total Turf Area Treated (acres)
0.29
Total TP Load Reduction Achieved in D.A. A (lb/yr)
0.87
Total TN Load Reduction Achieved in D.A. A (lb/yr)
6.36
Summary Print
Virginia Runoff Reduction Method Worksheet
Channel and Flood Protection
Weighted CN
1-year
storm
Adjusted
CN
2-year storm
Adjusted CN
10-year
storm
Adjusted
CN
Target Rainfall Event (in)
0.00
0.00
0.00
D.A.A CN
90
#N/A
#N/A
#N/A
D.A. B CN
01
1001
1001
100
D.A. C CN
01
1001
100
100
D.A. D CN
Ol
1001
100
100
D.A. E CN
Ol
1001
100
100
Summary Print
Bioretention Cell Design
H&S Project No. 32135-011 South Rivanna Water Treatment Plant
Site Plan
RVENAND S
Environmental EnginRers & Scientists
Prepared by
Date of Calculation
Client
Project Name
Description
Reviewer
Date Reviewed
Hazen and Sawyer, P.C.
Corinne Wilson, EIT
7/23/2014
Rivanna Water and Sewer Authority
South Rivanna WTP Upgrades
Bioretention Cell Design
Bret Edwards, PE
Table 1: Land Use Characteristics
Land Use
Area (ac)
CN
Rv
Grassed
0.29
80
0.25
Impervious
0.37
98
0.95
Total
0.66
90
0.64
Table 2: Treatment Volume Calculation
Precipitation depth, P in 1 1" water quality event
Rvpost - 0.64
Treatment volume, Tv cf 1539 (P)(Rv)(Area)/12
Table 3: Design Depth Calculation
Layer Depth (ft) Void Ratio (V,) Storage (ft)
Gravel 1 0.4 0.4
Media 3 0.25 0.75
Ponding 0.5 1 0.5
Total (Design Depth) 1.65
Table 4: Surface Area Calculation
Surface area, SA sf 1166 (1.25*Tv)/(design depth)
Length ft 30
Width ft 39
Site Diagrams
H&S Project No. 32135-011 South Rivanna Water Treatment Plant
Site Plan
� QU
�xJ
u
k
X
X
LIMITS OF
DISTURBANCE
'I
I LEGEND
x
DISTURBANCE LIMITS = 1.53 AC
IMPERVIOUS AREA = 0.17 AC
N �
'77
WOODED = 0.00 AC
F-1
GRASSED = 1.36 AC
i
i
i
i
i
i
50 25 0 50'
1 °=50'-0e
DESIGNED
DRAWN
HAZENAND SAWYER
Environmental Engineers & Scientists
RIVANNA WATER AND SEWER AUTHORITY
CHARLOTTESVILLE, VIRGINIA
SOUTH RIVANNA WTP UPGRADES
DRAINAGE AREA DIAGRAMS
CHECKED
4011 WestChose Boulevard, Suite 500
PRE —DEVELOPMENT LAND USE
PROJ.ENGR.
Raleigh, North Carolina 27607
WATER TREATMENT PLANT
NC License C-0381
GAC UPGRADES
APPROVED
FINAL DESIGN
DATE NOVEMM 2M4
THE SCALE BAR
SHOWN BELOW
Has JOB
MEASURES ONE
NUMBER =35-011
INCH LONG ON
THE ORIGINAL
CONTRACT
DRAWING
DRAWING.
NUMBER
NUMBER
FLA FlLE
0
DESIGNED
DRAWN
CHECKED -
PROJ.ENGR.
-3
u
HAZENAND SAWYER
Environmental Engineers & Scientists
4011 WestChose Boulevard, Suite 500
Raleigh, North Carolina 27607
NC License C-0381
k
X
X
LIMITS OF
DISTURBANCE
a
RIVANNA WATER AND SEWER AUTHORITY
CHARLOTTESVILLE, VIRGINIA
WATER TREATMENT PLANT
GAC UPGRADES
I P-rFNln
DISTURBANCE LIMITS = 1.53 AC
® IMPERVIOUS AREA = 0.61 AC
i
r'71 WOODED = 0.00 AC /
1
F-1
GRASSED = 0.92 AC
i
i
i
i
i
1 25 1 1
1 1 11 6nomm
FINAL DESIGN
SOUTH RIVANNA WTP UPGRADES
THE SCALE BAR
SHOWN BELOW
DATE NOVEMM 2M4
Has JOB
DRAINAGE AREA DIAGRAMS
MEASURES ONE
NUMBER—��
INCH LONG ON
CONTRACT
DRAWING
DIE ORIGINAL
POST —DEVELOPMENT LAND USE
DRAWING.
NUMBER
I NUMBER
APPROVED
0
BIORETENTION CELL
DO
x
LEGEND
r• �
IMPERVIOUS
DRAINAGE AREA
50 25 0 01
';p..�:
1 1=50'-0"
GRASSED
DRAINAGE AREA
FINAL DESIGN
D��m
RIVANNA WATER AND SEWER AUTHORITY
SOUTH RIVANNA WTP UPGRADES
THE SCALE BAR
DATE OCTOBER 2014
DRAWN
liL�LJI�l\
L]!\D \A.' l {
CHARLOTTESVILLE, VIRGINIA
SHOWN BELOW
H&S JOB
Environmental
Engineers & Scientists
DRAINAGE AREA DIAGRAMS
MEASURES ONE
NUMBER j—��
CHECKED
INCH LONG ON
ao1lRaleigh "NorthB Boulevard, 27so�soo
9
WATER TREATMENT PLANT
DRAINAGE AREA TO BIORETENTION CELL
THE
RAWNG.ORIGINAL
CONTRACT
NUMBER
DRAWING
NUMBER
BER
pROJ.ENGR.
NC License C-0381
GAC UPGRADES
1
08 14
FINAL DESIGN
DSB
V
UAIL
MOULU rUKAPPROVED
FLAT FILE
MS-19 Compliance Calculations
H&S Project No. 32135-011 South Rivanna Water Treatment Plant
Site Plan
STRUCT. ID
DRAINAGE
AREA (AC)
COMPOSITE
"CI'
Tc
(MIN)
C13-1
0.24
0.52
5
C13-2
0.07
0.25
5
EX C13-1
0.19
0.51
5
EX C13-2
0.21
0.65
5
EX C13-3
0.06
0.25
5
EX CB-4
0.06
0.95
5
OUTLET
STRUCTURE
0,66
0.41
5
DESIGNED .
DRAWN —
APPROVED
Y. I I I I WIN �I
I
OUTLET
�STRUCTURE
x
50
25 0
50
1 "=50'-0"
:..
FINAL DESIGN
��� SA�
Environmental Engineers & Scientists
RIVANNA WATER AND SEWER AUTHORITY
CHARLOTTESVILLE, VIRGINIA
SOUTH RIVANNA WTP UPGRADES
DRAINAGE AREA DIAGRAMS
THE SCALE BAR
SHOWN BELOW
MEASURES ONE
INCH LONG ON
DATE OCTOBER 2014
H&S JOB
NUMBER 321135-011
WATER TREATMENT PLANT
CONTRACT
NUMBER
DRAWING
NUMBER
4011 WestChase Boulevard, Suite 500
Raleigh, North Carolina 27607
PIPE NETWORK
THE ORIGINAL
DRAWNG.
NC License C-0381
GAC UPGRADES
FLAT FILE
Hydraflow Storm Sewers Extension for AutoCAD® Civil 3D® 2012 Plan
Storm Sewers v9.00
Storm Sewer Tabulation
Page 1
Station
Len
Drng Area
Rnoff
Area x C
Tc
Rain
Total
Cap
Vel
Pipe
Invert Elev
HGL Elev
Grnd / Rim Elev
Line ID
coeff
(1)
flow
full
Line
To
Incr
Total
Incr
Total
Inlet
Syst
Size
Slope
Dn
Up
Dn
Up
Dn
FULine
(ft)
(ac)
(ac)
(C)
(min)
(min)
(in/hr)
(cfs)
(cfs)
(ft/s)
(in)
(%)
(ft)
(ft)
(ft)
(ft)
(ft)
1
End
16.878
0.06
0.13
0.95
0.06
0.07
5.0
7.7
5.7
0.43
1.73
2.61
10
0.53
464.40
464.49
464.68
464.77
0.00
467.85
Pipe 27
2
1
51.324
0.07
0.07
0.25
0.02
0.02
5.0
5.0
6.4
0.11
1.10
1.94
8
0.49
464.99
465.24
465.13
465.39
467.85
470.63
Pipe 23
3
End
17.456
0.00
1.36
0.00
0.00
0.64
0.0
94.8
1.6
1.02
4.89
3.09
15
0.57
430.50
430.60
430.89
431.00
0.00
441.80
Pipe 20
4
3
182.316
0.00
1.30
0.00
0.00
0.63
0.0
9.5
5.3
3.35
6.68
4.95
15
1.07
431.27
433.22
431.90
433.96
441.80
448.78
Pipe 19
5
4
85.855
0.00
1.30
0.00
0.00
0.63
0.0
9.0
5.4
3.41
4.88
3.77
15
0.57
433.20
433.69
434.21
434.45
448.78
447.14
Pipe 18
6
5
31.118
0.19
1.30
0.51
0.10
0.63
5.0
8.8
5.5
3.43
20.28
8.39
15
9.87
438.41
441.48
438.76
442.23
447.14
445.88
Pipe 17
7
6
111.372
0.24
1.11
0.52
0.12
0.53
5.0
7.8
5.7
3.02
27.59
3.48
18
6.90
441.38
449.07
442.23
449.73
445.88
456.05
Pipe 7
8
7
53.099
0.00
0.66
0.00
0.00
0.27
0.0
5.3
6.3
1.71
26.82
7.89
15
17.25
451.84
461.00
452.05
461.52
456.05
467.37
PROP
9
8
26.584
0.66
0.66
0.41
0.27
0.27
5.0
5.0
6.4
1.74
11.20
5.10
15
3.01
462.95
463.75
463.28
464.27
467.37
470.00
Pipe 16
10
3
107.267
0.00
0.06
0.00
0.00
0.02
0.0
34.9
2.9
0.04
96.56
2.53
24
18.23
431.21
450.76
431.24
450.83
441.80
467.51
Pipe 22
11
10
97.837
0.06
0.06
0.25
0.02
0.02
5.0
5.0
6.4
0.10
22.65
2.37
18
4.65
455.33
459.88
455.40
459.99
467.51
465.89
Pipe 21
12
7
121.169
0.21
0.21
0.65
0.14
0.14
5.0
5.0
6.4
0.88
18.22
2.23
15
7.96
449.14
458.79
449.73
459.16
456.05
463.67
EX
Project File: New.stm
Number of lines: 12
Run Date: 11/21/2014
NOTES:Intensity = 45.86 / (Inlet time + 10.10) " 0.72; Return period =Yrs. 10 c = cir e = ellip b = box
Storm Sewers v9.00
Line Profile (Line 1) - Pipe 27
Page 1 of 1
Line 1 - Pipe 27
"Fr F`F
0
2D
25
El ev (ft)
Reach (ft)
F �M
Invert Elevation
Depth of Flow
Hydraulic Grade Line
Velocity
Cover
Line #
Q
Dn Up
(cfs) (ft) (ft)
Dn
(ft)
Up
(ft)
Hw
(ft)
Dn
(ft)
Up
(ft)
Jnct
(ft)
Dn
(ft/s)
Up
(ft/s)
Dn
(ft)
Up
(ft)
1
0.43
464.40
464.49
0.28
0.28
0.28
464.68
464.77
464.77
2.63
2.59
4.00
2.53
Project File:
No. Lines: 12
Rate: 11/21/2014
Storm Sewers
Line Profile (Line 2) - Pipe 23
Page 1 of 1
472.0v
46 r�
V . VI VI
VI aka
Line 2 - Pipe 23
El ev (ft)
MEE
47vL
472.00
14619. Ceu1
4 6O. C0
9.
.
00
1 D 15 20 2 9, av 35 4
Reach (ft)
Invert Elevation
Depth of Flow
Hydraulic Grade Line
Velocity
Cover
Line #
Q
Dn Up
(cfs) (ft) (ft)
Dn
(ft)
Up
(ft)
Hw
(ft)
Dn
(ft)
Up
(ft)
Jnct
(ft)
Dn
(ft/s)
Up
(ft/s)
Dn
(ft)
Up
(ft)
2
0.11
464.99
465.24
0.14
0.15
0.15
465.13
465.39
465.39
2.02
1.86
2.19
4.72
Project File:
No. Lines: 12
Rate: 11/21/2014
Storm Sewers
Line Profile (Line 3) - Pipe 20
Page 1 of 1
Line 3 - Pipe 20
Elegy+ (ft),
446. r.
4-42.00
442.00
433.E
43 B.{0
434.00
434.
430.00
430.00
ne
.vv
426.00
v
_
1v 15
25
30
Reach (ft)
Invert Elevation
Depth of Flow
Hydraulic Grade Line
Velocity
Cover
Line #
Q
Dn Up
Dn
Up
Hw
Dn
Up
Jnct
Dn
Up
Dn
Up
(cfs)
(ft) (ft)
(ft)
(ft)
(ft)
(ft)
(ft)
(ft)
(ft/s)
(ft/s)
(ft)
(ft)
3
1.02
430.50
430.60
0.39
0.40
0.40
430.89
431.00
431.00
3.14
3.04
4.00
9.95
Project File:
No. Lines: 12
Run Date: 11/21/2014
Storm Sewers
Line Profile (Line 4) - Pipe 19
Page 1 of 1
.00
.W
435.00
., II„ 1:1
MUM
I L �E�
20 r i 0i 110 h 20D 210
Reach (ft)
Line #
4
Project File:
Line 4 - Pipe 19
E e r
fO.H 1
445.00
MII
Invert Elevation
Q Dn Up
(cfs) (ft) (ft)
3.35 431.27 433.22
Depth of Flow
Dn Up
(ft) (ft)
0.63 0.74
Hydraulic Grade Line
Hw Dn Up Jnct
(ft) (ft) (ft) (ft)
0.99 431.90 433.96 434.21
No. Lines: 12
Velocity Cover
Dn Up Dn Up
(ft/s) (ft/s) (ft) (ft)
5.44 4.45 9.28 14.31
Rate: 11/21/2014
Storm Sewers
Line Profile (Line 5) - Pipe 18
Page 1 of 1
455. CC
.r F �
4.38.E
I
453M
0 5 ID 15 4.v 25 30 35 40 45 50 55 60 65 70 75 80 a5 90 95 1 O}
Reach (ft)
Invert Elevation
Line # Q Dn Up
(cfs) (ft) (ft)
5 3.41 433.20 433.69
Project File:
Depth of Flow
Dn Up
(ft) (ft)
1.01 0.76
9.00
Hydraulic Grade Line Velocity Cover
Hw Dn Up Jnct Dn Up Dn Up
(ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft)
1.06 434.21 434.45 434.75 3.20 4.35 14.33 12.20
No. Lines: 12 Rate: 11/21/2014
Storm Sewers
Line Profile (Line 6) - Pipe 17
Page 1 of 1
.00
,,00
4 .00
Line 6 -
Pile, 17
Elegy+ (ft),
r, ° H 22
444.00
.00
436.00
432.E
M
1
429.E
0 5 10
15 20
25
30 35
428.00
40 45
Reach (ft)
Invert Elevation
Depth of Flow
Hydraulic
Grade Line
Velocity
Cover
Line #
Q
Dn Up
(cfs) (ft) (ft)
Dn
(ft)
Up
(ft)
Hw
(ft)
Dn
(ft)
Up
(ft)
Jnct
(ft)
Dn
(ft/s)
Up
(ft/s)
Dn
(ft)
Up
(ft)
6
3.43
438.41
441.48
0.35
0.75
0.75
438.76
442.23
442.23
12.29
4.49
7.48
3.15
Project File:
No. Lines: 12
Run Date: 11/21/2014
Storm Sewers
Line Profile (Line 7) - Pipe 7
Page 1 of 1
ir1.r.1
��r1L,YV
�'J1.-1
I■
MOLE
ME
Mo-iraMO
461.01)
,t C
451.00
a F'F
4 .0", 1 1 1 1 1 1 1 1 i I436.0D
Reach (ft),
Invert Elevation
Depth of Flow
Hydraulic Grade Line
Velocity
Cover
Line #
Q
Dn Up
(cfs) (ft) (ft)
Dn
(ft)
Up
(ft)
Hw
(ft)
Dn
(ft)
Up
(ft)
Jnct
(ft)
Dn
(ft/s)
Up
(ft/s)
Dn
(ft)
Up
(ft)
7
3.02
441.38
449.07
0.85
0.66
0.66
442.23
449.73 j
449.73
2.93
4.03
3.00
5.48
Project File:
No. Lines: 12
Run Date: 11/21/2014
Storm Sewers
Line Profile (Line 8) - PROP
Page 1 of 1
.
00
4. C'v
459. D'-
4,54.01)
449.00
AAA . M
0 5
. OD
ne
�kco
v15 20 ? E 30 35 40 5055
Reach (ft)
Invert Elevation
Depth of Flow
Hydraulic Grade Line
Velocity
Cover
Line #
Q
Dn Up
(cfs) (ft) (ft)
Dn
(ft)
Up
(ft)
Hw
(ft)
Dn
(ft)
Up
(ft)
Jnct
(ft)
Dn
(ft/s)
Up
(ft/s)
Dn
(ft)
Up
(ft)
8
1.71
451.84
461.00
0.21
0.52
0.52
452.05
461.52
461.52
12.23
3.55
2.96
5.12
Project File:
No. Lines: 12
Rate: 11/21/2014
Storm Sewers
Line Profile (Line 9) - Pipe 16
Page 1 of 1
MF
PRIEM
I I_
F
Invert Elevation
Depth of Flow
Hydraulic Grade Line
Velocity
Cover
Line #
Q
Dn Up
(cfs) (ft) (ft)
Dn
(ft)
Up
(ft)
Hw
(ft)
Dn
(ft)
Up
(ft)
Jnct
(ft)
Dn
(ft/s)
Up
(ft/s)
Dn
(ft)
Up
(ft)
9
1.74
462.95
463.75
0.33
0.52
0.52
463.28
464.27
464.27
6.62
3.57
3.17
5.00
Project File:
No. Lines: 12
Rate: 11/21/2014
Storm Sewers
Line Profile (Line 10) - Pipe 22
Page 1 of 1
471.00
1.00
451.00
1.00
421.00
Invert Elevation Depth of Flow
Line # Q
Dn Up Dn Up
(cfs) (ft) (ft) (ft) (ft)
10 0.04 431.21 450.76 0.03 0.07
Project File:
471.01)
MAKE
r1.
F
Hydraulic Grade Line Velocity Cover
Hw Dn Up Jnct Dn Up Dn Up
(ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft)
0.07 431.24 450.83 450.83 3.82 1.24 8.59 14.75
No. Lines: 12 Rate: 11/21/2014
Storm Sewers
Line Profile (Line 11) - Pipe 21
Page 1 of 1
Une 11 Pipe 21 E,E-, (1)
470.00
460.00
47Q.OD
FF wI
. FF
.01) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5M
0 5 10 15 20 25 30 35 40 45 50 55 60 65 74 75 K M 9D .95 10} 105 110
Reach (ft)
Invert Elevation
Depth of Flow
Hydraulic Grade Line
Velocity
Cover
Line #
Q
Dn Up
(cfs) (ft) (ft)
Dn
(ft)
Up
(ft)
Hw
(ft)
Dn
(ft)
Up
(ft)
Jnct
(ft)
Dn
(ft/s)
Up
(ft/s)
Dn
(ft)
Up
(ft)
11
0.10
455.33
459.88
0.07
0.11
0.11
455.40
459.99
459.99
3.17
1.57
10.68
4.51
Project File:
No. Lines: 12
Rate: 11/21/2014
Storm Sewers
Line Profile (Line 12) - EX
Page 1 of 1
Line 12 - EX r
N1
J1:2.'0
,gjS.v0
.F O
F, F" F"
444.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ' 444.
0 1v 2v, 30 40 K Lv 70 SO 90 100 11120 130 140 150
Reach (ft)
Invert Elevation
Depth of Flow
Hydraulic Grade Line
Velocity
Cover
Line #
Q
Dn Up
(cfs) (ft) (ft)
Dn
(ft)
Up
(ft)
Hw
(ft)
Dn
(ft)
Up
(ft)
Jnct
(ft)
Dn
(ft/s)
Up
(ft/s)
Dn
(ft)
Up
(ft)
12
0.88
449.14
458.79
0.59
0.37
0.37
449.73
459.16 j
459.16
1.54
2.92
5.66
3.63
Project File:
No. Lines: 12
Rate: 11/21/2014
Storm Sewers
Relevant Pages of the Albemarle County Flood Insurance Study
H&S Project No. 32135-011 South Rivanna Water Treatment Plant
Site Plan
FLOOD
INSURANCE -
STUDY '4Q:1,
Albemarle County
ALBEMARLE COUNTY,
VIRGINIA
AND INCORPORATED AREAS
AND THE INDEPENDENT
CITY OF CHARLOTTESVILLE
COMMUNRY NAME COMMUNITY NUMBER
ALBEMARLE COUNTY
(UNINCORPORATED AREAS) 510006
CHARLOTTESVILLE, CITY OF 510033
(INDEPENDENT CITY)
SCOTTSVILLE, TOWN OF 510007
�QAer Revised: April 2, 2014
Federal Emergency Management Agency
tANn sect FLOOD INSURANCE STUDY NUMBER
51003CV000B
TABLE 3 - SUMMARY OF DISCHARGES - continued
FLOODING SOURCE
DRAINAGE AREA
PEAK DISCHARGES
(cfs)
AND LOCATION
(sg. miles)
10-YEAR 50-YEAR
100-YEAR 500-YEAR
NORTH FORK MEADOW
CREEK
At confluence with
Meadow Creek
0.9
450
800
1,100
1,700
NORTH FORK
RIVANNA RIVER
At confluence with
Rivanna River
178
17,700
31,900
39,700
62,700
At mouth
176
14,300
29,900
36,000
73,400
Upstream of Preddy
Creek
122
14,100
24,700
30,000
47,200
POWELL CREEK
At mouth
3.8
1,070
1,880
2,340
3,740
POWELLS CREEK
At confluence with
Lickinghole Creek
3.88
920
1,480
1,630
2,300
Upstream study limits
3.08
740
1,170
1,350
1,980
RIVANNA RIVER
Downstream study limits
568
35,900
71,900
93,000
157,400
Upstream of Buck Island
Creek
530
35,100
67,500
86,500
146,000
Upstream of Moores Creek
472
32,800
62,200
80,000
134,000
ROCK CREEK
At confluence with Moores
Creek
1.9
1,200
2,000
2,600
4,100
At confluence of 5t'
Street Creek
0.9
650
1,100
1,500
2,200
SLABTOWN BRANCH
At confluence with
Lickinghole Creek
1.21
600
1,060
1,240
1,820
Upstream study limits
0.11
70
120
150
210
SOUTH FORK
RIVANNA RIVER
At mouth
268
19,700
42,200
53,400
106,000
15
Appendix IV
Specification
H&S Project No. 32135-011 South Rivanna Water Treatment Plant
Site Plan
SECTION 02050
DFMni ITInN
PART 1 -- GENERAL
1.01 THE REQUIREMENT
A. The Contractor shall furnish all labor, materials and equipment in accordance with the
requirements of Section 01520 - Maintenance of Utility Operations During Construction and
Section 01540 - Demolition and Removal of Existing Structures and Equipment.
B. In addition, the Contractor shall demolish and remove all concrete and asphaltic paving,
curbs, sidewalk, and miscellaneous yard structures as required and shown on the Contract
Drawings during the construction work.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Section 01090 - Reference Standards
B. Section 01520 - Maintenance of Utility Operations During Construction
C. Section 01540 - Demolition and Removal of Existing Structures and Equipment
1.03 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS
A. References shall be in accordance with reference standards, codes, and specifications as
set forth herein and in Section 02100 - Clearing, Grubbing, and Site Preparation.
PART 2 -- EXECUTION
2.01 DEMOLITION
A. Existing concrete and asphaltic paving, curbs, sidewalk and miscellaneous yard structures
within the areas designated for new construction work shall be completely demolished and
all debris removed from the site.
B. Excavation caused by demolition shall be backfilled with fill free from rubbish and debris.
C. Work shall be performed in such manner as not to endanger the safety of the workmen or
the public or cause damage to nearby structures.
D. Provide all barriers and precautionary measures in accordance with Owner's requirements
and other authorities having jurisdiction.
E. Where parts of existing structures are to remain in service, demolish the portions to be
removed, repair damage, and leave the structure in proper condition for the intended use.
Remove concrete and masonry to the lines designated by drilling, chipping, or other suitable
methods. Leave the resulting surfaces reasonably true and even, with sharp straight
MS02050.MAS:04-13-11 02050-1 HS MASTER SPEC
corners that will result in neat joints with new construction and be satisfactory for the
purpose intended. Where existing reinforcing rods are to extend into new construction,
remove the concrete so that the reinforcing is clean and undamaged. Cut off other
reinforcing 1/2-inch below the surface and fill with epoxy resin binder flush with the surface.
F. Prior to the execution of the work, the Contractor, Owner and Engineer shall jointly survey
the condition of the adjoining and/or nearby structures. Photographs and records shall be
made of any prior settlement or cracking of structures, pavements, and the like, that may
become the subject of possible damage claims.
2.02 DISPOSAL OF MATERIAL
A. All debris resulting from the demolition and removal work shall be disposed of by the
Contractor as part of the work of this Contract. Material designated by the Engineer to be
salvaged shall be stored on the construction site as directed. All other material shall be
disposed of off site by the Contractor at his expense.
B. Burning of any debris resulting from the demolition will not be permitted at the site.
- END OF SECTION -
MS02050.MAS:04-13-11 02050-2 HS MASTER SPEC
SECTION 02100
CLEARING, GRUBBING, AND SITE PREPARATION
PART 1 -- GENERAL
1.01 THE REQUIREMENT
A. Includes all labor, material, equipment and appliances required for the complete execution
of any additions, modifications, or alterations to existing building(s) and new construction
work as shown on the Drawings and specified herein.
B. Principal items of work include:
1. Notifying all authorities owning utility lines running to or on the property. Protecting
and maintaining all utility lines to remain and capping those that are not required in
accordance with instructions of the Utility Companies, and all other authorities
having jurisdiction.
2. Clearing the site within the Contract Limit Lines, including removal of grass, brush,
shrubs, trees, loose debris and other encumbrances except for trees marked to
remain.
3. Boxing and protecting all trees, shrubs, lawns and the like within areas to be
preserved. Relocating trees and shrubs, so indicated on the Drawings, to
designated areas.
4. Repairing all injury to trees, shrubs, and other plants caused by site preparation
operations shall be repaired immediately. Work shall be done by qualified personnel
in accordance with standard horticultural practice and as approved by the Engineer.
5. Removing topsoil to its full depth from designated areas and stockpiling on site
where directed by the Engineer for future use.
6. Disposing from the site all debris resulting from work under this Section.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Section 02200 - Earthwork
1.03 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS
A. Virginia Administrative Code, Title 9
N
O
O
1.04 STREET AND ROAD BLOCKAGE
A. Closing of streets and roads during progress of the work shall be in compliance with the
requirements of the Owner and other authorities having jurisdiction. Access shall be
provided to all facilities remaining in operation.
32135-011102100:08108114 02100-1 GAC Upgrades at the Urban WTPs
1.05 PROTECTION OF PERSONS AND PROPERTY
A. All work shall be performed in such a manner to protect all personnel, workmen, pedestrians
and adjacent property and structures from possible injury and damage.
B. All conduits, wires, cables and appurtenances above or below ground shall be protected
from damage.
C. Provide warning and barrier fence where shown on the Drawings and as specified herein.
PART 2 -- EXECUTION
2.01 CLEARING OF SITE
A. Before removal of topsoil, and start of excavation and grading operations, the areas within
the clearing limits shall be cleared and grubbed.
B. Clearing shall consist of cutting, removal, and satisfactory disposal of all trees, fallen timber,
brush, bushes, rubbish, sanitary landfill material, fencing, and other perishable and
objectionable material within the areas to be excavated or other designated areas. Prior to
the start of construction, the Contractor shall survey the entire Contract site and shall
prepare a plan which defines the areas to be cleared and grubbed, trees to be pruned,
extent of tree pruning, and/or areas which are to be cleared but not grubbed. This plan shall
be submitted to the Engineer for approval. Should it become necessary to remove a tree,
bush, brush or other plants adjacent to the area to be excavated, the Contractor shall do so
only after permission has been granted by the Engineer.
C. Excavation resulting from the removal of trees, roots and the like shall be filled with suitable
material, as approved by the Engineer, and thoroughly compacted per the requirements
contained in Section 02200, Earthwork.
D. Unless otherwise shown or specified, the Contractor shall clear and grub a strip at least
15 ft. wide along all permanent fence lines installed under this Contract.
E. In temporary construction easement locations, only those trees and shrubs shall be
removed which are in actual interference with excavation or grading work under this
Contract, and removal shall be subject to approval by the Engineer. However, the Engineer
reserves the right to order additional trees and shrubs removed at no additional cost to the
Owner, if such, in his opinion, are too close to the work to be maintained or have become
damaged due to the Contractor's operations.
2.02 STRIPPING AND STOCKPILING EXISTING TOPSOIL
A. Existing topsoil and sod on the site within areas designated on the Drawings shall be
stripped to whatever depth it may occur, and stored in locations directed by the Engineer.
B. The topsoil shall be free of stones, roots, brush, rubbish, or other unsuitable materials
before stockpiling the topsoil.
C. Care shall be taken not to contaminate the stockpiled topsoil with any unsuitable materials.
32135-011W2100:08/08/14 02100-2 GAC Upgrades at the Urban WTPs
2.03 GRUBBING
A. Grubbing shall consist of the removal and disposal of all stumps, roots, logs, sticks and
other perishable materials to a depth of at least 6-inches below ground surfaces.
B. Large stumps located in areas to be excavated may be removed during grading operations,
subject to the approval of the Engineer.
2.04 DISPOSAL OF MATERIAL
A. All debris resulting from the clearing and grubbing work shall be disposed of by the
Contractor as part of the work of this Contract. Material designated by the Engineer to be
salvaged shall be stored on the construction site as directed by the Engineer for reuse in
this Project or removal by others.
B. Burning of any debris resulting from the clearing and grubbing work will not be permitted at
the site.
2.05 WARNING AND BARRIER FENCE
A. The fence shall be made of a visible, lightweight, flexible, high strength polyethylene
material. The fence shall be MIRASAFE as manufactured by Mirafi, Inc., or equal.
B. Physical Properties
Fence:
Color:
Roll Size:
Roll weight:
Mesh opening:
Posts:
ASTM Designation:
Length:
Weight:
Area of Anchor Plate
International Orange
4' x 164'
34 lbs.
1-1/2" x 3"
ASTM 702
5 feet long (T-Type)
1.25 #/Foot (min)
14 Sq. In.
C. Drive posts 12 to 18 inches into ground every 10' to 12'. Wrap fence material around first
terminal post allowing overlap of one material opening. Use metal tie wire or plastic tie wrap
to fasten material to itself at top, middle and bottom. At final post, cut with utility knife or
scissors at a point halfway across an opening. Wrap around and tie at final post in the
same way as the first post.
D. Use tie wire or tie wrap at intermediate posts and splices as well. Thread ties around a
vertical member of the fence material and the post, and bind tightly against the post. For
the most secure fastening, tie at top, middle and bottom. Overlap splices a minimum of four
fence openings, tie as above, fastening both edges of the fence material splice overlap.
- END OF SECTION -
32135-011102100:08108114 02100-3 GAC Upgrades at the Urban WTPs
SECTION 02140
DEWATERING
PART 1 -- GENERAL
1.01 WORK INCLUDED
A. Furnish all labor, materials, and equipment, perform all work necessary to lower and control
the groundwater levels and hydrostatic pressures to permit all excavations and construction
to be performed in dry conditions. The work shall include the following:
1. Testing, operation, maintenance, supervision, rewatering, and final dismantling and
removal from the site of the dewatering system.
2. The cost of any replacement or rehabilitation of the subgrade or structures damaged
due to dewatering system failures or Contractor negligence.
3. Compliance with all regulations relating to this work.
4. The diversion, collection, and removal of all ice, snow and surface runoff from the
work areas, and removal of groundwater from new excavations to permit
construction in the dry.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Requirements of related work are included in Division 1 and Division 2 of these
Specifications.
1.03 REFERENCE SPECIFICATIONS CODES AND STANDARDS
A. Without limiting the generality of other requirements of these Specifications, all work herein
shall conform to or exceed the applicable requirements of the following documents to the
extent that the provisions therein are not in conflict with the requirements of this Section.
1. ASTM D1556
2. ASTM D2167
3. Bureau of Reclamation
1.04 SUBMITTALS
Density of soil in place by the Sand Cone Method.
Density of soil in place by the Rubber Balloon Method.
Groundwater Manual Sediment Test by Imhoff Cone
A. Submit the following in accordance with Section 01300, Submittals:
1. Name of dewatering subcontractor, if applicable
32135-011102140:08/08114 02140-1 GAC Upgrades at the Urban WTPs
2. Shop Drawings indicating the following:
a. Plans showing the methods and location of dewatering and discharge
including a sufficient number of detailed sections to clearly illustrate the
scope of work.
b. Relationship of the dewatering system, observation wells, and discharge line
to existing buildings, other structures, utilities, streets and new construction.
C. Utility locations.
d. Drawings shall bear the seal and signature of the qualified Registered
Professional Engineer in charge of preparing the drawings.
e. List of materials and equipment to be used.
A sample of all well record forms to be maintained during construction.
3. Detailed description of the sequence of dewatering operations
4. Dewatering well installation records indicating an identification number, location,
dimensions, and installation procedures and materials.
5. Observation well installation records indicating an identification number, location,
dimensions, and installation procedures and materials.
6. Emergency observation plan to be put into operation during failure of the dewatering
system
7. Monthly Dewatering System Monitoring Reports containing the following data on
approved forms:
a. For observation wells, daily piezometric levels shall be identified by date,
time, well number and system (subsystem if multiple pumps are used)
pumping rate. Piezometric levels shall be noted in feet of drawdown and
groundwater elevation.
b. For dewatering wells, suspended material test results shall be identified by
date, time, well number, well pumping rate (if monitored) and system
(subsystem if multiple pumps are used) pumping rate.
C. Installation records for new wells.
8. Schedule and records of all maintenance tests for primary and standby dewatering
systems including the following:
a. Maintenance tests and water quality tests for suspended matter at the
discharge point including date, time of day, elapsed times of tests
procedures, components tested, suspended particles, resultant observations
and well readings.
b. Daily discharge rates.
32135-011W2140:08/08/14 02140-2 GAC Upgrades at the Urban WTPs
C. Installation and removal of wells.
d. General observations of the system such as equipment running times, and
failures.
9. Dewatering well removal records
10. Observation well removal records
1.05 QUALITY ASSURANCE
A. The Contractor shall be solely responsible for the arrangement, location, and depths of the
dewatering system necessary to accomplish the work described herein.
B. Dewatering shall prevent the loss of fines, seepage, boils, quick conditions or softening of
the foundation strata while maintaining stability of the sides and bottom of the excavation,
and providing dry conditions for construction operations.
PART 2 -- PRODUCTS
2.01 MATERIALS
A. Materials, especially the well screen, shall be carefully chosen to be compatible with the
environment to prevent erosion, deteriorization, and clogging.
B. Surging of the natural formation to form a "gravel pack" is strictly prohibited.
PART 3 -- EXECUTION
3.01 EXAMINATION OF THE SITE
A. Become familiar with the surface and subsurface site conditions.
B. Obtain the data required to analyze the water and soil environment at the site in order to
assure that the materials used for the dewatering systems will not erode, deteriorate, clog or
otherwise hinder the system's performance during the period of the dewatering.
C. Prior to the execution of the work, the Contractor, Owner and Engineer shall jointly survey
the condition of adjoining structures. Photographs and records shall be made of any prior
settlement or cracking of structures, pavements, and the like, that may become the subject
of possible damage claims.
3.02 DESIGN
A. The dewatering system shall be capable of relieving all hydrostatic pressure against the
height of the excavation walls and of lowering the hydrostatic level below the bottom of the
base slab a minimum of four (4) feet in the work areas both prior to excavation, and during
excavation and construction.
32135-011W2140:08/08/14 02140-3 GAC Upgrades at the Urban WTPs
B. The dewatering system shall be segmented so that if the operation of any one segment is
disrupted, the remaining segment plus activated redundant components are capable of
maintaining the groundwater at the stated levels.
C. Provide, operate and maintain all ditches, berms, site grading, sumps and pumping facilities
to divert, collect and remove all surface water from work areas. All collected water shall be
discharged into the outfall pipe.
D. Provide pipe and pumps of sufficient size and quantity to be able to flood the excavation
within 12 hours in an emergency situation. Restoration of the working area shall be carried
out by the Contractor at no additional cost to the Owner.
E. Carry the dewatering system discharge through pipes out of the area of the excavation into
the outfall junction manhole shown on the Drawings. Provide meters to measure the
discharge flow.
F. Place a portion of the header and discharge system underground to provide vehicle
crossings or access to existing structure as required.
G. Provide a standby dewatering system that meets the following requirements:
1. Provide 100 percent standby power.
2. Provide a 15 percent minimum increase in the number of wells and related
equipment required to operate the dewatering system installed and ready to
operate.
3. Provide a minimum of three separate power units for the standby power system and
one installed auxiliary unit for each individually powered pump.
4. Provide separate discharge lines from each well or common lines with valves such
that any well or wells that malfunction or are damaged can be isolated form the
others.
5. The systems shall be laid out and designed in such a way that portions of the
system may be isolated for routine maintenance or repair in case of accidental
damage without affecting the normal operation of the system.
H. Provide sufficient fuel to maintain a five day supply on site for fuel power systems.
Provide observation wells to determine compliance with dewatering requirements as
indicated on the Drawings, Shop Drawings, and the Engineer.
J. Designate certain observation wells as emergency observation wells.
3.03 INSPECTION
A. All tests and inspections require the witnessing and written approval of the Owner and
Engineer.
B. Provide safe access for the owner and Engineer to perform testing and inspection.
32135-011W2140:08/08/14 02140-4 GAC Upgrades at the Urban WTPs
C. The Owner and Engineer will provide oral and written notice to the Contractor for all tests
and inspections that do not meet approval.
3.04 INSTALLATION AND TESTING
A. Install the dewatering system from the existing ground surface or from the bottom of an
excavation which is located above the natural groundwater level.
B. Pump each well individually at its maximum or design flow and take a water sample using
the following procedures:
Obtain samples from stopcocks located along the discharge lines at points of high
turbulence or between 4 and 8 o'clock on the perimeter of straight sections of pipe.
2. Flush the stopcock for a few seconds before taking a sample.
3. Take a 1 liter sample with the stopcock fully open.
C. Test the sample following the Sediment Test by Imhoff Cone for two to three minutes and
measure the volume of settled materials to the nearest 0.01 milliliters (0.01 milliliters =
10 ppm).
D. All wells shall be evaluated as follows:
Wells producing 10 ppm or less shall be accepted.
2. Wells producing between 10 and 20 ppm may be accepted by the Engineer based
on the evaluation of average ppm for all wells, ppm of adjacent wells, and total
quantity of water which is actually pumped to dewater the excavation.
3. Well producing more than 20 ppm shall be abandoned and backfilled.
E. Observation wells shall consist of a standpipe or riser of minimum 1.0-inch inside diameter
and a minimum three (3) foot long well -point screen or slotted PVC section at the bottom.
Observation wells shall be installed as follows:
Employ the jetting method for all observation wells except those within ten feet of
existing structures, piping or utilities.
2. Employ Case Boring Techniques for all observation wells within ten feet of existing
structures, piping, or utilities and backfill the annulus between the well point or riser
and the natural soil with a free flowing granular material similar to Ottawa Sand.
F. Test observation wells by adding or removing water from the riser to demonstrate their
proper functioning.
3.05 DEWATERING PROCEDURE
A. Following soldier pile installation and dewatering system installation and testing and prior to
excavation, place the dewatering system into operation and lower the water level.
32135-011102140:08108114 02140-5 GAC Upgrades at the Urban WTPs
B. Schedule the dewatering work to coordinate with all the other related work such as
excavation, sheeting and tiebacks, pouring of concrete walls and slabs, and any other
operations by other Contractors that might be affected by this work.
C. Test the standby dewatering system with the following procedures:
1. Shut off the primary power source and demonstrate that the standby power can be
activated prior to the groundwater level rising to within one (1) foot of the bottom of
base slab elevation and that the standby power source is adequate to draw the
groundwater level back down to the Contractor's design depth or to the minimum
required depths.
2. Shut off one segment of the system and show that redundant components can be
activated prior to the groundwater level rising to within one (1) foot of the bottom of
base slab elevation and that the system is adequate to draw the groundwater level
back down to the Contractor's design depth or to the minimum required depths.
3. If the dewatering system fails to meet either performance requirement, the
Contractor shall draw the groundwater level to a greater depth, add wells, or modify
the system such that it will be in conformance with these requirements when
retested.
D. Operate the dewatering system continuously twenty-four (24) hours per day, seven (7) days
per week until all structures have been satisfactorily constructed, including placement of fill
materials, and no longer require dewatering.
3.06 MONITORING
A. Measure the piezometric water levels to the nearest one -tenth foot in all observation wells
and submit the readings daily.
B. Measure the concentration of suspended material in the discharge water of each well once
every two days. Wells which exceed the acceptable level of solids concentration shall be
replaced.
C. Test the performance of the standby system and all components by demonstrating that the
system is operational at least every two weeks.
D. Test the observation wells every two weeks by adding and removing water from the risers to
demonstrate their proper functioning.
E. Observation wells that become inoperable shall be immediately replaced while construction
is halted if the Engineer determines that the observation well is critical.
F. Remove and add riser pipe of each observation well located within the excavation as
construction progresses until the well conflicts with the structure. When the conflict occurs,
abandon the observation well, fill it with grout, and cut the riser off at grade.
G. In the event of a dewatering system failure, take the following steps:
1. Conduct in situ density tests conforming to ASTM D1556 or ASTM D2167
immediately above at the structure founding grades.
32135-011102140:08108114 02140-6 GAC Upgrades at the Urban WTPs
2. Remove all soils that show unacceptable density and replace them with compacted
fill as indicated in Section 02200, Earthwork.
3. Test the repaired soils as required by the Owner and Engineer to verify that they
have been returned to their original in situ state or better.
4. Repair or replace damaged structures.
3.07 REWATERING AND REMOVAL OF DEWATERING SYSTEM
A. Obtain written approval from the Owner and Engineer to being rewatering operations.
B. Provide an adequate weight of fill to prevent buoyancy.
C. Pump water into the excavation such that the water level inside the excavation is always at
a higher level than the rising groundwater on the outside until the groundwater level has
reached its static level.
D. Remove all dewatering wells, buried and surface piping, cables, pump foundations,
structural supports and all other support facilities.
E. Backfill as specified in Section 02200, Earthwork, all trenches and excavations below final
grades or in fill areas.
F. Provide documentation of dewatering and observation well removal including the date of
removal, well number, location, procedures, and materials used.
- END OF SECTION -
32135-011102140:08108114 02140-7 GAC Upgrades at the Urban WTPs
SECTION 02200
EARTHWORK
PART 1 -- GENERAL
1.01 THE REQUIREMENT
A. Furnish all labor, equipment and materials required to complete all work associated with
excavation, including off -site borrow excavation, dewatering, backfill, drainage layers
beneath and around structures, foundation and backfill stone, filter fabric, embankments,
stockpiling topsoil and any excess suitable material in designated areas, in place
compaction of embankments, backfill and subgrades beneath foundations and roadways,
excavation support, disposing from the site all unsuitable materials, providing erosion and
sedimentation control grading, site grading and preparation of pavement and structure
subgrade, and other related and incidental work as required to complete the work shown on
the Drawings and specified herein.
B. All excavations shall be in conformity with the lines, grades, and cross sections shown on
the Drawings or established by the Engineer.
C. It is the intent of this Specification that the Contractor conduct the construction activities in
such a manner that erosion of disturbed areas and off -site sedimentation be absolutely
minimized.
D. All work under this Contract shall be done in conformance with and subject to the limitations
of the latest editions of the Virginia Department of Transportation Road and Bridge
Specifications and the Virginia Erosion and Sediment Control Handbook.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Requirements of related work are included in Division 1 and Division 2 of these
Specifications.
1.03 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS
A. Without limiting the generality of the other requirements of the Specifications, all work herein
shall conform to the applicable requirements of the following documents. All referenced
Specifications, codes, and standards refer to the most current issue available at the time of
Bid.
Virginia Department of Transportation Road and Bridge Specifications.
2. American Society for Testing and Materials (ASTM):
ASTM C 127 Test for Specific Gravity and Absorption of Coarse Aggregate.
ASTM C 136
ASTM D 422
Test for Sieve Analysis of Fine and Coarse Aggregates.
Particle Size Analysis of Soils.
32135-011102200:08108114 02200-1 GAC Upgrades at the Urban WTPs
ASTM D 423 Test for Liquid Limit of Soils.
ASTM D 424 Test for Plastic Limit and Plasticity Index of Soils.
ASTM C 535 Test for Resistance to Degradation of Large Size Coarse
Aggregate by Abrasion and Impact in the Los Angeles Machine.
ASTM D 698 Standard Method of Test for the Moisture - Density Relations of
Soils Using a 5.5 lb. (2.5 kg) Rammer and a 12-inch (305 mm)
Drop.
ASTM D1556 Test for Density of Soil in Place by the Sand -Cone Method.
ASTM D1557 Test for Moisture -Density Relations of Soils and Soil Aggregate
Mixtures Using 10-lbs. (4.5 kg) Rammer and 18-inch (457 mm)
Drop.
ASTM D2049 Test Method for Relative Density of Cohesionless Soils.
ASTM D2167 Test for Density of Soil in Place by the Rubber -Balloon Method.
ASTM D2216 Test for Laboratory Determination of Water (Moisture) Content of
Soil, Rock, and Soil Aggregate Mixtures.
ASTM D2487 Test for Classification of Soils for Engineering Purposes.
ASTM D2922 Test for Density of Soil and Soil -Aggregate in Place by Nuclear
Methods (Shallow Depth).
1.04 SUBSURFACE CONDITIONS
A. Information on subsurface conditions is referenced under Division 1, General Requirements.
B. Attention is directed to the fact that there may be water pipes, storm drains and other
utilities located in the area of proposed excavation. Perform all repairs to same in the event
that excavation activities disrupt service.
1.05 SUBMITTALS
A. In accordance with the procedures and requirements set forth in Section 01300 -
Submittals, the Contractor shall submit the following:
Name and location of all material suppliers.
2. Certificate of compliance with the standards specified above for each source of each
material.
3. List of disposal sites for waste and unsuitable materials and all required permits for
use of those sites.
4. Plans and cross sections of open cut excavations showing side slopes and limits of
the excavation at grade.
32135-011102200:08108114 02200-2 GAC Upgrades at the Urban WTPs
5. Samples of synthetic filter fabric and reinforced plastic membrane with
manufacturer's certificates or catalog cuts stating the mechanical and physical
properties. Samples shall be at least one (1) foot wide and four (4) feet long taken
across the roll with the warp direction appropriately marked.
6. Construction drawings and structural calculations for any types of excavation
support required. Drawings and calculations shall be sealed by a currently
registered Professional Engineer in the Commonwealth of Virginia.
7. Monitoring plan and pre -construction condition inspection and documentation of all
adjacent structures, utilities, and roadways near proposed installation of excavation
support systems and near areas where dewatering is required to facilitate
construction.
8. Dewatering procedures.
1.06 PRODUCT HANDLING
A. Soil and rock material shall be excavated, transported, placed, and stored in a manner so
as to prevent contamination, segregation and excessive wetting. Materials which have
become contaminated or segregated will not be permitted in the performance of the work
and shall be removed from the site.
1.07 USE OF EXPLOSIVES
A. Excavation by blasting will not be permitted for this project.
PART 2 -- PRODUCTS
2.01 SELECT FILL
A. Soils from the excavations meeting requirements stipulated herein with the exceptions of
topsoil and organic material may be used as select fill for backfilling, constructing
embankments, reconstructing existing embankments, and as structural subgrade support.
B. Select fill used for embankment construction shall be a silty or clayey soil material with a
Maximum Liquid Limit (LL) of 50 and a Plasticity Index (PI) between 7 and 20.
C. Select fill used for backfilling shall either be material as described in Paragraph B above or
a granular soil material with a Maximum Plasticity Index (PI) of 6.
D. Regardless of material used as select fill, materials shall be compacted at a moisture
content satisfactory to the Engineer, which shall be approximately that required to produce
the maximum density except that the moisture content shall not be more than 1 % below nor
more than 4% above the optimum moisture content for the particular material tested in
accordance with the ASTM D698.
E. Select fill used as subgrade support shall be a coarse aggregate material meeting the
gradation requirements of #57 or #78 aggregates in accordance with ASTM C-33, or
Aggregate Base Course (ABC) as defined in Section 02207 — Aggregate Materials.
32135-011W2200:08/08/14 02200-3 GAC Upgrades at the Urban WTPs
F. Where excavated material does not meet requirements for select fill, Contractor shall furnish
off -site borrow material meeting the specified requirements herein. Determination of
whether the borrow material will be paid for as an extra cost will be made based on Article 4
of the General Conditions, as amended by the Supplementary Conditions. When the
excavated material from required excavations is suitable for use as backfill, bedding, or
embankments, but is replaced with off -site borrow material for the Contractor's
convenience, the costs associated with such work and material shall be borne by the
Contractor.
2.02 TOPSOIL
A. Topsoil shall be considered the surface layer of soil and sod, suitable for use in seeding and
planting. It shall contain no mixture of refuse or any material toxic to plant growth.
2.03 FOUNDATION DRAINAGE SYSTEMS
A. The Contractor shall provide foundation drainage systems as indicated on the Drawings and
specified herein. The materials and placement shall be as indicated under Section 02712 -
Foundation Drainage Systems.
2.04 GEOTEXTILES
A. The Contractor shall provide geotextiles as indicated on the Drawings and specified herein.
The materials and placement shall be as indicated under Section 02274 - Geotextiles.
PART 3 -- EXECUTION
3.01 STRIPPING OF TOPSOIL
A. In all areas to be excavated, filled, paved, or graveled the topsoil shall be stripped to its full
depth and shall be deposited in storage piles on the site, at locations designated by the
Engineer, for subsequent reuse. Topsoil shall be kept separated from other excavated
materials and shall be piled free of roots and other undesirable materials.
3.02 EXCAVATION
A. All material excavated, regardless of its nature or composition, shall be classified as
UNCLASSIFIED EXCAVATION. Excavation shall include the removal of all soil, rock,
weathered rock, rocks of all types, boulders, conduits, pipe, and all other obstacles
encountered and shown to be removed within the limits of excavation shown on the
Drawings or specified herein. The cost of excavation shall be included in the Lump Sum Bid
Price and no additional payment will be made for the removal of obstacles encountered
within the excavation limits shown on the Drawings and specified herein.
B. All suitable material removed in the excavation shall be used as far as practicable in the
formation of embankments, subgrades, and shoulders, and at such other places as may be
indicated on the Drawings or indicated by the Engineer. No excavation shall be wasted
except as may be permitted by the Engineer. Refer to the drawings for specific location and
placement of suitable excavated materials in the formation of embankments, backfill, and
structural and roadway foundations. THE ENGINEER AND/OR MATERIALS TESTING
32135-011102200:08108114 02200-4 GAC Upgrades at the Urban WTPs
CONSULTANT WILL DESIGNATE MATERIALS THAT ARE UNSUITABLE. The Contractor
shall furnish off site disposal areas for the unsuitable material. Where suitable materials
containing excessive moisture are encountered above grade in cuts, the Contractor shall
construct above grade ditch drains prior to the excavation of the cut material when in the
opinion of the Engineer and/or materials testing consultant such measures are necessary to
provide proper construction.
C. All excavations shall be made in the dry and in such a manner and to such widths as will
give ample room for properly constructing and inspecting the structures and/or piping they
are to contain and for such excavation support, pumping and drainage as may be required.
Excavation shall be made in accordance with the grades and details shown on the Drawings
and as specified herein.
D. Excavation slopes shall be flat enough to avoid slides that will cause disturbance of the
subgrade or damage of adjacent areas. Excavation requirements and slopes shall be as
indicated in the Drawings. The Contractor shall intercept and collect surface runoff both at
the top and bottom of cut slopes. The intersection of slopes with natural ground surfaces,
including the beginning and ending of cut slopes, shall be uniformly rounded as shown on
the Drawings or as may be indicated by the Engineer. Concurrent with the excavation of
cuts the Contractor shall construct intercepting berm ditches or earth berms along and on
top of the cut slopes at locations shown on the Drawings or designated by the Engineer. All
slopes shall be finished to reasonably uniform surfaces acceptable for seeding and
mulching operations. No rock or boulders shall be left in place which protrude more than 1
foot within the typical section cut slope lines, and all rock cuts shall be cleaned of loose and
overhanging material. All protruding roots and other objectionable vegetation shall be
removed from slopes. The Contractor shall be required to submit plans of open -cut
excavation for review by the Engineer before approval is given to proceed.
E. It is the intent of these Specifications that all structures shall bear on an aggregate base,
crushed stone or screened gravel bedding placed to the thickness shown on the Drawings,
specified in these Specifications, or not less than 6-inches. Bedding for process piping shall
be as specified in Section 15000 - Basic Mechanical Requirements, or as shown on the
Drawings.
F. The bottom of all excavations for structures and pipes shall be examined by the Engineer
and/or materials testing consultant for bearing value and the presence of unsuitable
material. If, in the opinion of the Engineer and/or materials testing consultant, additional
excavation is required due to the low bearing value of the subgrade material, or if the
in -place soils are soft, yielding, pumping and wet, the Contractor shall remove such material
to the required width and depth and replace it with thoroughly compacted select fill, and/or
crushed stone or screened gravel as indicated by the Engineer. Payment for such
additional work ordered by the Engineer shall be made as an extra by a Change Order in
accordance with the General Conditions and Division 1. No payment will be made for
subgrade disturbance caused by inadequate dewatering or improper construction methods.
G. All cuts shall be brought to the grade and cross section shown on the Drawings, or
established by the Engineer, prior to final inspection and acceptance by the Engineer.
H. Slides and overbreaks which occur due to negligence, carelessness or improper
construction techniques on the part of the Contractor shall be removed and disposed of by
the Contractor as indicated by the Engineer at no additional cost to the Owner. If grading
operations are suspended for any reason whatsoever, partially completed cut and fill slopes
32135-011102200:08108114 02200-5 GAC Upgrades at the Urban WTPs
shall be brought to the required slope and the work of seeding and mulching or other
required erosion and sedimentation control operations shall be performed.
Where the excavation exposes sludge, sludge contaminated soil or other odorous materials,
the Contractor shall cover such material at the end of each workday with a minimum of
6-inches and a maximum of 24-inches of clean fill. The work shall be an odor abatement
measure and the material shall be placed to the depth deemed satisfactory by the Engineer
for this purpose.
3.03 EXCAVATION SUPPORT
A. The Contractor shall furnish, place, and maintain such excavation support which may be
required to support sides of excavation or to protect pipes and structures from possible
damage and to provide safe working conditions. If the Engineer is of the opinion that at any
point sufficient or proper supports have not been provided, he may order additional supports
put in at the expense of the Contractor. The Contractor shall be responsible for the
adequacy of all supports used and for all damage resulting from failure of support system or
from placing, maintaining and removing it.
B. Selection of and design of any proposed excavation support systems is exclusively the
responsibility of the Contractor. Contractor shall submit drawings and calculations on
proposed systems sealed by a Professional Engineer currently registered in the
Commonwealth of Virginia.
C. The Contractor shall exercise caution in the installation and removal of supports to insure
that excessive or unusual loadings are not transmitted to any new or existing structure. The
Contractor shall promptly repair at his expense any and all damage that can be reasonably
attributed to installation or removal of excavation support system.
D. Contractor shall monitor movement in the excavation support systems as well as movement
at adjacent structures, utilities and roadways near excavation supports. Contractor shall
submit a monitoring plan developed by the excavation support design engineer. All pre -
construction condition assessment and documentation of adjacent structures on -site and
off -site shall be performed by the Contractor. If any sign of distress such as cracking or
movement occurs in any adjacent structure, utility or roadway during installation of supports,
subsequent excavation, service period of supports, subsequent backfill and construction, or
removal of supports, Engineer shall be notified immediately. Contractor shall be exclusively
responsible for repair of any damage to any roadway, structure, utility, pipes, etc. both on -
site and off -site, as a result of his operations.
E. All excavation supports shall be removed upon completion of the work except as indicated
herein. The Engineer may permit supports to be left in place at the request and expense of
the Contractor. The Engineer may order certain supports left permanently in place in
addition to that required by the Contract. The cost of the materials so ordered left in place,
less a reasonable amount for the eliminated expense of the removal work omitted, will be
paid as an extra by a Change Order in accordance with the General Conditions and Division
1. Any excavation supports left in place shall be cut off at least two (2) feet below the
finished ground surface or as directed by the Engineer.
3.04 PROTECTION OF SUBGRADE
32135-011102200:08108114 02200-6 GAC Upgrades at the Urban WTPs
A. To minimize the disturbance of bearing materials and provide a firm foundation, the
Contractor shall comply with the following requirements:
Use of heavy rubber -tired construction equipment shall not be permitted on the final
subgrade unless it can be demonstrated that drawdown of groundwater throughout
the entire area of the structure is at least 3 feet below the bottom of the excavation
(subgrade). Even then, the use of such equipment shall be prohibited should
subgrade disturbance result from concentrated wheel loads.
2. Subgrade soils disturbed through the operations of the Contractor shall be
excavated and replaced with compacted select fill or crushed stone at the
Contractor's expense as indicated by the Engineer.
3. The Contractor shall provide positive protection against penetration of frost into
materials below the bearing level during work in winter months. This protection can
consist of a temporary blanket of straw or salt hay covered with a plastic membrane
or other acceptable means.
3.05 PROOFROLLING
A. The subgrade of all structures and all areas that will support pavements or select fill shall be
proofrolled. After stripping of topsoil, excavation to subgrade and prior to placement of fills,
the exposed subgrade shall be carefully inspected by probing and testing as needed. Any
topsoil or other organic material still in place, frozen, wet, soft, or loose soil, and other
undesirable materials shall be removed. The exposed subgrade shall be proofrolled with a
heavily loaded tandem -wheeled dump truck to check for pockets of soft material hidden
beneath a thin crust of better soil. Any unsuitable materials thus exposed shall be removed
and replaced with an approved compacted material.
3.06 EMBANKMENTS
A. The Contractor shall perform the construction of embankments in such a manner that cut
and fill slopes will be completed to final slopes and grade in a continuous operation. The
operation of removing excavation material from any cut and the placement of embankment
in any fill shall be a continuous operation to completion unless otherwise permitted by the
Engineer.
B. Surfaces upon which embankments are to be constructed shall be stripped of topsoil,
organic material, rubbish and other extraneous materials. After stripping and prior to
placing embankment material, the Contractor shall compact the top 12-inches of in place
soil as specified under Paragraph 3.09, COMPACTION.
C. Any soft or unsuitable materials revealed before or during the in place compaction shall be
removed as indicated by the Engineer and/or materials testing consultant and replaced with
select fill.
D. Ground surfaces on which embankment is to be placed, shall be scarified or stepped in a
manner which will permit bonding of the embankment with the existing surface. The
embankment soils shall be as specified under Part 2 - Products, and shall be deposited and
spread in successive, uniform, approximately horizontal layers not exceeding 8-inches in
compacted depth for the full width of the cross section, and shall be kept approximately
level by the use of effective spreading equipment. Hauling shall be distributed over the full
32135-011W2200:08/08/14 02200-7 GAC Upgrades at the Urban WTPs
width of the embankment, and in no case will deep ruts be allowed to form during the
construction of the embankment. The embankment shall be properly drained at all times.
Each layer of the embankment shall be thoroughly compacted to the density specified under
Paragraph 3.09, COMPACTION.
E. The embankment or fill material in the layers shall be of the proper moisture content before
rolling to obtain the prescribed compaction. Wetting or drying of the material and
manipulation when necessary to secure a uniform moisture content throughout the layer
shall be required. Should the material be too wet to permit proper compaction or rolling, all
work on all portions of the embankment thus affected shall be delayed until the material has
dried to the required moisture content. Samples of all embankment materials for testing,
both before and after placement and compaction, will be taken at frequent intervals. From
these tests, corrections, adjustments, and modifications of methods, materials, and moisture
content will be made to construct the embankment.
F. Where embankments are to be placed and compacted on hillsides, or when new
embankment is to be compacted against embankments, or when embankment is built in
part widths, the slopes that are steeper than 4:1 shall be loosened or plowed to a minimum
depth of 6 inches or, if in the opinion of the Engineer, the nature of the ground is such that
greater precautions should be taken to bind the fill to the original ground then benches shall
be cut in the existing ground as indicated by Engineer.
G. When rock and other embankment material are excavated at approximately the same time,
the rock shall be incorporated into the outer portions of the embankments and the other
material which meets the requirements for select fill shall be incorporated into the formation
of the embankments. Stones or fragmentary rock larger than 4-inches in their greatest
dimension will not be allowed within the top 6-inches of the final grade. Stones, fragmentary
rock, or boulders larger than 12-inches in their greatest dimension will not be allowed in any
portions of embankments and shall be disposed of by the Contractor as indicated by the
Engineer. When rock fragments or stone are used in embankments, the material shall be
brought up in layers as specified or directed and every effort shall be exerted to fill the voids
with finer material to form a dense, compact mass which meets the densities specified for
embankment compaction.
3.08 BACKFILLING
A. All structures and pipes shall be backfilled with the type of materials shown on the Drawings
and specified herein. Select fill shall be deposited in successive, uniform, approximately
horizontal layers not exceeding 8-inches in compacted depth for the full width. Stones or
fragmentary rock larger than 4-inches in their greatest dimension will not be allowed within
the top 6-inches of the ground nor within 6 inches of pipes. No stone or fragmentary rock
larger than 12-inches in their greatest dimension will be allowed for any portion of backfill.
Compaction shall be in accordance with the requirements of Paragraph 3.09,
COMPACTION.
B. Where excavation support is used, the Contractor shall take all reasonable measures to
prevent loss of support beneath and adjacent to pipes and existing structures when
supports are removed. If significant volumes of soil cannot be prevented from clinging to
the extracted supports, the voids shall be continuously backfilled as rapidly as possible.
The Contractor shall thereafter limit the depth below subgrade that supports will be installed
in similar soil conditions or employ other appropriate means to prevent loss of support.
32135-011102200:08108114 02200-8 GAC Upgrades at the Urban WTPs
3.09 COMPACTION
A. The Contractor shall compact embankments, backfill, crushed stone, aggregate base, and
in place subgrade in accordance with the requirements of this Section. The densities
specified herein refer to percentages of maximum density as determined by the noted test
methods. Compaction of materials on the project shall be in accordance with the following
schedule:
Density %
Density %
Max. Lift Thickness
Std. Proctor
Mod. Proctor
as Compacted
(D698)
(D1557)
Inches
Embankments Beneath Structures*
98
95
8
Other Embankments
95
92
8
Backfill Around Structures
95
92
8
Backfill in Pipe Trenches
95
92
8
Crushed Stone Beneath Structures
**
**
12
Select Sand
--
98
8
Aggregate Base Course (ABC)
--
98
8
Beneath Pavements and Structures
Crushed Stone Backfill
**
**
12
Crushed Stone Pipe Bedding
**
**
12
In place Subgrade Beneath Structures 98 95 Top 12-inches
* Embankments beneath structures shall be considered to include a zone 10 feet out
from the foundation of the structure extending down to the natural ground on a 450
slope.
** The aggregate shall be compacted to a degree acceptable to the Engineer by use of
a vibratory compactor and/or crawler tractor.
B. Field density tests will be made by the materials testing consultant to determine if the
specified densities have been achieved, and these tests shall be the basis for accepting or
rejecting the compaction. In -place density tests will be performed in accordance with ASTM
D 1556, ASTM D 2167, or ASTM D 2922. The Engineer in conjunction with the materials
testing consultant will be the judge as to which test method will be the most appropriate.
Failure to achieve the specified densities shall require the Contractor to re -compact the
material or remove it as required. The Contractor shall, if necessary, increase his
compactive effort by increasing the number of passes, using heavier or more suitable
compaction equipment, or by reducing the thickness of the layers. The Contractor shall
adjust the moisture contents of the soils to bring them within the optimum range by drying
them or adding water as required.
C. Testing will be performed as frequently as deemed necessary by the Engineer and/or
materials testing consultant. As a minimum, one in -place density test shall be performed for
each 1000 cubic yards of embankment placed and 500 cubic yards of backfill placed or one
test performed each day for either.
32135-011W2200:08/08/14 02200-9 GAC Upgrades at the Urban WTPs
3.10 REMOVAL OF EXCESS AND UNSUITABLE MATERIALS
A. The Contractor shall remove and dispose of off -site all unsuitable materials. Within thirty
(30) consecutive days after Notice to Proceed, the Contractor shall submit to the Engineer
for review all required permits and a list of disposal sites for the unsuitable materials. If the
disposal site is located on private property, the submittal shall also include written
permission from the owner of record.
B. All unsuitable materials shall be disposed of in locations and under conditions that comply
with federal, state and local laws and regulations.
C. The Contractor shall obtain an off -site disposal area prior to beginning demolition or
excavation operations.
D. All excess and unsuitable materials shall be hauled in trucks of sufficient capacity and tight
construction to prevent spillage. Trucks shall be covered to prevent the propagation of
dust.
E. When all excess and unsuitable material disposal operations are completed, the Contractor
shall leave the disposal sites in a condition acceptable to the Owner and Owner(s) of the
disposal site(s).
3.11 BORROW EXCAVATION
A. Description
The work covered by this section consists of the excavation of approved material from
borrow sources and the hauling and utilization of such material as required on the Drawings
or directed by the Engineer. It shall also include the removing, stockpiling, and replacement
of topsoil on the borrow source; the satisfactory disposition of material from the borrow
source which is not suitable for use; and the satisfactory restoration of the borrow source
and haul roads to an acceptable condition upon completion of the work.
Borrow excavation shall not be used before all available suitable unclassified excavation
has been used for backfill and incorporated into the embankments.
B. Coordination with Seeding Operations
The Contractor shall coordinate the work covered by this section with the construction of
embankments so that the requirements of Section 02200 are met.
C. Materials
All material shall meet the requirements of Division 2 shown below:
Borrow Material .................................Section 02200, Subsection 2.01 - Select Fill
D. Construction Methods
General
The surface of the borrow area shall be thoroughly cleared and grubbed and
cleaned of all unsuitable material including all organics, topsoil, etc., before
32135-011102200:08108114 02200-11 GAC Upgrades at the Urban WTPs
2
3
beginning the excavation. Disposal of material resulting from clearing and grubbing
shall be in accordance with Section 02100.
Each borrow operation shall not be allowed to accumulate exposed, erodible slope
area in excess of 1 acre at any one given time without the Contractor's beginning
permanent seeding and mulching of the borrow source or other erosion control
measures as may be approved by the Engineer.
The topsoil shall be removed and stockpiled at locations that will not interfere with
the borrow operations and that meet the approval of the Engineer. Temporary
erosion control measures shall be installed as may be necessary to prevent the
erosion of the stockpile material. Once all borrow has been removed from the
source or portion thereof, the stockpiled topsoil shall be spread uniformly over the
source.
Where it is necessary to haul borrow material over existing roads, the Contractor
shall use all necessary precautions to prevent damage to the existing roads. The
Contractor shall also conduct his hauling operations in such a manner as to not
interfere with the normal flow of traffic and shall keep the traffic lanes free from
spillage at all times.
Owner Furnished Sources
Where borrow sources are furnished by the Owner the location of such sources will
be as designated on the Drawings or as directed by the Engineer.
The Owner will furnish the necessary haul road right-of-way at locations designated
by the Engineer. All haul roads required shall be built, maintained, and when
directed by the Engineer, obliterated, at no cost to the Owner. Where the haul road
is to be reclaimed for cultivation the Contractor shall plow or scarify the area to a
minimum depth of 8 inches.
The borrow sources shall be left in a neat and presentable condition after use. All
slopes shall be smoothed, rounded, and constructed not steeper than 3:1. Where
the source is to be reclaimed for cultivation the source shall be plowed or scarified
to a minimum depth of 8 inches, disc harrowed, and terraces constructed. The
source shall be graded to drain such that no water will collect or stand and a
functioning drainage system shall be provided.
All sources shall be seeded and mulched in accordance with Section 02910.
Contractor Furnished Sources
Prior to the approval of any off -site borrow source(s) developed for use on this
project, the Contractor shall obtain certification from the State Historic Preservation
Officer of the State Department of Cultural Resources certifying that the removal of
the borrow material from the borrow source(s) will have no effect on any known
district, site building, structure, or object that is included or eligible for inclusion in
the National Register of Historic Places. A copy of this certification shall be
furnished to the Engineer prior to performing any work on the proposed borrow
source.
32135-011102200:08108114 02200-12 GAC Upgrades at the Urban WTPs
The approval of borrow sources furnished by the Contractor shall be subject to the
following conditions:
a. The Contractor shall be responsible for acquiring the right to take the
material and any rights of access that may be necessary; for locating and
developing the source; and any clearing and grubbing and drainage ditches
necessary.
Such right shall be in writing and shall include an agreement with the Owner
that the borrow source may be dressed, shaped, seeded, mulched, and
drained as required by these Specifications after all borrow has been
removed.
b. Except where borrow is to be obtained from a commercial source, the
Contractor and the property owner shall jointly submit a borrow source
development, use, and reclamation plan to the Engineer for his approval
prior to engaging in any land disturbing activity on the proposed source
other than material sampling that may be necessary. The Contractor's plan
shall address the following:
(1) Drainage
The source shall be graded to drain such that no water will collect or
stand and a functioning drainage system shall be provided. If
drainage is not practical, and the source is to serve as a pond, the
minimum average depth below the water table shall be 4 feet or the
source graded so as to create wetlands as appropriate.
(2) Slopes
The source shall be dressed and shaped in a continuous manner to
contours which are comparable to and blend in with the adjacent
topography, but in no case will slopes steeper than 3:1 be permitted.
(3) Erosion Control
The plan shall address the temporary and permanent measures that
the Contractor intends to employ during use of the source and as a
part of the reclamation. The Contractor's plan shall provide for the
use of staged permanent seeding and mulching on a continual basis
while the source is in use and the immediate total reclamation of the
source when no longer needed.
4. Maintenance
During construction and until final acceptance the Contractor shall use any
methods approved by the Engineer which are necessary to maintain the
work covered by this section so that the work will not contribute to excessive
soil erosion.
- END OF SECTION -
32135-011W2200:08/08/14 02200-13 GAC Upgrades at the Urban WTPs
SECTION 02207
AGGREGATE MATERIALS
PART 1 -- GENERAL
1.01 THE REQUIREMENT
A. The Contractor shall furnish all labor, equipment and materials required to complete all work
associated with the installation of aggregate material beneath foundations, as backfill and
as roadway subgrades and other related and incidental work as required to complete the
work shown on the Drawings and specified herein.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Section 01090 - Reference Standards
B. Section 02200 - Earthwork
C. Section 02276 - Erosion and Sedimentation Control
D. Section 02510 - Paving and Surfacing
E. Section 02712 - Foundation Drainage Systems
F. Section 02910 - Final Grading and Landscaping
1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. Without limiting the generality of the other requirements of the Specifications, all work herein
shall conform to the applicable requirements of the following documents. All referenced
specifications, codes, and standards refer to the most current issue available at the time of
Bid.
1. Virginia Department of Transportation (VDOT), Road and Bridge Specifications.
2. ASTM C 127 Test for Specific Gravity and Absorption of Coarse Aggregate.
3. ASTM C 136 Test for Sieve Analysis of Fine and Coarse Aggregates.
4. ASTM C 535 Test for Resistance to Degradation of Large Size Coarse
Aggregate by Abrasion and Impact in the Los Angeles Machine.
1.04 SUBMITTALS
A. Submit the following in accordance with Section 01300, Submittals.
1. Materials gradation and certification.
2. ASTM C127, ASTM C136, and ASTM C535 test results
MS02207.MAS:08-29-05 02207-1 HS MASTER SPEC
PART 2 -- PRODUCTS
2.01 CRUSHED STONE, SCREENED GRAVEL and AGGREGATE BASE COURSE (ABC)
A. Crushed stone or screened gravel shall meet the requirements of Aggregate Standard Size
No. 57 or No. 67 as defined by VDOT Road and Bridge Specifications Sections 203 —
Coarse Aggregate, 205 — Crusher Run Aggregate Size No, and 309 — Aggregate Base
Course Size No. 21A or 22, respectively.
B. ABC shall meet the requirements of ABC as defined by VDOT Road and Bridge
Specifications.
2.02 SELECT SAND
A. Select sand shall meet the requirements of Sections 202 of the VDOT Road and Bridge
Specifications for materials and gradation. The size used shall be Grading A as listed and
defined in Table 11-1, "Fine Aggregate", of the VDOT Specifications.
PART 3 -- EXECUTION
3.01 CRUSHED STONE, SCREENED GRAVEL AND AGGREGATE BASE COURSE (ABC)
A. Contractor shall install crushed stone, screened gravel and ABC in accordance with the
VDOT Road and Bridge Specifications and as shown on the Drawings and indicated in the
Contract Documents.
Unless otherwise stated herein or shown on the Drawings, all mat foundations
(bottom slabs) for the proposed structures shall have a blanket of crushed stone or
ABC 6-inches thick minimum placed directly beneath the proposed mat. The
blanket shall extend a minimum of 12 inches beyond the extremities of the mat.
2. For subgrade preparation at structures and structural fill, the foundation material
shall be ABC where specifically specified on Drawings, otherwise, crushed stone or
screened gravel shall be used.
3. For ground under drains, pipe bedding, and drainage layers beneath structures the
coarse aggregate shall meet the requirements of aggregate standard Size No. 57 or
No. 67, as defined by VDOT Specifications.
3.02 SELECT SAND
A. Contractor shall install select sand in accordance with the VDOT Specifications and as
shown on the Drawings and indicated in the Contract Documents.
- END OF SECTION -
MS02207.MAS:08-29-05 02207-2 HS MASTER SPEC
SECTION 02274
GEOTEXTILES
PART 1 -- GENERAL
1.01 THE REQUIREMENT
A. The Contractor shall furnish and install all Geotextiles, including all necessary and
incidental items, as detailed or required for the Contractor to complete the installation in
accordance with the Drawings and these Specifications.
B. For the location of each type of Geotextile see the Drawings.
1.02 REFERENCES
A. AASHTO Standards
AASHTO M 288-06 (2011) Geotextile Specification for Highway Applications
1.03 SUBMITTALS
A. Prior to shipping to the site, the Contractor shall submit to the Engineer two copies of a
mill certificate or affidavit signed by a legally authorized official of the Manufacturer for
each type of Geotextile. The Supplier shall also submit three Geotextile samples of
each product, 1 yard square each, seamed and unseamed as appropriate, with the mill
certificate for each Geotextile type supplied. The mill certificate or affidavit shall attest
that the Geotextile meets the chemical, physical and manufacturing requirements stated
in the specifications. The samples shall be labeled with the manufacturer's lot number,
machine direction, date of sampling, project number, specifications, manufacturer and
product name.
B. The Engineer shall be furnished copies of the delivery tickets or other acceptable
receipts as evidence for materials received that will be incorporated into construction.
PART 2 -- MATERIALS
2.01 MATERIALS
A. Filter Geotextile shall be a minimum 6-ounce per square yard (nominal) nonwoven needle
punched synthetic fabric consisting of staple or continuous filament polyester or
polypropylene manufactured in a manner accepted by the Engineer and the Owner. The
Geotextiles shall be inert and unaffected by long-term exposure to chemicals or liquids with
a pH range from 3 to 10. The Geotextiles shall have a minimum threshold water head of
0.25-inches in the "as received" condition.
w
1. Filter Geotextile shall have a Survivability Class of Class 1, 2 or 3 in accordance
with AASHTO M288, unless otherwise specified herein.
32135-011102274:08108114 02274-1 GAC Upgrades at the Urban WTPs
B. Cushion Geotextile shall be a minimum 16-ounce per square yard nonwoven needle
punched synthetic fabric consisting of continuous filament or staple polyester or
polypropylene manufactured in a manner accepted by the Engineer and the Owner. The
Geotextiles shall be inert and unaffected by long-term exposure to chemicals or liquids
with a pH range from 3 to 10.
Cushion Geotextile shall have a Survivability Class of Class 1 in accordance with
AASHTO M288.
C. Type I Separator Geotextile shall be a minimum 8-ounce per square yard (nominal)
nonwoven neddlepunched synthetic fabric consisting of staple or continuous filament
polyester or polypropylene manufactured in a manner accepted by the Engineer and the
Owner. The Geotextiles shall be inert and unaffected by long term exposure to
chemicals or liquids with a pH range from 3 to 10.
Type I Separator Geotextile shall have a Survivability Class of Class 1 or 2 in
accordance with AASHTO M288, unless otherwise specified herein.
D. Type II Separator Geotextile shall be a woven slit film or monofilament synthetic fabric
consisting of polyester or polypropylene in a manner approved by the Engineer.
Geotextile shall be treated to resist degradation due to exposure to ultraviolet light.
Type II Separator Geotextile shall have a Survivability Class of Class 1 in
accordance with AASHTO M288, unless otherwise specified herein.
E. All Geotextiles shall conform to the properties listed using the test methods listed in
Table 1. The Contractor shall be responsible for timely submittals of all confirmation test
data for Geotextiles.
PART 3 -- EXECUTION
3.01 SHIPPING, HANDLING AND STORAGE
A. During all periods of shipment and storage, all Geotextiles shall be protected from direct
sunlight, temperature greater than 140OF water, mud, dirt, dust, and debris.
B. To the extent possible, the Geotextile shall be maintained wrapped in heavy-duty
protective covering until use. Geotextile delivered to the project site without protective
covering shall be rejected. After the protective covering has been removed, the
Geotextile shall not be left uncovered for longer than fourteen (14) days, under any
circumstances.
C. The Owner shall approve the shipping and delivery schedule prior to shipment. The
Owner shall designate the on -site storage area for the Geotextiles. Unloading and
storage of Geotextiles shall be the responsibility of the Contractor.
D. Geotextiles that are damaged during shipping or storage shall be rejected and replaced
at Contractor expense.
32135-011102274:08108114 02274-2 GAC Upgrades at the Urban WTPs
3.02 QUALITY ASSURANCE CONFORMANCE TESTING
A. At the option of the Engineer representative samples of Geotextiles shall be obtained
and tested by the Engineer to assure that the material properties conform to these
Specifications. Conformance testing shall be conducted by the Engineer and paid for by
the Owner.
B. Conformance testing shall be completed at a minimum frequency of one sample per
100,000 square feet of Geotextile delivered to the project site. Sampling and testing
shall be as directed by the Engineer.
C. Conformance testing of the Geotextiles shall include but not be limited to the following
properties:
1. Mass Per Unit Area (ASTM D5261)
2. Grab Tensile Strength (ASTM D4632)
3. Trapezoidal Tear (ASTM D4533)
4. Puncture Resistance (ASTM D6241)
D. The Engineer may add to, remove or revise the test methods used for determination of
conformance properties to allow for use of improved methods.
E. All Geotextile conformance test data shall meet or exceed requirements outlined in
Table 1 of these Specifications for the particular category of Geotextile prior to
installation. Any materials that do not conform to these requirements shall be retested or
rejected at the direction of the Engineer.
F. Each roll of Geotextile will be visually inspected by the Engineer or his representative.
The Engineer reserves the right to sample and test at any time and reject, if necessary,
any material based on visual inspection or verification tests.
G. A Geotextile that is rejected shall be removed from the project site and replaced at the
Contractor's expense. Sampling and conformance testing of the Geotextile supplied as
replacement for rejected material shall be performed by the Engineer at Contractor's
expense.
3.03 INSTALLATION
A. Geotextiles shall be placed to the lines and grades shown on the Drawings. At the time
of installation, the Geotextile shall be rejected by the Engineer if it has defects, rips,
holes, flaws, evidence of deterioration, or other damage.
B. It is the intent of these Specifications that Geotextiles used to protect natural drainage
media be placed the same day as the drainage media to prevent soil, sediment or
windblown soils to make contact with the drainage media.
C. The Geotextiles shall be placed smooth and free of excessive wrinkles. Geotextiles
shall conform to and be in contact with the approved subgrade.
D. When the Geotextiles are placed on slopes, the upslope fabric portion shall be lapped
such that it is the upper or exposed Geotextile.
32135-011102274:08108114 02274-3 GAC Upgrades at the Urban WTPs
E. Geotextiles shall be temporarily secured in a manner accepted by the Engineer prior to
placement of overlying materials.
F. In the absence of specific requirements shown on the Drawings, the following shall be
used for overlaps of adjacent rolls of Geotextile:
GEOTEXTILE TYPE/
APPLICATION
Filter Geotextile
Cushion Geotextile
Separator -Roadway
Applications
Separator -Slope Protection
Separator Geotextile
OVERLAP OF ADJACENT
ROLLSM
(INCHES)
6 min
12 min
12 min
18 min
12 min
TRANSVERSE END
OVERLAP (INCHES'
12 min
12 min
24 min
24 min
18 min
Overlaps may be reduced if adjacent panels are sewn or heat bonded where
approved by the Engineer.
G. Any Geotextile that is torn or punctured shall be repaired or replaced as directed by the
Engineer by the Contractor at no additional cost to the Owner. The repair shall consist
of a patch of the same type of Geotextile placed over the failed areas and shall overlap
the existing Geotextile a minimum of 12-inches from any point of the rupture.
H. Any Geotextile that is subjected to excessive sediment buildup on its surface during
construction shall be replaced by the Contractor prior to placement of overlying material.
32135-011102274:08108114 02274-4 GAC Upgrades at the Urban WTPs
TABLE 1 - MINIMUM REQUIRED GEOTEXTILE PROPERTIES*
TYPE I
TYPE II
GEOTEXTILE
FILTER
CUSHION
SEPARATOR
SEPARATOR
PROPERTY
GEOTEXTILE
GEOTEXTILE
GEOTEXTILE
GEOTEXTILE
Geotextile Construction
Nonwoven
Nonwoven
Nonwoven
Woven
Needlepunched
Needlepunched
Neddlepunched
Mass per Unit Area (Unit Weight),
5.6
15.7
7.8
N/A
ASTM D5261 oz/yd2
Ultraviolet Resistance, (500 hrs.)
ASTM D4355,
70
70
70
70
Average % Strength Retention
Grab Tensile Strength (Ibs.),
150
340
200
390(')X250(2)
ASTM D4632
Grab Tensile elongation (%)
50
50
50
20 MAX
ASTM D4632
Wide Width Tensile Strength, (Ibs./in.)
N/A
N/A
N/A
N/A
ASTM D4595
Trapezoid Tear Strength (Ibs)
65
155
90
100
ASTM D4533
Apparent Opening Size (AOS), (mm),
0.25
N/A
0.25
0.4
ASTM D4751
Permittivity at 50 mm constant head (sec'),
ASTM D4491
1.6
N/A
1.2
0.1
Puncture Resistance,
430
1100
575
950
ASTM D6241 (lb)
* MINIMUM AVERAGE ROLL
Warp Direction
(2) Fill Direction
VALUE (MARV)
- END OF SECTION -
32135-011 1022 74:08108114 02274-5 GAC Upgrades at the Urban WTPs
SECTION 02276
EROSION AND SEDIMENTATION CONTROL
PART 1 -- GENERAL
1.01 THE REQUIREMENTS
A. The Contractor shall employ a Construction Activity Operator certified in the Commonwealth
of Virginia who is responsible for implementing Best Management Practices (BMP's) to
prevent and minimize erosion and resultant sedimentation in all cleared and grubbed areas
during and after construction. This item covers the Work necessary for the installation of
structure and measures for the prevention and control of soil erosion. The Contractor shall
furnish all material, labor and equipment necessary for the proper installation, maintenance,
inspection, monitoring, reporting, and removal (where applicable) of erosion prevention and
control measures and to cause compliance with the General Virginia Pollutant Discharge
Elimination System (VPDES) Permit Regulation for Discharges of Storm Water From
Construction Activities (9 VAC 25-880) and VPDES General Permit No. VAR10 under this
Section.
B. All excavations shall be in conformity with the lines, grades, and cross sections shown on
the Drawings or established by the Engineer.
C. It is the intent of this Specification that the Contractor conduct the construction activities in
such a manner that erosion of disturbed areas and off site sedimentation be absolutely
minimized.
D. All Work under this Contract shall be done in conformance with and subject to the limitations
of the Virginia Erosion and Sediment Control Handbook (VESCH) and the State Water
Control Law, Regulations and Certification Regulations, as adopted in the Code of Virginia
Title 62.1, Chapter 3.1 and Sections 9 VAC 25-840 and 9 VAC 25-880 of the Virginia
Administration Code.
E. The Contractor shall comply with all applicable minimum standards set in the Virginia
Erosion and Sediment Control Handbook. The following excerpts from the VESCH
Minimum Standards are particularly important:
Permanent or temporary soil stabilization shall be applied to denuded areas within
seven days after final grade is reached on any portion of the site. Temporary soil
stabilization shall be applied within seven days to denuded areas that may not be at
final grade but will remain dormant (undisturbed) for longer than 30 days.
Permanent stabilization shall be applied to areas that are to be left dormant for more
than one year.
2. A permanent vegetative cover shall be established on denuded areas not otherwise
permanently stabilized. Permanent vegetation shall not be considered established
until a ground cover is achieved that, in the opinion of the local program
administrator or his designated agent, is uniform, mature enough to survive and will
inhibit erosion.
32135-011102276:10101114 02276-1 GAC Upgrades at the Urban WTPs
3. Stabilization measures shall be applied to earthen structures such as dams, dikes
and diversions immediately after installation.
4. All temporary erosion and sediment control measures shall be removed within 30
days after final site stabilization or after the temporary measures are no longer
needed, unless otherwise authorized by the local program administrator. Trapped
sediment and the disturbed soil areas resulting from the deposition of temporary
measures shall be permanently stabilized to prevent further erosion and
sedimentation.
F. Due to the nature of the Work required by this Contract, it is anticipated that the location and
nature of the erosion and sedimentation control devices will be adjusted on several
occasions to reflect the current phase of construction. The construction schedule adopted
by the Contractor will impact the placement and need for specific devices required for the
control of erosion. The Contractor shall develop and implement such additional techniques
as may be required to minimize erosion and off -site sedimentation. The location and extent
of erosion and sedimentation control devices shall be revised at each phase of construction
that results in a change in either the quantity or direction of surface runoff from constructed
areas. All deviations from the erosion and sedimentation control provisions shown on the
Drawings shall have the prior acceptance of the Engineer.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Section 02100 — Clearing, Grubbing, and Site Preparation
B. Section 02200 — Earthwork
C. Section 02222 — Excavation and Backfill for Utilities
D. Section 02910 — Final Grading and Landscaping
1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. Without limiting the generality of other requirements of these specifications, all Work
hereunder shall conform to the applicable requirements of the referenced portions of the
following documents, to the extent that the requirements therein are not in conflict with the
provisions of this Section.
Code of Virginia, Title 61.1, Chapter 3.1
2. Virginia Erosion and Sediment Control Handbook (VESCH), latest edition.
3. General Virginia Pollutant Discharge Elimination System (VPDES) Permit
Regulation for Discharges of Storm Water From Construction Activities (9 VAC 25-
880) and VPDES General Permit No. VAR10.
4. Erosion and Sediment Control Plan as required by the VPDES Permit.
5. Maintenance and Inspection Procedures as required by the VPDES Permit
B. See Specification Section 01090 - Reference Standards.
32135-011102276:10101114 02276-2 GAC Upgrades at the Urban WTPs
1.04 REGULATORY COMPLIANCE
A. Land disturbance activities are not authorized to begin until after all required erosion and
sediment control permits are obtained from the United States, Commonwealth of Virginia,
Albemarle County and the University of Virginia. Contractor is the Co -Primary Permittee
and Operator under the provisions of the VPDES Permit. As such, Contractor will be
required to sign certain certifications as described in the VPDES Permit. Contractor shall
comply with requirements specified in the Contract Documents or by the Engineer.
Contractor shall also comply with all other laws, rules, regulations, ordinances and
requirements concerning soil erosion and sediment control established in the United States,
the Commonwealth of Virginia, Albemarle County and the University of Virginia. The
following documents and the documents referenced therein define the regulatory
requirements for this Section 02276.
VPDES PERMIT: The Virginia Pollution Discharge Elimination System (VPDES)
General Permit (VAR 10) for Discharges of Storm Water from Construction Activity
governs land disturbance or construction activities of one (1) acre or more.
Contractor is responsible for complying with terms and conditions of this permit.
Contractor shall submit registration statements to Albemarle County and the
University of Virginia no later than 30 days after commencing land disturbing
activities.
2. Manual for Erosion and Sediment Control: Contractor shall follow Practices and
Standards of the Virginia Erosion and Sediment Control Handbook (VESCH), Third
Edition, or latest.
3. SWP3: When a Storm Water Pollution Prevention Plan (SWP3) is provided in the
Contract Documents, the Contractor shall follow the practices described in the
SWP3. (See the Appendix for the SWP3, if applicable.)
4. Contractor shall designate a Construction Activity Operator, approved by the Virginia
Department of Environmental Quality (DEQ) Erosion and Sediment Control (ESC)
Program, to oversee all erosion and sediment control operations on the construction
site.
5. Albemarle County: The Contractor shall follow the provisions of Albemarle County
Code, Chapter 17, and provide a security required for the stormwater and erosion
control plan and conditions of the VSMP permit as required by Albemarle County.
1.05 SUBMITTALS
A. Prior to the start of the Work, the Contractor shall prepare and submit a plan for applying the
temporary and permanent erosion and siltation control measures as shown on the Owner's
approved Erosion and Sediment Control Plan. Construction Work shall not commence until
the schedule of Work and the methods of operations have been reviewed and approved.
B. In accordance with the procedures and requirements set forth in the General Conditions
Division 1 and Section 01300, the Contractor shall submit the following:
1. Name and location of all material suppliers.
32135-011102276:10101114 02276-3 GAC Upgrades at the Urban WTPs
2. Certificate of compliance with the standards specified above for each source of each
material.
3. List of disposal sites for waste and unsuitable materials and all required permits for
use of those sites.
1.06 EROSION AND SEDIMENTATION CONTROL DEVICES
A. The following erosion and sedimentation control devices shall be incorporated into the
Work. Other devices, as necessary and acceptable to the Engineer shall be installed as
required.
Temporary Sediment Traps shall be constructed at the locations shown on the
Drawings, at the termination of all Temporary Diversions diverting sediment laden
runoff, and at other locations indicated by the Engineer. Temporary Sediment Traps
shall be constructed by excavating the appropriate size rectangular basin and
constructing a rock -fill dam on the discharge end to form a sediment trap.
Temporary Sediment Traps shall be spaced to limit the maximum tributary drainage
area to less than or equal to 3 acres. Temporary Sediment Traps shall be designed,
installed and maintained in accordance with the requirements of Section 3.13 of the
VESCH.
2. Temporary Diversions shall be constructed at the locations shown on the Drawings,
and at other locations indicated by the Engineer. Dimensions shall be as shown on
the Drawings. All diversion ditches transporting sediment -laden runoff shall
terminate in Temporary Sediment Traps. Temporary Diversions shall be designed,
installed and maintained in accordance with the requirements of Section 3.12 of the
VESCH.
3. Silt Fence shall be constructed at the locations shown on the Drawings, and at other
locations indicated by the Engineer. Silt fence shall not be installed across streams,
ditches or waterways. Silt Fence shall be designed, installed and maintained in
accordance with requirements of Section 3.05 of the VESCH.
4. Rock Check Dams shall be constructed at the locations shown on the Drawings, and
at other locations indicated by the Engineer. Dimensions shall be as shown on the
Drawings. Rock Check Dams shall be designed, installed and maintained in
accordance with the requirements of Section 3.20 of the VESCH.
5. Block and Gravel Drop Inlet Sediment Filters shall be constructed at the locations
shown on the Drawings, and at other locations indicated by the Engineer.
Dimensions shall be as shown on the Drawings. Block and Gravel Drop Inlet
Sediment Filters shall be designed, installed and maintained in accordance with the
requirements of Section 3.07 of the VESCH.
6. Block and Gravel Curb Inlet Sediment Filters shall be constructed at the locations
shown on the Drawings, and at other locations indicated by the Engineer. Gravel
Curb Inlet Sediment Filters shall be designed, installed and maintained in
accordance with the requirements of Section 3.07 of the VESCH.
7. Culvert Inlet Protection shall be constructed at the locations shown on the Drawings,
and at other locations indicated by the Engineer. Culvert Inlet Protection shall be
32135-011102276:10101114 02276-4 GAC Upgrades at the Urban WTPs
designed, installed and maintained in accordance with the requirements of Section
3.08 of the VESCH.
8. Temporary and Permanent Stormwater Conveyance Channels shall be installed at
the locations shown on the Drawings, and at other locations indicated by the
Engineer. Channels and Channel Linings shall be designed, installed and
maintained in accordance with the requirements of Sections 3.17 and 3.36 of the
VESCH.
9. Riprap Outlet Protection shall be constructed at the locations shown on the
Drawings and at other locations indicated by the Engineer. All Riprap Outlet
Protection shall be designed, installed and maintained in accordance with the
requirements of Sections 3.18 and 3.19 of the VESCH.
10. Temporary Construction Entrances shall be located at points where vehicles enter
and leave a construction site and at other locations indicated by the Engineer.
Temporary Construction Entrances shall be designed, installed and maintained in
accordance with the requirements of Section 3.02 of the VESCH.
1.07 GUARANTEE
A. All restoration and revegetation Work shall be subject to the one-year guarantee period of
the Contract as specified in the General Conditions.
PART 2 -- MATERIALS
2.01 MATERIALS
A. Materials for use in erosion and sedimentation control devices shall be in accordance with
the Virginia Erosion and Sediment Control Handbook.
2.02 TEMPORARY SEDIMENT TRAPS
A. Temporary Sediment Traps shall be constructed as shown on the Contract Drawings and as
specified herein. The Temporary Sediment Traps shall be constructed and maintained in
accordance with Part 3 of this Section, and Section 3.13 of the VESCH, to the satisfaction of
the Engineer and/or local program administrator until a vegetative ground cover has been
established. The cost of the Temporary Sediment Traps shall include the excavation,
grading, diversion ditches, stone for erosion control, washed stone, geotextile, etc. and all
maintenance activities required.
2.03 TEMPORARY DIVERSIONS
A. Temporary Diversions shall be constructed as shown on the Contract Drawings and as
specified herein. Temporary Diversions shall be installed and maintained in accordance
with Part 3 of this Section, and Section 3.12 of the VESCH, to the satisfaction of the
Engineer and/or local program administrator until the site has been stabilized. The cost of
Temporary Diversions shall include the excavation and all maintenance and restoration
activities required.
2.04 SILT FENCE
32135-011102276:10101114 02276-5 GAC Upgrades at the Urban WTPs
A. Silt Fence shall be installed and maintained in accordance with the Maintenance paragraph,
and Section 3.05 of the VESCH, to the satisfaction of the Engineer until the site has been
stabilized. The cost of Silt Fence shall include the fabric, posts, wire fabric, excavation and
all maintenance and restoration activities required.
B. Silt Fence shall be a woven geotextile filter fabric made specifically for sediment control.
Filter fabric shall not rot when buried and shall resist attack from soil chemicals, alkalies and
acids in the pH range from 2 to 13, and shall resist damage due to prolonged ultraviolet
exposure. Filter fabric shall be Type FX-11, as manufactured by Carthage Mills, Type
910SC, as manufactured by Synthetic Industries, Inc., Amoco 2130 as manufactured by
Amoco Fabrics & Fibers Co.
C. Filter fabric for the silt fence shall have the following minimum properties:
Value Test Method
Grab Tensile Strength 100 Ibs ASTM D 4632
Grab Elongation 15% ASTM D 4632
Trapezoid Tear Strength 50 Ibs ASTM D 4533
Mullen Burst Strength 265 Ibs ASTM D 3786
Puncture Strength 58 Ibs ASTM D 4833
Retained Strength
(500 hrs. accelerated
UV exposure) 80% ASTM D 4355
Filtration Efficiency 75% VTM-51
Flow Rate 10/gal/min/ft.2 ASTM D 4491
Height 36 inches
D. Posts for silt fence shall be steel and shall have the following properties:
ASTM Designation:
Length:
Weight:
Area of Anchor Plate:
ASTM A702
5-Feet Long (T-Type)
1.25 Ibs/foot (min.)
14 Sq. In.
Note: Five (T) Fasteners shall be furnished with each post.
E. Wire Fabric for the silt fence shall have the following properties:
Wire Fabric Designation
Designation:
Width:
Number of Line Wires:
Stay Wire Spacing:
Line and Stay Wires:
Top and Bottom Wires:
832-12-10-12.5 Class 1
ASTM A116
32"
8
12"
12.5 Ga.
10 Ga.
32135-011102276:10101114 02276-6 GAC Upgrades at the Urban WTPs
Wire Coating: ASTM Class 1 Zinc Coating
2.05 RIP RAP
A. The Contractor shall place rip rap as shown on the Drawings and as specified in Section
414 of the VDOT Road and Bridge Specifications. The stone for rip rap shall consist of field
stone or rough unhewn quarry stone. The stone shall be sound, durable, and free from
seams, cracks, or other structural defects. The rip rap shall be as specified on the
Drawings.
2.06 CULVERT INLET PROTECTION
A. Culvert Inlet Protection shall be constructed as shown on the Drawings and as specified
herein. The culvert inlet protection shall be constructed at the upstream end of all culverts
as indicated and maintained in accordance with Part 3 of this Section, and Section 3.08 of
the VESCH, to the satisfaction of the Engineer until the site has been stabilized. The cost of
the culvert inlet protection shall include the excavation, grading, stone for erosion control,
riprap, etc. and all maintenance activities required.
2.07 STRAW WITH NET TEMPORARY SOIL STABILIZATION BLANKET (SSB)
A. The Contractor shall place straw with net temporary channel and slope SSB as shown on
the Drawings. The blanket shall consist of clean wheat straw from agricultural crops made
into a knitted straw blanket that is machine assembled. The straw shall be evenly
distributed throughout the blanket. The blanket shall be covered with a photodegradable
synthetic mesh attached to the straw with degradable thread.
B. The Contractor shall place the straw with net temporary channel and slope SSB where
directed immediately after the channel or slope has been properly graded and prepared,
fertilized, and seeded. The netting shall be on top with the straw in contact with the soil.
C. The Contractor will immediately repair or replaced section of straw with net temporary
channel and slope SSB which is not functioning properly or has been damaged in any way
until a stable growth of grass has been established.
D. Straw with net SSB shall be North American Green S150 matting, American Excelsior Co.,
Curlex I, Contech SFB1, or equal with a minimum shear stress value of 1.50 lb. /ft.2
2.08 CURLED WOOD OR COCONUT FIBER TEMPORARY SOIL STABILIZATION BLANKET
(SSB)
A. The Contractor shall place curled wood or coconut fiber channel and slope SSB in channels
or on slopes as shown on the Drawings. The blanket shall consist of machine -produced
mat of curled wood excelsior or coconut fiber with consistent thickness and the fibers evenly
distributed over the entire area of the blanket. The top of the blanket shall be covered with
a biodegradable synthetic mesh. The mesh shall be attached to the curled wood excelsior
or coconut fiber with photodegradable synthetic yarn.
B. The Contractor shall place the curled wood or coconut fiber channel and slope SSB where
directed immediately after the ditch has been properly graded and prepared, fertilized, and
seeded. The mesh shall be on top with the fibers in contact with the soil.
32135-011102276:10101114 02276-7 GAC Upgrades at the Urban WTPs
C. The Contractor will immediately repair or replace section of blanket which is not functioning
properly or has been damaged in any way until a stable growth of grass has been
established.
D. Blanket shall be American Excelsior Curlex II, North American Green C125, Contech EFB4
or equal matting with a minimum shear stress value of 2.0 lb./ft.2.
2.09 SYNTHETIC SOIL STABILIZATION MATTING (SSM)
A. The Contractor shall place synthetic channel and slope SSM in channel or on slope as
shown on the Drawings. The mat shall consist of entangled nylon, polypropylene or
polyester monofilaments mechanically joined at their intersections forming a three
dimensional structure. The mat shall be crush -resistant, pliable, water -permeable, and
highly resistant to chemical and environmental degradation.
B. The Contractor shall place the synthetic SSM where directed immediately after the channel
or slope has been properly graded and prepared.
C. After the SSM has been placed, the area shall be properly fertilized and seeded as specified
allowing the fertilizer and seeds to drop through the net.
D. The Contractor will immediately repair or replace section of SSM which is not functioning
properly or has been damaged in any way until a stable growth of grass has been
established.
E. Synthetic SSM shall be Enkamat 7020 as manufactured by Colband Geosynthetics,
Synthetic Industries Landlock Erosion Mat TRM 1060, TH8 as manufactured by TC Mirifi, or
equal matting with a minimum shear stress value of 5.0 lb./ft.2.
2.10 TEMPORARY GRAVEL CONSTRUCTION ENTRANCES
A. Temporary gravel construction entrances shall be constructed as shown on the Drawings
and as specified herein. Temporary gravel construction entrances shall be maintained in
accordance with Part 3 of this Section, and Section 3.02 of the VESCH, to the satisfaction of
the Engineer until the site has been stabilized. The cost of temporary gravel construction
entrances shall include the gravel, truck wash racks and washwater, etc. and all
maintenance activities required.
2.11 TEMPORARY SOIL STABILIZER
A. The temporary agent for soil erosion control shall consist of an especially prepared highly
concentrated powder which, when mixed with water, forms a thick liquid such as "Enviroseal
2001" by Enviroseal Corporation, "Terra Control' by Quattro Environmental, Inc., or "CHEM-
CRETE ECO-110" by International CHEM-CRETE Corporation, and having no growth or
germination inhibiting factors. The agent shall be used for hydroseeding grass seed in
combination with other approved amendments resulting in a highly viscous slurry which,
when sprayed directly on the soil, forms a gelatinous crust.
PART 3 -- EXECUTION
3.01 INSTALLATION AND MAINTENANCE
32135-011102276:10101114 02276-8 GAC Upgrades at the Urban WTPs
A. Erosion and sedimentation control devices shall be established prior to the clearing
operations in a given area. Where such practice is not feasible, the erosion and
sedimentation control device(s) shall be established immediately following completion of the
clearing operation.
B. The Contractor shall furnish the labor, materials and equipment required for routine
maintenance of all erosion and sedimentation control devices. Maintenance shall be
scheduled as required for a particular device to maintain the removal efficiency and intent of
the device. Maintenance shall include but not be limited to 1) the removal and satisfactory
disposal of trapped sediments from traps or silt barriers and 2) replacement of filter fabrics
used for silt fences. Sediment removed from erosion and sedimentation control devices
shall be disposed of in locations that will not result in off site sedimentation as acceptable to
the Engineer, at no additional cost to the Owner.
C. The Contractor shall provide temporary sedimentation traps at all locations shown on the
Contract Drawings and for the settling of water pumped from the excavations or intercepted
by drainage ditches for keeping water out of the excavations or to protect existing
structures. The Contractor shall seed and mulch the earthen embankment with temporary or
permanent vegetation immediately after installation. The Contractor shall remove trapped
sediment from the basins when the design capacity has been reduced by 25% to maintain
their effectiveness or as indicated by the Engineer. Sediment material removed from the
basins shall be disposed by the Contractor in locations that will not result in off -site
sedimentation as acceptable to the Engineer, at no additional cost to the Owner.
Inspect temporary sediment traps at least once every 14 days and within 48 hours
after each runoff producing rainfall event. Remove sediment and restore the trap to
its original dimensions when the sediment has accumulated to one -forth the design
volume of the trap. Place the sediment that is removed in a designated disposal
area and replace the contaminated part of the aggregate facing.
2. Check the structure for damage from erosion or piping. Periodically check the depth
of the spillway to ensure it is a minimum of 1.0 ft. below the low point of the
embankment. Immediately fill settlement of the embankment to slightly above
design grade. Riprap displaced from the spillway must be replaced immediately.
3. After all sediment -producing areas have been permanently stabilized and
permission has been obtained from the plan approving authority, remove the
structure and all unstable sediment. Smooth the area to blend with the adjoining
areas and stabilize properly.
D. The Contractor shall provide temporary diversions at all locations noted on the Contract
Drawings. All temporary diversions shall outlet at a temporary sediment trap or other
appropriate structure.
Inspect temporary diversions at least once every 14 days and within 48 hours after
each runoff producing rainfall event. Immediately remove sediment form the flow
area and repair the diversion ridge. Carefully check outlets and make timely repairs
as needed. When the area protected is permanently stabilized and permission has
been obtained from the plan approving authority, remove the ridge and the channel
to blend with the natural ground level and appropriately stabilize it.
32135-011102276:10101114 02276-9 GAC Upgrades at the Urban WTPs
E. Silt fence shall be erected as shown on the Drawings and specified herein. Silt fence shall
be erected and maintained to the satisfaction of the Engineer until a vegetative ground
cover has been established. Replacement of the filter fabric, if required by the Engineer,
will be at the Contractor's expense.
Inspect silt fence at least once every 14 days and within 48 hours after each runoff
producing rainfall event. Make required repairs immediately.
2. Should the fabric of a silt fence collapse, tear, decompose or become in -effective,
replace it promptly.
3. Remove sediment deposits as necessary to provide adequate storage volume for
the next rain and to reduce pressure on the fence. Take care to avoid undermining
the fence during cleanout.
4. Remove all fencing materials and unstable sediment deposits and bring the area to
grade and stabilize it after the contributing drainage area has been properly
stabilized. Removal of silt fence shall be permitted only with the prior approval of
the Engineer, or the local governing agency.
F. Riprap shall be graded so that the smaller stones are uniformly distributed through the
mass. The Contractor may place the stone by mechanical methods, augmented by hand
placing where necessary or ordered by the Engineer. The placed riprap shall form a
properly graded, dense, neat layer of stone. The placed riprap shall have a minimum depth
of 24 inches. Filter fabric shall be used under all riprap. The filter fabric must meet the
requirements in Section 3.19 of the VESCH.
G. Riprap and stone for erosion control shall be dumped and placed in such manner that the
larger rock fragments are uniformly distributed throughout the rock mass and the smaller
fragments fill the voids between the larger fragments. Rearranging of individual stones by
equipment or by hand shall only be required to the extent necessary to secure the results
specified above, to protect structures from damage when rock material is placed against the
structures or to protect the underlying Filter Fabric from damage during installation.
H. The Contractor shall provide Culvert Inlet Protection at all locations noted on the Contract
Drawings.
Inspect Culvert Inlet Protection at least once every 14 days and within 48 hours after
each runoff producing rainfall event. Remove sediment and restore the inlet
protection to its original dimensions when the sediment has accumulated to one-half
the design depth. Place the sediment that is removed in a designated disposal area
and replace the contaminated part of the gravel facing.
2. Check the structure for damage from erosion or piping. Stone or riprap displaced
from the berm must be replaced immediately.
32135-011102276:10101114 02276-10 GAC Upgrades at the Urban WTPs
3. After all sediment -producing areas
permission has been obtained from
structure and all unstable sediment.
areas and stabilize properly.
have been permanently stabilized and
the plan approving authority, remove the
Smooth the area to blend with the adjoining
Engineer may direct the Contractor to place Straw with Net, Curled Wood or Coconut Fiber
SSB's and Synthetic SSM's in permanent channels or on slopes at other locations not
shown on Drawings.
All temporary and permanent channel linings shall be unrolled in the ditch in the
direction of the flow of water. Temporary and permanent linings shall be installed in
accordance with the requirements of Section 3.36 of the VESCH and per
manufacturer's specifications.
2. During the establishment period, check grass, SSB and SSM-lined channels at least
once every 14 days and within 48 hours after each runoff producing rainfall event.
For grass -lined channel once grass is established, check periodically and after every
runoff producing rainfall event. Immediately make repairs. It is particularly
important to check the channel outlet and all road crossings for bank stability and
evidence of piping and scour holes. Give special attention to the outlet and inlet
sections and other points where concentrated flow enters. Remove all significant
sediment accumulations to maintain the designed carrying capacity. Keep the grass
in a healthy, vigorous condition at all times.
The Contractor shall provide temporary slope drains at all location noted on the Contract
Drawings, and at other locations as may be directed by the Engineer.
Inspect the temporary slope drain and supporting diversion at least once every 14
days and after every runoff producing rainfall event and promptly make necessary
repairs. When the protected area has been permanently stabilized, temporary
measures may be removed, materials disposed of properly, and all disturbed areas
stabilized appropriately.
K. The Contractor shall provide temporary construction entrances at all locations noted on the
Contract Drawings, and at all other locations as may be directed by the Engineer.
Maintain the gravel pad in a condition to prevent mud or sediment from leaving the
construction site. This may require periodic topdressing with VDOT #1 course
aggregate. Inspect each construction entrance at least once every 14 days and
within 48 hours after each runoff producing rainfall event and clean out as
necessary. Immediately remove all objectionable materials spilled, washed, or
tracked onto public roadways.
2. Contractor shall provide wash rack and wash water for temporary construction
entrances. The roadway under the temporary construction entrance shall be graded
to drain into temporary sediment traps until construction activities cease and site
around temporary construction entrance has been permanently stabilized.
L. Permanent or temporary soil stabilization shall be applied to denuded areas within seven
days after final grade is reached on any portion of the site. Temporary soil stabilization shall
be applied within seven days to denuded areas that may not be at final grade but will remain
dormant (undisturbed) for longer than 30 days. Permanent stabilization shall be applied to
32135-011102276:10101114 02276-11 GAC Upgrades at the Urban WTPs
areas that are to be left dormant for more than one year. Preparation of areas for
permanent stabilization shall be performed in accordance with Section 2.32 of the VESCH.
Reseed and mulch temporary seeding areas where seedling emergence is poor, or
where erosion occurs, as soon as possible. Do not mow. Protect from traffic as
much as possible.
2. Generally, a stand of vegetation cannot be determined to be fully established until
soil cover has been maintained for one full year from planting. Inspect seeded
areas for failure and make necessary repairs and reseedings within the same
season, if possible.
3. Reseeding — If a stand has inadequate cover, re-evaluate choice of plant materials
and quantities of lime and fertilizer. Re-establish the stand after seedbed
preparation or over -seed the stand. Consider seeding temporary, annual species if
the time of year is not appropriate for permanent seeding.
4. If vegetation fails to grow, soil must be tested to determine if acidity or nutrient
imbalance is responsible.
5. Fertilization — On the typical disturbed site, full establishment usually requires
refertilization in the second growing season. Fine turf requires annual maintenance
fertilization. Use soil tests if possible or follow the guidelines given for the specific
seeding mixture.
M. Additional Requirements
All storm sewer piping shall be blocked at the end of every Working day until the
inlet is constructed above grade.
2. All streets around the construction area shall be scraped as necessary to prevent
accumulation of dirt and debris.
3. The Contractor shall provide adequate means to prevent sediment from entering
storm drains, curb inlets (curb inlet filter box), ditches, streams, or bodies of water
downstream of any area disturbed by construction. Excavation materials shall be
placed upstream of trench or other excavation to prevent sedimentation of offsite
areas. In areas where a natural buffer area exists between the Work area and the
closest stream or water course, this area shall not be disturbed.
4. The Engineer may direct the Contractor to place additional sediment and erosion
control devices at other locations not shown on the Drawings.
5. The Contractor agrees to hold the Owner or any of its agents harmless from any and
all liability, loss or damage that may arise out of a violation to the Erosion and
Sediment Control Ordinance.
6. The Contractor shall monitor and take precautions to control dust, including, but not
limited to, use of water or chemical dust palliative, limiting the number of vehicles
allowed on site, minimizing the operating speed of all vehicles.
32135-011102276:10101114 02276-12 GAC Upgrades at the Urban WTPs
3.02 INSPECTIONS AND MAINTENANCE
A. The Contractor shall be responsible for the implementation of the Maintenance and
Inspection Procedures as written by the Engineer. The implementation must comply with
guidelines as set forth in General Virginia Pollutant Discharge Elimination System Permit
Regulation for Discharges of Storm Water From Construction Activities (9 VAC 25-880) and
VPDES General Permit No. VAR10.
B. The Contractor shall designate a Qualified Person to perform inspections required by this
Section 02276. The following areas are to be inspected and maintenance performed, if
needed, at least once every 14 calendar days and within 48 hours of the end of runoff
producing storm event.
Disturbed areas of the construction site that have not undergone final stabilization
2. Erosion and sediment control structures
3. All locations where vehicles enter or exit the site
4. Material storage and construction laydown areas that are exposed to precipitation
and have not been finally stabilized
C. When a Storm Water Pollution Prevention Plan (SWP3) is provided in the Contract
Documents, the Qualified Person shall follow the practices inspection and maintenance
requirements described in the SWP3. (See the Appendix for the SWP3, if applicable). All
appropriate records required by the SWP3 shall be maintained on site.
D. Immediate action will be taken to correct deficiencies to BMP's. The State reserves the
right to stop all construction activities not related to maintaining BMP's until such
deficiencies are repaired.
E. In areas that have been finally stabilized, inspections and, if necessary, maintenance by
Contractor will occur at least once per month for the duration of the contract or project,
whichever is longer.
F. During inspections the following will be observed and appropriate maintenance procedures
taken:
The conformance to specifications and current condition of all erosion and sediment
control structures.
2. The effectiveness and operational success of all erosion and sediment control
measures.
3. The presence of sediments or other pollutants in storm water runoff at all runoff
discharge points.
4. If reasonably accessible, the presence of sediments or other pollutants in receiving
Waters.
5. Evidence of off -site tracking at all locations where vehicles enter or exit the site.
32135-011102276:10101114 02276-13 GAC Upgrades at the Urban WTPs
G. An inspection checklist is included in the SWP3. This checklist must be completed during
each inspection, dated, and signed by the Qualified Person conducting the inspection.
Completed inspection checklist shall be kept on -site with the Contract Documents and
submitted to the Engineer on a monthly basis. The Contractor will repair deficiencies within
24 hours of inspection.
3.03 REMOVAL OF TEMPORARY SEDIMENT CONTROL STRUCTURES
A. At such time that temporary erosion and control structures are no longer required under this
item, the Contractor shall notify the Engineer, Albemarle County, and the University of
Virginia of its intent and schedule for the removal of the temporary structures, and obtain the
Engineer's approval in writing prior to removal. Once the Contractor has received such
written approval from the Engineer, the Contractor shall remove, as approved, the
temporary structures and all sediments accumulated at the removed structure shall be
returned upgrade. In areas where temporary control structures are removed, the site shall
be left in a condition that will restore original drainage. Such areas shall be evenly graded
and seeded as specified in Section 02910, Final Grading and Landscaping.
3.04 NOTICE OF TERMINATION
A. When all construction activities have ceased, final stabilization has been implemented by
the Contractor, and the site is in compliance with the VPDES permit, the Contractor,
together with the Engineer shall submit a Notice of Termination.
- END OF SECTION -
32135-011102276:10101114 02276-14 GAC Upgrades at the Urban WTPs
SECTION 02500
SURFACE RESTORATION
PART 1 -- GENERAL
1.01 THE REQUIREMENT
A. Provide all labor, equipment, and materials necessary for final grading, topsoil placement,
and miscellaneous site work not included under other Sections but required to complete the
work as shown on the Drawings and specified herein.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Section 02200 - Earthwork
B. Section 02276 - Erosion and Sedimentation Control
C. Section 02910 - Final Grading and Landscaping
PART 2 -- MATERIALS
2.01 TOPSOIL
A. Topsoil shall meet the requirements of Section 02200 — Earthwork.
PART 3 -- EXECUTION
3.01 FINAL GRADING
A. Following approval of rough grading the subgrade shall be prepared as follows:
1. For riprap, bare soil 24 inches below finish grade or as directed by Engineer.
2. For topsoil, scarify 2-inches deep at 4 inches below finish grade.
3.02 TOPSOIL PLACEMENT
A. Topsoil shall be placed over all areas disturbed during construction under any contract
except those areas which will be paved, graveled or rip rapped.
0
B. Topsoil shall be spread in place for lawn and road shoulder seed areas at a 4-inch N
consolidated depth and at a sufficient quantity for plant beds and backfill for shrubs and A
trees.
C. Topsoil shall not be placed in a frozen or muddy condition.
32135-011102500:08108114 02500-1 GAC Upgrades at the Urban WTPs
0
E
Final surface shall be hand or mechanically raked to an even finished surface to finish grade
as shown on Drawings.
All stones and roots over 4-inches and rubbish and other deleterious materials shall be
removed and disposed of.
- END OF SECTION -
32135-011102500:08108114 02500-2 GAC Upgrades at the Urban WTPs
SECTION 02510
PAVING AND SURFACING
PART 1 -- GENERAL
1.01 THE REQUIREMENT
A. The Contractor shall furnish all labor, equipment and materials and perform all operations in
connection with the construction of asphalt concrete pavement, asphalt concrete overlay,
gravel roads, concrete curb and gutter, repair and reconstruction of existing asphalt
concrete pavement, repair of existing gravel roads, and pavement markings complete as
specified herein and as detailed on the Drawings.
B. All new roads including the replacement of portions of the existing roads shall be to the
limits, grades, thicknesses and types as shown on the Drawings. Patches for pipe
crossings and areas damaged during the construction work shall be asphalt and/or gravel,
depending upon the material encountered, unless otherwise indicated.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Requirements of related work are included in Division 1, Division 2 and Division 3 of these
Specifications.
1.03 RELATED SECTIONS
A. Section 02200 - Earthwork
B. Section 03300 - Cast -In -Place Concrete
1.04 STANDARD SPECIFICATIONS
A. Except as otherwise provided in the Specifications or on the plans, all work shall be in
accordance with the Virginia Department of Transportation Road and Bridge Specifications
except that any reference to WDOT", "Department" or "Unit" shall mean the "Owner".
B. Except with the approval of the Engineer, the placing of asphalt concrete surface paving
shall be subject to the Seasonal and Weather Restrictions set forth in VDOT Specifications.
91-TCYN Q I I 11T
2.01 SELECT FILL
A. The Contractor shall place select fill as necessary to complete the embankments,
shoulders, subgrade foundation and replacement for removed unsuitable material in
accordance with VDOT Section 303, and Section 02200, Earthwork.
32135-011102510:08108114 02510-1 GAC Upgrades at the Urban WTPs
2.02 GRAVEL
A. All work, including materials, associated with gravel shall be in accordance with VDOT
Section 202, Crusher Run Aggregate, Size No. 26.
2.03 AGGREGATE BASE COURSE (ABC) AND SUBBASE COURSE
A. All work, including materials, associated with Aggregate Base Course shall be in
accordance with VDOT Sections 308, Subbase Course, and 309, Aggregate Base Course,
except Articles 308.05 and 309.06 shall be deleted. Material shall be Type I Aggregate
Base Material, Size 21 A or 22, conforming with the applicable section of VDOT Section 208,
Subbase and Aggregate Base Material.
2.04 ASPHALT CONCRETE PAVEMENT
A. All work, including materials, associated with asphalt pavement shall be in accordance with
VDOT Sections 315, Asphalt Concrete Pavement, and 211, Asphalt Concrete, except that
Article 315.08 shall be deleted. Base Course shall be Superpave BM 25.0. Intermediate
Course, if required, shall be Superpave IM 19.OA. Surface course shall be Superpave 8M
9.5A.
B. The job mix formula shall be delivered to the Engineer at least two (2) weeks prior to
beginning paving operations.
2.05 CONCRETE CURB AND GUTTERS
A. Concrete shall be Class B in accordance with the requirements of Section 03300, Cast -In -
Place Concrete, except that concrete shall be air -entrained to provide an air content of 6%
± 1.5%.
B. Premolded expansion joint filler for expansion joints shall conform to ASTM D 1751 and
shall be 1/2-inch thick, minimum.
2.06 ASPHALT TACK COAT
A. All work, including materials, associated with asphalt tack coat shall be in accordance with
Section 310, Tack Coat, of the VDOT Standard Specifications for Roads and Structures,
except that Article 310.04 shall be deleted.
2.07 ASPHALT PRIME COAT
A. All work including materials associated with Asphalt Prime Coat shall be in accordance with
Section 311, Prime Coat, of the VDOT Specifications except that Article 311.04 shall be
deleted. Application rates shall be 0.40 gallons of asphalt per square yard of pavement with
a cover of #68 coarse aggregate at 30 pounds per square yard of pavement.
32135-011102510:08108114 02510-2 GAC Upgrades at the Urban WTPs
PART 3 -- EXECUTION
3.01 EMBANKMENT
A. The embankment shall be constructed in accordance with Section 02200, Earthwork.
3.02 SUBGRADE
A. The subgrade, where shown on the Drawings, shall be compacted in accordance with
Section 02200 - Earthwork.
3.03 BASE COURSE
A. The finished base course of all paving shall be ABC and shall be of the thickness shown on
the Drawings, formed true to crown and grade. Gravel roads, including repair to existing
gravel roads shall be ABC and shall be of the thicknesses shown on the Drawings, formed
true to crown and grade. No fill material except new ABC shall be placed on top of existing
gravel.
A. The finished base course of all paving shall be ABC and shall be of the thickness shown on
the Drawings, formed true to crown and grade. Finished density shall be as specified in
VDOT Section 309, Aggregate Base Course.
3.04 ASPHALT CONCRETE PAVEMENT
A. Prior to placement of the asphalt concrete base course, the aggregate base course shall be
inspected for damage or defects and repaired to the satisfaction of the Engineer. The
surface of the base course shall be approved by the Engineer.
B. The prime coat shall be applied to the surface of the approved base course as described in
VDOT Section 311, Prime Coat. Equipment for applying the prime coat shall be power -
oriented pressure spraying or distributing equipment suitable for the materials to be applied
and approved by the Engineer.
C. The asphalt concrete base shall be placed and compacted on the base course in layers not
to exceed four inches.
D. Prior to placement of the asphalt concrete surface course, the base/binder course shall be
inspected for damage or defects and repaired to the satisfaction of the Engineer.
E. The tack coat shall be applied to the surface of the approved base/binder course as
described in VDOT Section 310. Equipment for applying the tack coat shall be
power -oriented pressure spraying or distributing equipment suitable for the materials to be
applied and approved by the Engineer.
F. The Asphalt Concrete Surface Course shall be placed and compacted in accordance with
requirements of VDOT Specifications.
32135-011W2510:08/08/14 02510-3 GAC Upgrades at the Urban WTPs
3.05 CONCRETE CURB AND GUTTER
A. The expansion joint filler for concrete curb and gutters shall be cut to conform with the cross
section of the curb. Expansion joints shall be spaced at intervals of not more than 25-feet.
Formed control joints shall be installed at intervals not exceeding 10 feet. Depth of joint
shall be 1/3 the thickness. Curved forms shall be used where radii are indicated; straight
segments shall not be permitted. Upon removal of the forms, exposed curb faces shall be
immediately rubbed down to a smooth and uniform surface. No plastering shall be
permitted.
3.06 UNDERGROUND UTILITY LINES
A. Where an underground utility line is beneath the new roadway, the backfilling shall be
carried out with special care, and the final consolidation shall be accomplished by a
vibratory roller. Construction of the roadway over the trench shall be deferred as long as
practicable.
3.07 JUNCTION WITH OTHER PAVING
A. Where new asphalt concrete pavement abuts existing asphalt concrete pavement, the
existing pavement shall be cut back to insure obtaining the specified compaction of the new
pavement courses and interlocking adjoining courses. Existing subbase courses shall be
cut back from the subgrade level of the new pavement on a one-on-one slope into the
existing pavement, and the asphalt courses of the existing pavement shall be removed for
an additional 6-inches back from the slope. The edge of the existing asphalt courses shall
be saw cut straight and true. The faces between new and existing asphalt courses shall
receive an application of tack coat.
3.08 ASPHALT CONCRETE OVERLAY
A. Where asphalt concrete is proposed to be placed over an existing asphalt surface, the
surfaces shall be thoroughly cleaned by power brooming and a tack coat shall be applied in
accordance with VDOT Section 310, Tack Coat, prior to installing the overlay. The overlay
shall be applied in accordance with Subsections 2.06 and 3.05 and Standard Details shown
on the Drawings.
- END OF SECTION -
32135-011102510:08108114 02510-4 GAC Upgrades at the Urban WTPs
SECTION 02604
UTILITY STRUCTURES
PART 1 -- GENERAL
1.01 THE REQUIREMENT
A. Furnish all materials, labor, equipment, and tools required for the design, fabrication,
delivery and installment of utility structures and appurtenances in accordance with the
Drawings and as specified herein.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Section 02200 — Earthwork
B. Section 03200 — Reinforcing Steel
C. Section 03250 — Concrete Accessories
D. Section 03300 — Cast -in -Place Concrete
E. Section 03400 — Precast Concrete
F. Section 05540 — Castings
1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. Without limiting the generality of the other requirements of the specifications, all work herein
shall conform to the applicable requirements of the following documents. All referenced
specifications, codes, and standards refer to the most current issue available at the time of
Bid.
1. ASTM C478 — Specification for Precast Reinforced Concrete Manhole Sections
2. ASTM C857 — Minimum Structural Design Loading for Underground Precast
Concrete Utility Structures
3. ASTM C990 - Specifications for Joints in Concrete Pipe, Manholes, and
Precast Box Sections Using Preformed Flexible Joint Sealants
1.04 SUBMITTALS
0
A
A. Submit samples and/or Shop Drawings in accordance with Section 01300, Submittals.
w
W
A
B. In addition to items listed in Section 03400, Precast Concrete, Shop Drawings shall include,
but not be limited to:
1. Complete layout and installation Drawings and schedules with clearly marked
dimensions.
32135-011102604:08108114 02604-1 GAC Upgrades at the Urban WTPs
2. Material certificates on all piping materials.
3. Structural design calculations sealed by a P.E. registered in the State of Virginia.
Design calculations for precast manholes and vaults shall include confirmation
structures adequately resist flotation when they are totally empty and subjected to
groundwater full height of structure.
4. Results of leakage test
PART 2 -- PRODUCTS
2.01 PRECAST MANHOLES, VAULTS, AND METER BOXES
A. Precast utility structures shall be furnished with waterstops, sleeves and openings as noted
on the Drawings. Box out for wall pipes shall conform accurately to the sizes and elevations
of the adjoining pipes. Precast utility structures shall be watertight and conform to the
requirements of ASTM C 478 and ASTM C857 with the following modifications there to:
1. Materials shall conform to Section 03400, Precast Concrete.
2. Manholes shall meet the following:
a. Manhole section shall have an internal diameter of 4'-0", unless noted
otherwise.
b. Minimum manhole wall thicknesses shall be 5 inches for 4 foot and 5 foot
diameter manholes, 6 inches for 6 foot diameter manholes and 7 inches for
7 foot diameter manholes.
C. Manholes and utility structures shall include ballast concrete and/or other
means necessary to insure manholes resist flotation when empty and
subjected to groundwater full height of structure.
d. Precast manholes and utility structures shall be as manufactured by NC
Prod ucts/Oldcastle, Tindall Products, or equal.
3. The date and name of manufacturer shall be marked inside each precast section.
4. No more than two lift holes may be cast or drilled in each section.
5. Dimensions shall be as shown on the Drawings.
6. Covers and frames shall be as specified in Section 2.13.
7. Mechanical Details such as piping, electrical, and other details shall be as shown on
the Drawings.
B. Joints between manhole and utility structures riser sections and at base slabs shall be
groove type.
32135-011W2604:08/08/14 02604-2 GAC Upgrades at the Urban WTPs
2.02 BRICK
A. Brick shall be sound, hard -burned common brick conforming to ASTM C32, Grade MS.
2.03 MORTAR
A. Mortar shall conform to Section 04100 Mortar and Masonry Grout.
2.04 CONCRETE
A. Concrete shall conform to Section 03300, Cast -in -Place Concrete.
2.05 REINFORCING
A. Reinforcing shall conform to Section 03200, Reinforcing Steel.
2.06 PRECAST CONCRETE
A. Precast concrete shall conform to Section 03400, Precast Concrete.
2.07 CONCRETE BLOCK
A. Concrete block shall be solid, rectangular concrete masonry units conforming to ASTM
C139.
2.08 CASTINGS
A. Castings shall conform to Section 05540, Castings. Casting shall be of the type and size
indicated on the Drawings.
2.09 STEPS
A. Steps shall be constructed of Grade 60 steel reinforcing rod (min. 1/2-inch) and completely
encapsulated with a wear resistant and chemical resistant rubber.
B. Each step shall have a minimum vertical load resistance of 800 pounds and a minimum pull-
out resistance of 400 pounds.
C. The steps shall have 11-inch minimum tread width and shall be placed at 16-inches on
center, as shown on the Drawings.
D. Steps shall be cast in place with the concrete.
E. Steps shall only be installed as shown on the Drawings or required in the Specifications.
2.10 JOINT SEALANT
A. Joint sealant shall be a preformed flexible sealant conforming to the requirements of ASTM
C990, paragraph 6.2, Butyl Rubber Sealant. Joint sealant shall be Pro-Stik Butyl Sealant by
Press -Seal, Butyl-Nek Join Sealant by Henry ,CS-102 Butyl Rubber Sealant for all Precast
Structures by ConSeal, or equal.
32135-011W2604:08/08/14 02604-3 GAC Upgrades at the Urban WTPs
2.11 FLEXIBLE RUBBER SLEEVE
A. The spring set type shall have a stainless steel interior power sleeve or expander and shall
be the PSX assembly by Press -Seal Gasket Corporation, the Kor-N-Seal assembly by
National Pollution Control Systems, or Lock Joint Flexible Manhole Sleeve by Interpace
Corp.
B. The cast -in -place type shall conform to ASTM C923 and shall include stainless steel take up
clamps.
C. Flexible seal assemblies shall permit at least an eight (8) degree deflection from the center
line of the opening in any direction while maintaining a watertight connection.
2.12 RUBBER BLADDER
A. The rubber bladder seal shall conform to ASTM C923 suitable for pressure testing at 10 psi
minimum, with a 3/8 inch minimum wall thickness.
B. The rubber bladder seal shall contain an environmentally safe, anti -bacterial compound
which turns into a high viscosity gel when in contact with pressurized water.
C. The rubber bladder seal shall be NPC Contour Seal by Kor-N-Seal, or equal.
2.13 COVERS AND FRAMES
A. Covers and frames shall comply with Section 05540, Castings and shall be provided by the
utility structure manufacturer.
B. Manhole covers and frames shall meet the following requirements:
1. Locate so that there is ready access to the manhole steps
2. Clear opening shall be a minimum of 22 inches, unless otherwise indicated on the
Drawings.
3. Watertight manhole frames and covers shall be suitable for 20 psi internal pressure
and shall be Neenah Model R-1915, Type P or L or equal cast in place.
4. Non -watertight manhole covers shall be perforated and shall be Neenah Model R-
1668, or equal.
5. Storm drain grated inlet frames and grates shall be Neenah R-1878-B7G, East
Jordan Iron Works V5660, or equal.
6. Curb inlet frames and grates shall be Neenah R-3067, East Jordan Iron Works EJ
7030, or equal, and shall include frame, grate, and hood.
C. Vault covers shall have lifting handles and shall be bolted with stainless steel bolts
complying with Section 05050, Metal Fastening.
D. All frames and covers shall be given one shop coat of asphalt or coal tar varnish, unless
otherwise specified.
32135-011102604:08108114 02604-4 GAC Upgrades at the Urban WTPs
E. Frames and covers shall be identical throughout the Contract.
2.14 GRATES
A. Grates shall comply with Section 05540, Castings.
2.15 CONCRETE BALLAST
A. Concrete ballast shall be Class B concrete in conformance with Section 03300, Cast -in -
Place Concrete. Ballast shall be provided as necessary to insure manhole resists flotation
when empty and subjected to full height groundwater conditions.
2.16 FLEXIBLE JOINT SEALER
A. Flexible joint sealer shall be a rubber ring waterstop as manufactured by Fernco Joint
Sealer Co., or equal.
2.17 EPDXY BONDING AGENT
A. Epoxy bonding agent shall conform to Section 03250, Concrete Accessories.
PART 3 -- EXECUTION
3.01 DESIGN CRITERIA
A. Minimum structural design loading for underground precast concrete vaults shall be as
indicated in ASTM C857, unless otherwise noted herein. Precast items subjected to
vehicular traffic shall be designed for H-20 traffic loading. Other precast items shall be
designed for a vertical live load of 300 psf.
B. Walls of precast items shall be designed for a vertical surcharge of 100 psf.
C. Precast manholes and vaults shall be designed to resist flotation when totally empty and
subjected to groundwater full height of the manhole/vault.
3.02 FABRICATION AND CASTING
A. Fabrication and casting shall conform to Section 03400, Precast Concrete, and to Section
03300, Cast -in -Place Concrete.
B. All base sections designated to receive concrete ballast and all electrical manholes shall
extend monolithically a minimum of 6 inches beyond the outside face of the wall for the
entire periphery. All other utility structures shall have a standard base.
C. Utility structures built around existing pipe shall have a cast -in -place base slab.
3.03 HANDLING, TRANSPORTING, AND STORING
A. Handling, transporting and storing of precast items shall comply with Section 03400,
Precast Concrete.
32135-011102604:08108114 02604-5 GAC Upgrades at the Urban WTPs
3.04 INSTALLATION
A. Installation shall conform with Section 03400, Precast Concrete and with the manufacturer's
recommendations or to Section 03300, Cast -in -Place Concrete.
B. Frames and covers or grates shall be set so that tops are at elevations indicated on the
Drawings or flush with finished grade where no elevation is indicated.
C. Joints between riser sections shall be sealed with joint sealant.
D. All openings in utility structures shall have flexible rubber sleeves sized to fit the connecting
pipe and installed to provide watertight joints in accordance with the manufacturer's
recommendations. The interior of the sleeve shall be filled with Class B concrete.
E. Openings that are too large for flexible rubber sleeves shall utilize rubber bladder seals
which are expanded by water injected using a pressure pump.
F. All units shall be installed plumb and level.
G. All lift holes and joints shall be filled with non -shrink grout conforming to Section 03600,
grout inside and out.
H. The manhole frames shall be set to their required elevations either with grade rings or with
two or three courses of brick masonry laid around the top of the upper wall section. Such
brick work shall be given a 1-inch mortar coat on the inside and out.
Concrete ballast shall be placed so that it bears directly on the utility structure base against
the outer wall monolithically encircling the structure for the full height indicated on the
Drawings. Additional ballast may be required where the depth or elevation of the structure
varies from the Drawings.
Brick or Concrete Block
Brick or concrete block shall be laid with broken joints and all horizontal and vertical joints
filled with cement -sand mortar. Outside of walls shall be plastered with a minimum 1-inch
thick coat of cement -sand mortar troweled smooth.
K. Connection to Existing Pipe
Verify the diameter and invert elevation of existing pipe to be connected to new
utility structures prior to beginning work on the structures.
2. Provide adequate protection to prevent damage to the existing pipe.
3. Provide adequate means for plugging and/or transferring the existing flow in the pipe
to allow for the construction of inverts and grouting.
4. Cut off the existing pipe sufficiently for connection to the new structure and remove.
5. Thoroughly clean all foreign matter and coat the pipe surface with epoxy adhesive
where the pipe joins the new structure.
32135-011W2604:08/08/14 02604-6 GAC Upgrades at the Urban WTPs
6. Install a flexible joint sealer around the pipe.
7. Grout inside and outside of wall penetration with nonshrink grout.
L. Backfill structures in accordance with Section 02200, Earthwork.
M. Clean all structures of any accumulation of silt, debris, or foreign matter and keep clean until
final acceptance of the work.
N. Excavation shall conform to Section 02200, Earthwork.
O. Structure bases shall bear on a minimum of 8 inches of compacted stone unless otherwise
indicated on the Drawings.
P. Channel Inverts
Inverts shall be placed using Class B concrete with forms sufficient to provide a
smooth half -round shape as shown on the Drawings. Manhole bases employing full
depth precast inverts are acceptable.
2. Where the slope of the line does not change through a manhole, a constant slope
shall be maintained in the invert. Where slope changes occur within a given
manhole, the transition shall be smooth and shall occur at the approximate center of
the manhole.
3. Inverts shown on the Drawings are taken at the center of the manhole unless
otherwise noted.
3.05 ADJUSTMENTS TO EXISTING UTILITY STRUCTURES
A. Adjust structures as indicated on the Drawings using concrete or cast iron adjustment rings
by approved methods.
B. Clean covers and inlet castings of all foreign material and paint with one coat of coal tar
epoxy.
3.06 ADJUSTING COLLARS AND FINAL ADJUSTMENTS
A. Adjusting collars shall be as shown on the Drawings. Final adjustments shall be made so
that the manhole ring and cover will be smooth and flush with the finished grade of the
adjacent surface, or as otherwise indicated on the Drawings for manholes shown above
grade.
3.07 FLUSHING AND TESTING
A. Obstruction - After backfilling, all sewers shall be inspected for obstructions and shall be
flushed with water. Flushing shall be a minimum velocity of 2.5 feet per second for a
duration acceptable to the Engineer. Flushing shall remove all dirt, stones, pieces of wood
and other debris which accumulated in the sewer during construction. The Contractor shall
provide a means acceptable to the Engineer for removal of debris flushed from each section
32135-011102604:08108114 02604-7 GAC Upgrades at the Urban WTPs
of sewer. If after flushing, any obstructions remain, they shall be removed at the
Contractor's expense.
B. Visual Inspection - Sewer lines shall be visually inspected from every manhole by use of
mirrors, television cameras, or other devices for visual inspection, and the lines shall all
exhibit a fully circular pattern when viewed from one manhole to the next. Lines which do
not exhibit a true line and grade or have structural defects shall be corrected to meet these
qualifications.
C. Leakage - Sewers shall be tested for leakage. The program of testing shall fit the conditions
as mutually determined by the Engineer and the Contractor. The Contractor shall take all
necessary precautions to prevent any joints from drawing while the sewers or their
appurtenances are being tested. The Contractor shall, at his own expense, correct any
excess leakage and repair any damage to the pipe and their appurtenances, or to any
structures resulting from or caused by these tests.
D. Leakage Test Procedure - Each section of sewer shall be tested by closing the lower end of
the sewer to be tested and the inlet sewer of the upper manhole with stoppers and filling the
pipe and manhole with water to a point 6 feet above the crown of the open sewer in the
upper manhole, or, if ground water is present, 6 feet above the sections average adjacent
ground water level as indicated by a monitor well installed adjacent to each manhole. The
line shall be filled with water prior to testing and allowed to stand until the pipe has reached
its maximum absorption, but not less than two (2) hours. After maximum absorption has
been reached, the head shall be re-established and tested for at least six (6) hours
maintaining the head specified above by measured additions of water. The sum of these
additions shall be the leakage for the test period.
If ground water is present to a height of at least 6 feet above the crown of the sewer at the
upper end of the pipe section to be tested, the leakage test may be made by measuring the
rate of infiltration using a suitable weir or other measuring device approved by the Engineer.
Whether the test is made by infiltration or exfiltration, the allowable leakage shall not exceed
100 gallons per day per inch of diameter per mile of sewer being tested.
Where the actual leakage exceeds the allowable, the Contractor shall discover the cause
and correct it before the sewer will be accepted. For the purpose of this subsection, a
section of sewer is defined as that length of sewer between successive manholes or special
structures or stubouts for future connections.
E. Low Pressure Compressed Air Test - If the leakage cannot be located by infiltration or
exfiltration testing, this type test may be used. The pipeline shall be considered acceptable,
when tested at an average pressure of 3.0 psi greater than the average back pressure of
any groundwater that may submerge the pipe, if the section under test does not lose air at a
rate greater than 0.0030 cfm per sq. ft. of internal pipe surface.
F. Deflection Test - No sooner than thirty (30) days after final backfill installation, each section
of PVC pipe shall be checked for vertical deflection using an electronic deflecto-meter or a
rigid "Go -No -Go" device. Vertical deflection shall not exceed five (5) percent of the inside
pipe diameter for PVC pipe.
Where the actual deflection exceeds the allowable, the Contractor shall discover the cause
and correct it before the pipe will be acceptable. For the purpose of this subsection, a
32135-011102604:08108114 02604-8 GAC Upgrades at the Urban WTPs
section of sewer is defined as that length of sewer between successive manholes or special
structures or stubouts for future connections.
G. Cost of Testing and Repairs -Any and all work necessary to bring the line into conformance
with the infiltration and deflection specifications shall be performed by the Contractor at no
extra cost to the Owner. All apparent sources of infiltration and excessive deflection shall
be repaired by the Contractor.
The Contractor shall provide all water, plugs, hoses, pumps, equipment, etc. necessary for
the proper flushing and testing of the sewers.
- END OF SECTION -
32135-011W2604:08/08/14 02604-9 GAC Upgrades at the Urban WTPs
SECTION 02710
STORM DRAINS AND ROOF DRAINS
010-4awel: 1►10CL1I
1.01 THE REQUIREMENT
A. Furnish all labor, equipment and materials in connection with the installation of exterior
underground Storm drains and Roof drains as shown on the Contract Drawings and
specified herein.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Section 02200 — Earthwork
1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. ASTM C 76 - Standard Specification for Reinforced Concrete Culvert, Storm Drain, and
Sewer Pipe.
B. ASTM C 150 - Standard Specification for Portland Cement.
C. ASTM C 443 - Standard Specification for Joints for Concrete Pipe and Manholes, Using
Rubber Gaskets.
D. AWWA C 110 — Standard Specification for Ductile Iron Pipe & Fittings for Water and
Other Liquids.
E. ASTM C 150 — Standard Specification for Portland Cement
F. ASTM C 443 - Standard Specification for Joints for Concrete Pipe and Manholes, Using
Rubber Gaskets
G. ASTM C1619 - Standard Specification for Elastomeric Seals for Joining Concrete
Structures
H. AWWA C 151 - American National Standard for Ductile -Iron Pipe, Centrifugally Cast, for
Water.
I. ASTM D 2321 — Standard Practice for Underground Installation of Thermoplastic Pipe for
Sewers and other Gravity -Flow Applications.
J. ASTM D 3350 — Standard Specifications for Polyethylene Plastic Pipe and Fitting Material.
K. ASTM F 447 — Standard Specifications for Elastomeric Seals (Gaskets) for Joining Plastic
Pipe.
32135-011102710:08108114 02710-1 GAC Upgrades at the Urban WTPs
L. ASTM C990 - Standard Specification for Joints for Concrete Pipe, Manholes, and Precast
Box Sections Using Preformed Flexible Joint Sealants
M. AASHTO M 294 — Standard Specifications for Corrugated Polyethylene Pipe (12" to 36").
N. AASHTO Section 30 — Thermoplastic Pipe.
1.04 SUBMITTALS
A. Furnish and submit shop drawings and certificates for the piping work as outlined in the
General Conditions and Division 1.
B. Special care shall be exercised during delivery, distribution and storage of the pipe and
fittings to prevent damage. Damaged pipe will be rejected and shall be replaced at the
Contractor's expense. Storage of pipe and fittings, prior to use, shall be in such a manner
as to keep the materials clean and dry.
PART2-PRODUCTS
2.01 REINFORCED CONCRETE PIPE (RCP) - CULVERTS
A. Pipe and Fittings
1. Reinforced concrete pipe and fittings shall conform to ASTM Standard C-76, Class
III, Wall thickness B, unless otherwise noted on the Contract Drawings. All pipe
shall be of the sizes indicated on the drawings. Elliptical reinforcement will not be
permitted. All pipe shall be aged at the manufacturing plant for at least fourteen
(14) days before delivery to the job site.
B. Joints
Each joint for reinforced concrete culvert or storm drain pipe (RCP) shall have
male and female pipe ends with an approved flexible plastic gasket meeting the
requirements of ASTM C990, paragraph 6.2, Butyl Rubber Sealant. Gasket shall
be approved by the engineer and shall be installed per the manufacturer's
recommendations.
2. Each joint for reinforced concrete pipe specified as O-Ring RCP shall have male
and female pipe ends with a preformed rubber gasket. Preformed rubber gasket
shall meet the requirements of ASTM C-443 and shall be specifically approved
by the pipe manufacturer for use with the type of pipe joints supplied. Preformed
rubber gaskets shall meet ASTM C-1619 Class C requirements unless specified
otherwise. Gasket shall be approved by the engineer and shall be installed per
the manufacturer's recommendations.
C. Joint Lubricant
Joint lubricant shall be of the type recommended by the manufacturer. Use of
petroleum -based lubricants is not permitted.
32135-011102710:08/08/14 02710-2 GAC Upgrades at the Urban WTPs
2.02 Ductile Iron Pipe (DIP) - Roof Drains
A. Pipe
1. Shall be centrifugally cast in metal molds or sand lined molds in accordance with
ANSI A21.51 (AWWA C151) of grade 70-50-05 ductile iron. The above standard
covers ductile iron pipe with nominal pipe sizes from three (3) inches up to and
including fifty-four (54) inches in diameter.
2. Shall have a rated working pressure of 150 psi.
3. Shall be a minimum PC 150.
B. Fittings
1. Shall be manufactured in accordance with ANSI A21.10 (AWWA C110).
2. Shall be manufactured of grade 70 - 50 - 05 ductile iron.
3. Shall have a rated working pressure of 250 psi.
4. Grey iron fittings which conform to the specifications contained herein may be used
with ductile iron pipe providing the piping systems minimum working pressure is met
or exceeded, and only where ductile iron fittings are not manufactured for a specific
fitting.
C. Coatings and Linings for Pipe and Fittings
1. The standard asphaltic coating shall be applied to the exterior wall of the pipe and
fittings in accordance with ANSI A21.51 (AWWA C151).
2. The pipe and fittings shall be cement mortar lined to twice the standard thickness in
accordance with ANSI A21.4 (AWWA C104) except as specified in the pipe
schedule. A seal coat of asphaltic material shall be applied to the mortar lining.
D. Joints
Joints shall be push on type in accordance with ANSI A21.11 (AWWA CIII).
2.03 SMOOTH LINED CORRUGATED POLYETHYLENE PIPE - STORM DRAINS
A. General
1. Smooth lined corrugated polyethylene pipe shall be used for storm drains and shall
be BLUE SEAL watertight HDPE pipe as manufactured by Hancor, Inc., N-12 WT IB
(Watertight) Pipe by ADS, Inc., or approved equal.
32135-011102710:08/08/14 02710-3 GAC Upgrades at the Urban WTPs
B. Pipe and Fittings
1. Smooth lined corrugated polyethylene pipe and fittings shall conform to AASHTO
M252-TYPE S for 4" to 10" cp and AASHTO M294 - TYPE S for 12" to 36" cp. All
pipes shall be of the sizes indicated on the drawings.
C. Joints
Joints shall be watertight bell and spigot type; Hancor, Inc. BLUE SEAL, ADS, Inc.
N-12 WT IB, or equal.
D. Foundation Drains
Foundation drains shall conform to AASHTO M252-TYPE C. Drains shall have
drilled perforations and be Heavy Duty-AASHTO Pipe as manufactured by Hancor,
Inc., Single Wall Corrugate Pipe by ADS, Inc., or approved equal.
2.04 BACKFILL MATERIAL
A. Locally available materials shall be used for pipe backfill if Contractor demonstrates the
soils meet one of the acceptable soil classifications outlined in Table 1. Imported
materials meeting the criteria of Table 1 may also be used.
TABLE 1 — ACCEPTABLE BACKFILL MATERIAL AND COMPACTION
REQUIREMENTS
SOIL CLASSIFICATIONS
ASTM
ASTM
AASHTO
Minimum Standard
DESCRIPTION
D 2321
D 2487
M 43
Proctor Density %
Graded or crushed, crushed
Class 1
--
5
Dumped
stone, gravel
56
Well -graded sand, gravels and
Class II
GW
57
95%
gravel/sand mixtures, poorly
GP
6
graded sand, gravels and
SW
gravel/sand mixtures; little or no
SIP
fines
Silty or clayey gravels,
Class III
GM
Gravel
95%
gravel/sand/silt or gravel and
GC
and Sand
clay mixtures; silty or clayey
SM
(<10%
sands, sand/clay or sand/silt
SC
fines)
mixtures
PART 3 — EXECUTION
3.01 INSPECTION
A. Each length of pipe and fittings delivered to the property shall be inspected by the
Contractor, in the presence of the Engineer, for flaws, cracks, dimensional tolerances and
32135-011102710:08/08/14 02710-4 GAC Upgrades at the Urban WTPs
compliance with the referenced Standards. The Contractor shall provide the Engineer with
suitable templates or calipers for checking pipe dimensions. Only lengths of pipe and
fittings accepted by the Engineer and so marked may be installed in the work.
3.02 INSTALLATION
A. Trenching, bedding and backfilling shall be as specified in Section 02200 - Earthwork of
these Specifications and Section 2.04 Backfill Material of this Specification. Under no
condition shall pipe be laid in water or when trench conditions or weather are unsuitable for
such work.
B. All pipes and fittings shall be handled carefully in loading and unloading. They shall be lifted
by hoists or lowered on skidways in such a manner as to avoid shock. Derricks, ropes or
other suitable equipment shall be used for lowering the pipe into the trench. Pipe and
fittings shall not be dropped or dumped.
C. Each pipe and fitting shall be inspected before it is lowered into the trench. The interior of
the pipe and all joint surfaces shall be thoroughly cleaned and shall thereafter be
maintained clean. The open ends of pipe shall be securely plugged whenever pipe laying is
not in progress.
D. Pipe and fittings shall be selected so that there will be as small a deviation as possible at
the joints and so that inverts present a smooth surface. All joints shall be installed, made up
and inspected in accordance with approved printed instructions of the manufacturer. Pipe
and fittings which do not fit together to form a tight joint will be rejected.
E. Cutting of reinforced concrete pipe will be permitted only at connections to structures and be
accomplished by abrasive saws. Cutting of other pipe materials shall be done only with
mechanical cutters and in accordance with the manufacturer's recommendations.
F. Pipe shall be laid accurately to the lines and grades shown on the drawings or as directed
by the Engineer.
G. If an adequate foundation for the pipe is not available at the desired depth, additional
excavation shall be required and the foundation brought to desired grade with suitable
granular material.
H. Rock outcroppings, very soft soils such as muck, and other similar materials not providing
proper foundation support shall be removed/replaced with suitable granular material.
Bedding material directly under the pipe invert shall be left in native condition and not
compacted. Pipe shall be placed on the bedding, then backfilled under the pipe haunches
before further backfill is placed.
Class I materials may be dumped around pipe. Voids shall be eliminated by knifing under
and around the pipe or by other approved technique.
L. Inorganic silts, and gravelly, sandy, or silty clays, and other Class IV materials (not shown in
Table 1) shall not be used for pipe backfill.
32135-011W2710:08/08/14 02710-5 GAC Upgrades at the Urban WTPs
M. Any section of the pipe that is found defective in material, alignment, grade, joints, or
otherwise, shall be satisfactorily corrected by the Contractor at no additional cost to the
Owner.
3.03 COMPACTION
A. General
1. Place and assure backfill and fill materials achieve an equal or higher degree of
compaction than undisturbed materials adjacent to the work.
2. In no case shall degree of compaction below "Minimum Compactions" specified be
accepted.
B. Compaction Requirements: Unless noted otherwise on the Drawings or more stringently
by other sections of these Specifications, comply with following trench compaction
criteria:
TABLE 2 — - MINIMUM COMPACTIONS
LOCATION
SOIL TYPE
DENSITY
1. Compacted select backfill:
All applicable areas
Cohesive soil
95 percent of maximum dry
density by ASTM D698
Cohensionless soils
75 percent of maximum relative
density by ASTM D4253 and
ASTM D4254
2. Common trench backfill:
Under pavements roadways
Cohesive soils
95 percent of maximum dry
surfaces, D698 within
density by ASTM D698
highway right-of-ways,
adjacent to retaining walls
Cohensionless soils
75 percent of maximum relative
density by ASTM D4253 and
ASTM D4254
Under turfed, sodded plant
Cohesive soils
95 percent of maximum dry
seeded, non -traffic areas
density by ASTM D698
Cohensionless soils
75 percent of maximum relative
density by ASTM D4253 and
ASTM D4254
C. Ensure backfill materials have moisture content within three (3) percent of optimum
moisture content at the time of placement.
3.04 TESTING
A. General
1. The Contractor shall provide at his own expense, all labor, material, measuring
32135-011W2710:08/08/14 02710-6 GAC Upgrades at the Urban WTPs
devices and water necessary to perform the required tests. All tests shall be
performed in the presence of the Engineer. Disposal of water shall be in
accordance with Section 01010.
B. Tests by Manufacturer
An infiltration and exfiltration test for the pipe shall be made at the place of
manufacture. Certified test results shall be submitted. The infiltration or exfiltration
allowance shall not exceed 250 gallons per inch of pipe diameter per mile per day.
One joint test for each two hundred feet of pipe to be furnished.
C. Exfiltration and Infiltration Tests
The pipe shall be tested for leakage by exfiltration and/or infiltration tests after
installation and back -filling. Exfiltration or infiltration shall not exceed 250 gallons
per inch of pipe diameter per mile per day. If the leakage is greater than that volume
allowed, the Contractor shall locate and repair or replace defective joints or pipes at
his expense until the leakage is within the specified allowance.
2. Exfiltration tests shall be performed on all pipe where the ground- water elevation is
one foot above the crown of the pipe or less. Exfiltration tests shall impose a head
of at least 2 feet on the pipe at the maximum elevation of the length to be tested. An
allowance of an additional 10 percent of gallonage shall be permitted for each
additional 2 feet of head over the initial 2 foot minimum. Infiltration tests shall be
performed for all other pipe where the groundwater table is greater than one foot
above the crown of the pipe.
END OF SECTION
32135-011W2710:08/08/14 02710-7 GAC Upgrades at the Urban WTPs
SECTION 02712
FOUNDATION DRAINAGE SYSTEMS
PART 1 -- GENERAL
1.01 THE REQUIREMENT
A. The Contractor shall furnish and install foundation drainage systems in accordance with the
requirements of these Specifications and Drawings. The Contractor shall provide all
supervision, labor, materials, equipment, tools, instruments, and supplies of whatever
nature required for the completion of the work described herein.
B. The work includes but is not limited to:
1. Provide required submittals.
2. Furnish and install Filter Geotextile as indicated on the Drawings.
3. Furnish, place and compact drainage stone, as indicated.
4. Furnish and install perforated and closed subdrain pipes, clean out pipes, and
fittings as indicated.
5. Furnish and install geotextile underslab drain, as indicated.
6. Furnish and install Geocomposite wall drain, as indicated.
7. Protect the drainage course material from contamination at all times by covering
with a plastic membrane.
1.02 RELATED SECTIONS
A. Section 02200 - Earthwork
B. Section 02207 - Aggregate Materials
C. Section 02274 - Geotextiles
1.03 SUBMITTALS
A. In accordance with the procedures and requirements set forth in the General Conditions and
Section 01300 - Submittals, the Contractor shall submit the following:
w
0
0
N
1. Name and location of all material suppliers. A
2. Specifications for each material submitted indicating compliance with the standards
specified herein.
32135-011W2712:08/08/14 02712-1 GAC Upgrades at the Urban WTPs
3. Samples of reinforced plastic membrane, Filter Geotextile, Geocomposite wall drain,
and geotextile underslab drain, with manufacturer's certificates and catalog cuts
stating their mechanical and physical properties. Samples of each material shall be
at least one square foot in size.
4. Samples of perforated and closed drainage pipe, with manufacturer's certificates
and catalog cuts stating their mechanical and physical properties. Samples of each
pipe shall be at least one foot long. Also submit a sample of the cap used on clean
outs.
5. Representative samples of drainage stone provided in plastic lined bag(s) clearly
marked as to the source and sample identification. A minimum of 20 lbs. of material
from each source shall submitted.
6. Shop Drawings of installation.
7. The Contractor shall provide the Engineer with Record Drawings clearly indicating
the completed drainage systems. Locations of the components of the drainage
systems and appropriate dimensions shall be shown on the Drawings.
PART 2 -- MATERIALS
2.01 REINFORCED PLASTIC MEMBRANE
A. A 3-ply reinforced plastic such as "Griffolyn 65" as manufactured by Griffolyn Co., Houston,
Texas, "Rufco 400", as manufactured by Raven Industries, or equal. Splices shall be made
by overlapping the edges 12-inches and taping the edges down with approved tape.
Installation shall be done in a matter so as not to rupture, tear, puncture or cut the
membrane.
B. Adhesive/Tape: Type approved by the manufacturer of the membrane material.
2.02 GEOCOMPOSITE WALL DRAIN
A. The Geocomposite wall drain shall be a composite subsurface drainage mat consisting of a
Filter Geotextile bonded to one side of a drainage core. The wall drain shall have a
minimum flow rate of 4 gpm/ft width when tested under a normal compressive stress of
3,600 psf at a hydraulic gradient of 1.0 per ASTM D-4716.
B. Geocomposite wall drain shall be installed where shown on the Drawings per
manufacturer's instructions.
C. Geocomposite wall drain shall be ENKADRAIN 9120 by Akzo Nobel Geosynthetics Co.,
Asheville, NC; MIRADRAIN 2000 by Nicolon Mirafi Group, Charlotte, NC; SHEET DRAIN
HS by Greenstreak, Inc., St. Louis, MO; or equal.
2.03 GEOTEXTILES
A. Filter Geotextile shall be furnished and installed in accordance with Section 02274 -
Geotextiles, where shown on the Drawings.
32135-011102712:08108114 02712-2 GAC Upgrades at the Urban WTPs
2.04 PERFORATED AND CLOSED DRAINAGE PIPE AND FITTINGS
A. Subdrainage pipe shall be rigid PVC pipe with solvent welded type joints. Perforated pipe
shall have four (4) rows of 3/8-inch diameter holes spaced approximately 900 apart along
the circumference of the pipe. Longitudinal spacing of holes shall be 8-inches on center.
Perforated pipe shall be PVC, Schedule 40. Solid or closed pipe shall be PVC, Schedule
80.
2.05 DRAINAGE STONE
A. Drainage stone shall be VDOT No. 57 or No. 67 stone as shown on the Drawings and meet
the requirements specified in Section 02207 - Aggregate Materials.
2.06 GEOTEXTILE UNDERSLAB DRAIN
A. The geotextile underslab drain shall be a composite subsurface drainage mat consisting of
a geotextile filter fabric bonded to one side of a dimpled polymeric core. The polymeric core
shall be a dimpled solid sheet that shall not allow any earth or concrete materials to pass
from one face to the other.
B. Geotextile underslab drain shall be MIRADRAIN 6000 by Mirafi, Charlotte, N.C., or equal.
PART 3 -- EXECUTION
3.01 GENERAL
A. The Contractor shall be solely responsible for the manufacture, handling, transportation and
installation of under drainage systems shown on the Drawings and specified herein. The
Contractor shall keep drainage and filter fabrics and other materials enclosed in protective
covering until ready for use, and shall prevent damage to them during handling and
installation. Drainage stone shall be stored, handled and placed so as to prevent
contamination.
3.02 INSTALLATION OF SUBDRAINAGE SYSTEMS
A. The subgrade shall be cut to a generally smooth surface prior to placing subdrainage
system. Freestanding water, mud, loose or disturbed soil and rock shall be removed from
the subgrade surface. Sharp projections shall be removed from the subgrade surface.
B. Installation of reinforced plastic membrane shall be done in a manner so as not to rupture,
tear, puncture, cut, or abrade the materials. Where such damage occurs, it shall be
repaired with a patch which extends at least 24-inches beyond the edge of the damaged
area. Installation of geotextiles shall be in accordance with Section 02274 - Geotextiles.
C. Place and compact drainage stone to the level of the bottom of the subdrain pipe, as
indicated. Do not displace or damage Filter Geotextile during placement and compaction of
drainage stone.
32135-011102712:08108114 02712-3 GAC Upgrades at the Urban WTPs
D. Lay and connect the subdrain pipe directly on the drainage stone with perforations facing
down. All dead ends shall be capped or plugged. Perforated drainage pipes shall have a
minimum gradient of 0.5 percent unless otherwise indicated on the Drawings. Clean -outs
shall be installed where shown on the Drawings and shall be equipped with an approved
vandal -proof cap.
E. Place and compact drainage stone over the subdrain pipe. Drainage stone compaction
requirements are specified in Section 02200, Earthwork. Compact with a hand -operated
mechanical tamper in trenches, immediately above drainage pipes, and areas inaccessible
to larger equipment.
F. Water test the drainage system by flushing water through the subdrain pipes.
G. Where geotextile underslab drain is shown on the Drawings, place it on top of the subgrade
with fabric side down. Edges of adjacent panels shall be interlocked by overlapping of
dimples.
3.03 INSTALLATION OF WALL DRAINAGE SYSTEM AGAINST FORMED WALL
A. Place Filter Geotextile against the outside wall footing as shown on the Drawings. Overlap
fabric edges 24 inches.
B. Place and compact drainage stone to the level of the bottom of the subdrain pipe as
indicated. Do not displace or damage Filter Geotextile during placement and compaction of
drainage stone.
C. Lay and connect the subdrain pipe directly on the drainage stone with perforations facing
down. All dead ends shall be capped or plugged. Perforated drainage pipes shall have a
minimum gradient of 0.5 percent unless otherwise indicated on the Drawings. Clean -outs
shall be installed where shown on the Drawings and shall be equipped with an approved
vandal -proof cap.
D. Fasten the Geocomposite wall drain against the wall and drape around the drainage pipe.
Geotextile side shall face backfill soil. Install according to the manufacturer's
recommendations, as approved by the Engineer. The wall drain shall be continuous around
the structure as shown to a height of 12 inches below finish grade. The remaining 12
inches shall be sealed with a bentonite enriched fill material. The material shall be
continuous behind the walls and be a minimum of 2 feet wide.
E. Place and compact drainage stone over the subdrain pipe, and extend Filter Geotextile
around the drainage stone as shown on the Drawings. Do not displace or damage footing
drainage pipe, Filter Geotextile, or Geocomposite wall drain during placement of drainage
stone.
F. Water test the drainage system by flushing water through the subdrain pipes.
G. Backfill in accordance with Section 02200 - Earthwork, after the wall drainage system has
been approved. Do not displace or damage wall drainage fabric during backfilling.
- END OF SECTION -
32135-011102712:08108114 02712-4 GAC Upgrades at the Urban WTPs
SECTION 02831
STEEL FENCING
PART 1 -- GENERAL
1.01 THE REQUIREMENT
A. The Contractor shall furnish and install steel fencing, posts, gates, etc., where shown on the
Drawings and in compliance with these Specifications.
B. Fencing shall be of the chain link type topped with barbed wire. The 6-foot high fabric shall
clear the final grade by 3 inches, and shall be topped with three strands of barbed wire. The
barbed wire shall be angled outward at the top. All components which are to be galvanized
shall be hot dipped galvanized, coating to be 1.8 ounces per square foot of surface.
Alternate coatings which employ a zinc coating of less than 1.8 ounces per square foot are
not acceptable.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Section 03300 - Cast -in -Place Concrete.
1.03 SUBMITTALS
A. Shop Drawings shall be furnished in accordance with Section 01300, Submittals.
PART 2 -- PRODUCTS
2.01 CHAIN LINK FABRIC
A. Fabric shall be 9 gauge aluminum coated wire woven in a 2-inch diamond mesh conforming
to ASTM A491. Top and bottom selvage to have a barbed finish. Minimum weight of
coating shall be 0.40 ounce per square foot of wire surface. The coated wire shall have a
minimum tensile strength of 80,000 lbs. per square inch.
B. Install fabric 3 inches above ground level. Fence shall be stretched tight and securely
fastened to posts at points spaced 12 inches apart maximum.
2.02 POSTS
A. Posts and rails shall be galvanized standard weight pipe conforming to the requirements of
ASTM F1083.
1. Line Posts: Line posts shall be Schedule 40, 2-3/8 inch O.D. galvanized pipe with
minimum bending strength of 201 pounds under a 6-foot cantilever load. Line posts
shall be spaced at a maximum 10-foot O.C.
32135-011102831:08108114 02831-1 GAC Upgrades at the Urban WTPs
2. Terminal Posts: All end, corner, intermediate, and pull posts and gate leaves 6'0"
wide and less shall be 2-7/8 inch O.D. galvanized Schedule 40 pipe with minimum
bending strength of 381 pounds on 6-foot cantilever load. Gate posts for gate
leaves shall be Schedule 40 pipe complying with ASTM F1083 of diameters as
follows:
Gate Leaf Width
0' to 6'
Over 6' to 13'
Over 13' to 18'
Over 18'
2.03 TENSION WIRE
Pipe O.D.
Weight per Ft.
2-7/8"
5.79 I bs.
4"
9.1 lbs.
6-5/8"
18.97 I bs.
8-5/8"
24.7lbs.
A. Top and bottom tension wire shall be No. 7 gauge aluminum coated steel wire. Fabric shall
be securely tied to tension wire at intervals not to exceed 24-inches.
2.04 POST TOPS AND BARBED WIRE SUPPORTS
A. Gate, end, corner and line post tops shall be malleable iron or pressed steel and shall be
hot dipped galvanized conforming to ASTM A153.
B. Extension arms for supporting the three (3) strands of barbed wire for line posts shall be of
pressed steel with malleable iron base, or solid aluminum alloy castings.
C. Angles for line post extension arms shall be approximately 45 degrees from the vertical and
the top slot for barbed wire shall be a minimum of 12 inches above the fabric and a
minimum of 10 inches from the fence line.
2.05 BARBED WIRE
A. Barbed wire shall consist of three strands of 12-1 /2 gauge aluminum coated steel wire with
4-point barbs of 14 gauge aluminum wire spaced 5 inches apart, conforming to ASTM A585.
B. Additional strands of barbed wire shall be added beneath the chain link fabric at all ditch
crossings to maintain the security of the fence installation.
2.06 BRACES AND TOP RAILS
A. Braces and top rails (where shown on the Drawings) shall be 1.66-inch O.D., Schedule 40
galvanized pipe with minimum vertical bending strength of 202 pounds on 10-foot span.
B. Top rails shall be continuous and shall pass through the post tops. The coupling used to
join the top rail lengths shall allow for expansion. Brace rails shall be provided at all
terminal posts, located between the top and grade lines and extend from the terminal post
to the first adjacent post. Braces shall be securely fastened at both ends. Brace ends for
receiving brace rails shall be malleable iron or castings of 356.0 (formerly SG70A) alloy, or
equivalent of ASTM B26 or B108.
C. Truss and stretcher bands shall be 1/8-inch x 7/8-inch pressed steel, supplied with carriage
bolts and nuts. Bolts shall be 5/16-inch by 1'/4 inch. Truss rods shall be 3/8-inch nominal
diameter.
32135-011102831:08108114 02831-2 GAC Upgrades at the Urban WTPs
2.07 FABRIC TIES
A. Wire ties shall be preformed 0.148-inch diameter (9 gauge) aluminum. Flat band type ties
shall be 1100-H18 or 3003-H14, .064-inch thick by 1/2-inch wide.
B. Hog rings for attaching tension wire to fabric shall be 0.105-inch diameter, Alloy 1100-H14.
2.08 GATES
A. Gate frames shall be made of 2-inch O.D. ASTM F1083 pipe, 2.72 lbs. per foot hot dipped
galvanized. Fabric shall match fence. Gate frames shall be welded or assembled with
riveted corner castings. Gate frames shall be equipped with 3/8-inch diameter adjustable
truss bars. Hinges shall be ball and socket.
B. Gate shall be equipped with positive latching device with provision for padlocking.
Personnel gates shall be minimum 36-inch clear opening.
2.09 SLIDING GATE
A. Sliding gates shall be cantilever type of the same height as adjacent fence. Gate shall be
constructed of 2-1/2-inch O.D. Schedule 40 pipe 2-inch O.D. braces. Unit shall be similar
in construction to swing gates.
B. The main entrance gate shall be a double slide cantilever type gate with electric gate
operators and vehicle detector loops for automatic operation.
C. The truck entrance gate shall be a single cantilever type gate with electric gate operator and
vehicle detector loop for closing operation.
D. Gate Operators shall be heavy duty rated for high frequency commercial installation.
Motors shall be 1 HP minimum, 480V, 3-phase.
2.09 SLIDING GATE
A. Sliding gates shall be cantilever type of the same height as adjacent fence. Gate shall be
constructed of 2-1/2-inch O.D. Schedule 40 pipe 2-inch O.D. braces. Unit shall be similar
in construction to swing gates.
B. The main entrance gate shall be a double slide cantilever type gate with electric gate
operators and vehicle detector loops for automatic operation.
C. The truck entrance gate shall be a single cantilever type gate with electric gate operator and
vehicle detector loop for closing operation.
D. Gate Operators shall be heavy duty rated for high frequency commercial installation.
Motors shall be 1 HP minimum, 480V, 3-phase.
E. Card Reader shall be provided under Section 11050, Access Security System.
1. Intercom shall provide full two way communication between the gate and the Control
Building control room and reception room. Intercom speaker at the gate shall be
32135-011102831:08108114 02831-3 GAC Upgrades at the Urban WTPs
pedestal mounted adjacent to the card reader. Intercom speaker in the reception
room shall be wall -mounted adjacent to remote push button for gate operation.
Intercom speaker and remote push button in control room shall be mounted in
control console by distributed control system contractor. Speaker and push button
shall be provided by Contract 2A, General Construction.
2. Operation of the gate shall be as follows:
a. Entrance - A driver or pedestrian can open the gate from the card reader
device. The gate shall also be opened manually from the remote push
button located in the reception room or control room. The gate shall
subsequently close automatically after the vehicle passes through the gate
and energizes the inside detector loop, or after an adjustable 0-3 minute
time delay located at the operator controls. Should the gate encounter an
obstruction during the closing cycle, the gate shall automatically reverse to
the open position and the timer reset to full cycle. Auxiliary contacts shall be
provided as required to receive gate open command signals from the loop
detectors, card reader system, or the remote push buttons.
b. Exit - The inside loop detector shall open the gate automatically as a vehicle
approaches. The gate shall close automatically when the outside loop
detector is energized or after an adjustable 0-3 minute time delay.
3. The gate shall be furnished complete with all operating controls by the fence
supplier. Loop detectors shall be installed as directed by the Engineer including
interconnecting wiring to the gate operating controls. Power control and intercom
wiring shall be furnished and installed to provide a complete operational system.
4. The 480 volt, 3 phase power shall be provided to the gate control unit under
Contract 213, Electrical Construction. Gate control unit shall be complete with all
necessary transformer for 24 volt do control power and intercom power.
5. Intercom cable shall be furnished under Contract 2A, General Construction and
installed under Contract 2B, Electrical Construction.
6. All connections, start-up and check out shall be under Contract 2A, General
Construction.
7. Gate operator system shall be as manufactured by Customline, Inc.; Crusader
Division of McKinney Electronics, or equal.
PART 3 -- EXECUTION
3.01 INSTALLATION
A. All line posts shall be spaced equidistant in the fence line on a maximum of 10-foot centers.
Posts shall be set plumb in concrete bases as detailed on Drawings. The top of the posts
shall be brought to a smooth grade line. The wire fence shall be set accurately to line and
grade and shall be plumb.
32135-011W2831:08/08/14 02831-4 GAC Upgrades at the Urban WTPs
B. End, corner, pull or intermediate posts shall be placed in the following locations: corners;
changes in direction; abrupt changes in grade; intervals no greater than 500 feet in the
fence line. Each end or gate post shall have one brace assembly and each corner or
intermediate post shall have two brace assemblies.
C. Horizontal braces shall be provided at all terminal posts, corner posts, and intermediate
posts between top rail and ground and shall extend from the above -mentioned posts to the
first adjacent line posts. Braces shall be securely fastened to the line posts by brace ends
and brace bands and to the terminal posts by approved rail end connectors. Diagonal brace
rods shall be trussed from the brace end on the line post back to the terminal post, corner
post or intermediate post and fastened to it by an approved connector.
3.02 POST FOUNDATIONS
A. Post holes shall be in true alignment and of sufficient size to provide a permanent
foundation of concrete. Holes shall be well centered on the posts. A minimum diameter of
12 inches shall be required for all posts.
B. Post foundations shall be carefully rodded or tamped into place. The top of concrete shall
extend 2 inches above ground line and shall be neatly troweled and leveled up from edges
to the posts so as to have a pitch outward in all directions.
C. No materials shall be installed on the posts, nor shall any load be applied to the posts within
3 days after the individual post foundation is completed.
D. All concrete shall be Class "B" in conformance with Section 03300, Cast -in -Place Concrete.
3.03 RESETTING OF EXISTING FENCE
A. Where shown on the Drawings that resetting of existing fence is required, the fence, after
resetting, shall be in a condition that is equal to or better than before the fence was
removed.
B. The Contractor shall replace any of the fence components which have been unnecessarily
damaged by him.
3.04 PADLOCK AND KEYS
A. One solid brass padlock shall be furnished with each gate. Padlocks shall be master keyed
to the system specified under Section 08710, Finish Hardware.
3.05 TEMPORARY FENCING
A. The Contractor shall furnish and install all temporary fencing and appurtenances as shown
on the Drawings or as required during construction to adequately secure the site prior to
installation of the permanent fence.
- END OF SECTION -
32135-011102831:08108114 02831-5 GAC Upgrades at the Urban WTPs
SECTION 02910
FINAL GRADING AND LANDSCAPING
PART 1 -- GENERAL
1.01 THE REQUIREMENT
A. Furnish all labor, equipment, and materials necessary for final grading, topsoiling, seeding,
and miscellaneous site work not included under other Sections, but required to complete the
work as shown on the Drawings and specified herein. Under this Section, all areas of the
project site disturbed by excavation, materials storage, temporary roads, etc., shall be
reseeded as specified herein.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Section 02276 - Erosion and Sedimentation Control.
B. Section 02500 - Surface Restoration.
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01300, Submittals.
1. Product Data
2. Certification of all materials
3. Three (3) copies of composition and germination certification and of test results for
grass seed.
PART 2 -- PRODUCTS
2.01 CONTRACTOR'S RESPONSIBILITIES
A. Furnish and submit certification for the materials used as specified in the General
Conditions, Division 1 and Division 2.
2.02 TOPSOIL
A. Upon completion and Engineer's approval of the rough grading, the Contractor shall place
the topsoil over all areas disturbed during construction under any contract except those
areas which will be paved, graveled or rip rapped. Topsoil shall not be placed in a frozen or
muddy condition and shall contain no toxic materials harmful to grass growth. Topsoil shall
be as defined under Section 02200, Earthwork.
ib
2.03 WATER
A. Water shall be furnished to the Contractor by the Owner from existing facilities as directed
by the Engineer.
32135-011102910:08108114 02910-1 GAC Upgrades at the Urban WTPs
B. The Contractor shall furnish all hoses and connections necessary to complete the
landscaping work.
2.04 FERTILIZER
A. Fertilizer shall be a complete commercial fertilizer with components derived from
commercial sources. Fertilizer composition shall be determined from field soil sampling in
appropriate number taken by the Contractor and analyzed by the Cooperative Extension
Service Soil Testing Laboratory at VPI & SU or by a reputable commercial laboratory.
Contractor shall furnish fertilizer in accordance with the recommendations of the testing
laboratory and Section 3.32 of the Virginia Erosion and Sediment Control Handbook
(VESCH).
B. Fertilizer shall be delivered in standard size bags marked with the weight, analysis of
contents, and the name of the manufacturer. Fertilizer shall be stored in weatherproof
storage areas and in such a manner that its effectiveness will not be impaired.
2.05 LIME
A. Contractor shall use an agricultural grade of limestone. Quantity shall be determined from
field soil sampling in appropriate number taken by the Contractor and analyzed by the
Cooperative Extension Service Soil Testing Laboratory at VPI & SU or by a reputable
commercial laboratory. Contractor shall furnish lime in accordance with the
recommendations of the testing laboratory and Section 3.32 of the VESCH.
B. At least 50% shall pass a No. 200 U.S.S. mesh sieve. At least 90% shall pass a No. 100
U.S.S. mesh sieve and 100% shall pass a No. 10 U.S.S. mesh sieve. Total carbonates
shall not be less than 80% or 44.8% Calcium Oxide equivalent. For the purpose of
calculation, total carbonates shall be considered as Calcium Carbonate.
2.06 GRASS SEED
A. Provide the kinds and amounts of seed to be seeded in areas disturbed by the construction
work. All seed shall bear an official "Certified Seed" labeled and meet the requirements in
Section 3.32 of the VESCH. All seed must have been certified by Virginia Crop
Improvement Association within twelve (12) months immediately preceding the planting of
such material on the job.
B. The inoculant for treating legume seed mixture shall be a pure culture of nitrogen -fixing
bacteria prepared specifically for the species. Inoculants shall not be used later than the
date indicated on the container. Inoculants should be applied at two times the supplier's
recommended rate on dry seedings and five times the recommended rate when included in
hydroseeder slurry. The quality of the seed shall conform to the following:
Minimum
Minimum
Maximum
Seed Purity
Germination
Weed Seed
Type (%)
(%)
(%)
Kentucky 31 Tall Fescue
Perennial Ryegrass
97 85 0.50
98 90 0.50
32135-011102910:08108114 02910-2 GAC Upgrades at the Urban WTPs
Type
Minimum
Seed Purity
N
Minimum
Germination
N
Maximum
Weed Seed
N
Kentucky Bluegrass
97
85
0.50
Annual Ryegrass
97
90
0.50
Weeping Lovegrass
98
87
0.50
German Millet
98
85
0.50
Cereal (Winter) Rye
98
85
0.50
Redtop
94
80
0.50
C. Seed mixtures to be used on the project shall be as follows:
P - 180#/acre Kentucky 31 Tall Fescue, 5#/acre Perennial Ryegrass,
5#/acre Kentucky Bluegrass
TW - 575#/acre Annual Ryegrass, 75#/acre Cereal (Winter) Rye
TSP -- 75#/acre Annual Ryegrass
TSU -- 75#/acre German Millet
Note: PW - Permanent Seeding
TW - Temporary Winter Seeding
TSP - Temporary Spring Seeding
TSU - Temporary Summer Seeding
D. On cut and fill slopes 2:1 or steeper add 20#/acre of Weeping Lovegrass to the P seed
mixture in the Spring and add 20#/acre Annual Ryegrass in Fall and Winter.
2.07 WOOD CELLULOSE FIBER MULCH
A. For use in hydroseeding grass seed in combination with fertilizers and other approved
additions, shall consist of especially prepared wood cellulose fibers such as "Conwed",
"Silva -Fiber", or approved substitute, and have no growth or germination inhibiting factors,
and be dyed green.
B. The wood cellulose fiber shall have the additional characteristic of dispersing rapidly in
water to form a homogeneous slurry and remain in such state when agitated in the hydraulic
mulching unit, or adequate equal, with the specified materials.
C. When applied, the wood cellulose fiber with additives will form an absorptive mat but not a
plant inhibiting membrane, which will allow moisture, natural or mechanical, to percolate into
underlying soil.
D. Fiber mulch can be applied over top of newly seeded areas immediately after seed mixture
is applied to soil bed or applied as part of the hydroseeded slurry containing the seed
mixture. Anchored straw mulch shall be used in place of fiber mulch during hot and dry
summer months and late fall. Fiber mulch can be used to tack (anchor) straw mulch. All
fiber mulch shall adhere to requirements set forth in Section 3.35 of the VESCH.
32135-011102910:08108114 02910-3 GAC Upgrades at the Urban WTPs
E. The mulch shall be supplied, compressed in packages containing 50 pounds of material
having an equilibrium air dry moisture content at time of manufacture of 12% plus or minus
2%. Wood cellulose fiber mulch shall be stored in a weatherproof storage area and in such
a manner that effectiveness will not be impaired.
2.08 STRAW MULCH
A. Straw used for mulch shall be wheat or oats. Straw shall be undamaged, air dry, threshed
straw, free of undesirable weed seed. Straw mulch shall be spread by hand or machine and
must be anchored or tacked down. Straw mulch is not required for seeded areas treated
with a temporary soil stabilizer. All straw mulch shall adhere to requirements set forth in
Section 3.35 of the VESCH.
2.09 TEMPORARY SOIL STABILIZER
A. The temporary agent for soil erosion control shall consist of an especially prepared highly
concentrated powder which, when mixed with water, forms a thick liquid such as "Enviroseal
2001" by Enviroseal Corporation, "Terra Control" by Quattro Environmental, Inc., or "CHEM-
CRETE ECO-110" by International CHEM-CRETE Corporation, and having no growth or
germination inhibiting factors. The agent shall be used for hydroseeding grass seed in
combination with other approved amendments resulting in a highly viscous slurry which,
when sprayed directly on the soil, forms a gelatinous crust.
2.10 SOIL STABILIZATION BLANKET (SSB)
A. The SSB shall be as specified in Section 02276 - Erosion and Sedimentation Control.
2.11 SYNTHETIC SOIL STABILIZATION MAT (SSM)
A. The SSM shall be as specified in Section 02276 — Erosion and Sedimentation Control.
2.12 RIPRAP AND HERBICIDES
A. Furnish and install sufficient quantity of landscape gravel or riprap to cover over the ground
to a minimum 4-inch depth for gravel and 24-inch depth for riprap, unless otherwise noted,
or indicated on the Drawings. Also furnish and apply an approved herbicide to the subgrade
surface just prior to installing the landscape gravel or riprap.
B. During placing, the stone shall be graded so that the smaller stones are uniformly
distributed through the mass. The Contractor may place the stone by mechanical methods,
augmented by hand placing where necessary or ordered by the Engineer. The placed
riprap shall form a properly graded, dense, neat layer of stone.
C. All topsoil and vegetative matter shall be removed from the subgrade surfaces prior to the
application of the weed killer (herbicide) and to the placement of landscape gravel or riprap.
Apply commercial -type herbicide as preemergence control of miscellaneous grasses and
broadleaf weeds in granular or liquid form such as "Treflan", "Dymid", or approved
substitute. Methods and rates of application shall be in strict compliance to manufacturer's
directions and acceptable to the Engineer.
D. The herbicide selected shall be safe for use around ornamental plantings, have long-lasting
weed control, and shall be resistant to leaching away under excessive rainfall.
32135-011102910:08108114 02910-4 GAC Upgrades at the Urban WTPs
E. A second application of the herbicide shall be made on the surface of the landscape gravel
or riprap sometime after the first six (6) months, but not later than twelve (12) months.
Same methods and rates apply as specified previously.
2.13 TREE SHRUB PLANTING
A. Provide trees and shrubs as shown on the Drawings and as specified in Section 3.37 of
VESCH.
PART 3 -- EXECUTION
3.01 GRADING
A. After approval of the rough grading, the Contractor shall commence his preparations of the
subgrade for the various major conditions of the work as follows:
Bare soil for riprap area at subgrade (24-inches below final grade, or as directed by
the Engineer).
2. Topsoil for lawn and road shoulder seed area - scarify 2-inch depth of subgrade
(4-inches below final grade) prior to placing topsoil.
B. Final surface grading of the topsoiled, landscape graveled, and riprapped areas shall be
mechanically raked or hand raked to an even finished surface alignment.
3.02 TOPSOIL
A. Topsoil shall be spread in place for quantity required for lawn and road shoulder seed areas
at 4-inch consolidated depth, and sufficient quantity for certain plant beds and backfill for
shrubs and trees as specified.
B. Topsoil shall be hospitable as a growth medium meeting all requirements as indicated by
Sections 3.30 & 3.32 of VESCH.
3.03 HYDROSEEDING AND GRASS
A. The Contractor shall grow a stand of grass on disturbed areas. The Contractor shall be
responsible for the satisfactory growth of grass throughout the period of the one-year
guarantee from Contract Closeout.
B. The Contractor's work shall include the preparation of the topsoil and bare soil seed bed,
application of fertilizer, limestone, mulching, inoculant, temporary soil stabilizer, watering,
and other operations necessary to provide a satisfactory growth of sod at the end of the
one-year maintenance period.
C. When hydraulic seeding method is used, include all additives and amendments required. A
"Reinco", "Finn", or "Bowie" type hydromulcher with adjustable nozzles and extension
hoses, or approved substitute, shall be utilized. General capacity of tank should range from
500 to 2,500 gallons, or as approved by the Engineer.
32135-011102910:08108114 02910-5 GAC Upgrades at the Urban WTPs
D. Hydraulic seeding shall be carried out in three steps. Step one shall consist of the
application of lime. In step two the seed mixture shall be mixed with the fertilizer, wood
cellulose fiber mulch, and any required inoculants and applied to the seed bed. The seed
mixture can be applied as a separate process prior to the application of the slurry mixture.
Step three shall consist of application of top dressing during the first spring or fall, whichever
comes first, after step two.
E. Top dressing shall consist of a commercial grade fertilizer plus Nitrogen or other analysis as
may be recommended by soil testing. Types and application rates of seed mixtures shall be
as shown in the Seeding Schedule.
F. Ingredients for the mixture and steps should be dumped into a tank of water and thoroughly
mixed to a homogeneous slurry and sprayed out under a minimum of 300-350 pounds
pressure, in suitable proportions to accommodate the type and capacity of the hydraulic
machine to be used. Applications shall be evenly sprayed over the ground surface. The
Contractor shall free the topsoil of stones, roots, rubbish, and other deleterious materials
and dispose of same off the site. The bare soil, except existing steep embankment area,
shall be rough raked to remove stones, roots, and rubbish over 4-inches in size, and other
deleterious materials and dispose of same off the site.
G. No seeding should be undertaken in windy or unfavorable weather, when the ground is too
wet to rake easily, when it is in a frozen condition, or too dry. Any bare spots shown in two
to three weeks shall be recultivated, fertilized at half the rate, raked, seeded, and mulched
again by mechanical or hand broadcast method acceptable to the Engineer.
H. Areas that have been seeded with a temporary seed mixture shall be mowed to a height of
less than 2-inches and scarified prior to seeding with the permanent seed mixture.
The Contractor shall provide, at his own expense, protection for all seeded areas against
trespassing and damage at all times until acceptance of the work. Slopes shall be protected
from damage due to erosion, settlement, and other causes and shall be repaired promptly at
the Contractor's expense.
The Contractor shall water newly seeded areas of the lawn and road shoulder mix once a
week until the grasses have germinated sufficiently to produce a healthy turf, or unless
otherwise directed by the Engineer. Each watering shall provide three (3) gallons per
square yard. The Contractor shall furnish all necessary hoses, sprinklers, and connections.
K. The first and second cutting of the lawn grasses only shall be done by the Contractor. All
subsequent cuttings will be done by the Owner's forces in a manner specified by the
Contractor.
3.04 SOIL STABILIZATION BLANKET (SSB)
A. All channels and slopes indicated on the Drawings shall be lined with a SSB. The area to
be covered shall be properly graded and hydroseeded before the blanket is applied.
Installation shall be in accordance with Section 02276, Erosion and Sedimentation Control.
32135-011W2910:08/08/14 02910-6 GAC Upgrades at the Urban WTPs
3.05 SOIL STABILIZATION MAT (SSM)
A. All channels and slopes indicated on the Drawings shall be lined with a SSM. The area to
be covered shall be properly graded before the mat is applied. Once the mat is placed and
anchored, the area shall be seeded and mulched in accordance to this Specification and
Section 3.36 of the VESCH. Installation shall be in accordance with Section 02276, Erosion
and Sediment Control.
3.06 MAINTENANCE
A. The Contractor shall be responsible for maintaining all seeded areas through the end of his
warranty period. Maintenance shall include but not be limited to, annual fertilization, repair
of seeded areas, irrigation (until permanent vegetation is fully established), and weed
control. The Contractor shall provide, at his own expense, protection for all seeded areas
against trespassing and damage at all times until acceptance of the work. Slopes shall be
protected from damage due to erosion, settlement, and other causes and shall be repaired
promptly at the Contractor's expense.
B. Annual fertilization shall consist of an application of 500#/acre of 10-10-10 commercial
grade fertilizer, or its equivalent and 60#/acre of nitrogen in early fall, or other analysis as
may be determined by soil test. Annual fertilization shall be in addition to top dressing and
shall be performed by the Contractor each fall season after planting until the work is
substantially complete.
C. Mowing shall be scheduled so as to maintain a minimum stand height of 4-inches or as
directed by the Engineer. Stand height shall be allowed to reach 8 to 10-inches prior to
mowing.
D. All seeded areas shall be inspected on a regular basis and any necessary repairs or
reseedings made within the planting season, if possible. If the stand should be over 60%
damaged, it shall be re-established following the original seeding recommendations.
E. Weed growth shall be maintained mechanically and/or with herbicides. When chemicals are
used, the Contractor shall follow the current Virginia Agricultural Experiment Stations' weed
control recommendations and adhere strictly to the instructions on the label of the herbicide.
No herbicide shall be used without prior approval of the Engineer.
3.07 CLEANUP
A. The Contractor shall remove from the site all subsoil excavated from his work and all other
debris including, but not limited to, branches, paper, and rubbish in all landscape areas, and
remove temporary barricades as the work proceeds.
B. All areas shall be kept in a neat, orderly condition at all times. Prior to final acceptance, the
Contractor shall clean up the entire landscaped area to the satisfaction of the Engineer.
32135-011102910:08108114 02910-7 GAC Upgrades at the Urban WTPs
3.08 SEEDING SCHEDULE
A. All seeding and mulching to be completed by the Contractor shall conform to Sections 3.32
and 3.35 of the VESCH. No permanent seeding shall be performed from May 1 - August 31
and November 1 — February 31. Temporary seed mixtures will be used during these times if
seeding is necessary. Areas seeded with temporary seed mixtures shall be reseeded by
the Contractor at no additional cost to the Owner with permanent seed as directed by the
Engineer.
B. Application rates of seed mixtures, lime, fertilizer, mulch and top dressing are shown in the
schedule.
32135-011W2910:08/08/14 02910-8 GAC Upgrades at the Urban WTPs
SEEDING SCHEDULE
Application Rates (Pounds/Acre)
Seed
Planting
Strawe
Annual
Mixture
Season Limea
Seed
Fertilizera,d
Mulch
Topdressinga
Fertilizer
Comments
P
Feb. 15-April 30 4000
200
1000 of
4000
500 of
Same as
Preferred planting seasons are Sept. 1 —
Sept. 1-Oct. 31
10-20-10
10-10-10
Topdressing
Sept. 30 and Feb. 15 — March 30.
60 of Nitrogen
TW
Sept. 1-Feb. 15 C
100
600
4000
-
-
Over seed with Type P seed mixture during
next planting season.
TSP
Feb. 16-Apr. 30 C
100
600
4000
-
-
Over seed with Type P seed mixture during
next planting season.
TSU
May 1-Aug. 31 -°
50
600
4000
-
-
Over seed with Type P seed mixture during
next planting season.
Footnotes:
a. Application rates and/or chemical analysis shall be confirmed or established by soil test.
b. On cut and fill slopes 2:1 or steeper add 20#/acre of Weeping Lovegrass to the P seed mixture in the Spring and add 20#/acre Annual Ryegrass in
Fall and Winter.
C. Lime requirements for temporary seeding shall be based on pH test results for site, according to the following table:
PH Test Recommended Application
Below 4.2 3 tons/acre
4.2 to 5.2 2 tons/acre
5.2 to 6 1 ton/acre
d. Fertilizer shall be a 10-20-10 mix or equivalent nutrients.
e. Alternative methods of mulching may be utilized. Alternative methods shall conform to requirements in the Virginia Erosion and Sediment Control
Handbook.
- END OF SECTION -
32135-011102910:08108114 02910-9 GAC Upgrades at the Urban WTPs
Building a Better World for All of Uso
Sustainable buildings, sound infrastructure, safe transportation systems, clean water,
renewable energy and a balanced environment. Building a Better World for All of Us communicates
a company -wide commitment to act in the best interests of our clients and the world around us.
We're confident in our ability to balance these requirements.
Join Our Social Communities