WPO file number:WP0201800083
TMP(s):
Date Estimate Completed: 11/20/18
Erosion and Sediment Control Bond Estimate
Item Item No. Unit Unit Cost Cost
Number (installed)
stablization(PS,TS) acres $5,000.00 $5,000.00
silt fence(SF) ft $5.00 $29,250.00
safety fence(SAF) ft $5.00 $0.00
diversion(DD,FD,RWD) ft $13.00 $0.00
temporary slope drain(TSD) pipe length ft pipe diameter MIN in $0.00 $0.00
silto fence inlet eaten (IP) ■ $100.00 $0.00
stone inlet protection(IP) $200.00 $4,800.00
outlet protection(OP) length ft width ft $0.00 $0.00
channel(SCC,matted) length -ft width ■ft $0.00
check dam depth in channel ft channel width ft $0.00 $0.00
construction entrance(CE) $2,500.00 $0.00
wash rack $2,000.00 $0.00
paved construction entrance $3,500.00 $0.00
rip-rap,placed depth -ft length !ft
width (tons) tong $60.00 $0.00
survey and layout(price per 0.1 mi.) acres traps and basins $0.00
mobilization $2,500.00
stream crossing(computed independently) $0.00
cost sum $41,550.00
contingency $4,155.00
Total $45,710
11/20/2018