HomeMy WebLinkAboutWPO201800083 Bond Estimates 2018-11-20 Meriweather Hill Water Main Replacement Project WPO file number:WP0201800083 TMP(s): Date Estimate Completed: 11/20/18 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number (installed) stablization(PS,TS) acres $5,000.00 $5,000.00 silt fence(SF) ft $5.00 $29,250.00 safety fence(SAF) ft $5.00 $0.00 diversion(DD,FD,RWD) ft $13.00 $0.00 temporary slope drain(TSD) pipe length ft pipe diameter MIN in $0.00 $0.00 silto fence inlet eaten (IP) ■ $100.00 $0.00 stone inlet protection(IP) $200.00 $4,800.00 outlet protection(OP) length ft width ft $0.00 $0.00 channel(SCC,matted) length -ft width ■ft $0.00 check dam depth in channel ft channel width ft $0.00 $0.00 construction entrance(CE) $2,500.00 $0.00 wash rack $2,000.00 $0.00 paved construction entrance $3,500.00 $0.00 rip-rap,placed depth -ft length !ft width (tons) tong $60.00 $0.00 survey and layout(price per 0.1 mi.) acres traps and basins $0.00 mobilization $2,500.00 stream crossing(computed independently) $0.00 cost sum $41,550.00 contingency $4,155.00 Total $45,710 11/20/2018