Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201800083 Stormwater Management Maintenance Agree. 2018-11-15
,�,�"►� COUNTY OF ALBEMARLE i'`I' jai\• Department of Community Development ry= 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Tel.(434)296-5832 •Fax(434)972-4126 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) for Construction Activities at: Meriwether Hill Water Main Replacement Project (Albemarle County Service Authority Project No.2017-11) Location: Owensville Road(Route 678)from Meriwether Drive(Route 1601)to Holkham Drive(Route 1636); Leeds Lane(Route 1603); Lewis Street(Route 1602); Meriwether Drive (Route 1601);Kimbrough Circle(Route 1604);Verde Place(Route 1606);Tall Tree Court (Route 1605); Timberlake Road(Private);Andrew Lane(Private); Stowe Court(Private);and Vinton Court(Private) Hydrologic Unit Code(HUC)020802040202-JR07 Receiving Waters: Ivy Creek-Little Ivy Creek WPO201800083 140LTHOp. • O+ Prepared by: oZ� cA n � Ic.N.7.02Q4u78A4s, Michael Baker International,Inc. 5c C7 Virginia Beach,Virginia /ONAL# Prepared for: Albemarle County Service Authority(ACSA) APPROVED Charlottesville, Virginia by the Date ll-ZvAlbemarle County Community Develo ment Department -t File ,g SWPPP Preparation Date:November 2018 Estimated Construction Dates: June 2019 through May 2020 (This document is to be made publicly available in accordance with 9VAC25-880-70,Part II,section D) Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 1 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 This page intentionally left blank. • 4 w_, tt • 1 Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 2 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 Table of Contents SECTION 1:REGISTRATION STATEMENT&NOTICE OF GENERAL PERMIT COVERAGE 7 SECTION 2: DEQ GUIDANCE MEMO 15-2003 8 SECTION 3:NATURE OF ACTIVITY 12 3.1 OVERVIEW 12 3.2 PROJECT DESCRIPTION 14 3.3 SITE CHARACTERIZATIONS 15 3.3.1 EXISTING SITE CONDITIONS 15 3.3.2 Soils 15 3.3.3 ROCK 16 3.3.4 CRITICAL AREAS 16 3.4 ESTIMATED AREA OF DISTURBANCE 16 3.5 INTENDED SEQUENCE OF CONSTRUCTION 17 SECTION 4: EROSION AND SEDIMENT CONTROL PLAN 18 4.1 EROSION CONTROL MEASURES 18 4.2 TEMPORARY STRUCTURAL PRACTICES 18 4.3 TRENCH DEWATERING 18 4.4 TEMPORARY AND PERMANENT SEEDING 18 SECTION 5: STORMWATER MANAGEMENT PLAN 21 5.1 NEAREST RECEIVING WATERS 21 SECTION 6:POLLUTION PREVENTION PLAN 22 SECTION 7:POTENTIAL SOURCES OF POLLUTION 23 7.1 SPILL PREVENTION AND CONTROL 23 7.2 CONSTRUCTION DEBRIS AND DISPOSAL 23 7.3 CONCRETE TRUCK WASHOUT 24 7.4 SANITARY FACILITIES 24 7.5 MUD,DEBRIS AND DUST CONTROL 24 7.6 STOCK PILES AND STAGING AREA 24 7.7 EFFLUENT FROM DE-WATERING ACTIVITIES 24 7.8 ADDITIONAL SOURCES OF POLLUTION 25 7.9 RESPONSE AND REPORTING 25 7.10 POLLUTION PREVENTION AWARENESS 25 SECTION 8:DISCHARGE TO IMPAIRED WATERS 26 SECTION 9: MAINTENACE OF SWPPP 28 9.1 TRANSFER AGREEMENT 29 SECTION 10: INSPECTIONS/QUALIFIED PERSONNEL 30 SECTION 11: CERTIFICATION 32 SECTION 12: DESIGNATION OF AUTHORITY 33 SECTION 13: INSPECTION REPORT 34 SECTION 14: CONSTRUCTION GENERAL PERMIT(VAR10) 37 APPENDIX A-EROSION AND SEDIMENT CONTROL(ESC)PLANS Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 3 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 This page intentionally left blank. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 4 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 SWPPP REVISION CHRONOLOGY Date Author Description 11/15/2018 Warren Wilczynski Prepared as part of VSMP Permit plan review RLD 36021 Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 5 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 • This page intentionally left blank. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 6 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 SECTION 1: REGISTRATION STATEMENT&NOTICE OF GENERAL PERMIT COVERAGE Not Required. Coverage under the General Permit No.VAR10,"General VPDES Permit for Discharges of Stormwater from Construction Activities Authorization to Discharge Under,the Virginia Stormwater Management Program and the Virginia Stormwater Management Act" (9VAC25-880), effective date July 1, 2014, expiration date June 30, 2019, is not anticipated for construction of the Albemarle County Service Authority's Meriwether Hifi Water Main Replacement Project(ACSA Project No.2017-11). (Refer to Section 14 for a complete copy of the referenced General Permit No.VAR10) This work will be performed in accordance with the Commonwealth of Virginia, Department of Environmental Quality, Water Division's Guidance Memo No. 15-2003 entitled "Postdevelopment Stormwater Management Implementation Guidance for Linear Utility Projects under the Virginia Stormwater Management Program Regulation,9VAC25-870",dated April 23,2015. Upon completion of construction and final stabilization, this project will not significantly alter the predevelopment runoff characteristics of the land surface. Furthermore, the Albemarle County Service Authority assures the criteria noted in the Guidance Memo will be adhered to; and, has incorporated these conditions into the erosion and sediment control plan established for the project,as well as the Contract Documents. (Refer to Section 2 for a complete copy of the referenced DEQ Guidance Memo) NOTE: The determination made herein is based on the understanding of Guidance Memo No. 15-2003; 9VAC25-870;and, the General Permit contained in 9VAC25-880-70 which is set to expire prior to the expected completion date for this project. The requirement for future General Permit coverage will be determined at a later date, based on the provisions of the new permit, or in the event the findings outlined in DEQ Guidance Memo No. 15-2003 are modified, reissued or revoked. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 7 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 SECTION 2:DEQ GUIDANCE MEMO 15-2003 COMMONWEALTH OF VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY WATER DIVISION Subject: Guidance Memo No.15-2003 Postdevelopment Stormwater Management Implementation Guidance for Linear Utility Projects under the Virginia Stormwater Management Program Regulation,9VAC25-870 To: Regional Directors and Local VSMPI'�o Administrators From: Melanie D.Davenport,Director��V rvK 1 1' t `t f Date April 23,2015 Copies: James Golden,Jeff Steers,Fred Cunningham,Joan Salvati,Allan Brockenbrough, Jerome Brooks,Regional Stormwater Compliance Managers Summary: Section 76(Linear Development Projects)of the Virginia Stormwater Management Program(VSMP) Regulation,9VAC25-870,sets forth the postdevelopment stormwater management requirements for linear development projects. The purpose of this guidance document is to clarify the implementation of Section 76 with regards to the construction of linear utilities(e.g.,waterlines,sewer lines,electric lines, telephone lines,oil and gas distribution pipelines,etc.)and was developed for use by the Department and local VSMP Authorities. Electronic Copy: An electronic copy of this guidance document in PDF format is available for staff internally on DEQNET, and for the general public on DEQ's website at: bttp://www.deq.virrinia.gov/Programs/W ater/Laws.Regulati ons.Guidance/Guidance/W aterPermitGuidaa ce.asox. Contact Information: Please contact Drew Hammond,Office of Stormwater Management,at(804)698-4037 or Andrew.Hammond@deq.virginia.gov with any questions regarding the application of this guidance. Disdaimer: This document is provided as guidance and,as such,sets forth standard operating procedures for the agency. However,it does not mandate or prohibit any particular action not otherwise required or prohibited by law or regulation. If alternative proposals are made,such proposals will be reviewed and accepted or denied based on their technical adequacy and compliance with appropriate laws and regulations. 1 Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 8 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 Postdevelopment Stormwater Management Implementation Guidance for Linear Utility Projects under the Virginia stornnvaster Management Program Regulation,9VAC2S-870 Definitions: "Land disturbance"or"land-disturbing activity"means a manmade change to the land surface that potentially changes its runoff characteristics including clearing,grading,or excavation,except that the term shall not include those exemptions specified in§62.1-44.15:34 of the Code of Virginia. "Linear development project"means a land-disturbing activity that is linear in nature such as,but not limited to,(i)the construction of electric and telephone utility lines,and natural gas pipelines;(ii) construction of tracks,rights-of-way,bridges,communication facilities and other related structures of a railroad company;(iii)highway construction projects;(iv)construction of stormwater channels and stream restoration activities;and(v)water and sewer lines. Private subdivision roads or streets shall not be considered linear development projects. "Postdevelopment"refers to conditions that reasonably may be expected or anticipated to exist after completion of the land development activity on a specific site. "Predevelopmant"refers to the conditions that exist at the time that plans for the land development of a tract of land are submitted to the VSMP authority.Where phased development or plan approval occurs (preliminary grading,demolition of existing structures,roads and utilities,etc.),the existing conditions at the time prior to the first item being submitted shall establish predevelopment conditions. "Stabilized"means land that has been treated to withstand normal exposure to natural forces without incurring erosion damage. "Stonnwater management plan"means a document(s)containing material for describing methods for complying with the requirements of the VSMP Regulation,9VAC25-870. "Virginia Stonnwater Management Program(VSMP)authority"means an authority approved by the Board after September 13,2011 to operate a Virginia Stonnwater Management Program or the Department. Regulatory Text: 9VAC25-870-76. Linear development projects. Linear development projects shall control postdevelopment stonnwater runoff in accordance with a site- specific stonnwater management plan or a comprehensive watershed stormwater management plan developed in accordance with these regulations. 2 Men wether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 9 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 Guidance: Section 76 of the VSMP Regulation,9VAC25-870,establishes the requirement that linear development projects control postdevelopment stonnwater runoff in accordance with a site-specific stonnwater management plan or a comprehensive watershed stormwater management plan. The purpose of this guidance document is to clarify the implementation of Section 76 with regard to the construction of linear utilities(e.g.,waterlines,sewer lines,electric lines,telephone lines,oil and gas distribution pipelines,etc.) and was developed for use by the Department and local VSMP Authorities. The VSMP Regulation does not distinguish between various types of linear development projects such as aboveground or underground utilities,highway construction,rights-of-way,bridges,tracks and related structures of a railroad company. The Department of Environmental Quality(DEQ)recognizes that the construction of aboveground or underground linear utilities may not result in changes to the predevelopment runoff characteristics of the land surface after the completion of construction and final stabilization. Also,the application of the postdevelopment water quantity and water quality controls to these types of projects and the preparation and implementation of a stormwater management plan may provide minimum water quality benefit Examples of such projects include: • The installation of underground utilities(e.g.,waterlines,sewer lines,oil and gas distribution pipelines)beneath existing impervious cover(e.g.,asphalt pavement,concrete pavement)that will be returned to its predevelopment condition after the completion of construction and final stabilization; • The installation of underground utilities(e.g.,waterlines,sewer lines,oil and gas distribution pipelines)beneath existing pervious cover(e.g.,forest/open space,managed turf)that will be returned to its predevelopment condition after the completion of construction and final stabilization;or • The installation of aboveground(i.e.,overhead)utility lines. DEQ staff or the local VSMP authority should utilize their best professional judgment when evaluating aboveground or underground linear utility projects. If the project will not result in significant changes to the predevelopment runoff characteristics of the land surface after the completion of construction and final stabilization,then DEQ or the local VSMP authority,at their discretion,may waive the requirement for the preparation and implementation of a stormwater management plan. DEQ recognizes that on a site specific basis a stormwater management plan may be required especially if the linear utility project will significantly alter the predevelopment runoff characteristics of the land surface. In addition,the construction of aboveground or underground linear utilities may be conducted without requiring coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities(Construction General Permit)provided that: • The project does not significantly alter the predevelopment runoff characteristics of the land surface after the completion of construction and final stabilization; • The project is managed so that less than one(1)acre of land disturbance occurs on a daily basis; • The disturbed land where work has been completed is adequately stabilized on a daily basis; • The environment is protected from erosion and sedimentation damage associated with the land- disturbing activity; 3 Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 10 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 • The owner andor construction activity operator designs,installs,implements,and maintains pollution prevention measures to: > Minimize the discharge of pollutants from equipment and vehicle washing,wheel wash water,and other wash waters; ➢ Minimize the exposure of building materials,building products,construction wastes, trash,landscape materials,fertilizers,pesticides,herbicides,detergents,sanitary waste, and other materials present on-site to precipitation and to stormwater, ➢ Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures; ➢ Prohibit the discharge of wastewater from the washout of concrete; > Prohibit the discharge of wastewater from the washout and cleanout of stucco,paint, form release oils,curing compounds,and other construction materials;and > Prohibit the discharge of fuels,oils,or other pollutants used in vehicle and equipment operation and maintenance. • The owner and/or construction activity operator provides reasonable assurance to DEQ or the local VSMP Authority that all of the above conditions will be satisfied. This may be accomplished by incorporating these conditions into an erosion and sediment control plan developed for the project. As previously noted,DEQ staff or the local VSMP authority should utilize their best professional judgment when evaluating aboveground or underground linear utility projects. If the owner and/or construction activity operator provides reasonable assurance to DEQ or the local VSMP Authority that all of the aforementioned conditions will be satisfied,then the linear utility project may be conducted without requiring coverage under the Construction General Permit. Please note that this does not relieve the owner and/or construction activity operator from complying with any and all other applicable federal, state,and local requirements. DEQ or the local VSMP Authority reserves the right to require a registration statement for Construction General Permit coverage if the aforementioned conditions are not satisfied. If the linear utility project will significantly alter the predevelopment runoff characteristics of the land surface requiring postdevelopment stormwater management or if other site specific conditions warrant Construction General Permit coverage,DEQ or the local VSMP authority may require a registration statement for permit coverage. 4 Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 11 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 SECTION 3: NATURE OF ACTIVITY 3.1 Overview It is the policy of the Albemarle County Service Authority (hereinafter referred to as"OWNER") to ensure compliance with the Commonwealth of Virginia's regulations regarding the discharge of stormwater from construction and land disturbing activities associated with the construction of linear pipe and appurtenances, or other facilities, as part of all Authority-owned construction projects. The SWPPP has been prepared by Michael Baker International, Inc. (herein after referred to as "ENGINEER") for land disturbing activities directly associated with the construction of the Meriwether Hill Water Main Replacement Project,which is located in Albemarle County,Virginia. Included in this SWPPP are the elements necessary to comply with the General Permit issued by the Virginia Department of Environmental Quality (VDEQ) under the Virginia Stormwater Management Program(VSMP). Omissions from this SWPPP do not relieve the Contractor(herein after referred to as "OPERATOR") of his/her responsibility for compliance with the regulations contained in 9VAC25-870 et seq.and 9VAC25-880 et seq.,of the Virginia Administrative Code. The project requirements include all labor, materials, equipment, incidentals and other means of temporary and/or permanent construction necessary or proper for performing and completing the work as shown in the Contract Documents. These requirements include erosion and sediment control measures, as well as the control of stormwater runoff and discharges from construction activities. No site development activities will occur as a result of this project. Key elements of this project include: • Temporary land disturbances will be kept to the minimum required in order to facilitate construction activities; • High-definition preconstruction site photography shall be performed,clearly documenting the existing site and structure conditions within the work limits, easement areas, staging areas and access routes for this Contract; • Trenching operations may be performed using both rubber-tire and track-mounted equipment. All excavated areas will be secured using trench boxes, steel plating,or other shoring mechanisms; • Trench excavations will be limited to a distance of not more than one hundred(100) feet along streets and highways and two hundred (200) feet at other locations ahead of pipe laying at any time,unless specifically authorized by the ENGINEER or OWNER; • Only suitable, unfrozen material excavated during construction(free from cinders, ashes, refuse,organic material or other deleterious material)will be used for backfill; • Backfill material will be compacted in lifts to prevent subsequent settlement; • All surplus material excavated from the trench will be removed from the site and disposed of in a proper and legal manner; Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 12 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 • Source control methods will be provided at the project site to reduce the amount of pollutants entering stormwater runoff; • Establishment of a dense permanent cover of grass by seeding for all areas disturbed by construction operations. In areas where sod may be used,sod shall be well rooted,healthy, pasture type sod,reasonably free from weeds. • Restoration efforts will be performed to match pre-construction conditions,with no changes in grading,or stormwater runoff quality,quantity or velocity. The OPERATOR is required to conform to all aspects of the VSMP regulations, as contained in 9VAC25-870 et seq. and 9VAC25-880 et seq., of the Virginia Administrative Code. Full conformance with the VSMP General Permit regulations will be required for all portions and/or phases of the work. The prime OPERATOR,subcontractors,or any other parties involved with any activity that disturb soils, or who implement a pollutant control measure identified in the Storm Water Pollution Prevention Plan(SWPPP),as part of this project,must comply with the requirements of: • Virginia Stormwater Management Program(VSMP)Regulation; • VSMP General Permit for Discharges of Stormwater from Construction Activities; • Virginia Erosion and Sediment Control Handbook(VESCH); • Virginia Erosion and Sediment Control Technical Bulletins; • Albemarle County Service Authority(ACSA)Construction Specifications,latest edition; • Albemarle County Design Standards Manual,latest edition; • Albemarle County Code of Ordinances;and, • other documents which may be incorporated in this SWPPP by reference. The OPERATOR must comply with the VSMP General Permit (VAR10) notification and SWPPP accessibility requirements in accordance with Part II C and Part II D of the General Permit,respectively.A copy of the SWPPP document shall be kept on site at all times,and be available to the general public. The OPERATOR shall maintain the posted information until termination of general permit coverage as specified in Part I F of the General Permit. The OPERATOR shall be responsible for all aspects of erosion and sediment control by,as required by the General Permit,including but not limited to: • Performing the required routine inspections of control measures; • Participating in any required site inspections by DEQ,the local program authority,or other agencies; Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 13 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 • Repairing, replacing or installing additional erosion measures, as required to mitigate deficiencies; • Provide required revisions, additions and/or deletions to sub-sections of the SWPPP as required or at the direction of DEQ,the local program authority or other agencies; • Incorporation of additional sub sections to the SWPPP as required or at the direction of DEQ,the local program authority or other agencies;and, • Payment of any and all fees,fines,or penalties,as a result of noted deficiencies,bypass or upsets. 3.2 Project Description This project will construct approximately 13,428 linear feet of new 12-inch, 8-inch,6-inch and 4- inch diameter water main by open-cut methods predominantly within or along the edge of existing hard-surface pavement areas.The primary purpose of this project is to replace existing water mains which have reached the end of their useful life. Secondarily, water service and fire protection within the project vicinity will be dramatically improved. Associated new appurtenance installations include: bends, tees, sleeves, caps, plugs, blow-off assemblies or other fittings;valves and valve/access boxes; fire hydrants; interconnections;water services connections,including water meters and meter boxes;pipe restraint;erosion and sediment control measures; temporary traffic control measures; in-place abandonment of existing water mains and removal of abandoned appurtenances such as existing valve boxes and fire hydrants; and, surface and site restoration. This project does not include stationary construction. All construction activities will progress along each affected street as pipe installations are performed -- and completed. The project will consist of the following basic activities: • Site grading(minor,as part of installations,restoration efforts and abandonment) • Pavement restoration(patching,mill and overlay) • Installation of linear underground utilities and associated services • Other activities(erosion and sediment control;temporary traffic control;and,and all other labor, materials,equipment,incidentals and other means of temporary and/or permanent construction necessary or proper for performing and completing the Work as shown in the documents) Without adequate control, there is the potential for pollutants to be transported by storm water. Construction phase pollutant sources anticipated at the site are: • Disturbed(bare)soils • Vehicle fuels and lubricants • Chemicals associated with building construction and building materials Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 14 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 • Asphalt and asphalt pavement waste • Chlorine for water line flushing • Other pollutants(including but not limited to:uncontaminated effluent(groundwater)from trench de-watering activities;dust;construction debris;litter;recyclable materials;on-site sanitary facilities; dumpsters; waste piles; stockpiles; vehicle wash and/or concrete truck washout locations;paints;stains; soaps;solvents;detergents;mulches;fertilizers;or other caustic materials and petroleum-based products.) 3.3 Site Characterizations 3.3.1 Existing Site Conditions Prior to commencing construction digital photography shall be performed by the OPERATOR clearly documenting the existing site and structure conditions within the work limits and access routes for this Contract. This project alignment is located within an urban developed residential neighborhood, predominantly within the limits of public right-of-way owned by the Virginia Department of Transportation. In general,new water mains will be installed within or along existing hard-surface pavement areas along: Owensville Road(Route 678)from Meriwether Drive (Route 1601) to Holkham Drive (Route 1636); Leeds Lane (Route 1603); Lewis Street (Route 1602); Meriwether Drive (Route 1601); Kimbrough Circle (Route 1604); Verde Place (Route 1606); Tall Tree Court (Route 1605); Timberlake Road (Private); Andrew Lane(Private);Stowe Court(Private);and Vinton Court(Private). 3.3.2 Soils The Natural Resources Conservation Service's Web Soil Survey indicates the following soils which may be present with the project limits: Map Unit Symbol Map Unit Name Ashe loam, 7 to 15 percent slopes 4C (Natural drainage class:Somewhat excessively drained; Runoff class:Low;Depth to water table:More than 80 inches) Ashe loam, 15 to 25 percent slopes 4D (Natural drainage class:Somewhat excessively drained; Runoff class:Medium;Depth to water table:More than 80 inches) Cullen loam,2 to 7 percent slopes 19B (Natural drainage class:Well drained;Runoff class:Medium; Depth to water table:More than 80 inches) Cullen loam, 7 to 15 percent slopes 19C (Natural drainage class:Well drained;Runoff class:Medium; Depth to water table:More than 80 inches) Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 15 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 Cullen clay loam,7 to 15 percent slopes,severely eroded 20C3 (Natural drainage class:Well drained;Runoff class:Medium; Depth to water table:More than 80 inches) Hayesville clay loam, 7 to 15 percent slopes,severely eroded 37C3 (Natural drainage class:Well drained;Runoff class:Medium; Depth to water table:More than 80 inches) Hayesville clay loam, 15 to 25 percent slopes,severely eroded 37D3 (Natural drainage class:Well drained;Runoff class:High; Depth to water table:More than 80 inches) Hiwassee loam,2 to 7 percent slopes 41B (Natural drainage class:Well drained;Runoff class:Medium; Depth to water table:More than 80 inches) Hiwassee clay loam,2 to 7 percent slopes, severely eroded 42B3 (Natural drainage class:Well drained;Runoff class:Medium; Depth to water table:More than 80 inches) Riverview loam 76 (Natural drainage class:Well drained;Runoff class:Low; Depth to water table:About 30-60 inches) Source: Natural Resources Conservation Service Soil Survey Area: Albemarle County, Virginia Web Soil Survey: http://websoilsurvey.nres.usda.gov Survey Area Data: Version 11,Oct 11,2017 Refer to the Geotechnical Engineering Report located in Appendix A of the Project Manual for a summary of soil borings and sampling locations performed as part of this project. The report contains test boring logs as well as laboratory test data and analysis. 3.3.3 Rock A copy of available geotechnical information in included in Appendix A of the Project Manual for reference purposes only. No representation is provided regarding the presence or nature of rock within the project limits. The Contract Documents state that all excavations are unclassified.It shall be the OPERATOR's responsibility to determine the nature,composition and extent of rock presence. 3.3.4 Critical Areas Disturbances in steep slope areas,if encountered,will be kept to the minimum required for construction in accordance with Chapter 17 of the Albemarle County Code.In accordance with Section 02920 of the Project Manual, the OPERATOR will be required to utilize sodding or soil stabilization blankets(or other methods, if approved)to prevent erosion in areas of steep slope. 3.4 Estimated Area of Disturbance Total anticipated disturbances from trenching operations within,along or off the edge of hard- surface pavement areas are estimated at approximately 44,185 square feet (1.014 acres), and includes: 13,428 LF of installed water, hydrant and interconnection mains, two(2) feet in width; 3,368 LF of installed water service connection, one (1) foot in width; and, 107 water meters, 10 blow-offs/air releases and 26 fire hydrants at 100 square feet each. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 16 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 No off-site staging/storage areas have been identified in the Contract Documents. The OPERATOR will be wholly responsible for location, negotiation, financial compensation, and acquisition of adequate staging and storage area(s) for materials and equipment, as well as all required permits,at no additional cost to the OWNER. A copy of all Agreements by and between the OPERATOR and private land owners shall be provided to the OWNER, along with executed Property Release Form(s)upon completion of construction and restoration. Disturbances associated with this linear development project will not result in changes to the predevelopment runoff characteristics of the land surface after completion of construction and final stabilization,as noted in Section 1 of this SWPPP. 3.5 Intended Sequence of Construction All construction methods and materials will conform to the project documents and applicable regulatory requirements including Albemarle County Service Authority standards and/or preferences,County ordinances,state codes,amendments,and laws. Erosion and sediment control measures shall be placed prior to,or as the first step in construction. The OPERATOR shall be responsible for maintaining these measures throughout the life of the project. In accordance with the Contract Documents, it shall be OPERATOR's responsibility to propose a construction schedule to complete all work in the specified contract completion time period, and the OPERATOR shall be responsible for the sequencing, means and methods, scheduling and coordinating the Work,for monitoring the progress of the Work,and for taking appropriate action to keep the Work on schedule. The actual schedule for implementing pollutant control measures will be determined by project construction progress. Down slope protective measures must always be in place before soil is disturbed. Upon re-establishment of seeded areas, and when authorized by OWNER or its duly appointed representative(s), after final inspection, the OPERATOR will remove all erosion and sediment controls. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 17 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 SECTION 4:EROSION AND SEDIMENT CONTROL PLAN 4.1 Erosion Control Measures Erosion and sediment control shall be in accordance with the Minimum Standards, as set forth under 9VAC25-840-40 of the Virginia Administrative Code. Unless otherwise indicated, all vegetative and structural erosion and sediment control structural practices shall be constructed and maintained according to minimum Standards and Specifications of the Virginia Erosion and Sediment Control Handbook, latest edition. The OPERATOR shall be required to provide erosion and sediment control measures during all phases of the work. All erosion and sediment control measures shall be installed and maintained in accordance with the Contract Documents. The erosion and sediment controls shown on the plans represent the minimum required. The OPERATOR may be required to provide additional controls as necessary to prevent erosion and sedimentation at the direction of the OWNER or its duly appointed representative,or in the event that site conditions require additional controls in order to effectively control erosion and sedimentation. All temporary erosion and sediment control (ESC)measures shall be removed within thirty (30) days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the OWNER or its duly appointed representative. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. REFER TO APPENDIX A FOR ESC PLANS. 4.2 Temporary Structural Practices Some controls are intended to function temporarily, and will be used for erosion and sediment control during the construction period. These include: Erosion and Sediment Control Minimum Standards; Erosion and Sediment Control Notes; Temporary Silt Fence, denoted as "SF" on the plans;Tree Protection,denoted as"TP"on the plans;Inlet Protection,denoted as"IP"on the plans and temporary and permanent seeding charts. Reference is made to Straw Bale Barriers as an additional practice to be utilized as a means of intercepting and detaining small amounts of sediment if field conditions warrant. All erosion and sediment control measures shall be in accordance with the standards identified herein. Refer to Section 3.1 of this Stormwater Pollution Prevention Plan. 4.3 Trench Dewatering Refer to Section 7.7 of this Stormwater Pollution Prevention Plan. 4.4 Temporary and Permanent Seeding Seeding and mulching procedures shall conform to the applicable provisions of the Virginia Erosion and Sediment Control Handbook,and associated Erosion and Sediment Control Technical Bulletins.Vegetated/grassed areas will be temporarily and permanently stabilized by seeding. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 18 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 TABLE 3.31-B (Revised June 2003) TEMPORARY SEEDING SPECIFICATIONS QUICK REFERENCE FOR ALL REGIONS SEED APPLICATION DATES SPECIES APPLICATION RATES Sept. 1 -Feb. 15 50/50 Mix of Annual Ryegrass(lolium multi- 50 100(lbs/acre florum)&Cereal(Winter)Rye(Secale cereale) Feb. 16-Apr.30 Annual Ryegrass(lolium multi-florum) 60-100(lbs/acre) May 1 -Aug.31 German Millet 50(lbs/acre) FERTILIZER& LIME • Apply 10-10-10 fertilizer at a rate of 450 lbs./acre(or 10 lbs./1.000 sq.ft.) • Apply Pulverized Agricultural Limestone at a rate of 2 tons/acre(or 90 lbs./1,000 sq.ft NOTE: 1 -A soil test is necessary to determine the actual amount of lime required to adjust the soil pH of site. 2-Incorporate the lime and fertilizer into the top 4—6 inches of the soil by disking or by other means. 3- When applying Slowly Available Nitrogen, use rates available in Erosion&Sediment Control Technical Bulletin #4.2003 Nutrient Management for Development Sites at http://www.dcr.state.va.us/sw/e&s.htm#pubs Permanent or temporary soil stabilization shall be applied to denuded areas within seven(7)days after final grade is reached on any portion of the site.Temporary soil stabilization shall be applied within seven(7)days to denuded areas that may not be at final grade but will remain dormant for longer than fourteen(14)days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one(1)year. Soil stabilization measures shall include(but not limited to) vegetative establishment,mulching,and the early application of gravel base material on areas to be paved. At the beginning of the next planting season, following that in which the permanent grass was sown, the stand will be inspected. Grassed areas will be accepted if a ninety-five percent(95%) cover by permanent grasses has been established and weeds are not excessive. Re-grade, fertilize and reseed any areas not acceptably covered with dense grass or containing significant stands of weeks. Continue to water,weed, fertilize and otherwise maintain the entire stand until the end of that planting season,when another inspection will be made. Only when a dense stand of weed-free grass is established will the planting be accepted. Men wether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 19 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 TABLE 3.32-D (Revised June 2003) PERMANENT SEEDING SPECIFICATIONS FOR PIEDMONT AREA SEED' LAND USE SPECIES APPLICATION PER ACRE Tall Fescue' 95-100% Minimum Care Lawn Perennial Ryegrass 0-5% (Commercial or Residential) Kentucky Bluegrass' 0-5% TOTAL:175-200 lbs. High-Maintenance Lawn Tall Fescue' TOTAL:200-250 lbs. Tall Fescue' 128 lbs. General Slope(3:1 or less) Red Top Grass or Creeping Red Fescue 2 lbs. Seasonal Nurse Crop2 20 lbs, TOTAL 150 lbs. Tall Fescue' 108 lbs_ Low Maintenance Slope Red Top Grass or Creeping Red Fescue 2 lbs. (Steeper than 3:1) Seasonal Nurse Crop 20 lbs. Crownvetch3 20 lbs. TOTAL: 150 lbs. 1 -When selecting varieties of turfgrass,use the Virginia Crop Improvement Association(VCIA)recommended turfgrass variety list. Quality seed will bear a label indicating that they are approved by VCIA. A current turfgrass variety list is available at the local County Extension office or through VCIA at 804-746-4884 or at httpl/sudan.cses.vt.edu/html/Turf/turf/publications/publications2_html 2-Use seasonal nurse crop in accordance with seeding dates as stated below: February 16th-April Annual Rye May 1"-August 151" Foxtail Millet August 16th-October Annual Rye November-February 15°i Winter Rye 3-Substitute Sericea lespedeza for Crownvetch east of Farmville,VA(May through September use hulled seed, all other periods,use unhulled Sericea).If Flatpea is used,increase rate to 30 IbsJacre. If Weeping Lovegrass is used,include in any slope or low maintenance mixture during wanner seeding periods,increase to 30-40 FERTILIZER&LIME • Apply 10-20-10 fertilizer at a rate of 500 lbs.I acre(or 12 lbs./1,000 sq.ft.) • Apply Pulverized Agricultural Limestone at a rate of 2 tons/acre(or 90 lbs./1,000 sq.ft.) NOTE: -A sod test is necessary to determine the actual amount of lime required to adjust the soil pH of site. -Incorporate the lime and fertilizer into the top 4—6 inches of the soil by disking or by other means. - When applying Slowly Available Nitrogen,use rates available in Erosion&Sediment Control Technical Bulletin #4,2003 Nutrient Management for Development Sites at http://www.dcr.state.va.us/swle&s.htm#pubs Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 20 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 SECTION 5: STORMWATER MANAGEMENT PLAN Neither modifications to the current drainage pattern,nor changes in stormwater runoff quantity or quality will result from this project. No additional impervious area will be generated as a result of this linear development project;and,there will be no changes in volume/velocity of runoff caused by this project. Temporary erosion and sediment control measures will be utilized to control stormwater runoff during construction,while permanent seeding measures will control post-development stormwater runoff in the same manner as pre-development conditions. As this project will not result in significant changes to the pre-development runoff characteristics of the land surface upon completion of construction and final stabilization, it is our understanding the preparation and implementation of a separate stormwater management plan will not be required, as such a plan would provide minimum water quality benefit. (Interpreted from Guidance Memo No. 15-2003, Postdevelopment Stormwater Management Implementation Guidance for Linear Utility Projects under the Virginia Stormwater Management Program Regulation, 9VAC25-870, dated April 23, 2015.) The OPERATOR shall maintain proper drainage at all times during construction to prevent localized flooding or other detrimental stormwater 1.1 management conditions. The OPERATOR is required to strengthen, augment, or provide other erosion control measures as required, in order to control erosion. The OPERATOR shall restore drainage patterns and ground cover conditions to be consistent with original materials and conditions. • 5.1 Nearest Receiving Waters The project site is located within Hydrologic Unit Code (HUC) 020802040202-JR07, with the nearest receiving waters to the project site being Little Ivy • . Creek,Clover Lake and unnamed tributaries thereto. Executing Query Number of Catchments Found:3 Receiving Water Name(NHD Waters) Impaired/Listed Waters and Causes Listed Waters with TMDLs Unidentified Water(460) Little Ivy Creek(460) Little Ivy Creek(460) Little Ivy Creek(558) Clover Lake(390) Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 21 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 SECTION 6:POLLUTION PREVENTION PLAN A variety of temporary stormwater pollution controls or Best Management Practices(BMPs)have been included in the construction plans for this project. These controls are reflected in the erosion and sediment controls notes and details,as shown in the Erosion and Sediment Control plan. Such control measures are considered part of this SWPPP and are to be installed and maintained as a condition of the VSMP General / Stormwater Management Permit issued for this project and Virginia Erosion and Sediment Control Law. Note: There are no permanent BMPs to be constructed as a part of this project. Vegetated/grassed areas will be permanently stabilized by seeding. Seeding and mulching procedures shall conform to the applicable provisions of the Virginia Erosion and Sediment Control Handbook. The OPERATOR shall perform dewatering operations in accordance with the project-specific Erosion and Sediment Control Plan (included) and the Contract Documents. The OPERATOR shall be responsible for prevention of discharge of solid materials and wastes to the surface waters adjacent to the site. Water used for construction, which discharges from the site, must originate from a public water supply or private well approved by the Virginia Department of Health. Water used for construction that does not originate from an approved public supply must not discharge from the site,and it to be retained in ponds until it infiltrates and/or evaporates. The OPERATOR must update the plan to reflect its operation and to identify and maintain current descriptions and storage/locations of all potential pollutant sources. Potential sources of pollution include, but are not limited to: litter, construction debris, recyclable materials, on-site sanitary facilities, dumpsters, waste piles, stockpiles, vehicle wash and concrete truck washout locations, fuels, oils, greases, hydraulic fluids, lubricants, paints, stains, soaps, solvents, detergents, chemicals, fertilizers,or other caustic materials. In accordance with 9VAC25-870-10, "qualified personnel" means a person knowledgeable in the principles and practices of erosion and sediment and stormwater management controls who possesses the skills to assess conditions at the construction site for the operator that could impact stormwater quality and quantity and to assess the effectiveness of any sediment and erosion control measures or stormwater management facilities selected to control the quality and quantity of stormwater discharges from the construction activity. For VSMP authorities this requires the use of a person who holds a certificate of competency from the board in the area of project inspection for ESC and project inspection for SWM or combined administrator for ESC and combined administrator for SWM as defined in 9VAC25-850-10 or a combination of ESC and SWM qualifications from these two areas." In general these individuals include those possessing a valid: • Responsible Land Disturber Certificate; • DCR Certification for Combined Administrator, Administrator, Plan Reviewer, Inspector,or Contractor;or • Virginia Professional Engineer,Land Surveyor,Landscape Architect,or Architect Prior to award of a construction contract for this project,the individual responsible for pollution prevention practices is listed in Section 9 of this SWPPP. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 22 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 SECTION 7:POTENTIAL SOURCES OF POLLUTION The following descriptions summarize anticipated potential sources of pollution associated with this project. 7.1 Spill Prevention and Control Substances that have the potential for polluting surface and/or groundwater must be controlled by any means necessary to ensure there is no discharge from the project area.The OPERATOR shall provide proper storage,handling,and use of all potential pollutant sources. Such measures will be provided to control drips, leaks or spills, and may include (but not be limited to) secondary containment,such as portable dikes,berms,spill containment pallets,drip pans and spill recovery and cleanup kits. All drips,leaks or spills shall be cleaned in a manner consistent with the magnitude of the impact they represent, and be disposed of in accordance with all local, state and/or Federal regulations. This includes the removal, treatment and disposal of affected soil, to prevent impacts to groundwater. All storage containers, regardless of their contents, shall have approved spill containment where required,be in sound condition,and free of rust,cracks or other damage which might compromise the containment. Hoses, valves, fittings, caps, filler nozzles and associated hardware shall be maintained in proper working condition at all times. To notify DEQ Valley Regional Office of a spill during normal business hours of 8:30 a.m.to 4:30 p.m., Monday through Friday, call the Pollution Reporting and Environmental Response (PREP) Coordinator, Jennifer Welcher at(540) 574-7854 or(540) 574-7800. Follow-up correspondence and documentation should be sent to Jennifer.Welcher@deq.virginia.gov. Alternatively, citizens and permittees may report pollution events online at: http://www.deq.state.va.us/Programs/PollutionResponsePreparedness/PollutionReportingForm.aspx Nights,holidays,and weekends,call the Department of Emergency Management's(DEM)24-hour reporting number at(800)468-8892(in-state calls only)or(804)674-2400(out-of-state calls). The DEM staff will relay the information to on-call DEQ personnel. 7.2 Construction Debris and Disposal No solid materials (including building materials, cartons, containers or other packaging) are allowed to be discharged from the site with storm water. All solid materials,including disposable materials incidental to the major construction activities,must be collected,removed from the site and disposed of in a legal manner. The materials collection area will not receive a substantial amount of runoff from upland areas and does not drain directly to a waterway. Containers shall have lids covered before periods of rain,or be located within a covered area. Scheduled collections shall be performed to prevent overfilling. SOLID MATERIALS ARE NOT TO BE BURIED ON-SITE. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 23 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 7.3 Concrete Truck Washout Direct all concrete truck wash water into a leak-proof container or leak-proof settling basin. The container or basin shall be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wastes. Liquid concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be discharged to surface waters. 7.4 Sanitary Facilities All personnel involved with construction activities must comply with state and local sanitary or septic system regulations,and be serviced regularly. Temporary sanitary facilities provided at the site shall be serviced by a commercial operator, and shall comply with state and local sanitary or septic system regulations. In accordance with OSHA regulations,hand washing facilities must be provided. 7.5 Mud,Debris and Dust Control The OPERATOR shall clean streets of mud and dust and take whatever measures necessary to ensure that the streets are kept in a clean and dust free condition at all times. Dust control shall be provided by the OPERATOR to a degree that is acceptable to the OWNER, and in compliance with applicable local and state dust control regulations.After construction,the site will be stabilized(as described elsewhere),which will reduce the potential for dust generation. 7.6 Stock Piles and Staging Area Stock piles of soil and other erodible materials shall be stabilized or protected with sediment trapping measures. The OPERATOR is responsible for the temporary protection and permanent stabilization for stockpiles onsite as well as for materials transported from the project site. As a result of the project being a linear water main installation project,the staging area will be constantly moving with the trench,except in the area of the horizontal direction drill which will be a stationary operation. No off-site staging/storage areas have been identified in the Contract Documents. If additional stockpiling or staging areas are required, it is the responsibility of the OPERATOR to legally obtain these areas. 7.7 Effluent from De-watering Activities Uncontaminated effluent from dewatering operations shall be filtered through a VDOT-approved sediment dewatering system, and discharged in a manner that does not adversely affect adjacent properties,wetlands,waterways,or the storm drainage system.Approved systems include:Dirtbag by ACF Environmental,Filter Bag by GeoProducts LLC,Ultra-Dewatering Bag by UltraTech,and FBI,FB3,and FB4 by Frank Roberts & Sons,Inc. The dewatering system shall be in accordance with VDOT Standard Detail EC-8 of the VDOT Road and Bridge Standards. No contaminated effluent or groundwater may be discharged without a separate Virginia Pollutant Discharge Elimination System(VPDES)discharge permit. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 24 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 7.8 Additional Sources of Pollution The operator shall note the following additional potential sources of pollution and implement appropriate pollution prevention practices or control measures. Pollutant,or Pollutant Prevention Practices, Generating Activity Location on site Control Measures Follow Erosion and Sediment Control Plan. Dispose of Clearing,grading,excavating, Land disturbance area clearing debris at acceptable and un-stabilized areas disposal sites.Seed and mulch, or sod within 7 days of land clearing. Cover storm drain inlets and use Paving operations Driveway and Paved drip pans and absorbent/oil dry Construction Entrances for all paving machines to limit leaks and spills. Designated areas for material delivery and storage. Placed Material delivery and storage Designated area shown on plan near construction entrances, away from waterways and drainage paths. Material use during building Follow manufacturer's process Building areas instructions and provide all MSDS sheets. Apply fertilizers in accordance Landscaping operations Landscaped areas with manufacturer's recommendations and not during rainfall events. To be treated in a sediment basin or better control as specified on Wash Waters Wash areas shown on plan plan.Minimize the discharge of pollutants from equipment and vehicle washing. Provide containment and Vehicle and equipment washing Designated areas shown on plan filtering for all wash waters per the plan. The OPERATOR shall minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste,and other materials present on the site to precipitation and to stormwater. 7.9 Response and Reporting Response and reporting of any leaks, spills or discharges shall be in accordance with Part III (Conditions Applicable to All State Permits)of the General Permit. 7.10 Pollution Prevention Awareness The SWPPP shall be kept on site an accessible at all times and the content of the SWPPP will be included as an agenda item and discussed at regularly scheduled progress meetings. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Pape 25 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 SECTION 8:DISCHARGE TO IMPAIRED WATERS No adverse effects are anticipated resulting from construction activities and minor land disturbances associated with this project. For informational purposes, the following data was obtained through EPA's Watcrbody Quality Assessment Reports. ID: VAV-H26R_XLIO 1 A 16 Location: Little Ivy Creek including tributaries from the headwaters downstream to its confluence with Little Ivy Creek Comments: Records state "No monitoring data available during the 2016 assessment cycle." ID: VAV-H26R_LIG01 A00 Location: Little Ivy Creek and tributaries from the headwaters downstream to its confluence with Little Ivy Creek Comments: Records state "No monitoring data available during the 2016 assessment cycle." ID: VAV-H26R_IVC03A00 Location: Ivy Creek from the headwaters downstream to its confluence with Little Ivy Creek Comments: 2008 Waterbody Report for Ivy Creek as shown below with no TMDL data having been recorded by EPA. Water Quality Assessment Status for Reporting Year 2008 The overall status of this waterbody is Impaired. Designated Use Designated Use Group Status Aquatic Life Fish,Shellfish,And Wildlife Protection And Propagation Impaired Fish Consumption Aquatic Life Harvesting Not Assessed Recreation Recreation Good _ Wildlife Fish, Shellfish, ildlife Protection And Propagation Good d Causes of Impairment for Reporting Year 2008 Cause of Impairment Cause of Impairment Group Designated Use(s) State TMDL Development Status pH pH/Acidity/Caustic Conditions Aquatic Life TMDL needed Probable Sources Contributing to Impairment for Reporting Year 2008 Probable Source Probable Source Group Cause(s)of Impairment Atmospheric Deposition -Acidity Atmospheric Deposition pH Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 26 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 ID: VAV-H27R_M01A04 Location: Ivy Creek from the headwaters downstream to its confluence with the Lynch River Comments: 2008 Waterbody Report for Ivy Creek as shown below with no data for impairments or probable contributing sources being reported to EPA; and, no TMDL data having been recorded by EPA. Water Quality Assessment Status for Reporting Year 2008 The overall status of this waterbody is Good. Designated Use Designated Use Group Status Aquatle Fish,Stih,And a ProteAnd PROMO qatim Fish Consumption Aquatic Life Harvesting Not Assessed Recreation Recreation Not Assessed 1111111111111111111111111111111111111111111 Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 27 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 SECTION 9:MAINTENACE OF SWPPP The techniques described in this SWPPP focus on providing control of pollutant discharges with practical approaches that utilize readily available expertise,materials,and equipment. Refer to Part II B (Stormwater Pollution Prevention Plan) of the General Permit for specific requirements regarding amendments,modifications and updates to the SWPPP. As described below,the OPERATOR shall conduct regular inspections to determine effectiveness of the SWPPP. The SWPPP shall be modified by the OPERATOR as needed to prevent pollutants from discharging from the site. The OPERATOR's inspector must be both a person familiar with the site and the nature of the major construction activities and be qualified to evaluate both overall system performance and individual component performance. Additionally,the OWNER's qualified representative shall be empowered to implement modifications to this SWPPP and the pollutant control devices, if needed, or in order to increase effectiveness to an acceptable level. If a new Designation of Authority(Section 12)is provided,the qualified representative listed herein will be void and the new OPERATOR's qualified individual shall be listed below: Former Qualified Individual Telephone Updated Qualified Individual Telephone This SWPPP shall be updated each time there are modifications to the pollutant prevention system or a change of OPERATORs working on the project that disturbs site soil. The OPERATOR shall notify the OWNER before these modifications are implemented, unless immediate OPERATOR action is necessary to prevent unauthorized discharges. If immediate OPERATOR action is needed, then the OPERATOR shall notify the OWNER of the action as soon as possible. This SWPPP must be amended as necessary during the course of construction in order to be kept current with the pollutant control measures utilized at the site. Amendments to the SWPPP may include, but are not limited to: addenda; sketches and/or revised drawings; handwritten notes or revisions;added,deleted or modified sections as applicable;Contract Change Orders;and/or,other pertinent records or documentation as applicable. If a section or phase of the project reaches final stabilization prior to the entire project reaching final stabilization, then that section may be clearly marked on the site plans and the date of fmal stabilization recorded in the SWPPP. Areas so marked are no longer required to be inspected as a part of permit compliance. This SWPPP is intended to control water-borne and liquid pollutant discharges by some combination of interception, filtration, and/or containment. The OPERATOR and all subcontractors implementing this SWPPP shall remain aware of the need to periodically refine and update the SWPPP in order to accomplish the intended goals. A review of the contents of the SWPPP shall be a standing agenda item and shall be discussed at each construction progress meeting held by the OPERATOR performing actual construction activities on site. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 28 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 Full compliance with the SWPPP and implementing regulations as contained in 9VAC25-870 et seq.and 9VAC25-880 et seq.of the Virginia Administrative Code is required in order to fulfill the Contract requirements and shall be considered incidental to the total contract value. 9.1 Transfer Agreement Not Applicable. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 29 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 SECTION 10:INSPECTIONS/QUALIFIED PERSONNEL Site inspections to assess performance of pollutant controls shall be conducted by the OPERATOR's designated E&S inspector.This individual may be: • a Virginia licensed Professional Engineer; or, • a Virginia certified Responsible Land Disturber;or, • another person who holds a certificate of competency from the Virginia Soil and Water Conservation Board in the area as an erosion and sediment control inspector or erosion and sediment control combined administrator. The OPERATOR's inspector must meet the definition of"Qualified Personnel"as contained in the Virginia Storm Water Management Program regulations(9VAC25-871-10)which means"a person knowledgeable in the principles and practices of erosion and sediment and stormwater management controls who possesses the skills to assess conditions at the construction site for the operator that could impact stormwater quality and quantity and to assess the effectiveness of any sediment and erosion control measures or stormwater management facilities selected to control the quality and quantity of stormwater discharges from the construction activity." Additionally, the OPERATOR's inspector must either be someone empowered to implement modifications to this SWPPP and the pollutant control devices, if needed, in order to increase effectiveness to an acceptable level,or someone with the authority to cause such things to happen. Inspection Schedule and Procedures: • In accordance with 9VAC25-880-70,inspections shall be conducted at a frequency of: at least once every five(5)business days; or at least once every ten(10)business days and no later than 48 hours following a measurable storm event(a rainfall event producing 0.25 inches of rain or greater over 24 hours). In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day. • Inspection procedures (requirements) shall be in accordance with Part II (Stormwater Pollution Prevention Plan), paragraph F (SWPPP Inspections) of the General VPDES Permit for Discharges of Stormwater from Construction Activities, and are incorporated by reference. • The inspections will verify that all BMPs required in Sections 2 and 3 are implemented and maintained effectively minimizing erosion and preventing stormwater contamination from construction materials. • All inspections will be coordinated with an inspector from the Albemarle County Service Authority. An Albemarle County Service Authority inspector will accompany the OPERATOR's designated E&S inspector,when possible during inspections. Corrective actions shall be in accordance with paragraph G of the aforementioned Permit. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 30 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 If corrective actions are required as a result of an inspection by the Albemarle County Service Authority's inspector or the OPERATOR's designated E&S inspector, a copy of the inspection report will be submitted to Albemarle County Service Authority. The OPERATOR's designated E&S inspector will be responsible for initiating corrective action as soon as practical,but no later than seven (7) days after discovery. All corrective actions must be performed prior to the next measurable storm event. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 31 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 SECTION 11:CERTIFICATION "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is,to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Role: ENGINEER on behalf of the OWNER Name: Warren Wilczynski,ENV SP(RLD#36021,expires 07/01/2020) Title: Technical Specialist Company: Michael Baker International,Inc. Address: 272 Bendix Road,Suite 400 Virginia Beach,VA 23452 Signature: Date: November 15,2018 Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 32 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 SECTION 12: DESIGNATION OF AUTHORITY I, (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit,at the MERIWETHER HILL WATER MAIN REPLACEMENTS PROJECT(ACSA Proiect No.2017-11)construction site. The designee is authorized to sign any reports,stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city,state,zip) (phone) By signing this authorization,I confirm that I meet the requirements to make such a designation as set forth in the Construction General Permit(CGP),and that the designee above meets the definition of a"duly authorized representative". Role(check one): _OWNER _ ENGINEER _OPERATOR Name: Company: Title: Signature: Date: Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 33 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 SECTION 13: INSPECTION REPORT Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 34 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 POLLUTANT PREVENTION MEASURES INSPECTION REPORT Meriwether Hill Water Main Replacements Project Project Number 2017-11 Inspection Date/Time Inspector Name Inspecting Company Name Inspector Title Reason for Inspection: 0 Regular Inspection 0 Pre-Rainfall Inspection 0 Re-Inspection 0 Post-Rainfall Inspection Has a sediment discharge occurred since the last inspection? 0 Yes 0 No Are the pollutant control measures in compliance with E&S regulations? 0 Yes 0 No Check only one box for each item listed below: (Check "N/A"only if the item does not apply to this project) Item Description In Compliance at the Time of Inspection SWPPP located on-site 0 Yes 0 No CI N/A (contains all E&S control updates) Construction Entrances 0 Yes 0 No 0 N/A Sediment Barriers El Yes 0 No 0 N/A Storage/Disposal Areas 0 Yes 0 No 0 N/A Sediment Traps 0 Yes 0 No 0 N/A Check Dams 0 Yes 0 No 0 N/A Inlet Protection CI Yes 0 No 0 N/A Tree Protection 0 Yes ID No 0 N/A Silt or Super Silt Fence 0 Yes El No 0 N/A Diversion Dikes 0 Yes 0 No 0 N/A Stockpile Stabilization 0 Yes 0 No 0 N/A Temporary Stabilization of Denuded 0 Yes 0 No 0 N/A Areas Is Temporary Stabilization Adequate 0 Yes 0 No 0 N/A Permanent Stabilization of Denuded 0 Yes El No 0 N/A Areas Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 35 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 Item Description(continued) In Compliance at the Time of Inspection Is Permanent Stabilization Adequate 0 Yes 0 No 0 N/A Turbidity Curtains 0 Yes 0 No 0 N/A Public Roads Free of Dust and Debris 0 Yes 0 No 0 N/A Removal of Accumulated Sediment 0 Yes 0 No 0 N/A Discharge Points Free of Sediment 0 Yes 0 No 0 N/A Deposits at Receiving Waters Site Free of Trash/Litter 0 Yes 0 No 0 N/A Site Free of Spills,Leaks or Other 0 Yes 0 No 0 N/A Harmful Materials Dumpsters Secured and Covered 0 Yes 0 No 0 N/A Natural Resources Protected 0 Yes 0 No 0 N/A Temporary Fuel Tanks Secured and 0 Yes 0 No 0 N/A Contained Wash Facilities'Maintained 0 Yes 0 No 0 N/A Sanitary Facilities Maintained 0 Yes 0 No 0 N/A Dewatering Devices 0 Yes 0 No 0 N/A Removal of Pollutant Control Measures 0 Yes 0 No 0 N/A Which Are No Longer Required Repair of Defective,Damaged or Failing 0 Yes 0 No 0 N/A Pollutant Control Measures VSMP Permit Letter and SWPPP 0 Yes 0 No 0 N/A Location Information Displayed Other 0 Yes 0 No 0 N/A El Yes 0 No 0 N/A CI Yes 0 No 0 N/A Are additional sheets attached as a part of this Inspection Report? 0 Yes 0 No (Provide additional sheets as required for documentation) CORRECTIVE ACTIONS TO BE TAKEN: 0 Yes 0 No (Explain all Item Descriptions above checked"No",attach additional sheets as necessary) Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 36 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 SECTION 14:CONSTRUCTION GENERAL PERMIT(VAR10) This information is being provided for reference purposes only with respect to Maintenance of SWPPP and Inspection Requirements. Coverage under the General Permit No.VAR10,"General VPDES Permit for Discharges of Stormwater from Construction Activities Authorization to Discharge Under the Virginia Stormwater Management Program and the Virginia Stormwater Management Act" (9VAC25-880), effective date July 1, 2014, expiration date June 30, 2019, is not anticipated for construction of the Albemarle County Service Authority's Meriwether Hill Water Main Replacement Project(ACSA Project No.2017-11). Refer to Section 1 for more information. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 37 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY General Permit No.:VAR10 Effective Date:July 1,2014 Expiration Date:June 30,2019 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia Stormwater Management Act and regulations adopted pursuant thereto, operators of construction activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of Virginia, except those specifically named in State Water Control Board regulations that prohibit such discharges. The authorized discharge shall be in accordance with this cover page, Part I - Discharge Authorization and Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions Applicable to All VPDES Permits as set forth herein. I Meriwether Hill Water Main Replacement Project(A GSA Project No. 2017-11) Page 38 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 General Permit No.:VAR10 Page 1 of 21 PART I DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS A.Coverage under this general permit 1. During the period beginning with the date of coverage under this general permit and lasting until the general permits expiration date,the operator is authorized to discharge stormwater from construction activities. 2. This general permit also authorizes stormwater discharges from support activities(e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas,borrow areas)located on-site or off-site provided that: a. The support activity is directly related to the construction activity that is required to have general permit coverage for discharges of stormwater from construction activities; b. The support activity is not a commercial operation, nor does it serve multiple unrelated construction activities by different operators; c. The support activity does not operate beyond the completion of the last construction activity it supports; d. The support activity is identified in the registration statement at the time of general permit coverage; e. Appropriate control measures are identified in a stormwater pollution prevention plan and implemented to address the discharges from the support activity areas;and f. All applicable state,federal,and local approvals are obtained for the support activity. B. Limitations on coverage. 1. Post-construction discharges. This general permit does not authorize stormwater discharges that originate from the site after construction activities have been completed and the site, including any support activity sites covered under the general permit registration, has undergone final stabilization. Post-construction industrial stormwater discharges may need to be covered by a separate VPDES permit. 2. Discharges mixed with nonstormwater. This general permit does not authorize discharges that are mixed with sources of nonstormwater, other than those discharges that are identified in Part I E (Authorized nonstormwater discharges)and are in compliance with this general permit. 3. Discharges covered by another state permit. This general permit does not authorize discharges of stormwater from construction activities that have been covered under an individual permit or required to obtain coverage under an alternative general permit. 4. Impaired waters and TMDL limitation.Discharges of stormwater from construction activities to surface waters identified as impaired in the 2012 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for (i) sediment or a sediment-related parameter (i.e., total suspended solids or turbidity)or(ii)nutrients(i.e.,nitrogen or phosphorus)are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP that minimizes the pollutants of concern and,when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations. In addition, the operator shall implement the following items: Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 39 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No:VAR10 Page 2 of 21 a. The impaired water(s),approved TMDL(s),and pollutant(s)of concern,when applicable,shall be identified in the SWPPP; b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events;and d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: (1) Inspections shall be conducted at a frequency of(i)at least once every four business days or (ii)at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. 5. Exceptional waters limitation. Discharges of stormwater from construction activities not previously covered under the general permit issued in 2009 to exceptional waters identified in 9VAC25-260-30 A 3 c are not eligible for coverage under this general permit unless the operator implements the following: a. The exceptional water(s)shall be identified in the SWPPP; b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events;and d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: (1) Inspections shall be conducted at a frequency of(i)at least once every four business days or (ii)at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters. 6. There shall be no discharge of floating solids or visible foam in other than trace amounts. C. Commingled discharges. Discharges authorized by this general permit may be commingled with other sources of stormwater that are not required to be covered under a state permit, so long as the commingled discharge is in compliance with this general permit. Discharges authorized by a separate state or VPDES permit may be commingled with discharges authorized by this general permit so long as all such discharges comply with all applicable state and VPDES permit requirements. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 40 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 3 of 21 D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, I C,and I E,all discharges covered by this general permit shall be composed entirely of stormwater associated with construction activities.All other discharges including the following are prohibited: 1. Wastewater from washout of concrete; 2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; 3. Fuels,oils,or other pollutants used in vehicle and equipment operation and maintenance; 4. Oils,toxic substances,or hazardous substances from spills or other releases;and 5. Soaps,solvents,or detergents used in equipment and vehicle washing. E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction activities are authorized by this general permit when discharged in compliance with this general permit: 1. Discharges from firefighting activities; 2. Fire hydrant flushings; 3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered,settled,or similarly treated prior to discharge; 4. Water used to control dust that has been filtered,settled,or similarly treated prior to discharge; 5. Potable water sources, including uncontaminated waterline flushings; 6. Routine external building wash down where soaps, solvents or detergents have not been used and the wash water has been filtered,settled,or similarly treated prior to discharge; 7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred(or where all spilled or leaked material has been removed prior to washing);where soaps, solvents, or detergents have not been used; and where the wash water has been filtered, settled, or similarly treated prior to discharge; 8. Uncontaminated air conditioning or compressor condensate; 9. Uncontaminated ground water or spring water; 10. Foundation or footing drains where flows are not contaminated with process materials such as solvents; 11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered,settled,or similarly treated prior to discharge;and 12. Landscape irrigation. F.Termination of general permit coverage. 1. The operator of the construction activity shall submit a notice of termination in accordance with 9VAC25-880-60 to the VSMP authority after one or more of the following conditions have been met: Merivvether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 41 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No:VAR10 Page 4 of 21 a. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible. When applicable, long term responsibility and maintenance requirements shall be recorded in the local land records prior to the submission of a notice of termination; b. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; c. Coverage under an alternative VPDES or state permit has been obtained;or d. For residential construction only, temporary soil stabilization has been completed and the residence has been transferred to the homeowner. 2. The notice of termination should be submitted no later than 30 days after one of the above conditions in subdivision 1 of this subsection is met. Authorization to discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection. Termination of authorizations to discharge for the conditions set forth in subdivision 1 a of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of the notice of termination,whichever occurs first, 3. The notice of termination shall be signed in accordance with Part III K of this general permit. G.Water quality protection. 1. The operator must select, install, implement and maintain control measures as identified in the SWPPP at the construction site that minimize pollutants in the discharge as necessary to ensure that the operator's discharge does not cause or contribute to an excursion above any applicable water quality standard. 2. If it is determined by the department that the operators discharges are causing, have reasonable potential to cause, or are contributing to an excursion above any applicable water quality standard, the department, in consultation with the VSMP authority, may take appropriate enforcement action and require the operator to: a. Modify or implement additional control measures in accordance with Part II B to adequately address the identified water quality concerns; b. Submit valid and verifiable data and information that are representative of ambient conditions and indicate that the receiving water is attaining water quality standards;or c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3. All written responses required under this chapter must include a signed certification consistent with Part III K. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 42 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 5 of 21 PART II STORMWATER POLLUTION PREVENTION PLAN A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a registration statement and implemented for the construction activity, including any support activity, covered by this general permit. SWPPPs shall be prepared in accordance with good engineering practices.Construction activities that are part of a larger common plan of development or sale and disturb less than one acre may utilize a SWPPP template provided by the department and need not provide a separate stormwater management plan if one has been prepared and implemented for the larger common plan of development or sale. The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans such as a spill prevention control and countermeasure(SPCC)plan developed for the site under§311 of the federal Clean Water Act or best management practices(BMP) programs otherwise required for the facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II A. All plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan incorporated by reference does not contain all of the required elements of the SWPPP,the operator must develop the missing elements and include them in the SWPPP. Any operator that was authorized to discharge under the general permit issued in 2009,and that intends to continue coverage under this general permit, shall update its stormwater pollution prevention plan to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. A.Stormwater pollution prevention plan contents.The SWPPP shall include the following items: 1. General information. a. A signed copy of the registration statement, if required, for coverage under the general VPDES permit for discharges of stormwater from construction activities; b. Upon receipt,a copy of the notice of coverage under the general VPDES permit for discharges of stormwater from construction activities(i.e.,notice of coverage letter); c. Upon receipt,a copy of the general VPDES permit for discharges of stormwater from construction activities; d. A narrative description of the nature of the construction activity, including the function of the project(e.g.,low density residential,shopping mall,highway,etc.); e. A legible site plan identifying: (1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; (2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; (3) Locations of major structural and nonstructural control measures, including sediment basins and traps, perimeter dikes,sediment barriers,and other measures intended to filter,settle,or similarly treat sediment, that will be installed between disturbed areas and the undisturbed vegetated areas in order to increase sediment removal and maximize stormwater infiltration; (4) Locations of surface waters; Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 43 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 6 of 21 (5) Locations where concentrated stormwater is discharged; (6) Locations of support activities, when applicable and when required by the VSMP authority, including but not limited to (i) areas where equipment and vehicle washing, wheel wash water,and other wash water is to occur;(ii)storage areas for chemicals such as acids,fuels, fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site;and(vi)construction waste storage;and (7) When applicable, the location of the on-site rain gauge or the methodology established in consultation with the VSMP authority used to identify measurable storm events for inspection purposes. 2. Erosion and sediment control plan. a. An erosion and sediment control plan approved by the VESCP authority as authorized under the Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan"as defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan prepared in accordance with annual standards and specifications approved by the department. Any operator proposing a new stormwater discharge from construction activities that is not required to obtain erosion and sediment control plan approval from a VESCP authority or does not adopt department-approved annual standards and specifications shall submit the erosion and sediment control plan to the department for review and approval. b. All erosion and sediment control plans shall include a statement describing the maintenance responsibilities required for the erosion and sediment controls used. c. A properly implemented approved erosion and sediment control plan, "agreement in lieu of a plan,"or erosion and sediment control plan prepared in accordance with department-approved annual standards and specifications,adequately: (1) Controls the volume and velocity of stormwater runoff within the site to minimize soil erosion; (2) Controls stormwater discharges, including peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; (3) Minimizes the amount of soil exposed during the construction activity; (4) Minimizes the disturbance of steep slopes; (5) Minimizes sediment discharges from the site in a manner that addresses (i) the amount, frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the site; (6) Provides and maintains natural buffers around surface waters, directs stormwater to vegetated areas to increase sediment removal, and maximizes stormwater infiltration, unless infeasible; (7) Minimizes soil compaction and,unless infeasible,preserves topsoil, (8) Ensures that stabilization of disturbed areas will be initiated immediately whenever any clearing,grading, excavating,or other land-disturbing activities have permanently ceased on any portion of the site,or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 days;and Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 44 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 7 of 21 (9) Utilizes outlet structures that withdraw stormwater from the surface (i.e., above the permanent pool or wet storage water surface elevation), unless infeasible,when discharging from sediment basins or sediment traps. 3. Stormwater management plan. a. New construction activities. A stormwater management plan approved by the VSMP authority as authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25- 870), or an"agreement in lieu of a stormwater management plan"as defined in 9VAC25-870-10 from the VSMP authority,or a stormwater management plan prepared in accordance with annual standards and specifications approved by the department. Any operator proposing a new stormwater discharge from construction activities that is not required to obtain stormwater management plan approval from a VSMP authority or does not adopt department-approved annual standards and specifications shall submit the stormwater management plan to the department for review and approval. b. Existing construction activities. Any operator that was authorized to discharge under the general permit issued in 2009, and that intends to continue coverage under this general permit, shall ensure compliance with the requirements of 9VAC25-870-93 through 9VAC25-870-99 of the VSMP Regulation, including but not limited to the water quality and quantity requirements. The SWPPP shall include a description of, and all necessary calculations supporting, all post- construction stormwater management measures that will be installed prior to the completion of the construction process to control pollutants in stormwater discharges after construction operations have been completed. Structural measures should be placed on upland soils to the degree possible. Such measures must be designed and installed in accordance with applicable VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits must be obtained. 4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant-generating activities that may reasonably be expected to affect the quality of stormwater discharges from the construction activity,including any support activity.The pollution prevention plan shall: a. Identify the potential pollutant-generating activities and the pollutant that is expected to be exposed to stormwater; b. Describe the location where the potential pollutant-generating activities will occur, or if identified on the site plan,reference the site plan; c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit,that are or will be commingled with stormwater discharges from the construction activity, including any applicable support activity; d. Identify the person responsible for implementing the pollution prevention practice or practices for each pollutant-generating activity(if other than the person listed as the qualified personnel); e. Describe the pollution prevention practices and procedures that will be implemented to. (1) Prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other releases;and(ii) procedures for reporting leaks,spills,and other releases in accordance with Part III G; (2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and maintenance activities (e.g., providing secondary containment such as spill berms, decks, spill containment pellets, providing cover where appropriate, and having spill kits readily available); Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 45 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 8 of 21 (3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with stormwater; (ii) collection and proper disposal in a manner to prevent contact with stormwater; and (iii) a similarly effective means designed to prevent discharge of these pollutants); (4) Minimize the discharge of pollutants from vehicle and equipment washing,wheel wash water, and other types of washing(e.g., locating activities away from surface waters and stormwater inlets or conveyance and directing wash waters to sediment basins or traps, using filtration devices such as filter bags or sand filters,or using similarly effective controls); (5) Direct concrete wash water into a leak-proof container or leak-proof settling basin. The container or basin shall be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wastes. Liquid concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be discharged to surface waters; (6) Minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials, and wastes including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape materials; and (iii) construction and domestic wastes such as packaging materials, scrap construction materials, masonry products,timber,pipe and electrical cuttings,plastics,Styrofoam,concrete,and other trash or building materials; (7) Prevent the discharge of fuels,oils,and other petroleum products, hazardous or toxic wastes, and sanitary wastes;and (8) Address any other discharge from the potential pollutant-generating activities not addressed above;and f. Describe procedures for providing pollution prevention awareness of all applicable wastes, including any wash water,disposal practices,and applicable disposal locations of such wastes,to personnel in order to comply with the conditions of this general permit. The operator shall implement the procedures described in the SWPPP. 5. SWPPP requirements for discharges to impaired waters, surface waters with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit, and exceptional waters.The SWPPP shall: a. Identify the impaired water(s),approved TMDL(s),pollutant(s)of concern,and exceptional waters identified in 9VAC25-260-30 A 3 c,when applicable; b. Provide clear direction that. (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events;and (3) A modified inspection schedule shall be implemented in accordance with Part I B 4 or Part I B 5. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 46 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 9 of 21 6. Qualified personnel. The name, phone number, and qualifications of the qualified personnel conducting inspections required by this general permit. 7. Delegation of authority.The individuals or positions with delegated authority,in accordance with Part III K,to sign inspection reports or modify the SWPPP. 8. SWPPP signature.The SWPPP shall be signed and dated in accordance with Part III K. B.SWPPP amendments,modification,and updates. 1. The operator shall amend the SWPPP whenever there is a change in the design, construction, operation,or maintenance that has a significant effect on the discharge of pollutants to surface waters and that has not been previously addressed in the SWPPP. 2. The SWPPP must be amended if, during inspections or investigations by the operators qualified personnel,or by local,state,or federal officials,it is determined that the existing control measures are ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed and implemented to correct problems identified. If approval by the VESCP authority, VSMP authority,or department is necessary for the control measure, revisions to the SWPPP shall be completed no later than seven calendar days following approval. Implementation of these additional or modified control measures must be accomplished as described in Part II G. 3. The SWPPP must clearly identify the contractor(s) that will implement and maintain each control measure identified in the SWPPP.The SWPPP shall be amended to identify any new contractor that will implement and maintain a control measure. 4. The operator shall update the SWPPP no later than seven days following any modification to its implementation. All modifications or updates to the SWPPP shall be noted and shall include the following items: a. A record of dates when: (1) Major grading activities occur; (2) Construction activities temporarily or permanently cease on a portion of the site;and (3) Stabilization measures are initiated; b. Documentation of replaced or modified controls where periodic inspections or other information have indicated that the controls have been used inappropriately or incorrectly and where modified as soon as possible; c. Areas that have reached final stabilization and where no further SWPPP or inspection requirements apply; d. All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; e. The date of any prohibited discharges, the discharge volume released, and what actions were taken to minimize the impact of the release; f. Measures taken to prevent the reoccurrence of any prohibited discharge;and g. Measures taken to address any evidence identified as a result of an inspection required under Part II F. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 47 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 10 of 21 5. Amendments,modifications,or updates to the SWPPP shall be signed in accordance with Part III K. C. Public Notification. Upon commencement of land disturbance,the operator shall post conspicuously a copy of the notice of coverage letter near the main entrance of the construction activity. For linear projects, the operator shall post the notice of coverage letter at a publicly accessible location near an active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall maintain the posted information until termination of general permit coverage as specified in Part I F. D.SWPPP availability. 1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the SWPPP available at a central location on-site for use by those identified as having responsibilities under the SWPPP whenever they are on the construction site. 2. The operator shall make the SWPPP and all amendments,modifications,and updates available upon request to the department, the VSMP authority, the EPA, the VESCP authority, local government officials, or the operator of a municipal separate storm sewer system receiving discharges from the construction activity. If an on-site location is unavailable to store the SWPPP when no personnel are present, notice of the SWPPP's location must be posted near the main entrance of the construction site. 3. The operator shall make the SWPPP available for public review in an electronic format or in hard copy. Information for public access to the SWPPP shall be posted and maintained in accordance with Part II C. If not provided electronically, public access to the SWPPP may be arranged upon request at a time and at a publicly accessible location convenient to the operator or his designee but shall be no less than once per month and shall be during normal business hours. Information not required to be contained within the SWPPP by this general permit is not required to be released. E. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments, modifications, and updates from commencement of land disturbance until termination of general permit coverage as specified in Part I F. 1. All control measures must be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. If a site inspection required by Part II F identifies a control measure that is not operating effectively,corrective action(s) shall be completed as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority,to maintain the continued effectiveness of the control measures. 2. If site inspections required by Part II F identify an existing control measure that needs to be modified or if an additional control measure is necessary for any reason, implementation shall be completed prior to the next anticipated measurable storm event. If implementation prior to the next anticipated measurable storm event is impracticable,then alternative control measures shall be implemented as soon as practicable,but no later than seven days after discovery or a longer period as established by the VSMP authority. F.SWPPP Inspections. 1. Personnel responsible for on-site and off-site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP.The operator is responsible for insuring that the qualified personnel conduct the inspection. 2. Inspection schedule. a. Inspections shall be conducted at a frequency of: Meriwether Hill Water Main Replacement Project(A GSA Project No. 2017-11) Page 48 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 General Permit No.:VAR10 Page 11 of 21 (1) At least once every five business days;or (2) At least once every 10 business days and no later than 48 hours following a measurable storm event In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted no later than the next business day. b. Where areas have been temporarily stabilized or land-disturbing activities will be suspended due to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection frequency may be reduced to once per month. If weather conditions (such as above freezing temperatures or rain or snow events) make discharges likely, the operator shall immediately resume the regular inspection frequency. c. Representative inspections may be utilized for utility line installation, pipeline construction, or other similar linear construction activities provided that: (1) Temporary or permanent soil stabilization has been installed and vehicle access may compromise the temporary or permanent soil stabilization and potentially cause additional land disturbance increasing the potential for erosion; (2) Inspections occur on the same frequency as other construction activities; (3) Control measures are inspected along the construction site 0.25 miles above and below each access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature intersects the construction activity and access does not compromise temporary or permanent soil stabilization);and (4) Inspection locations are provided in the report required by Part II F. 3. Inspection requirements. a. As part of the inspection,the qualified personnel shall: (1) Record the date and time of the inspection and when applicable the date and rainfall amount of the last measurable storm event; (2) Record the information and a description of any discharges occurring at the time of the inspection; (3) Record any land-disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls,such as silt fence; (b) Soil stockpiles,when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization; • Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 49 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 12 of 21 (d) Cut and fill slopes; (e) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (f) Temporary or permanent channel, flume, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated;and (h) Construction vehicle access routes that intersect or access paved roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for initiation of stabilization activities; (6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for completion of stabilization activities within seven days of reaching grade or stopping work; (7) Inspect for evidence that the approved erosion and sediment control plan,"agreement in lieu of a plan,"or erosion and sediment control plan prepared in accordance with department- approved annual standards and specifications has not been properly implemented. This includes but is not limited to: (a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that have not been filtered,settled,or similarly treated prior to discharge,or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; (e) Required stabilization has not been initiated or completed on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance outside of the approved area to be disturbed; (8) Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation,maintenance and effectiveness of the procedures and practices; (9) Identify any pollutant generating activities not identified in the pollution prevention plan;and Meriwether Hill Water Main Replacement Project(AC'SA Project No. 2017-11) Page 50 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 13 of 21 (10)Identify and document the presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report.Each inspection report shall include the following items: a. The date and time of the inspection and when applicable,the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The location(s)of prohibited discharges; d. The location(s)of control measures that require maintenance; e. The location(s)of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The location(s)where any evidence identified under Part II F 3 a(7)exists; g. The location(s)where any additional control measure is needed that did not exist at the time of inspection; h. A list of corrective actions required(including any changes to the SWPPP that are necessary)as a result of the inspection or to maintain permit compliance; i. Documentation of any corrective actions required from a previous inspection that have not been implemented;and j. The date and signature of the qualified personnel and the operator or its duly authorized representative. The inspection report and any actions taken in accordance with Part II must be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the SWPPP and this general permit.The report shall be signed in accordance with Part III K of this general permit. G.Corrective actions. 1. The operator shall implement the corrective action(s)identified as a result of an inspection as soon as practicable but no later than seven days after discovery or a longer period as approved by the VSMP authority. If approval of a corrective action by a regulatory authority(e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. 2. The operator may be required to remove accumulated sediment deposits located outside of the construction activity covered by this general permit as soon as practicable in order to minimize environmental impacts.The operator shall notify the VSMP authority and the department as well as obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the removal of sediments accumulated in surface waters including wetlands. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 51 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 14 of 21 PART III CONDITIONS APPLICABLE TO ALL VPDES PERMITS NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor stormwater discharges or control measures, the operator must comply with the requirements of subsections A,B,and C,as appropriate. A. Monitoring. 1. Samples and measurements taken for the purpose of monitoring shall be representative of the monitoring activity. 2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S.Environmental Protection Agency, unless other procedures have been specified in this general permit. Analyses performed according to test procedures approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under regulations adopted by the Department of General Services(1 VAC30-45 or 1 VAC30-46). 3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements. B. Records. 1. Monitoring records and reports shall include: a. The date,exact place,and time of sampling or measurements; b. The individual(s)who performed the sampling or measurements; c. The date(s)and time(s)analyses were performed; d. The individual(s)who performed the analyses; e. The analytical techniques or methods used;and f. The results of such analyses. 2. The operator shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this general permit, and records of all data used to complete the registration statement for this general permit,for a period of at least three years from the date of the sample, measurement, report or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the operator,or as requested by the board. C.Reporting monitoring results. 1. The operator shall update the SWPPP to include the results of the monitoring as may be performed in accordance with this general permit, unless another reporting schedule is specified elsewhere in this general permit. 2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided, approved or specified by the department;or in any format provided that the date, location, parameter, method,and result of the monitoring activity are included. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 52 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 General Permit No.:VAR10 Page 15 of 21 3. If the operator monitors any pollutant specifically addressed by this general permit more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this general permit,the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or reporting form specified by the department. 4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this general permit. D. Duty to provide information.The operator shall furnish,within a reasonable time,any information which the board may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this general permit or to determine compliance with this general permit. The board, department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans, specifications,and other pertinent information as may be necessary to determine the effect of the wastes from his discharge on the quality of surface waters, or such other information as may be necessary to accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall also furnish to the board,department, EPA, or VSMP authority, upon request, copies of records required to be kept by this general permit. E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this general permit shall be submitted no later than 14 days following each schedule date. F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater discharge from a construction activity. G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110,40 CFR Part 117,40 CFR Part 302,or§62.1-44.34:19 of the Code of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge that may reasonably be expected to enter surface waters, shall notify the Department of Environmental Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department and the VSMP authority within five days of discovery of the discharge.The written report shall contain: 1. A description of the nature and location of the discharge; 2. The cause of the discharge; 3. The date on which the discharge occurred; 4. The length of time that the discharge continued; 5. The volume of the discharge; 6. If the discharge is continuing,how long it is expected to continue; 7. If the discharge is continuing,what the expected total volume of the discharge will be;and 8. Any steps planned or taken to reduce,eliminate and prevent a recurrence of the present discharge or any future discharges not authorized by this general permit. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 53 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No:VAR10 Page 16 of 21 Discharges reportable to the department and the VSMP authority under the immediate reporting requirements of other regulations are exempted from this requirement. H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a "bypass"or"upset,"as defined herein, should occur from a facility and the discharge enters or could be expected to enter surface waters,the operator shall promptly notify, in no case later than within 24 hours, the department and the VSMP authority by telephone after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed.The operator shall reduce the report to writing and shall submit it to the department and the VSMP authority within five days of discovery of the discharge in accordance with Part III 12. Unusual and extraordinary discharges include but are riot limited to any discharge resulting from: 1. Unusual spillage of materials resulting directly or indirectly from processing operations; 2. Breakdown of processing or accessory equipment; 3. Failure or taking out of service of some or all of the facilities;and 4. Flooding or other acts of nature. I. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect surface waters or may endanger public health. 1. An oral report to the department and the VSMP authority shall be provided within 24 hours from the time the operator becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under this subdivision: a. Any unanticipated bypass;and b. Any upset that causes a discharge to surface waters. 2. A written report shall be submitted within five days and shall contain: a. A description of the noncompliance and its cause; b. The period of noncompliance, including exact dates and times, and if the noncompliance has riot been corrected,the anticipated time it is expected to continue;and c. Steps taken or planned to reduce,eliminate,and prevent reoccurrence of the noncompliance The department may waive the written report on a case-by-case basis for reports of noncompliance under Part III I if the oral report has been received within 24 hours and no adverse impact on surface waters has been reported. 3. The operator shall report all instances of noncompliance not reported under Part III I 1 or 2 in writing as part of the SWPPP.The reports shall contain the information listed in Part III 12. NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP authority. Reports may be made by telephone,email,or by fax.For reports outside normal working hours, leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468- 8892. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 54 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 General Permit No.:VAR10 Page 17 of 21 4. Where the operator becomes aware of a failure to submit any relevant facts,or submittal of incorrect information in any report, including a registration statement,to the department or the VSMP authority, the operator shall promptly submit such facts or correct information. J.Notice of planned changes. 1. The operator shall give notice to the department and the VSMP authority as soon as possible of any planned physical alterations or additions to the permitted facility or activity. Notice is required only when: a. The operator plans an alteration or addition to any building, structure,facility, or installation that may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870- 420; b. The operator plans an alteration or addition that would significantly change the nature or increase the quantity of pollutants discharged.This notification applies to pollutants that are not subject to effluent limitations in this general permit;or 2. The operator shall give advance notice to the department and VSMP authority of any planned changes in the permitted facility or activity, which may result in noncompliance with state permit requirements. K.Signatory requirements. 1. Registration statement.All registration statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i)a president, secretary,treasurer,or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation;or(ii)the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations;the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements;and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship:by a general partner or the proprietor,respectively;or c. For a municipality,state,federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. 2. Reports, etc. All reports required by this general permit, including SWPPPs, and other information requested by the board or the department shall be signed by a person described in Part Ill K 1 or by a duly authorized representative of that person.A person is a duly authorized representative only if: a. The authorization is made in writing by a person described in Part Ill K 1; b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager,operator of a well or a well field,superintendent,position of equivalent responsibility,or an individual or position having overall responsibility for environmental matters for the operator. (A duly authorized Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 55 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 18 of 21 representative may thus be either a named individual or any individual occupying a named position);and c. The signed and dated written authorization is included in the SWPPP.A copy must be provided to the department and VSMP authority,if requested. 3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the construction activity,a new authorization satisfying the requirements of Part III K 2 shall be submitted to the VSMP authority as the administering entity for the board prior to or together with any reports or information to be signed by an authorized representative. 4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following certification: "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations." L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water Act,except that noncompliance with certain provisions of this general permit may constitute a violation of the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds for enforcement action;for state permit termination, revocation and reissuance, or modification;or denial of a state permit renewal application. The operator shall comply with effluent standards or prohibitions established under§307(a)of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been modified to incorporate the requirement. M.Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the expiration date of this general permit,the operator shall submit a new registration statement at least 90 days before the expiration date of the existing general permit, unless permission for a later date has been granted by the board. The board shall not grant permission for registration statements to be submitted later than the expiration date of the existing general permit. N. Effect of a state permit. This general permit does not convey any property rights in either real or personal property or any exclusive privileges, nor does it authorize any injury to private property or invasion of personal rights,or any infringement of federal,state or local law or regulations. O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant to any other state law or regulation or under authority preserved by§510 of the Clean Water Act. Except as provided in general permit conditions on"bypassing'(Part III U)and"upset"(Part III V), nothing in this general permit shall be construed to relieve the operator from civil and criminal penalties for noncompliance. P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to which the operator is or may be subject under§§62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law or§311 of the Clean Water Act. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 56 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WP0201800083 General Permit No.:VAR10 Page 19 of 21 Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances), which are installed or used by the operator to achieve compliance with the conditions of this general permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems,which are installed by the operator only when the operation is necessary to achieve compliance with the conditions of this general permit. R. Disposal of solids or sludges.Solids,sludges or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such materials from entering surface waters and in compliance with all applicable state and federal laws and regulations. S. Duty to mitigate.The operator shall take all steps to minimize or prevent any discharge in violation of this general permit that has a reasonable likelihood of adversely affecting human health or the environment. T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit. U.Bypass. 1. "Bypass,"as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any portion of a treatment facility. The operator may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient operation.These bypasses are not subject to the provisions of Part III U 2 and 3. 2. Notice. a. Anticipated bypass. If the operator knows in advance of the need for a bypass,the operator shall submit prior notice to the department,if possible at least 10 days before the date of the bypass. b. Unanticipated bypass.The operator shall submit notice of an unanticipated bypass as required in Part III I. 3. Prohibition of bypass. a Except as provided in Part III U 1, bypass is prohibited, and the board or department may take enforcement action against an operator for bypass unless: (1) Bypass was unavoidable to prevent loss of life, personal injury,or severe property damage. Severe property damage means substantial physical damage to property, damage to the treatment facilities that causes them to become inoperable, or substantial and permanent loss of natural resources that can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production; (2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance;and (3) The operator submitted notices as required under Part III U 2. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 57 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 20 of 21 b. The department may approve an anticipated bypass, after considering its adverse effects, if the department determines that it will meet the three conditions listed in Part III U 3 a. V.Upset. 1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is unintentional and temporary noncompliance with technology-based state permit effluent limitations because of factors beyond the reasonable control of the operator. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities,lack of preventive maintenance,or careless or improper operation. 2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology- based state permit effluent limitations if the requirements of Part III V 4 are met. A determination made during administrative review of claims that noncompliance was caused by upset,and before an action for noncompliance,is not a final administrative action subject to judicial review. 3. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or careless or improper operation. 4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed,contemporaneous operating logs or other relevant evidence that: a. An upset occurred and that the operator can identify the cause(s)of the upset; b. The permitted facility was at the time being properly operated; c. The operator submitted notice of the upset as required in Part III I;and d. The operator complied with any remedial measures required under Part Ill S. 5. In any enforcement proceeding,the operator seeking to establish the occurrence of an upset has the burden of proof. W. Inspection and entry. The operator shall allow the department as the boards designee, the VSMP authority, EPA, or an authorized representative of either entity(including an authorized contractor), upon presentation of credentials and other documents as may be required by law to: 1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this general permit; 2. Have access to and copy,at reasonable times,any records that must be kept under the conditions of this general permit; 3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and control equipment),practices,or operations regulated or required under this general permit;and 4. Sample or monitor at reasonable times,for the purposes of ensuring state permit compliance or as otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any substances or parameters at any location. For purposes of this section,the time for inspection shall be deemed reasonable during regular business hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection unreasonable during an emergency. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 58 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 General Permit No.:VAR10 Page 21 of 21 X. State permit actions. State permits may be modified, revoked and reissued, or terminated for cause. The filing of a request by the operator for a state permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any state permit condition. Y.Transfer of state permits. 1. State permits are not transferable to any person except after notice to the department. Except as provided in Part III Y 2,a state permit may be transferred by the operator to a new operator only if the state permit has been modified or revoked and reissued,or a minor modification made,to identify the new operator and incorporate such other requirements as may be necessary under the Virginia Stormwater Management Act and the Clean Water Act. 2. As an alternative to transfers under Part III Y 1,this state permit may be automatically transferred to a new operator if: a. The current operator notifies the department at least 30 days in advance of the proposed transfer of the title to the facility or property; b. The notice includes a written agreement between the existing and new operators containing a specific date for transfer of state permit responsibility,coverage,and liability between them;and c. The department does not notify the existing operator and the proposed new operator of its intent to modify or revoke and reissue the state permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in Part III Y 2 b. 3. For ongoing construction activity involving a change of operator, the new operator shall accept and maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over operations at the site. Z. Severability.The provisions of this general permit are severable, and if any provision of this general permit or the application of any provision of this state permit to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this general permit shall not be affected thereby. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 59 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 This page intentionally left blank. Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Page 60 Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 APPENDIX A EROSION AND SEDIMENT CONTROL(ESC)PLANS Meriwether Hill Water Main Replacement Project(ACSA Project No. 2017-11) Storm Water Pollution Prevention Plan—November 2018 Albemarle County WPO201800083 Alhemarle County Service Authority CHARLOTTESVILLE, VIRGINIA EROSION AND SEDIMENT CONTROL PLAN (WPO201800083) MERIWETHER HILL WATER MAIN REPLACEMENT PROJECT PROJECT NUMBER 2017-11 p[Guumpr coIIPUANCE \ \„t 6 - v o p INDEX OF DRAWINGS .o.call b won.a OccerdaMe.M7 lM bms,candles and wawa.et Wi pMl 1\ ublbes.+mr pe.Mb,Inducting br.1 m.tna to �.• ` ee N0I' �. Na SHEET 1111E 1. ....el Tworteien lc.D.he. OW b con.el I e.no mod- .a 17:0* a 07 COMM WV boleti bona. �O v 000E alone M1 I,LIIVET 1U6.LEGEND.a M.R1 OVER.BOI MDR`, 17 CDf I.q..0 Gaon w+S.eM.ml CawA Men. Refer b EVEfliC1.3 RN MIS.!011D6 WIVE END :fib c W N M1yef Iweel *404**1071100114:11111/111 RCVS RN a MILL ama ut OW ST.0.00 TO WV 3. +air.°Sow..Weepront Proses(YSII)Db.I+'WES WO Ter DIsnaIT IRCVS RAM a MORE.OlpMvf3L OW m.fwD TO 1N30 of Stowe.ream C ypn SOW(WOW.We....TT b RRM RM a RMRL.oIpISY4[fMD m.t3.SD r0 ISWO A Y b..10 In 1M`Wino DepoWed of rn..enmmlol 0.0rd7'.WO)�rleaa+ ��S � Rtl07 MAM!rIOPaG olOISMLL[MMD m.1f1a r0 n.oD wee'5-3003 ebbed roaea..a...1 slerm.nb Me^aP.er1 Impl.malWbe ALBEMARLE COUNTY / co e ''Q FSCPU. PUN I MOM,MIOtMMUS M AO m.35+00 70 32.00 "..Ally Me..II b b.mpinb sborion wnap.e.nt (5omuel Miller Magial rial Disfriel) Q o PROJECT ram Pew..Llns.Ally N b.R b aIhe ArgIpo.o Stow. Me^W MI. Rua SW 1 FldIE.Oa0OV11[M310 m.mwo 10 37.M u .rorvuM WIO are.Ter to:WW1.Ml.ul fee..cows LW So d �,• MVO PIM l IlalL.RCMMCOII WE mL OW TO 6.50 D.e.wl Y.a3IWO is 11... SW...Tn.rod Ca Caro..Ar M. '� LOCATIONS e\ NCanAwnbn Comm P..Nl R.I.b r Fedee $.lnrbl Cs. • ° (TYP.) t.S1911 PUN l Ilan[.rlor.Fnv OWE m.f.50 TO 13.eo mum WOW and NW°n 3Md CL01 M ma.blen.. .441111‘1, O O Ra13 InII&rla1AL Y040 0IG goat m.1N5010 3017E se'....w..es..a.......y..92l00ala (p M �1 RCP13 PLM!Ilau.Mon MELT S.0M0 TO..5 I. .edMMeIM.nfn!ANT baAMblca 0......4 b 4.... b O �e����/� II / /•• J �- RCPIa RM a WELL LSLDS WE S.D.OD ID WV pane.m.m wolf a.eman0.e1 w.lure.anew;and,eA Denies end \/\// CSCPIS Pw t WELL LLF 6 WE STA.6+3 TO tl.a Imp•As.Wad.ores.nl be W.b MbM predere..d cewllbn open owl.e el co.ruden and Iiwl.bnd.a 0. • WIf ILO&PROM.WOW INAp i Nm TO a.on C. Slerwaler POW.tree..Man(S..AI Tor No cle.s.MI OW.In �c``0 T�L"� �.� [5ry1) MM l MaLL RYMOIIDx aRttL m.M00 ro f.,D coon Q.R.Meum.l pw)al. Rd.r b APanda D W Ind nqM Ibluel. R / [Satf PUN l IIIa1l/.Ml11ROIMAI COW m.MS0 ro 15100 Rroucnom or LEAD N WAKING wATTR ` OO�O�.�- 4��to:4 [W1l MLx l Il01lf.Y IRd EN CML[mA 1S a ro INnrlr.Cs*.Ili pr.A1e e!rye..lard aMlaMa el eMr�IleMa)le ase...nM RCMD PIAM!MallF.allRaIVD.I CRICIL mA tf.ri ro 35el0rM 3011 100..aI t.af b OW.44 M(S.WV.sect s we.a Irl M O �� ..Y� ESCP21 Mn l MOM.Van PLACE!TALL nix caw cro*,//....� 3r(1121.arw�r}iPLM-rrydmr R s.� D� �� iO/IaQ/ v ��� RO13 OM a WILL A1106•LAC STA.S.W ro MS1 lNea• ...s.a.dlls•MV•41-04140,144.4-rrir4.M.3s) O� Aadnb•an•alr.anMy drarPM b lr...A.....I..d caw M K L d LW Tr. ife ,�4, MCI. MAA a Ilan.MOW mum m o.a TO 71a MPe.Mope.M1M.a.S.+a.•d Mu M ETW.•.4-(03 E.005.a WW1 N f3 a • T.� Ran PIM a MOLL.MMM.OOKr T.0.00 rt.4.27 .04 DI 17.a).01.Include ae l.blls end cer01.bn ros.ers.b aew.RN W.L. ^..�Q���'� DQOo7 �� �,' Ran SAX!MOP L MOM.PM M.MO ro 0.34 .mw.4,.I A nM a b.a rm,pabnb.b ........+.M lad M mllM iTà 'y�*e, 00 tit e We.r M1w ruble waled b due.n10. (NJ37 ON51011 a snam DAM NOM l WNW STA14YM5 etb.//.s Ia/A•7a/MNA-Arl-0l-l%M/.tl17-O71441 NI n WM �.: ���� _ .1b.//car 1144/4 14-All-s-r7/I//10,1-0 raen NI n MO) xr a 1, Ran now.!MEW COMM a1MS -'7,j1A1111P IAITRR.STAORI.AIIO STORAGE 1REA5 ���� uOL. ,Cwilnew. .Meer rand 0.Pore raa'.n.r ode en,WW1 s.,er Mn..1 aw 3^'.-�• .�� a Q M aar•ab A.wM and.lean dal.)far maMiol.and.wFMnW,a.dl a C CC:� a Wood pon ..W o Wk.sot le AR. A copy of a.scuba Mrw.•.b •.�� \�Q 41 and Wow M Cs..end TWIG bnd own OW Io 2..d.e b KS.,ebp N. 6 ...a°r.1.rlr Reba.Wt.)•Ile°..r+.M*Won and resenll.n. IbMba 0 a • -- \ .,`, _ POLLi'ION PREYrNIION NOTES _ 17 WON Wen sand dp.4,.0In r set sollowl 011.I.wort.IIm%of SIT r.rc.a r. el °rds m..w1 m..I.,.... aemon.. ., MI wi....m ow.* a001rOr r ' cederr ae inriellarbns ore remolded LOCATION MAP "7 WWI,b°l ebb aM"� c a d to container 0 IS)l_60" SCAIE'. ' =500' a sb on! A. sWV.a .a bid. 00 M lesl.d and WY.by Ind Connate s reoulM ond/a m wed.m.eur.ere 0.00. Michael Baker ""' . SAMUEL MILLER MAGISTERIAL DISTRICT 3 an'o.ma I� r Ter pollen. e�/er d. �� ol.son, .cap pub ,brag:. been INTERNATIONAL ; / , TAX MAPS058B 058C �7�IoneO ma steswea...�Ilbp�peb .�d�a EscP t I.[VW,' ale e+m.r MraMa.(be of a bb..a b).«°wear aenm'wr.m. : n s .OW Ws,sA1 celAobmnt penA.,drip pone end.qn 222 Bead.Rod.SU*400 ='C a mrn Virginia Beach VA23452 p N .. n b Sabo,7 n In.SIem.Wa+010be M.neien IIa($•'I.)b. ' Mom 057)4634370 40 4 SrNOVEMBER add..pal.en'm your.of nel...Tossfen,,dance.and rectrol O FM:17571463-0503 maam GENERAL NOTES LEGEND I. lM u,falpated.orkkg press„far the Pre.is..p.dd to be M1.amn 75 and 125 p.ai., 22. 1M 0*4,50 1• 11 a reswvib•for ran.wb.g and placing adding Tans,m maul..10 IaiWnle EXISTING PROPOSED dom...lob.n,based an an arrflew a.mlen al 7/5 feet al WRA's SO..Tank. weer man pevlrucnen,al no eladenal Mn ce . r Owner. Such barns kwde l ,butm t anned •posts.MNMl,fences.rapbps.guardrails.mallbeaw,awn,....•....•desPro.,..P4 2. Nadu..conlyd surrey b1 M bard MM.en Is ba an VCS 198MM.Sean Slate Plane):and. ts,...narks.ull n.. 0 a wniaal coml..d on N6VD 1966. ElevoNanr on In Ida°ben mean•ea 1 tot..+.m wwse,pdesble.peg.spr turbo,w.•n,d poneilk N1dvM Fin NY ronl mop.• Imp 1 ., O mate.,el en sprinkle.• ., ,1.m.madd durltq nmew «n-irebllMlcon mhall M npMd TO mate..el equal a lade'awNly by T. • Water YeNr Wafer Neer S. Al maM.ls d c.o..chat*ampry.Nh Ida cum.reWbn I the peru.M Wed d Speer Wtrae..M n°dd.nal cod le Me Owner. _ • wain'Valve Water VaH• Candruclbn Specilcarlan and bpr°rd Products U.as°doped by Mr AMomarie County Sere. AWMrIh.unless adore.not.. 23. the Condor shall safeguard all Meting and known prod,ao merM,a adpcat ha.I r•la.1.I^e Work o.shall P..9b,ish Tam 11 dleu.bd or M,bofd,of ono s. shell be M.'le Ingnect.by Abanarde Ca.Sar.•AUMa.y...on. TM Canbaclef MIT,row Reducer .11I kbe re•Pon...few MOW.T.mow Senor Auto.,erodes aI N.Mad°f 1M work. additional cant b M.Owner.. Any Prepay..ors dlMurMd mud be n-.MaMsnd bra Lad p g.aha.n.Mo plane„b*arpo..from OIS data.armed„oho.far Sun.,P*amd 4.r.Cemmon.•dnr el Vlglnb. s. wuMin.and e..anper gXn N Bwd x.. Bird on Mfemaabn provided by W WIN or vYpinb,ullliry service prowled„.IT...projM r. me u.pa„ono are inched..but ma na M Emit.kr O U9M Pad • Tee 6. Cam,:'A TOR Sled BE AWARE 1NA1 UNTIL UNDERGROUND Ufa.,NAT DOT WIINN 1!E'WORN AR, -AB.nv.County S•rNw.AWerN1(AC1A21) 0 Ground L19M M Mew-oil Aw84154 JOEIJ_ARE KT INPIGAMO.111E PLµS AND/OR ARE NYAR E 1XE f ELO In.Contra.',ha exceed.. N ceed .p c•elm ,nee l all aM6.s ad eruct.from EnpI1eM .mro•a• u01 n n9 Dorn.*b o le,aan l,...aM.M no.,guy. m ° h.Contact n.n1 LT..w-6n-41q,Eat.11d ct:Sc.Rrebelbr,A3.-531-0)14 Eat 1A6 I Cagle 1V Roder. w Air Relww Aeembry ha s I b road.by Ile Contra...no M.on4inal tended.at no additional roe to Ida Owner. In I..nnf el darn..can 43-531-0114.Eat.IAf m Telpam Cdlmr Water YaYt 7. The leq9lan of Meting ailNlq of•shown as approx...In 1w6on,and an band on u2nry -Cwturyll.(C11.151) d191.111.•PMOmW...a 011ty of Virgin.Dnlgner Tlckel Non: Engineer.C.a.Thera Bryant,434-1171-1371 ® T•epho.Vault cge Wafer Serdc•(Bend) A801602327-00A,Ur.Lan Ipr,re clad Canlaa:SRN,R04-606-5640 0 1M•paw Pedestal ..1111. watt.5.0..(Doan Cut) 1735301359-00A.Le.Sneer'• . In line e.nr a dom.call 800-78B-3600 1135201284-00A,WO..D.".�•:-n,. • e1Mr OP.c Mark. f Cu!It Cap Es.Wenner.In 1734101235-00A,Owe..Road from.1kam Drew I.Andrew lane roft'O"' -domino wad and Sere.Author.(RW5099) Engl..Conte Contact Vice rla fall,T4-9777-21/0.2970,Ext.205 ll.tHy Clwnaul .. E..WONT YalI a s•AbanOond A]U'20123f-00e.D.anwIN Red from Andre.lam 10 WrN•Xm 0dw I,7-cis,L,r. MN Contact Ybbrla Fero A5A-9))-3f10,[cot.205 v C 1735301370-00k.nmberbk.Drew '-.•a,la'7: In the nave.M dam per call 434-977-2970(Otter hove 414-215-2306) G Ed Sac... P.rm°,M Eae.me4 A735401926-0OA,IC burgh C.I.„lean,.'.' -Camcaet(CI9C501) A73530,362-00A,Mena Lane'.Lr./7d' Belied A)lAfOCf01-WA,Slone Cart Ir7/�am•rr E.1.4eg CanNM Amy Cmd,301-625-3407 E Temporary ConMn .em.abn Ea .1 A73A900592-OOA,W.Cevt'rri.t.r, Mk Ce8111 Cub.Protection. 011Services.BOA,DpI..61 Traffic S19n Slit tone. In the even.el dames•call 800-.A1-6917,°anon I nee s id.e.mains we nor mark design nee,GO or eal•nn9 record In •icefer..nr. In,d to d 1c.1M prom.,o and°.show 1 opprorimol• t«aloe. On Contractor -Daminbn MpMla Pawn(MATO) • YalRun/P0p•rb0a Oran.Safety raga Mall be n.yenel.I.the.rlflcolbn M the brallon,a.•and Moth a all ed. unlees,bed Field Contact.SRN,60A-606 - -5.0 v ww O .bd 0200 1drw --_- Straw Bale Banter sala.and eqbMaace. Th d�•Coniraor 1.I1 immeotely money Ida Engle.'of any disarms.. In Ida T.of.maw call 868-6117-3000 beNwn the plane and obeerwe hem c0ndillor., I I -p- yM,r am 6. the Connector.hall he re....I 25. Pie Insulation,ball be rm..around I.n water mn a omen ru.,when a mum Underground Tole.an IWr.e..r m) -2 Sf Tres Proteelon ore... el.ng Yq Un.y D/VlMee(a11 a 1-600-552-7a01) .paMl.a r.(3)leel 71 .need.inert.cannot.pre Ned. The type of Insulation andUnderground cab.TV yea aesn 7w.ANree) -pr Into Protd11. IICNMIy In advance of Me,tart o a.areflon.In accordance.Ida See.01500 01 Ida Me mad.el appealinn shall..Norm 10 me manufacturer's pub110hd rw„monger. -CM- ill 5pw1fIcaans. 9. AR weer male.and TT.sell Mal«-coat.and^ape a min..a lose ad eon-MI -WfrP- UnMrpfeune Wa.(Lk*rwrry r aft.A<.nr) ® SB Zrr,f)feel ill row.mwsue.lrorn MM99M Ibrh•d 9ro.b rM by ill a.P49. TM.inchde. RIVANNA WATER & SEWER AUTHORITY (RWSA) -g- D'M'a'°""d Water C.mar.µr`""' -n_ k.nyaronr Imes,eeMce gab Id.a Ud•ngraud E4anle tar u.ay raw.) 10. A9 app./Henan.(sod as rare ad .1w.hydrants,.ere bares•ed me.real..)an le GENERAL WATER & SANITARY SEWER NOTES ® IP b au la•a r.da.ah:hes..vlr. - - UNI.Y Lawn. 11. Unbar.anal lace.all gd1ng weer service pees and 9.Mry iot.o4 Mar 011 M Imwcld by 5Ma.anal mMhd9 o1 nvn*Men.d1 comply oft Ida b1•s1 wraps'of Ida General Wa.1 • Bush/Shrub con.ruell0n,and.n.0 e d MSNn9.err r-c3nnacd. Tied adjustments Mall be and•for I. a1M Sewer Dwgn ad Consnuc60n Sid..-Venbn 1.0,dept.In D.ember 2015,arced 83 .n one ppurenanc•(such a a Ma.a voM)tar may be foundto In rand*,.Ida.1., morn.Wow or...led.. I nor Tram con 11. Upan compl.11 n a Ie•win.gniw MMalbana.all adding.err qua N.mar wen ane 2. RWSA Toll approve all wn•huaion male..and made.of cons... A pmon0lroc0. 9 ...co stall M kohl with RWSA phew.nee rear,°f coy work. m.l•r wee,,111p a0don mad/.remand b accordance wM line pan Malls M•prefect ABBREVIATIONS SpsIfiedl°w.kunl *Teresa t.. 3. 1M ten.r.hall be reseals.Ion nnlNng Tss IMPry(1-100-S52-7001). 13. Ur*ethe.iq no.,rolelirg.ate maIns may be mb.0..cement Oran...)pie. The C.Mrat. A. RWSA Eryln..e(Valorb fort at(434)977-2970 eat.205)Tel be ne1X.d IN.e!W1me de.polar .m Asphalt Meg*amply we Sal.02510 of 1M SpclnraSena for alddnp.1*91r3 ad a9po•al of a4M' II Ono.lam of cannab.. cam.(Tans.)pep•Tn..,a.ea a.III app.ceble local.gee and 1.09.1 rroaalon. 5, war Y.dyes leMown.pig RWSA elf. N• m le the q.Xrg ata•m.hag b.'mad. •• Asp.,0dr•.ar IA D.A.a'ail 01.es are Mae.unlm 1n.cad 11n invert.I..a One e Conine-Tr Tail1M. il wIlnor1 coon. .with ad presence of RWSA Matt, toe work shall be co...on MU am 87k Realm.,Wag .sling ahINy elevolla.sufl44n in nt ate nabli.p.npa.d ruler man,end.RM weekends facedee on kelds holidays.drove special e perm.ton pml0n from R.A.1M l piw word..(en rm..)4 grow to pr....mum c.a..ill 111 Irk.far lanitary for fa..Nary saw.Ilk ranMrdMwt "'SA mil requln b5. Pumpbp ter 11e-in b r11.wlellrq N MTh 51dewalk pe„/Tawas.16 Inc.Ion RWSA war.es,neat 12 Imes Ion an ether allXlw.a no eddXiwla ...m, All da..se manholes rm.M ors..-.bad Mlon a conned..made le de e..m. WATER METER AND METER BOX NOTES r b Me Owner. a. Can. design 15. Tn«n.9 la pep.In.la11.M pen-eared area.shall M in accedence we 1'.n0 0ab11 shown on 7' as 7 The 1anmenad',g 4.dill.•or aha.n e.M.pr i9 from 11 b°reldle a.the the el.01. I n Shoe C2.02. Trench r.Mera.n I.rate male Ivlalla9ns In pavam.M a along public . complete f accurate. n11 es bCoronado'rf.1 M d sub.rt•e. On wontracor Rebr to Sc.n9 01200 and 02l10 of Me Project Manual for Wan Service Cemvc6on Cencrera A.en Tag M acaraw with To 1001 land Use Permit Asphalt Pavement RaeO16 Marl for Own I the IecaXon,ebe and dplh e a acletlrg u Mes,bed eurfan and .a.T. )11a Contractor n9ulnmrm, Ca UIR11 Ineall°0ens. CanTall...slor lyunliduo d[er..11p on all haalM4..d eructuns m damagead fed vl ell c�Rlmes The 2. M newgrate mMen Sall M 5/B-fah In Mr..ad placed.aec..«e wIM Me 000a a Cenea.0arwp 16 Prwhl..•pan llfac.mkxa.n In D11wdan*a.inn Ida V001 Rood and Berge SpMllca.ns ad •lneher Mown.To pions not pro.Damaw to any.8MIIg 1911es Me M rewind by II. Mwn on SMM C2.01. a Canards RMainirg Wail SM.,.02)00 of I.SpecrNcoll.a Neer to UM C501 for 6m1ts of pa...resaralen,.as Connacbr le One orlNnl candi.at no adnlowl c.f to Me Owner. 3. I.Contract.ad/or the ACSA Impact.may Reid d)u0 new wlel meat and meta a. .R.'.M direct.by Ida Ergln.or Int.,. 3. Erosion and . n..•901m1 control I.III shall rot be wrm RWSA tlfed In Me easement .haul spec. lean....a a•...I.basedGel on d ca...fa ovoid d9nuc6 a pns aver v Cone.21MwaM II. Pommel!ar0 aura.M.areas of consnd..which are damaged 0.I I.01 el hauling',lamb .Met wrmeaon Irom RWSA. No grading rag b.pen...to RWSA vawmanl vole.parroted phwka Ia1u m,or 4 en..eaw.a89ry. 1.. Caner.Wheal Stop and eeubmanl,.hd M mowed to Me Mead.,of 0001,al no edal0d cost to Ida Dane e11e91ee by MA 4 end.. ad In nor-por end -gra..ewe a lwl 1a es et sub 18. The Contractor.011 M rpaabl n .for mntanbproper.9*c.c.s 10 III proper cacr.n1X ri n9 m all 9. Ile .beading s .be p.n !1IM4 100 feet of RW Na rs boa. 5A 111ee utma ana . .parminlan a.RWL A *0aal looding, bad. shall be glad M a 5bdard(Car.2200 Series).Iastic baler RO.. re Curb ad Curler property e.mn 1e have pavement edges cleared of an a eles.as ma.,In dw1.ce el p4pa I,YM9 approval of Ida dad.;plan. Ore.. .n.Aq du r g Illa0ng and a pre-bb8.unq may M 5. raw mac.M.w Rican.4 pea win grovel aeon,and mbI«r I.1MIculer Marge ry DM.e..5 pp ration,at.1wMnnng.inn all pronely 9wvn 1.temporary aa.w ad emprory wale more.. For blvs6.q aMb Igo Ida al arrt opera..RWSA se.aalhe4 pg..wmphg an0/.P.- Ma11 be plat.Ina Special Oaf.Reid(OldcaM•fL30)W1e Boa. ..pel•e w Interruption during n�.o TM Centrabr may MM.mma parking on bah sides at.peat-CCTV may M required, RWSA may aba require cwllfkai.from o,...profenaanl ill M•road b order to m°Intaln ntraflc at all times, .rgMser Oa.Ma Ida pr .Dblb9 W11 not dom..any RWSA f11110*. Damaw to ant InMolbans Laredo,but(Ds no1aG glace)may nee M Nnr11t.b,1M feRwlrg addresser Edge of lvremenl elides due to biding MM1 be repaired by To Centro..the elpinal rove ffon e no additional -1155 Owen..Rood -2655 YMwethar pin. -2633 Verde Pic. 19, All Ila9pin9...an.cod ap„pda•lemwnry Ira.contra plea .hall be 1MMiee ad at..Me Owner. f.isling nr..In accordance.In toe Virgin.Mad Am P I Manual,bra 41111.subject te Me -1163 Oamne114 R. -2710 Lee.Law -2925 Tail Ow Cwm of the VI bl Ivpw1.. Avers pe,o.mirg I.ppirp w„1lene mud M wMOd,and w.'.. 10. The contract.call oboe...0038,,m...on mulr•mend I.all.,dos... When a crospnp ^• Ora.Driveway aved and 1wlMble ce1UkaMn Care.Ida 1Mm whme.r they an wffwming IbggMg awn.an. Is ma.under an..ling IaOX.,1equal•slnwlu 4 Me support salt be p'.id•d for Ida nest.. pew, -1700 W M.d.4r Dr. -2775 lord Aam Law -2550 r ton Oven wre c°n mpMNg alp...Work ZOOS traffic Central training reeler and . g Me Ida area of Icreasing ^ail b c9• be ck1111dith w camp..57 n Io Ma sprltglM of Ida e.dlrg w,. Wald.tald m•daw A Dpprroppr a..nd ad wenable°rardllatlen card will M per..rat overage.mwro ry hall.combat plea -new IT,*Drive -SA20 ilblbnugn C.. -1560 And.tan °L • 11. 1.water main Install..Tall be cow...deed.MlwMal•4.NM.awl Is.wad ROMP. -2fl5 Wd.eMer pa -3AR0 Cbrw9h CI'. -26M Neer Cad r• Sidewalk 20, 11.•Cenlrafa shall be ngenaRY.for me2ng all deur.d am.le IXMr aginal.4nlbn.,.Ian approved one le making era permanent corm..10 Ida public.0.r„I.. Appnwd Iola.a -245 Yed.MM.Dr. -2590 11..ro4h CInN -2725 VMen Cad M Sinn.Rd01Mrg Wall .M•1M Inacated on 1M drawls.. Mang and hushing new water ma..RI Pe requkd to.event any contomineion of Ida pudic weer 21. The Top....err mad Man pal M Maned rime"than sia(6)Ida 4 arm erIMn9 ulii.pole. w Tim..R•NMlnp Watt guy.M or 9a pale.nh0ur pro.li g same. Whenever Ida wMe main is 01.M(6)red a M• '2. III III col.wsem.r.fa new RWSA N'•••.nail M gcwe•e Prig•l.d9 M pew Idr'''.lad Rd... ... LNR.Y N.dhale 6N011 w4,9.1 airs a 9u7 pale,the C.nader.all na1.y IIII Owner M eane.and bar Me cost 13. No 4.manent Mroau1M fac11Mes we11 MwnMd p b II,.RWSA...M. ON.Ircludq bidding let„w'.Y bracing 0r Mon16.. .1. °rep,,Main...'odors for any eruct...dnem 9haurr,M:. 14 ire.an pet parrnl.9d In the PIRA.arm•M. Mask AND SEDIMENT CONTROL PLAN(WP0201E000E3) +' T�� MERIWETHER HILL A01 WATER M REPLACEMENT PROJECT 91EE1 r.�. OEVDdn 9)OW 4` IT. S,,2% 272 Benda Rah.Suite W 0 i service uthArkv DRAVA�V J tad/ tones 2 Michael Baker ]rtyM Beech VA23.02 (PROJECT�'�'T-") ESCP tiB„]4 Nat 1'>37)463-8770 ,. Ot1°' INTERNATIONAL Fart:(75 71 46103 03 GENERAL NOTES, ABBREVIATIONS, LEGEND 5w-ge�g �� DAR Nov mu Fan ,+� Rare,, & WATER METER & BOX NOTES 02 inn DAM \ I / �•• � r'�' ` 1 � /7 , � �� I/ / ; ,r - - - - - I' ' x7\ , O jf n, •0 ♦ / 1 II P 1 I fwc • / Lehi .0.4 TIMBE E---A - J' Imo__ \ \ ♦` . . y_- rle L--; Nam\ ♦ I \ /�' \� �r�p•� ♦�• / 7 ' \ ��\. y ♦ Pam`` �.-Ni � _ ► g®o �Ir p •i �" ?� - �. ��� ♦ pi rt L 1 wit ( 1� y/ `'a I\ \ _ /\\Ilt ♦ / �. ,♦ Os �` 1:�' �� / ZC�!� �i� ;s�' 26 •5 \ / \ / �-`�+ / ... ``�R it '' �J �� o • PI-- "r l• I / 1 `.', ji ( /'�� ; I \ j 1 � 1 6 — — -I- 1 I 18 t "� �I ) i �. J1� SURVEY TRAVERSE LISTING 1 u1 I',�'\J /I 19 .X., / 1 1 I / ( �71 J' .. SURVEY TRAVERSE LISTING atria, edmD WON Ceiba 21- •�.( 1 /d ��--�I •/�--/�/ � , ,� \ et9t.JN. aaMn Lagos EDA. I 3909.6P..94m II,I54.05287,, SalII / /' \I / `' - • ' 1 \ I • 24 t9➢9.010 23 Um Ir.14 13511D.O]I) SSS it 2 1965.511AS9 r94S4456 Or1, 5975I - -Qs_, ` ,y. J 4509.5510446 II,456.263.8578 59043 I 550�- •N/ / • / 4l_. \ C �, `--J n 1914902 sue III$a 713WI 54eM 4 1.904 raeOe Ir.431 r11498 59052 / I. /1 .,--� / I. - •\ \ 26 isn.n0s*m 71.464n90J 601Q 5 390494[llef 11,431904 r.Tl Ere 47 - : ♦ \ O 27 1911.]le6!! IL4e1,l7ZS7D 60230 6 19,022171997 11,4SS58599, 6r904 L� 4 / ` _ ]I 1911.777103 0,455447WI L8M 7 1914612N)t 11,.53.969A5 6J9e6 / �- -'\ ♦ / ... `\ \ a t9149XM]4 11,457,37•.I077 =66 6 48748572W 77.41S7e59502 63r47 1/ I �1 30 4914704.6ee1 7I.437,U45154 54564 6 16146222JM r1.4S4015a761 67177 1/ i� 21 I \ 31 3.901512.1713 0.457.265.300 55253 10 19II101•06 114581429146 59045 / 1 TALL 579 re 0.456. -� --- 1 22 19146122N1 11,431,e00.6p1 MOOSrl .NR5/W6 4N 71.4 3J 1/r21N4r7p II,I5I,QI JI>r STQ 78 16Ir I] 101.45131111 ,7.454.1562527 sane 't TREE,,, 34 1112046e1116 19 451I91J11 53127 IJ 3.110.7230471 0,454708351 371161 + CT. `.. I 75 1917,8470948 12467.2811564 52414 71 1n2r670593 17,456.646.1e72 49324 S6 19122377359 Ir,Q4p43 56 50167 75 102244 04 0,45482,6306 51747 J7 1612242.5353 794344671616 15495 • re SI1206.FS• 1I.458.7403458 MOO D 191238112037 II.454113.5480 Man 17 16121117416 0,4545445442 inn - 24 1911041.6276 71.4542175W 804.0. re 19610410L0 144543995117 807e5 40 40,267274J0 11,455401XJ780 MN 75 1011.14514 0.456.7927764 104.75 4159054052202 79454774 NW 570,7 20 1651193076 11.4517710115 60648 41 19045547069 11.4541115066 Al.le a 5Po4532611N 77.4l•a.7743 57626 43 1904744.7064 r7.4313471658 lean EROSION AND SEDIMENT CONTROL PLAN(WPO201800083) I p� r,� � MERIWETHER HILL WATER WJN REPLACEMENT PROJECT AEI !`asty o� Ww 9`c` r,,,,,.. nx6mm.R•.6so6«n (MACE Na mtx-tq 1 /�•p'��y�•��p ����y" p1•IM toMichael Baker T*61,:4 ern VA an [c(`E� service ���'•'J 04C4D IW 4y z . i t Phone:(757)463-8770 E S C r 1 c c; ,r ,�g ( INTERNATIONAL P49:pm463-0503 SHEET LAYOUT & 03 I s.,b•c9..:4 9.1F Nw mn %, ,5� 96,,,.';, SURVEY TRAVERSE O as -- I Ara r MAWS r G I NOWAY i Prop. ww,Prop.6'D.I.P.MAW Veil 0417 rro Cab.0M0 6'NI Vora I lame Ea Ir Pee t Cane41 r I.Ls it Ode Vete.Intel 12' Prop.6'D.I.P. a..L4 tr Cen es.ere Da ND ear Adyr t 12•IA'Mdw Wale M•In re•£wl 0•A•SOW Te - SIa.0t9s d fat ISO.PE SN) 0.Oda Wet -—_ ��—__` to IOLProJP.W ,r.n..... .__ a is Brae„ -• IcOil)ama - 2 " - o (sa 0AA SIM moo-—- - --_ -- - 1—'-- b - -. -- - a i 0 0 _- _ _ --_ ��� - ,,, i .:T ETU. )"• 1 a '', . _. o_ O �wfe AT7eJ me7M 7 I - — r -' OW LE ROAD aWCepE.War NY 1 _.. ,.. — Est _ _ - W Li- / • - .-- _man °' - _ ` _/ .4 - � Te A ra A'NAlrfa.,e.,1 —Al / LL xr,909�wr ?" \ _T_ I N (06 m/,V rx, _ Ste.04s1(Deana*4) .- 1�I • �b� InY sT,w Ix1 4 mt ME n m1 Sh 0400(WMdler or.) 5 !Kb roe are.ry r.�l \ \ ` ` ... _ ' for Ter _ NV7 \ r Ear der E u S. I 1•. Rope 6'D.LP.• \ ` 0'Ore Valve t 0a 1 - 1 '� hew.Fom•rd r ., Water lain I \ �.� ri U ^�j 1 $ )_... '�., ‘, e00n.a1 m..ewer weer ee(02 S ryixl r \ �/t��,.w'�4.\ -- -- "--__ 4. b,..Water Carrico(Syp,) row as eh 1 \ `y\► p3 -- 1 1 \ { ----— PIp.r DJ.P.WAS 1 (56•snot C1.07) RWr B ��-�__ I IPan I wane mane ema..b I -— atOGrr J it I. rer,er.n m.,p ____ gRO 1 r- warder. .IRA the aloes on SM.I C2.01. 1,£200•.l' I, '11 I I, tEe7E7Me Mt• \• AENE7IEAl*2 `-.�_ I LR.IEMer Mt 2 bdeebe le welly all wefnp allies Poor b oaehmila. bier b Gent ale I.7,a I Plan a 54M GI.02. Swat:PITS'Mer. S. Refer to Gnome Motes 22 It 23 on 5he1 G1.02, 4. Weer a Ahew4nmri Men or.ShM C4.01. 670 - -_-- .-_.-____ - c70 • J �sAI _.$.Z I • _g IM_ wafter no 660 r'�P es r.8 it es waftera erI•m es,3 I NNN _ we mead___et a. t le le .re eay.r fle. — 650 1 ' -- le ..•r tame el weareamGee _ _- _ Mt = no ic e-e...)Jll11 merle.et I e Len... 8 im -- ALIWIAMWI - -SY lye.0m) W t - C /x-' __--------•--��u NOW N E� MI NM el Ea 4•Vow rem ! Prop.W DIP.Motor Yoin - -___-- I INN - ------- III IM 620 - - --.. _ 620 u s INN 610 - _. - - ----- .. —_- _— t G R NO 0 1 2 3 A 5 6 Prpiile >a a 7o a 10 a Seale:1.zs'Hem I.—— 1� 1'•10'Vert GRAPHIC SCALE:1•=25' (Nee) 626\1IIC SCALE:1•.10' (VM.) EROSION AND SEDIMENT CONTROL PLAN(W10201800083) AlbemarleCoady OMER WOW `A�r♦,' �e �2 Banat Roe&Sate� I/ERIWETHER HILL WATER MAIN REPLACEMENT PROJECT ? `�', �,,^• 5" Michael Baker 1s nVAZHn (PRDJEc=No.2Dn-u) _ Service Auth•rity �` �� ,n I>m.W •- In�.�•� ESCP � � OECrao ISO `;�';'r jls(le�/Q INTERNATIONAL Feu an)463ma3 PLAN & PROFILE, OWENSVILLE ROAD 6 •-6, OAR: ID1201W %,�.4B� '+06tAL6 STA. 0+00 TO 6+00 04 / aM1001150 n HDIS c«xw[I a.nnIIn.' .e.. os S a r a\ 1. e«.-aeR. � ws aM on sl.r .ol. / \ ` toM 2. Cmhecfer to reel al 001511 a aII orlon .H67 \ can4c11en. Mr.to Germ.M Gen. eta 6. Slo `QQO./ A'Gee Von a Do. 6a6f \ l,..G 6 Re.to c.nono GMse.22 a 15 m SMaI Z _ ..c.a(Ownwlo to)_ \ • -- ' o? I. R.I«to Abandonment Ron.n sn..I u.01. e� - Sta.0 w(Dm6.n.M.Or.) Y 6w.�RM A Iwill ../ e lou roi.wh {� II1Wu1W • fee/, er.o69 \ \�' (Sr wen.SwF aoq �S Jce w nc ♦1 <: .��..., Prop.6'O.LP. - _�/• ./v' `fir' / /\'',„ f //\�1I�,, • `J wale Wahl t Na 50?Po . / ,,...� OIIGI.J nLV.RI/IY/_ -. H.� Nr��/ /�` 0O" !no era h n,l / 1 \ _ _-- •40:1„., ®<G \\\ / aeurtnac+: / \ ;.N. 1 / MA low,h rw/ \ / / i� - it >X / \ / � y `- - __ _ — — _- 1.-.0e0 /. w r. 4 N. - \ Prop.6•/!-DIP.W/r L M ae1 1, ' -AL AV \ ..--",,--"- / / (S o ShM C1.13) me era w m) \ Cennm I.Weir M.l. C<�1� s / / le Ea.Warr Serr. lop.) \ \ (0)M V (pI (See NON I.iM.5L.0 ('� dMr t `\ d c a rts" / ' PACEICIM r \ MO\ r 000.11.111 temtM,\ \ 66440 n MAN y / i lceanr6a wI IV:"_ / 'w'[''["r` dr \ ���, r2 � rEa« F20.41 Seale I.13 Her4 650 - I. ___ S _.. — ._. _...... I 650 QO - _.. \ I -.. __ -. - _ 610 I Al jeI r;o} I 6e0 I 3 8 I —� 640 620 - f X-o - ' 620 I L t I ... \ 630 a \ /j - -- • 630 610 - -- - o to 610 0- N a • W W Vl fi20 -_- - -.. N------ 620 600 - N - __ _ - $ 600 ___ _ m _ t --�R ORYI'O • - . M _--__- ir.,ant I w.Illo.) I N 610 -- -- I I 610 590 I --_�5s-_- —N 590 __ u Prep.r DIP RyM,M� Prop.8'D.I.P.water Wain — --1 600 c _ L--1600 560 _ _7c-. 580 • 1 590 M - _ - _.- __ _ ___-- _J 590 570 - .. -- _ M 570 I 1 I I i/N - I I 6 7 8 9 9 10 11 12 Ffl( Lam— n 4 7 aL'1_ to SeaN:1 u'Hera. INIMI rule'VertWGPHIC SCALE:1'=25' Nee.) GRAMM SCALE:I.=10' (0.n.) EROSION AND SEDIMENT CONTROL PLAN(WP0201800003) • �� \A►'�c WA :72 B.d-Rue Sde am MERIWETHER HILL WATER MAIN REPLACEMENT PROJECT SHEET ; Coady • aA« NEE 4•o. n `A Michael Baker \'�roi•Re1ck WA 23492 (PROJECT Na 2017-11) Service Aufh�nty ,�„� ,� �' f : L9�� = P.m(757)163470 ESCP 1 _ ='��1. 1 I M T E R N A T 1 0 N A L Fa:05n/6sa503 PLAN & PROFILE. OWENSVILLE ROAD 05 } y.Weco*.,. 0•1[� 16)v f016 O,a j 1y,,,,. STA. 6+00 TO 12+50 lon NM /l • -Sin.13H7(Owns.,la.)= -Ya.If.t2 /ll SU.0.00(IOm6roea^c.) ISI'S.Y.too Too6•Cw Who a en. 10 U6•DJ.I.WY I SI, Hf Sta.13.60 IMronl I 6'Gala Vt., t 1l e., 8'G.V.w a b. (S..Wail.sloe C2.01) I t a w o 1 �N -- ---- a -—--—-- - ----� ----- -- - -- -- 1 Sea 142. ....; ` y.:: 1 I - �' "��. ., f�ir�a 15 ONENpaNe a LLE aR(7A0 fi 17 I 1e , 1 b_ n`' T sk.IS.19 7�_+ ��, _, ^ / CO--- �r_.s rMf+" rI i-..F-1 IE s-vh,..�—� ti I ♦ /h � 3 `9 w A..r. 3 \T99`lss __ \ a 4 T uwlfa.wr $b.14445 �1Il a Pop 6•D.I.P.Wa16r Meina V MO SC-'.Pa 7iU Sl Gal*Valve tBB.%Po llrl MO eqh T!) 1 f aM / 5 \ I ' , I \ RQILI I1, l.cenn«I all«Men/water...In.In Pa6 11.0 s` \ I occoraona.lA.Moll.on S6M C2.01. fie' r 2l I ` `Plop,6'OJ.P.Will orr LOT 5 Faa 2. Ca1nz,>to«nry ao«I.11rq a1mIM I aaex c I 1 N.SHRRI Ct.1!) an e - / 6tae7 e \ or 10 a ean.ln,e6en. w1..b General lid.,S. EMEO{P AW7M AE1CC'Wen, _ At161E6tW ACRM LOT C a.t a to Sn.N 01 01. SE[19/.af I I RC16W flap SEMI MA 1C1R5'Pas EwEAER Mt 1 r 1 1 E/BE0lR Altl FAa` ROM MU , \YFPEAEP a 3. Rohr to Stowe/Wu 22 A 23 en SI* 01.02. PIcr1 4. R.l«to Abcnimm.o Pon en Sb«I C4.01. 620 — •_ ..._..__. - 620 510 _ _ _.. - _— _ _- - - 590 610 _� L '• I I~ 610 580 L - I -- I 580 '' '' =s5 i I I I I t t. ~ 1 I 600 C \ / \/- - 600 570 - - 570 d U N i 8. 590 - - - N--+L.-- 590 560 - N -__ Z -_. -. _.._ LM P waw = SEO H _ 580 N _ - i 1 580 550 _ - 1�- - - A 550 1 -____SP ou o 12 r-_. _ C ' 1 c 570 SAO • u l ' sq Prop.a. D.I.P.WaMr Yain - Prep.6•D.LP.WaM Yoft. 7 O .CY o 56D ---M I _ ___ I -_. _. - -- 560 530 -_ I I Me 530 ... - R...All J6IM. -' - ...In All Jnlnla -- ::: --- II /, IS50 520I i _ t411 F. : Y 1 -- 560 510 -I _- ---- --- -- 510 13 14 15 16 16 17 16 19 l'.25 P . 0 n IS 0 O0 Ba Sawa 25•Ho, 1'.10'V.r1 MANIC SCALE:I'=25' (I....) GRAPHIC SCALE:1'=10. (we.) t EROSION AND SEDIMENT CONTROL PLAN(WP0201800063) AkinMERIWETHER HILL WATER MAIN REPLACEMENT PROJECT 4+EE1 A 0O01EQ WOW G`�: m 0mai.Reel Suit fm (PROJECT NO.2017-11) _ ,vice AVth•� Met ",, �t Michael Baker �hVAnf>z �/ llmntlm Phone InnA63mD ESOP �` -/� 0OfECKM 611- iso . ` 2,'; INTERNATIONAL F..:nsn a63mw PLAN & PROFILE, OWENSVILLE ROAD 1 s.:at .. an: WV m16 40 y 'w,..3 STA. 12+50 TO 19+00 06 .o WlL / eon 1. NMI . . -� .,K,-rr_ �� 1. Reconnect al.Onl lM to wolor woks. S M C2.01. 2. Gotta..to..Mry aR»lMlnl unalr.prior I to caMrvcllon. r Gnat l.r to net Rol.L. I ` S New 1a Gerral Nola 22 A 23»Slrl I C1.02. 1. Refer le Abandonment Plan an Sled CA.01. I r-rer.....__xe» /171742 sae 20.e0 61.1.Toe I 1 ;If 1•D.I.P.a/e ` ro _ •Gale Va.A Bo. tL ,F...- CA I I -- _ i Ay OLP.•/u Sta.25.92(O.en.A.IL) 14 _ Tape 7'On tM. 04-00 F _ (o.-a1 Soo .s m.' 55P T. / Inn - _— S O) - ' H 2a�-.� f e --�._ 21 �»[/YSN/iC'RQA©. - .. -• Ma. 23N5 t I n ,�M'r 7 .s �_�. }„ _ (tPoots 6,1� 5•al.ww A `/' %c^ t ® - ?2 _ Are �G'-o 0lfl I 1 / i /,'''' r nss Rend \ ' 1 .- 1 y_ a._ c cwr I �0f'10 .. ' Prof.5'D.LP.Wafer Ilde -- - ✓ fax I re,s...... I POS ];e EOM c I eon Prop.VC W.IV , • A' tor r SE fan \ teas Ale -i �' 4 WC rx< IEcluv CAE (Sw •SAM C1.1!) , ,% JEcna ac Plan Scala,1•.25'More. 570 ( 4-Pllif 'IS' aj L 'y -� __ _ �- 570 390 --_ _.1 r r I - I 590 I. 5e0560 - -- - ; SOO 590 s I i • 2. 2.. 550 — I -. _ _ •_ ._. - --_ - 550 570 \ I/ 370 �a 8 ___--_- p ft..) y -- P�P ------ I ------ L 5b 540 --w - _--__1--�_-__---_-- � --- N _ 540 560 N _ 1 a 4.4.47 :: 1 ji :: cl • 52.. X am O. • u 7 { 0 510 I .. I --.- s10 5391____1 I -_ _. ____-�= 530 —_R»lnln MI JeMfi bingo All Jde. 500 I I 500 520 - I - /I` -- ! S20 400 I g I 490 510 I - - - - ---- V.5 2 Y r! 510 u 19 20 21 22 22 23 25 Profile e r n o re x _fie Scab:1•.25'Ma¢. 1'.10'V.-I MMIE SCAB:I-.25' Sc*..) GRAPHIC WALL 1'=10' (*.o) EROS1011 AID SENIOR CO117II0L PUN(MP0201100053) EWE. NON +F flue O.A 11ERIME0HER HILL NAM WIN REPLACEMENT PROJECT 91EEr dA.e Na * Ck�,�% 4l011p� Z Michael Baker r2.Benda Rood,Same 400 v" •Bock VA 23452 (PROJECT Na 2017-11) ESCP ��}y Rom(757)IO A770 5 Service��—"'/ crEOM` "W i 'y,= s�`"'°2"re• INTERNATIONAL Fax oSn/Atasns PLAN do PROFILE, OWENSVILLE ROAD 07 } SeurSAGa.euq are lglli0/5 ;oro, E+ „�•N STA. 19+00 TO 25+00 p Wl[ • I a�C.. rGW.S Q- i . 21.G. • i 7rws.0-.sr )4t /r , 1/(5«SAM 81.21) ` W I 1 ; a.$076 8.],..ear t L - n'S „, J e•.6's.NY Tot y .__ >o A / r Cob Yee A 6m \ J r ,. In 3 \` (s«DMA S.41 CLO1) 1 ....R- _a.y f.. " - . �r ,, Af" - w.7'G-- -.. � -- _ - - s 4" SW.vim .. v OK£NSNLLE ROAD sEr r co.raw. 1-__ ,- 28 (RRuN678) 30 - "' Ic7 / man t- , -__' "T--� ' - a.! .. k . _..- / b.0.60 easy CL) r 6eb vale ..,4•,6 ,yd u,] _ n - y' _� Conrad Noe 11414r Malse 40 le[.*Mt Ser.iee(Tsy.) 8S 1 (Soo Nob 1.TNe a.l) W 5` PPtP.M D.I.WR16P Y! 1 1 BQ C3 1 5 1. eo.n..,aD aberp.ehr e.Mw b ae0nn lei.hr 6.6022 sn 01 CL01. p36J 1 prs OM /na' sddl1iiyy CC!r I LW', I COl7 (0'!l 2. en. Nlw b C.rd Ibl.e 6. A e FCC J. I MI6 Mt won MY0 1 1 IF.]M[C (£ems r!r. 1 secDw>o sEcm.o .s..1 a.D2. 3. RV..10 G.wrei bobs 7 a 23 an Awl 01.01 Plan I. 6.1.r 10 A0•0enm.M Pbn en SA.E C.A1. Scale: t'=25'Here. 610- _ _ - _-- -j 610 610 --_ - - .. -_.-_ --.---j�Z 640 6a.. - __----.- -— I 600 630 I lie it- 630 I f I i I +.`o 590 ---_._ - I. __ __ --. _ I ' 590 620 I - -__ _ r_ 620 0 I U i w v a vw 580 --- w r'ier..,.__. .-�.... N 550 610_H ----_. ---_ _]A'Wh 171P•)- �$$ 610 a n [r rare.+^+-. y n ml I I 570 in - 1 1F- 1 570 SOO 1 �i 600 1 I -- `- Prop.E.D.LP.Water Yin 1 c!— MI c 1 1 inn C 'Proo.6'D.I.P.:11:11-o-in = 550 Z _ ...__ _-_ -_' 550 380 M. ----.-_-_ .. 7 580 I I I sAO-_- I---- -- / \ . I NM 560 370=NM I 570 a[ 530 -- _ R. E! _ _ I 530 500----.__ I R 1 - s� 25 26 17 28 29 30 31 32 Pr it 3001e:1 25'lb's 0 H N H 0 00 M M 1110'ver., GOAPMC SCALE:1•=73' (Men.) GRAPHIC SCAM 1'=10' (e.0) EROSION AND SEDIMENT CONTROL PLAN(WP0201800083) SHEET Albemarle Gutty NAMED WOW p�ta.'�'' 'b r2 Belo Re.0.Sae ban YERIR'ETHER HILL WATER PAIN REPLACEMENT PROJECT 11 T. erviceeAIA th maw Ila ,- %, L two, Michael Baker S,reM:e Beech VA a.32 (PROJECT NO 2017-11) ESCP Plots(757)H616770 *yam IRO ; IL e c IIIId9 INTERNATIONAL P.r:037166.30303 PLAN & PROFILE, OWENSVI'LLE ROAD ISIMOCO..,:0 Q� wrt: 1w E0,. °ro•.:.•�+1 �F+Au,,,s,'ar _ 1 .1 tux STA. 25+00 TO 32+00 08 I1EM51 -MT ©-_O� V� • 1011 M.SHa1(O.w,nOM b.}- tlDIES 1 8 uu nLL-rrsr aa� r RSJ,WM .00>v SM. (HaYM.Dr.) I. Reconnect ect all nail,B valor wilco.In 1 FR6 ' ,`\•���'PI �..57H2 12•.12•Tw oavaoro.vRN IM d.b,lo on SMM CL01. I41 2. C«rracla 1 wriii d:11.';o7RM.prbr O ) 2 ♦ I IY OM.Wlw In 12'Sta Colo 11 V la construction. bar to General Nolo.S. ...'... .L.. 11 %n,n Iz•0a1.ralw&Boo 1.t e an Shoot 01.02. n ` AFL_,t _- __12%r blew Prop.it-DIP.W0.,War s. R. lo Gonad Montt 22 02 23 an SAW n l _-a'S� ' - n -" '_-_ I - t Ir.R'al.r Wh .. brw le.la�lna- Flan an SMVI U.01. I O J- ""'�4— _ (L1 002W.5MN C2.02) S. Ilex t la and MwAd lan nal NYII Cl AC 01rO low and coronet as npulnd. -'ifs , __....„ . .6-';.2.1,J , ----....„ \� l r,a 1-1 ii�\�\ice \5�1� \\\Or�'�\`�\\\�\\� K tIry , m r \` UMW 11 bar %SSW(Om..lu.Pa.)_- ',.. 0/... 1 -'.\ �\ ���'� �� � 6 D.I.P.Wahl'Nam Sta.0.ro trtir�� I ` f �1 Sta.32.82 (5.•No b Er.,2•N/3 to ` �� ����� ' K lir Mks* .l %None \ m `\` Slo.22H5 (U.NaLML Natal MOO +.� 12•AT Bond 1•A•Wool T« (per.«P«ulr.d) .., PIN a, P•Gale Volvo A Bon ,Rr J (. 16A3 b3M.Drina 2 LT 6•D.I.P.W/M 1 20 fl ' 'X Cal 0 Co Er.Warr Neln - re Cemr Wator lo.ro Er. (5«Mall.SM.r GOOD 2;. (Soo D.loil,Shoo,C2.02) o�-'ate /h Os\ 5\, J Prop.12-D.I.P.D.LP.Will ` pin �Con«d Moo We.,Rev .`r I / ) O.ShRR1 C1.23) to„, to h.Maar Senn(Tip.) mr.\ 2 / EMS;Ku ' (Sr Me,.I.7b1.SbM) , ¢tT0`r no '-w`'1ETIC 1201 Soo*I.25'lMn. :: - i 1. `-L t R = T= 3 S.E Ls .i — NO _ h 1. 1_ 1. — I 630 g N - - _ \ / / 630 _ l.a 620 —1--.e 4a-MM.tar ra a•Non.) y wa __ — L rin, ei ra aaro IAL Nikki- y 610 --- 1 610 I � �tli01ED �-__ __________-_ _ ammooPoNom 600 t N1i1 Pnp.r TAM Wir Nolo — 590 3 - Prop.12•D.I.P,water Mom — I --__. -_ - —_ 510 -May.LarNWd e1 b 12-Pb*Mar 550 - ' _ i ./. — NO I ! t --- ! 4 1111 !k ': ! 520 — 570 32 33 36 35 36 37 Profile 0 » So 2S 0 10 m 0 Stole:1•t25'Ho.:. I•.10'V.5 GRAPHIC SCALE:I•=25' (inn.) GRAPHIC SCALL 1.=tar (5w.) EROSION AND SEDIMENT CONTROL PUN 0/P02011300063) MET JJ__ COO. M.pO; +� /07 NER400140R HILL WATER MARI REPLACEMENT PROJECT • krOtllQR 7/2 Bantu Road.SMv am Service �ML_ DRAW NEE `�� � '- Michael Balker ar 1117)A.'A23Nn (PROJECT N0.2Dn-1q it �W M 1,5,).6. ESCP y�• INTERNATIONAL T.. (5sr,++ln5n, PLAN do PROFILE. OWENSVILLE ROAD ISinia ,a••ai �� OAR. NOV 2010 ;oro �,' Iia; .� STA. 32+00 TO 37+88 09 ilet OM • . I - •,, it I 1•, ir • , ,,,, I tor! 8001 I Or E soar e . I sate . I wed MEE WADY WEE I • . ...-% /fEm,E,.../ \ VOIVIISS WC \ I IIIENIETEIER WI- AP, E.;' 4/,',, I _, ,, It'D.I.P.wild(Soo Shoe C1.01) ,' ,' 77 1 --, 7 Or I ,p,/ , / / I 4 1 4:1• E......:.• . ,' ••.0+00(AM./tiller Dr)z /, ,, 0..0151(Cmns.•Id) --`..4./..../.,, i , , / e'pia ,, i, \ I J-,77'n.--,—,—/-1 I 1. N....,‘ Prop.r triP.WM „ss : - Cal. ..., , \ \ (544 Slwat C1.01) • , Q i I .4,ei / ,,, ,,,,, . tomorot I , ,, /, I U I/ . illA;e:i T..‘ Sta.MO 8.41.SRA*144 \ Sto.4643 e.e so.*Tal I ' '' ' // / r '-'--i LZ-,-z---- \ 1440° fil. - I.Go%Volo.11 los • e Golo Volvo 4 lox 1 . ' 12 Li r 0.0.WV 1 15 IS r WA Wm r_ '''":-.•-'4,' \ croroo or.wow mow t \ No Dolol.Ste*C2.09 Prop.w.i.0 DiwriP. 1• '. .. ''.:-' -- ' qt -..' .''''' t / '....'............,.....: -.^.......,, 716. •_. A.) 0_4 .u,',7\ rais .1 :v. 11 •, .' _.... .a,:,p., - I ------ •-- kii11818111.1640.111111i.' .A ion* ..m 4f.',/ g MIS MIE Ey r,$) 08...N,,,,' .--.-".. haft_ , • 3 ''. i 5 HER/OCHER DRIVE 4 (Routs 1600 NM ____....--....... ..........."'!".". _ -... / / 1 ' 1 a c,..,,,,-. ---- It --AO -1- ,„&,•"--- 1-111Pre.-...--. r-7-•;_...., ',. . . . \ / L44'..4- "; - I - \.., --- ' 7- - - 7...711.- ' 7....0"-,C.' Ise. ' teitte il S., t din ,. sntle PM • / / / (/Ag, ,1 ss,... \ ma gra ,, -....„,, , I t- ..' — — — — ------0 drZ I 4 I I 1 „ ior 3 \ LOT i blOCS A pArs SESSEN NEE E..64.-1 I LOT 3 81001..,1 !CT e Roar A NIES 1. Recennee oil cabling gm*ow-rfegos 1.1 / / ;' , . , ' ,,,Sta,I A Ini NREE lielask,Es At' VEMIIESEER.4," \ SWIM NESE R,J5 I SESsmi IMIZ ocardon..1111 Sr4 0414.04 Id Stml CUE A 1,EssIEIMEs lEtl" "IALMNESES.1" t 2. C4ntr46or 14 wily 411 44141101 NM..odor to coorInNI•• %for Is Coond KIN 11.1,N 11 najl on 2.441 01.02. kale 1•25.Nom 1 Mr to Gond wore a a 73 oo WA*41.0L 4. Rev to A00akpmEs1 SW se SNP MI. Fa I 1 Mk.? . , 670 I I 'or . I 3 uli? . 8 660 I . • le - . 660 h 1.41b I .... 15 . 650 ' I / arr... a- wo.toroorr i 8 IP SE NEMO 640 ------......... j...a.Thit.••• I I I 640 .. ___, '''''............. Mew 3..• : - 630 4 ---i /as ow ProJ ---------------------- ---------I--- -----------------+_ 2 620 -----------+---------- ! 11 610 - - .- jg = 610 ‘ Prop.11.GIP.w.i..wan- I 600 . [ 1 • -- _ I N , 590 , 2 1 .__ 7 o 3 .4 5 6 300 Prpfile IS to n o lo 1, 111 I•10 Vert — GRAPHIC SCALE:1.4 29 Own.) GRAM WALL 1"=IC coo,., 0114:4420 WI 4.••.. OP EROSION AND SEDIMENT CONTROL PUN(41,02013000113) Albemarle Cady otLtIII Rt PIII< ( : i 'ERN/ETHER HILL WATER MAIN REPLACEMENT PROJECT arm ‘7.‘ %,,,..,.,140 ,m,,a t. Michael Baker 72&Mx Row.SON 400 Service Auth•rity MAIINt NEL -- Vo•girio BeocIL VA 23412 (PROJECT NO.2017-11) 4 OECRED WO — 4634770 ESCP 1107 20t6 1 5444011Cooming C------ ---> BM: '4._,i, INTERNATIONAL F.i.‘ r57.rotamm PLAN & PROFILE, MERIWETHER DRIVE 1 NO. WOE %tr.;fr. '444,4„,.4.4'. STA. 0+00 TO 6+50 1 0 tor. IT lots I (aro I I/��, iori I ore M100 B 1+I ROM B I ' I (�Roo t 4Got B I �(%r B �� ylyl6 wYr union F SWIM MFF SEC00V TIH 3EC>~,"--__ SEGal.AWE SFC1V.WE I. bea.«t all« lF«AE•fB uu'-/-f 1EMIEago nrt' 1EM«=_-- 3pn1E6ER nI• 1OBIEBEB a[:' ec«a0w..1 I.MOW.3M C2.01. �� abs 1, �" �/I aT0 I - pare J. Cleeen..11 Mr tooG..x.. anp j I I 1 7,I n SAM 61.02. I S. Miw le Gnerol Nelr?Z!17 n SAeM I I ll 1 G1.03. / �I L`�-_r I IOMrOr) I Sh.0.06(LnY SO r 11w R•Iw ow I 1 [ / ;T:IN1 Caaa«1 M.Ra.wlx 1 .W/N to Ea.Rohr Sonia(Top.) M+M1+ I \i.,,; (5.Yeh 1,TMa SMM) IMvain (7'.0�'`ti i(Soo DIA S d CIA). GI ____,----:.\:-"-- r _ I Prep.ton* ., J\,[. I _4 �aD /'�---/-�--y��'+�-'--� aCO. 1 \ • TJ m▪l 7 3 - ,pL MfRINEIfIfR DRIVE to (Rate 1601) II 13 ; '" J one a <.�w © r. JIll emn z,.. f1r vuP -" 11) WI`I �/ S —r '1 ▪ • r.7 5J s ``I Eawe.. gTs d t I • 0 1 1 `^^ 1 e.... Ira_I..a.». I 6.r C. V,I T. iirIR SAW 13� ` 1I 6'C.Va.!Boy p_rj . 1 - 1 15 if 6'O.I.P.W/11 „45 iJ_ I 1 \ M j I i 1 e '.rJ' .• 7- / /lB1GEAFR M:' 1 a AEartiPEY Mt' ., 1� 1ERI[0EB Mgr ✓/ A SFR>KRfR n¢'S // P v sale I.15.N«c 840 640 • --1 I 1 T•s? me „fo L I 7. I r.rrne i...a.-. ..,3 < 5 I s.1,yej� - .. I Wt MIS L- s - 620 •--C.- -. I _ \\ Iem NM no N MI. 810 INN NI fa wW.R�.Jl1. VI M. irk I - '�-- --__-_ "sumrTTTT'_ rp•3 --- 1 NE E--,. Y i Prop.3•0.1 P.Rohr 11.*- O Prpfile n 6B ,, P „ „ saw:1.IS'Non. '6— 1'.10'Vert GRAPHIC SCALE:I.25' (N«aJ GRAPHIC SCALE 1'=10' M«J EROSION AND SEDIMENT CONTROL PLAN(WP0201 E00033) M�e.&.e(may COWED WOW Ae 4.p MERIWETHER HILL WATER MARI REPLACEMENT PROJECT SHEET • c_��• • Du. NI t C\^•� A'D- + zrJ B«di.Rand 5.:.an PROJECT NO.2017-1 I Service Oaam Aso ,��43,n EEnaW Michael Baker yne47.Pa,VA 7,W-11z.z ( ) ESCP 1'hac 17571 Mt-M70 { � i�j 1""°' INTERNATIONAL Fax n371.3-05r13 PLAN & PROFILE, MERIWETHER DRIVE 1 1 s..aa�.:N MR NOV 2018 % ,+ 'Yon..I? STA. 6+50 TO 13+50 ;. I LOT , ,.,. , 10112 `+ 1 STL'/gr Raft \ Atibv O+iEE \ T. ZOOM M a ,♦ 1.9.1,4—.,' 1 II(R At:' 1AAICDIR ARC" / 1 leara6W Wu" / / 162.0 \116 bKro 1 \\\\ 1 •e :Y r Sla l0.7S Hydrant I r" 1 11-eals mom It lox S 'IR '' ,'� -' (Sw D.Wl.SnM C2.01) iate} v °�5��� I Gn s1»"WeM wNr {�q 4 lb rY far W to E.Wolof SOW,(f A) '� Prep.6•DJ.P. 1 a1a[a....r (Sw Nolo 1,Ibis Shoal) �! \\ WaM Yoin SI.ItaII CUR o!h•,I .. �� / G 6•.i'(74j;Tw 1 -r Sla.2N32 / . 1'G4 Vat.!N I Prep"6•D.LP. r e IOW _ t Ii t•DPP.W/Y A.1N73 Nato/Main .-- "/ ' r,. (`� o�� ea*w. i z ii , 4J` % - ... fse D•r5 ar q 01) 1 - N / -- — —('_ 4""."•.�, / �g � Q�— l� ' is(""l," - �;21101141.11 �.. 2"F tom° s r f STIT / V __Atil -s MEN ,, • 3 Xv / / -- _ 1 (��` \pas \ KM I. R.conn.af all Wennp.a.MN ao,'n C T , Sb.1 1 ` accordant*.IM 6N drink on Shoe C2,01, �' ' Y IIJIS 6•M 1 ` 2. Cenirxror to nrR,all..bMno LI0..prior LOT 1? .., LOT I. -."If /, 0(00B PIAf\ BLCA=B L019 1 81000E \J ROM WE.MORE / 3EC2gr ago pitt3 4Cm'C■ r 7,8 on n. C11.0 to Gn.AI M11•I i, 1E.41KR re.' \ 1E.CIFE1 Mt' , I C' A2a13 1BIra{R Mi. �U 11 '— AtW.DIrC_ ].!8 on Si..!S 01.01. r , \ YA0000010:' 3. Nlor lo Gmroi Motu 22&23 on S./ 01.01, P 1. R•1or N Ae4Mmm.e Plan on S6o•1 C1.01. Seale.1+23'Harz. 630 -_.—.T .. -_ -__ - -_.._.__. -. _. _ Lyl 630 3 `` i 1 AI ya 5 ......gal a I 610 610 1 _ --\ / - No. \ .i m..nwl —.. di,R _ rR..u.loN) boporollon or 1e nunN N NLM•' W J —Ct O2t1M 600 - _ 600 N lilir D r.lrltlm Rr r r sDlo 520 N ) Prop.r D.I.P.Woke MeY +_____ _ ,_-- —__________ --+ Prop.r DAP. at WYIw Ilrtr _—s es 570 2 - --- J —I II 570 I I •.—LI.Mr At YY— T— 560 I _I I J t __. I 1560 `aI , , 550 14 15 16 17 18 19 20 Pro(Ile MI 50 o e e 2e r Seal:1•.25'11o.z. 1..10.Von GRAPHIC SCALE:I.25' (Ho...) GRAM SCALE:1'=10' (r.P.) 000 y EROSION AND SEDIMENT CONTROL PLAN(WPO2OI8000R6) 1 Service Gouty avae, WOW _ �`AL A 4ERIWETHER RILL WATER YAM REPLACEMENT PROJECT r a7��1���erity m.r MEl /\'R ',arml.Rood.v Suite an (PROJECT N0.2017-I I) ��, Michael Baker DIn.6.A 1A 11+1 9 pECxFD R50 = IC4w�Y�o =� 1•hnlr r23]1 M1.K/)0 ESOP E 3•�oe�•••+e � _ OAR NOV2016 `t$ % I l'ls/re INTERNATIONAL 1.. ns7rm3asnl PLAN & PROFILE, MERIWETHER DRIVE i 1 •+'•_ "t...ev STA. 13+50 TO 20+73 1 2 tO1'A I acn-e , �'1� I etoa a )A5 1 mow, e, p6A; SEL'1EW OaEF !tlU / SEGRCM OAFS I FCOOv WI „ / w • lEe/eET6E.K' j 0 7 I 6M' IEW,.E•KI' lFMK14 Kt' / L T"CY MICR P SECTOR DAVE/ lifftEI.6,MU" 2 y \ hop EwMwM �'�' \ 71a OM I :', `r.f- `-- Spa 0.00( S) ��` }' ' / }I • Mo.10.9E c .GrI _ �_`itiir ` ' "C � �s^,� _- _-�y_'�- -- - rs- - f j Prep,e'D.1.P.Wild e're'l« V -s=''€iT �� J' __ i 'Yd.'''. // Ow Sheer 81,11) �f)7 se�"n �l II 2 '� N1$J1El1T) r` /� _-Sna 4465 DWI St.)_ _- l //// lie :.w��A> �I —__ Prep.r WNW Yob LP. w...3108 %f.,_ `It �II /I/ nuHee3 �` /, I ...., , ' *a 0.1115 t6' {!� !r Y I� a• / xpm i Ha fA . 1..1��'1 I I. Rocenrw[t all«MMp new sonic«In / xCRW RAEF 1 SECTOR'THREE 6i r I 11 ORA «c>Aewn.MI'ID.Molls en Shoot 02.01. / f/�I IEwRE^EA Kt' I lERreFTEA Kt" I;�I�', .1 1 2. rnmlrvctlee. Rehr re General non 6,7.•8 Plan on SMM 61,02. Scale:1'.25'Harz. 3, R.I.r Io General Ma.22 E 23 on Sent GI.02. 4, R.1.r 1.Aealgwmwl Plan on SD..I C4.01. 620 - —_- d i y I I I 620 600 I -. - ! 600 7s 610 i --- - — - L y - ' 610 590 I .. - 590 . 9. I r I 600 -- —%- i-- 600 580— - - - 580 ria-t _ Irk'' e" JALRAO2 0 N- 590 570 —In -Se War.. - _ ww� - 570 MOO A.aW,«enJ Rd.1.w w w -_- r4 ma,/r ,epl® __ ----j_ l6A.IY«.1 /i lMsoJ I- _ �StwA.Dew. rff Nen MN 580 -- - I 580 560 - I ... 560 — I w wI - Proa.8'D,I.P.' = Prop II-D.I.P. _ Ware,Yaln - MAW Ilrlt 570 -- 0 .570 550 = - — - 550 ssc - I bo sb I i 1 --' i;; 510- _.. - SIE 520 - -_ --- 520 0 , 2 3 prpfHe a „ Seat:1•25'Hem _— 1�j a —. per^ 1'.10'Vint GRAPHIC SCALE:1'=25. (Sr..) GRAPHIC SCAM 1'=10' (ann.) • �� NOW ` raw • VUH Nf, EROS'ON AND SEDIMENT CONTROL PLAN(WP0201000003) .tl_�_( CA♦ a' _^ 772 Sandia pw45o¢i(n Yf RIWFTHER HILL WATER MAIN REPLACEMENT PROJECT SHEET Service Au�rinq • DRAM wa ` Wed � Michael Baker ',.EM:.ewa16 VD 2AS2 (PROJECT NO.2017-11) ESCP �/ 88 Pbc 1757)�Q20 ---/ °Eq®` "S0 G 1 r ".'','"• INTERNATIONAL /v n57,�m0D PLAN & PROFILE, LEWIS STREET IF SAog6Cca YeR � � are NOV m+! yapII.jA� 'a. STA. 0+00 TO 4+85 3 Mn sox \ - �� -'. -L SEC,.�DaiEf 4� HIM SY Xaa:-.. 0Ev,Ev_r v...' I 7M'RnE0ER 141" 11 1ERo'." -- I. become 01 wi,liny eater wrier In occoraanoo a /� 1 I -sl A' 2. Con3octx I..111) OH12 OR relating utt1M0 2DAor _'•°Ff--a A /i ` to mnotr clbn. ROW to Gomm,Moto 1. / - -- yY/ ti._)1 7 t R co SAW cl.oz A'? k MS 4401E IL) ��/ / / /.I 1 3. Rotor to G.0001 No*22 t 23 co SHIM // / / 3 514 N!(Loeb L) v�/ IP7>S// i 1 ` G1.02. C ' .s i i \ bond M..Mow Motor re T // I \ R- Rotw to Ma,do,t.t Pan on 53»t 04.01. i Iv h halo,Sonia(TIa.) I /i ,K'. / a 1t-Rr (3.Nolo I.m.SHIN) sla. • 1.Y C<-.= / 1 ►nP.E�w.NN o 1•a/•WWI 1» 1 . ,. ram+ \ 1'Gala Yoko t Sou Z3r..Y D.LP. Prop.r D.V. 4 r Prop,t•D.LP.1 22 v/'D.I P.WY W S,. 3M5 SM. s. 1 Nar> ".,, >�tt NgIRr Ado 1 (5..0 r sm.YYa t t» r Fla Vol»t R1N r C. Al (Soo DOA.sme am) )' a&wet E..ma P , Y.. , / ml ' _ .wa+ 0. A:• .... o`:a..... 1 r.»aaaa� 4 1 tl�` Jam"" Vic ' ,m„v 33 L. • ' Ea.EY ` � it p L. Y • ��I m e n w 2.. LEEDS WE rsat) s !h1 c�� R = . .`ten -- y\R. - . =-` - -- moo s� +' ' '4fi= yr . -I-..- 4 \ /./ I vf!. ; 31.0] -J `\ ` �n.6isR- ' S1a s./L I Maw 3 I ... 1•01 SW.r« Sla. Ike M.6-r r Got.Yoko t Boa 1 1•Clte Valve t 10a//,3H•.. 'tee' •�• I LMN� 1\�.�- -. '�\ K520 11 IF 6'D.I Hydrant Typo•A'Dead CodLod 0 I ,y ,1 (Soo Mail.SSW 02.01) 11 Bkx- (s..De.n.asm.!kNornbly a.02) Pn0 F \Tt ... O. / LEIT 3•SFr PIiEc LOT f�" YT nwrf V. \ Prep.3'DLP.W/Y (s.o Shoot ctl0) . ` WHEW N2• ,, IEOEaEA Kt a-�, , t. Plan Seale 1..26'Km. 590 _.. _.__ itfi<( i I ti:-i--* - __._.- - -J; 590 �,,, h4, S S C S S ) T \ ).n 0. 5 L= 580 aA u.ewJ wEAM 1Vl 57D _• r W �.. 3.1•lh ____�---------- ,E. -Ea r!r ty 'Yr)'rev y, 560 R1 EIMrig�ll RIf AFrIO --_ ...Ito a..3Mn 77 C 550 -- -. e e - 550 3'D.I.P. -. V�r Wl.b i Nolo MO Weir I - I 3 5/0 1�.�air NI Atli -.-_. 530 .— — /!\ • I 830 I a 520 ' R I! 1 I di __ __ I 520 0 I 2 3 1 5 6 P►pftle o u SO n 10 20 w Sod.1.23'Hors. 1110'Vert GRAPHIC SCALE:1'=25' (Hem) GRAPHIC SCALE:1'=10' (got) NYeN� EROSION AND SEDIMENT CONTROL PLAN(WP0201500013) • DONOR NOW V at.4f OlA MERIWE-HER MILL WATER MAN REPLACEMENT PROJECT AEI a Cr`�<< - ' PT Bedia Rod.sties 11D Service Auth•rity Mot NEE - it unser = Michael Baker ."•Vm e»ap VA 25452 (PROJECT Na 2017-1I) k'.l. • ,„ > HMIs(75n463477D • ESCP f ��� °Etl¢D "� r igp INTERNATIONAL Fa.:omN63a503 PLAN & PROFILE, LEEDS LANE i .agtn..g DATE iRlv30/t %..t."0 +aIM..N STA. 0+00 TO 6+00 1 4 NO oarz lt.`rti+E;n i' I ...�• F 'Mjeic7c Kt' I 1yPYR'16'- 1. Roman +o6•.+Nine maim irk..In 1 ` I �Y N1•elrw Woe <N J v oawdona MO,+M dMah w sn..l C3.Ot. 1 E Y 4 trlr Unto NA) I + / 1. ttn.+rv<11mn.to bl..:It, i G'pwdR xab.nes 6, 1 T swo � e� Gw Nolo 1.lw se.l) r `_ 1 7,a e an sn..r ci.a:. hBp r W. &,t Q.--�+--�.}. '�_ i 6m Dl►. I / s G1.02.a c.n•w Ra«ss a ss an Shoot trr MOM 04- . hp. .. R.r«to Abandonment non on sn«r C4.01. o PST ��111111111011111 I7r_ oo '. .....--r•' 1...,•/ r" �,.-41e. . • 11',0 Niii oL ,! !? © ©-> 0 m '' i N .- 1 , jinn ` /.y fu' ,C / • r S` 1 . rrim w NO w No s1,m _ _ t .... S ` i ,1 rur;rn:µ: m a 6'Ow wwt6. 'c •. !_ '� •svrw.gN I ,I ",v wig vas 1- F�i -0 1 . 4/4/1... , r,/,,,,,-11 • \\ p-. 2 1 / w.BeAr-1, —,ra.nau .Cab Valve 1 Bo, --,1-.--' ,' 'J�' 1 Orr / I Bo.-011 Assembly -: , ¢ FAA / + (A,Dotal,SMM 4.07) `, R1,0 • HDik>~D, �-"7 tort I tort \ P/SB won m11EL 1 1 -. - , / S[C IUV Rif • ',MN ME `I,' "1EAK11EP Kt" 1 : / 1EbESEO Kt' a_.CiKA Kt" Plan Seal:1.-1S'Mars. a -1 610 ____ V l ! _-__ -- J 610 r- 1 N &RIm m 4,it i - -------- 070 c - - p�� _ _ _ 570 7 Prep.a D.I.P. F—' _- `hp.r D.V.Weir INN WNW Yale j I o — 660 560 1 4 I ,�R.IhIn y � M 11e1Y sso . � I sso I 6 7 8 6 10 11 Lmtli Seel.:1•75'More. H w 744 . 10, M w 111010'Vor1 GRAPHIC SCALE:1".25' (Wrt.) GRAPHIC SCALE 1'=10' (11r0) 1 Mends Gouty Doom Owl ... 4,.,'°` EROSION OSIIINETNED HD ELL ENTWAT CONTROL REPLACEMENT NP2016 0003)JECT S/EEi i Service 81.. • - - :.-,w-'`< moun—t,v an (PROJECT N0.2017-•1) Michael Baker ESCP �� Phone 1757)e61Rr70 ��� A INTERNATIONAL P..:om•63d141 PLAN & PROFILE, LEEDS LANE 5.1000a•o+q DAR. IRw 2016 40 110. STA. 6+00 TO 1 1+47 1 5 i cc wx V r 6. 6 \ °�+.. ¢. \ - IT r-�T-f — t \ 7,7 1 .Urfl1EF KI \ , r OJ.P.W I I pm I II ) APp.x.Location el Nw RAr 1 1 1• (S�RR Shod CI.02)M 1 I I Sb.ir 200 I r `S..Nn 2"MOPE — �l I I 1 i . )..1 JJ r eiy./ r. .a 4-1.--1 1 LJ 11P.'A'D.End _ tw+«+bo ro e:.rot.. Bb.-0l1 Anon. 0S.Mn Shoo G ,) -- I 1 (So.DSa0.SMM C2.02) CCONImtd.N6 Ih. r I ' 1 ----- / I.awr1'I D.n.r, I P1q.rDIP I ' ,- R'dr Nab l / L� \ //A \ , ,,,f. , ..i,,t, i .., ...I._ i '.4/ • �:'{' DMBERCAKE RDAD _ .!• �s/ I . Slo.P.0(c;w.rt.Dr.)- O ._ ( (Private) 'i/ A sc,SLYWA 2.11E St.,6+66(0..m.Y4 .. 1;� +"' 7 mrs e•xe Bales. N..rCbr Y. I.' I I i Sb.0013 I.EA WaM1r S.Mo0(Ip.) I , e e 5.. T. (5..�N ..5.S) i .:1 8•Gal.VOILA.S I NNAM /' \ 1, / WEN R2M \ 1 ar. 1 -) I / wr.N.. U.—.—n..Frc r / SOMA rreiatVERME1,27 AI' \� Pin Seale 1.25'Nee. WEI I. Rm..oh AA./.ab Ne tp r tor. in 670 g -T-- 1T0 we rdena..66 II.ASCII an 56..1 C2.01, 'C . IIR ., p1.1 L_-1 2. Cto c.o.d.. Wet b Go ralmlb Pe r f ,R�e E_ ` 2.l Bon St.101.02. 660 .F- �87 -� . , -----. 660 3. R.1.lo Grwl no.I2!23.n 51wr us L' . Sr 1. RAW ro khandonm mt Pbn on Si.CO,Ot. 650 -_,-1 J I /// � i ix L;. fib Doti . Rf 640 - - • 640 u R1eI-- ---- 630 - ---- 630 EA r2•ani. R NNW Prop. D I.P. fA aw Me/ 620 ^' ..�-• lam- ---' I 620 J 610 -- - - - - -----. ---__- .... _---_ -__-..— 610 ` Prop.6'D.I.P.-/' Victor Men Y -' - - 590 ---- ---- — - - - - - , - S>b 0 • 2 3 l Profile Soot:1•.25'Core. 6- - 1� p -a Xi 36 1'.10'Von PANIC SCALE:1'.25' (Mom.) MANIC SCAM 1'.10' (V.I.) EROSION AND SEDIMENT CONTROL PLAN(WP0201800083) omom WOW •b a .4.4) 0j MERIWETHER NIL1 WATER MAIN REPLACEMENT PROJECT MEET m IJerdlx Ro.d s lE1n { SeService •uth rity W. Nn eq`� i R>mn®� Michael Baker to n (PROJECT N0.2017-11) ESCP rvice!�{/�—= PECKED R5° a; '�, ��`"'""; INTERNATIONAL Foci(7571 610503 PLAN & PROFILE, TIMBERLAKE ROAD I s.dye�..+W owe "R mte Ab op 1 f. STA. 0+00 TO 4+00 16 n0 0.1E Mr • 1 - 1 St.C , ROM c P �[ t. LOT I AMR o .:.. 1 E.aEaea NOM AAA,ERE.R N MAI I PrxeII a "' - 1,M.Y `YEISEN MOM I ',9cib pee AOM I ® 9ME ,20,001 FOP IF5RIC MIl " I,I �• 'v" IFAICMER I[! Ig1EM•MU L INOS Ms "„"' y I PUS lfNr„,, t•e•sar r«\ . /'Geo Who t lea ^ ,y Per: e'our-WSao.205 I+ 11 6 r OJJ'.W/M 3N(]`a/ (SM sl.r CI Ili \ , _ ;' trope e•ALP. M20raM sk: 1 1 . Mohr Main ,(S«Wok S.*C2.01) __-.--1'o.25 o•• ^/ - s o. 1 ' A = ..--.. i_t _ * /4 YG� I.SNA sk 0Mo(RMnbraugh h.)- ►' 1 '. ' , 6 1 - fa .��H sla.13+57(0.•rHlb Re.) 1 r.� / _ ` m no"T« 1 ' 1 •.eaW _ '' ^ Sk.3+12(10mbr.u/b CI.) em. __-__.. � - -tif e'eGah tBoa 1 l o 'I A Sta.25+10(Kimbrougb 0.) sn rs ---. Z _._ _ _ 111 1 e-d-T, __ - 1 y Z1 0 \' 'Si' Come M..rake M.M 1 , g 5 1 a• 51e.5113 k E,.I101er Sere«(fp.) -7 c 8•Goa YaM t e« 1 (Sao wow I.iM.3M«0 ,o 3 0 1 y f5••lIEM CI AS) , 1 ,' 1� , 1 1 1 1 1 }Vfi ,C.,. I. Reeomsl all n6Mip nM1r own,.In I cCO,C tor 22 �., _ won:loon Mt NM dnalla en SI+M C2.01, BIXxC 1✓�.1 1 00.EOE+MOPM ^prt; �! ; .F1•EAB KRM 2. Canhocbr to nrllr or nIdI NMI.prior k Yi M•r•OIR ( YCR•r(Rp. nmMuclbn RN•m General Mora A),t 1 1 .RAIN Mn +ce.rneA�,. .n sn.a c1.02. PPS 3. R.t.r to General Mahe 22 t 23«SI•e1 G1.02. Seal:1 25'N.rs- A. R.1.r 1.Ab0Monmeal Pan an Uwe CA.01. 520 2 6 g - 1 .111 -- g e ji - I _ 620 i ....4, L 610 -_. • L'-L ie T L _ 610 • • 1 on to-M•M•) I _ 600 - _ RAeA•e O _ em 4.a • I f'Eyrr••)� �d .... A<AMtlr Wood r i.....ieo _AI'eR..O.e.) 590 _- -__�__ 4asr.) ','„,:,::Z.-1, ALAtA1�RD e I -� na Prop.8*D.I.P.Water Mal, _ • 570 - - 7 570 ii 560 _._ ----- I� MEM NMI 550 1 ii OM- - 550 sac f A -----. - --_1 --• SAO 0 1 2 3 A 5 6 Profile ts 0 10 00 • Scale:1'.25•M 0 o —— . e — 1'.10'Y.5 GRAPNC SCAM:1'=251 (Men.) GRAPHIC SCAM:1'=10' (wn.) EROSION AND SEDIMENT CONTROL PLAN(WP020/e00083) ��N a` WERIWETHER HILL WATER MAIN REPLACEMENT PROJECT STET i Service Auth�� 272 Bendia Pad.Salle ADD •�ady a�DRAM MEL O �`�<< Michael Baker s &WS Vi63A770R (PROJECT NO.2017-11) ESCP f -"'/ «am Rw GG,(�,r °f"" INTERNATIONAL P«:vmA63mro PLAN & PROFILE, KIMBROUGH CIRCLE [ s.:et�..+e � � OAE: MM Iou '`!,f �Aa lIB ow.Ow STA. 0+00 TO 6+50 1 7 1 _MO 041E tore ory core ——� Scar a MI, / F Rape • ,Rear o pn• 6cIE3 EREMNR ACRM £ +•MEAiW RIM YEAISSIElr A66M— 1. R.oamwcl all xklbie.obr winnow In SEL/RM£aw / dEC'r0V MO `\ £CRT'F01.P nem/Canm.Nh 1M d.Mk on Shoal C2.01. \ weans.ne! // MUMMER E2 r.ERlA hll I, cano-anr b..nq N a.CI.g uNARa wk. 11 �`\ £ • 4 t> alnn �/ b con.IrvcM. tbt.to o.n.d Mar e. `Q s5.5 F _ F� C/i r,Al on Swot M& S ,t` / `^'r.... sb.7.16 F \ /r (4, 5. x.M to Gourd Mar a1 6 23 r Anal ( c1.52 Cree F ��2. tr'sm.Votes 2 boo // -�'------1 • crop.e'DIP.ral.r Nolo / ��jj' `,rB .. Rotor 1a Aeendennwrit Plan.n Wet C4.01. e i V _J. 23�r D.I.I.W/M F- -� _ off y °S Ze / ;Mail,Sheet c2al) // a1u.a-.-_� \• G. sides i { ,y"i%i \ /jBe/ \ \Kt. tr. ' ($N Mob I.1hk Sheet) :/ ' /. �� /: -IPJaa-� N. ^Wm ISO N. /, Z yA .r. / v ror, .V - rar T. .-.,. / / star c oa•IEAF',A0>M war Pala \\ 'f" • ".. t.SN. r oab rar 6 to ` =mew Muir AereEnEa net • L nFnrl Free •\ �., a,q.. „��. •� r liar bk No.oNl £' :- 5'. `/ ' E.L o.Ma ens `k �j!'A it�- •\ ------:'*---- —:----: �F_ sin; i'• f i Inl4r 1 --1 aos. for 2o4 F.s _ � v �I��� .. `..rtw tOr li ( n£oa 0E ENER a04nr '�. - �ERn[A�Ea A.YM t•/d•D.V.w/M. - �A_�!r , i• • y0r 17 C 1FiaEMe NJRM F- rEtov e,.1.1 ,,/ greo.row O.511.M CI.f6)`\ r_f79, - .ceESENA¢.w` ternov fa* ..9.Ent.test .NSAR.. 5E004 K; , *MEW... \ tigl SealeSeale:te25.gem 610 - I rIZ --- -_. _— —jr-------- I 610 a a 1;1. :.a 590 n _ - - - - .__- ---- -. a NO£.tar-aro• d Rx 1 8 V E AMYL 560 c --- -._-__ --_ fr.NZaA J 360 ---' t L o Pep.r D3r.War lids a I I 530 -_ I Jill _ >c — _ _ - __-. 530 7 B 9 10 11 12 13 Prof tle S.ab:1.25•Ibri. 0.,- ,a „ 10. 0 10 ,a ba 1•.10'Vert MAROC SCALE:I'=25i (1M+.) GRAMM WALL I'.105 (von.) EROSION AND SEDIMENT CONTROL PLAN(WP0201600063) u IE0 ROW kR tYA MERRTETHER HILL WATER MAN REPLACEMENT PROJECT AEET 2 1I E'G Fe Ze2 Badge Rao.Suite 400 ' � • �••� IN � s" = Michael Baker moi.Beech VA2MS2 (PROJECT NO.2017-11) A Service�� (WONT s� Mane Inn+A3 eno E S C P t 0411. 01D ti?i,t,l, It 'ar,a INTERNATIONAL Fat:(757106smro PLAN do PROFILE, KIMBROUGH CIRCLE18 s.:ae�.e:v ww: WO tole oro 3+ aq,, f STA. 6+50 TO 13+00 Ma-tuc r,., tNTEi 1. llseonnoci all exPling eater meeker In .., ` orcerdara'Hn the MbI.an SM.1 C1.01. SAP ♦ \J/ 2. Cle ontra-Mr wlryn bier to c'Mraa..Ive / Prop.e'D.I.P.wale Win ?..SrOe 3Prep.e•D.I.P.Wale YM \ s - 1 MM ro G.n'n1 NM.73 A 1J an sN..l Oe cl.o7. Seeaf \ , 10[r' ` . ♦ r'I«1.ebvnd.mm�l elan an$MN u.01. JCe'�F\``�\ a.e s.Ha Tw • -SAL 1000 6 C�,A `\ . 6� o et, r0ale valve a In Y; -• , '- \iS • / ♦, i (Sr dal,s6..r COAL) a d.Tie �_- ♦ Tsar i ' `!R c•Gee Valve a am \`rC,o PO, _a?t -S?- Q� r Gel.van.•e.. / !/ % � F' to v c•6�.r.rry 1� ,„,,At._ 5 Prep.Erna ss lE e•D.Lr.r/Y , ! r Ir // \ .. �, 4 /, lherull `` Ginnie b E,.e•rim - _. / / \ '� `•'1r:' (S..Delc,swat C7.p1) \ • ♦ ,y� !t_ Sta.Is.x- ./r I..,SNtl Slam 1 1/-J ♦ / '(� ,./' (. •n`,03' e5•4® e•Galo ver.f On ♦ f� Y V� 'f' i N ::... .10♦ A \co Cal aCap E.. Sta.IS.x P11�, '474, 2p♦ _:' 1..1 4y 1tlS pk. e•cal.YaM • • -" 'A r. ♦ \ (S..r a 13 en - I6.ry(Ember*CL)• .i OO. .,[/ "it \`' .� _ `\� \ sM.l ca6x) S 0.00(7a 7r..Cl.) 6e e\. yGS ' ' ice, , .IhN -< - Connect N..rev,ever' ♦ 1 �r� e•11.25 ' q 1' �.E,1-'aH\ l E..raw Sevin(i1P) 0 - Bead -Ya.t.ff �� e // `- ct, r 11 8 /y (Gee Nw.1.T61.Skid) o n•.a'a. ♦ _,.�yi lr-- . 'eA An. /' C., :.t 41- Ili — ♦ n.m `� Z� �' `�1�� rn»w •••, we u. 1.1er MIA l� igi - t l • /r • /' Ali C \, 5 T.Ni lee.e l 1.1111.1.. �� = ea r% R� r\> 8100,[ WAIVER Ia«a ` rmro .\ Ea v way r...« • f 0L.N/Y Q.` r[»[nta+rn►rn• ` . +IDne-nSECIMw rs. ) \ / o,,, ♦ .% ,, ;ON viol CMS) `_- '/ *WNW r+u • Plan scale:1 Ter Nam 630 I f a' T 1 1ii g1 F I -- . 670 i. dfe 1 J ''Ia4d H - h . 'E L I 610 • o3 S 55 2 I 1 e i.a.c'vow s .- 621• bait. 1. �ar \ 1 • I N me 4 rersehme.. 1• 4 re• 4!a. -_ rf1.1 ' - 1 -tr r 1tn.) m.ve...aa+.w J SOO IA 597 _- - 59D Prop.r DAP. rn.to I c 580 c - - -�I i.. ' - S6D I . Ypp 570 Z I - '7 - 370 I 67 I I SW sw I - - —. _.-.- --__I__- :— oll f __ 1 _. _. _9. I yyp 13 14 IS 16 17 16 19 Pr it Seep:l••25.Her!. — » !D a la » W 1•.10'Yon C — CMPNIC SCALE:1•=23' (Nan.) GRArMM:SCALE:1'=10' ('ail.) EROSION AND SEDIMENT CONTROL PUN(WP0201800003) 3 Abend. coam Wo. • O/r PERM ETHER HILL WATER YAM REPLACEMENT PROJECT 9EET i G`�<< �yi 3-�'F :n ema:.Root Suite WI (PROJECT NO.2017-11) a.« in ,* *, twig g Michael Baker I n Service Autherity ,_ E s C P i - �� ; r 1��Is�e INTERNATIONAL T E R N AT 10 N A L For C57146JA507 PLAN & PROFILE, KIMBROUGH CIRCLE s.+rlw.+v DAIL MN HMI aro,.0 °•Ire.Or STA. 13+00 TO 19+25 9 a o.n A smu , flax, \ KDao li /-. 4CM.,cry., / a[R.R ,c SWIM F#4 \ 1.--:...7 �•— ---- / 00. «M.CT6'Mrt �,1. //if <__ \_`Of/, �\ RSA t , . a o.c..Mai I a:TIC(NMr..Ma)..• OM ,-� - . Cnav'c e,0/ .fj { 'y` �• / < \ \ // /. _ apeaFTEF MAM \ eats 4,4� ° / Prep.I•DIP.Oa*Wean ��� / \ v� , So.ss.w ,ate R °"✓. �' • i �\ o tit,, , Do.3e r 11.75 t1n1a der may/ i '' 2,D, �� C I133'Rwtl Re.22.05 ',77%� .. sk.non- n'• . 41, f(..'�'.r 41 rat"Soh"1« ` �� %!a/' W Gab Vntw .^> / '� a j' 6•w.wH.►D« tier e°°. \ `,\ 4'4�< / ',ram 15 LT�•Dlr.W Y' j yj Plop.I•DJA.11/N . y .#�\ — Pea MN.,_Oat_ aol)/ �f ., (5«SMa c1.u • i-N --- �Z � — 'ice 1,�'.., R . ,s,„, , ",:-,:..-.,..,:: • _ ,. . ,,,- -, . ....•_ 0 „ •Cr.. J , r f ,+7w;I 'f+:.ae e-•-• cannon x..eater Men - _ ) ^ *' _ _,� . b EA Waer Sarke -•`- •tl4II3 .v / C _ - a^ �.... 1. S (S..Nob 1,N.sma)) !�\ I. N.cannwf all Mall en !0!F \ '0!5 � - KY Loll \ \ •W.vb.services In 00.c \/ , 6a0 C 1 I 4 O �� .+f a0R c RM3 30ar�C / oraanw.at Me Molls en Sheol Cz01. .cw[:.r».Ir•M / MF,�Mw Meat ! to I'»Wa[00,ro.nr ��y .AI[INA NarN le , r "inFl.n wee m Gan.°•a New.6.01111.110°rT�a<6 4,0_,,5:t. SE.;a0.FM/ Roc flIXfr C 4 Fttn SECwEI.FdK uE0IF E.0: / ,,�.FRiTwp Mt( / K¢T,p1 MFM AWQ' I .. IC'ala AwMI[T(N M[( ` V 1t/1E116r Mfl / «$MN GI.02. S. R.lv b C.rera`wet«22 W 23 on SMW GI.OL Pylon .. R.l.le AL.Men, o Ran>5..1 U.o,. Scow 1.25 Hart. I —- - - -_. g ...---- _. - �- - 6w digi _ 6T0 I • = 5 I_« 830 .- I L= L EL N y 8 E.Aer.lo ; 610 am L'k(RR N VI Ir 1 ________ ____ _,,___ - - - ____ 600 -__ 590 590 — c - n.P.r D.I.P.water Nam u 0 l I a no f TI 570 f 560 --._-._ _ ---- ram_ 560 20 21 22 23 24 25 Profile amim;min n er e enSeek:1•.2.9'Harz. 1•010'Vert GRAPHIC SCALE:I'.25' (lee,.7 CRANK SCALE:1'.10' NM) _ ER0SION AND SEDIMENT CONTROL PLAN(WP0201800083) t ccvoty WOW r�er�e 4� Sx , 272 ea.eia Rawl sia ADD MERIWETHER HILL WATER MAIM REPLACEMENT PROJECT SECT Serviceii ��erity aA� Nat k`�= tWNW .1. t WNW 1. Michael Baker aab.R«anvAzuu (PROJECT NO.2017-11) °ECam Rso i rHo •• INTERNATIONAL Pogo PLAN do PROFILE, KIMBROUGH CIRCLE ESOP } s.:WAc.«q �� SAM Nov 2016 ;"e :r a+�r �E STA. 19+25 TO 25+80 20 w ME ( L t Z Lana° 33211 liVi V 30Vld 30213A ,e4r."."4,.. 4.14,;'-)it oi01 6,0.1 11v0 311dO V1/11 eld NYld SOP0190 V-SI.)Ind 1011VNIIiINI ......,..,% OSII 6130310 G•---- • .> i i dOS3 011.11-PN QS°PIPPd ". OSUMI IT n AlPgifinV e3FdeS /. .1 ISM VA+4...e..tv, Jaws peiplAi IL. s..,, •,,.., 1 '. lavivl (II-110Z'ON(proud) t COP IPS VPII PIP0 Za -,vt-f. ..0,010.11,1•,0 i 419 Valli i 133IS 1331'0211 1/131933V1.1311 NMI 131991 TIIP 83)1.13111111319 *•. /4006 01.06. (rametozodat)Mild loamoo 11011103S 0141 NOWA i • 1 P.413 01 PP MVOS 31149110 IPA.010.1 PA.010.1 Vit - Vet 01 66.11,00•I vvIvvt "Arvi VV.1 PIPS (PP) SZ PP TIPS 0111000 elThOld 4164 IIRTQ9 St M a 0 0 111 . -- ozs --e -i , ozs I 1 ,---1 P I its ors -"i4.44- ---------_ :": 1"41- 1.°:::: OfS .....". :„. _ Ii - OE {---- 0116 OK otS 91,111.1991 1 .1911 APS '1111.9 ilwa 06S OK OSS ------ OSS ....... __ -1 ----__41, ........,_.9 PPP 71 ----- ---"-- - 1 009 klia.a.09 Pnia.r9...."r1 /;:"41IL.Ftd.216;.'6•1kilv°P.I7616•II.‘' 09S - arenW....o34f - , 09S anar,xl I I . - 019 1 011 OLSUS 11".'..°90 PP:4j .....''' I PI 9 OL-1-0'PS 10 PP.Pr) I i --, PP P1 1104 0 IVO PS __ ---- P PIPPN PU tvvid N", 's I / OZ9 '' / OZ9 1013 1.00S 013S ---- .."/".".... OVS Si. Irrt P PP IrIPPPIPI vi PP 't ..:, -. 10 l9 PIPS P ___ fl I' cr, ,g, a- - SZ I LZ IPP IPPO P PIP f c P Of9 ----4 -i• 1:1-Fr,• .,f , 1 Kg 20'10 PIS vt.I 4 ri'9 PP IPPO a PIP 06S -- -- I% --- r I 7:1 '7: • . 1 -. 06S _ tIi. r ii .i ,s• n . 11,,. 609.661.666•66166 PI., PPP ilt PIP tl PPP.] 1 -- rg. 4 I fe.PPE Pp 1. 019 rizt.ir 4:Orr ir i 099 1013 PPS ut PPP PI SOP PIPIP.ti PI., ON PIP OPPIP 0...PP 'I 'LP,SZP.I PIPS Sir& PP,410.4 tl.”S UDICI U°101 II0 Z3 P'S(C19P.'"9.733 \ " (.tt.), / " - 4'4... ...:, \ 7.e.)30v. PS.011 , ..„...,,, 'Pp \ ruerti v36/316.101 • 0 XXV 16.4441 \ , TV.a/613mM erriOd A00.39S ;LL6tVe VP.10.31, • t 4006 ....r# N• ;4.:07 n/a dla.9 11 Il Pll•PPI.P03.9 •r.16 \ • Jall "I PAI.S.1..2 ..... 6;..07 '1;1'\'‘Sill/11 ale . /)( .8.3161a. 000 AS '' Nt • 4,1,POE s, /N/ I/ • // Ps.4.002310 i I' i --v3S 0 • PP r''' "r "tr iftli , ',./ 1' ,107 t ', , I 7 0 • PM PP P • if, (arra ma VPII MO ‘.. ;; -' _ -, '').,I 41.. 'sys.,...... S" • ma as amm yo-am .•-111r,-.. .i ' i "./ . ....., Pe me v .111 ' •. ow*Ng "PI''Mg . , \- tri i •• f . P.PM P ...• , ,/0 .. Well.1119911 .../ '1 i WI.1 / - -'-, W. : MI.15 't/ b r•1.. •••• 66* IC. SOO PS( umeiiiiilL'''';'-' I / .- . j•17,_-.7----1- lei : NAI:d.i.,.9...k.., "1.9%0 (PIS PILL'I PP PS) i , MO a .3 ., ....,....„.,, , , ...70F14/1 . .t., .. Al ( . PP/Wok..ei mown • i 300090'7d/,J3/.02i) d.3,1 1 'OA.1*id 411111141111111111111.1.1.11114rilf t 1 t......- _ .,./..,, -'119.>. -_ , 0113 PPS PS) (L013 PM iPPII PS) /pump p0-0019 • *IA .01.P.0 1t \0\s „„....„.......- t• ' GP!AM \ WM 110.9 9.4 pn p...4.r..441 r 'erg A 104 I P,fru.# '-•Z: . -tiin;,,,,• 1 .v6.9 • I 't 0.ti PPM e1 l5 t I Aim .1.1 1/.11*f4 1,/ ,-t-0--6-.6-;.6,.1N---::` rsea9S ttaO.7 h aAffr a.1,lam ', 3'049t.,/'..')';"•.t-.I....l4.l.6-. ...‘\ \NA 30 NIPer.1/,,J,si.AJ,SO91HP03, .R30S9 I 1.016 ,.. PON . / / / i . / / - 0-.7.01v/3V•SA 0...V.w.P.6,•s'(61Ps1,0'.oi 6rc.,sP.1n..,.1-,6t0-°1,o16 S..09•1I.oPntNPV..s5Ps91)) II •. ,,.- t)\ ._ - I 1 __ , . z, j I Connect lbw War w. 541e ' ,\k4 1 • Oiler w(fin r tsar a eld babababa(fw er.1.nee aw D end / 1I Sec ass _ `-� / re•al..l T - ^ , e•Gale valve I e., c� --2r / a.awn INOM . • yy u v e'DIP.•ry I aRs.. allmisting water e.nka b ,I •7 ROMP j 1 - 4 de / nion.a..Its dean.on SI..l C2.01. I (se.D.IaA,Sh..e C2.m) _L^i 1 - a\ , •� i ® * �"9• 7N614P uift Z b caiNrvclbn b(.,l blGar.raelIng alNM.a 6., I 1 �. .err /' r a7 bad T.t e an sn..e GAM �/\D�a i / ,.`` 1,04 -^1e)-.. itit 3. Pale�a G.r.rol wet.22 t$5 an SAwI 1Ir [[ f`W�^ m.D1 • I , ��..,,qy).��L a _. \`\ 4 6. .. Paler Ia A66...nl Plan en Shoot CA61. I ' r_ 1V!" w Sta.0.00(A..IA)- Au I - y ,tree I v �ew.vant Box I $ � Pq.rD17. I / _ / _ - - I ) Prop.e'DJP.W/N 1 / • KI �> 1(see v.. n.a) I QrxA*Mb. Y I -'II I / '51..1.21^ ra.5v was I• I 1 LOT I, 1 V 0 i r D.LP. I LOT a • 1` te.s m'I-arsr I I F.on..., I ` LSj Li I 1 II/11 I SECS lM i.® �_ • p C ? nT, I -gee Sheet E. / 3 ' ( 1 Y '•[ ROM I --octalune I Plan style r.er 0..e. 590 vij j: I I I I I - - . _. 5eo E 7 1 580 11. I. I. /LL L --- 570 . \/ ( _ .",- — 570 ~� _ t. t ---_.114"1 �` _ - 4ll.r! GYM $- 5�550 t �•,��- - r/ - N _ st.O. I _ C 540 — PRO.r DIP. -E POPx P•op.6"DIP. - -__-___-__-- 7 SIO Wafer Nab sr. Wow Nye _ u 0 520 -- a - l l - 520 510 4 '9 _ .# " I I ! ___V - 1510 0 I 2 3 e 5 Profile a ee w >6 a e Scats:1'.25'eo.r, e— — 1'.t0'v..• MINIM ORMRC SCALE:r=25• (Mrt.) MAMC SCALE I'=10• amt.) EROSION AND MOMENT CONTROL PLAN(R'P0201500053) µ m _�p Coady mecn pow CA.A, A�NIN m e NERRRl1ER WILL WATER MAIN REPUCEMENT PROJECT SHEET Service�� �«m ISO _ i ��r aRW55017: Michael Baker Mow 1 � a (PROJECT Na mn-1q ESCP ,r p INTERNATIONAL F,<:�me55asc0 PLAN do PROFILE, ANDREW LANE } s.•ems..:• � � DATE NOV m1R ;ay.t j ,,,,,,,_tie" STA. 0+00 TO 5+00 22 NO De][ . S lOr! NOM "'EMS U" QCRd WE ' -- / I. Re...me al onelnp es.eeek«In / /0510 / oun.lan«.MI,In.decal on SAe0 C2.01. I 2. to 00P*ceen. bl✓to 0.nwtO Nolo,I. / ].t 5 an Shoe 01.02. ' / S Mix Iv Gone.Mee 22&23 on Shoe 61.02. 6 006 / /' 4. Re.In Abo Sonmanl Men on Shoe C4.DI. `may ' ' 0 - e See4 ,y.�• \ / /,, Anso - 1 `c,F.r --_ / cenn«,Nov wer McNr O4 .. '....... ` \`\< '` _ . s - (Soo Note I rN5MW).) 4 ` •. - 99EEVV � { Om 5415 ® - '- - .1 >�V'^ C.r �� B.A.S.IM T« NrdraM A>r rn. }�1 J rY �N. S �" y i'Gal Volvo It See SN ♦21 DdhVaM a Bo. i LE i•DIP w/Y t'4'RedNer 'AMbOEn L� /r•m.y 1•PNy./1 / (Soo 0eeR Sheol cz.or) Type A•Deed End Ye.-011 Aeemeh J E®Prop.1'DJ.P. .. ._. . afer \ / /' w Main ow \ \ H o moor G SECIVI swhr Plgn Seale,.t3 Nwc qir 560 5SC ---- - ' 45 y ~J 550 E. I. E!�{ SAO - 84. /r 510 f/I -Pomp 0'DIP. Sx0 __0a YaM __ Prop. . lerom -_---- ___ 510 7 510 -_, --, o —. Rwne.y — j AS MYY NO -. -____.--- -- E50 I '. = t !- 1 MO 5 6 7 8 Profile Seale:1•.25'sou. "— ,� ej �a � 1'e10'Yen 0RA055C SCALE:,•=25' (INw.) GRAPHS;SCALE,I•=10' (we.) EROSION AND SEDIMENT CONTROL PUN(w'P0201000083) 3 ServiceAmesar r_—, mom wow R •�1 YER W THER HILL WATER WIM REPUCEYEN PROJECT T i�`�< y+7_�K 'n )•RO't S'd'nI (PROJECr No.2017-I1) ..aL ity a•ee ICL ,? 'i P, : tNAN � Michael Baker •ten 52 Emoat ISO ,� ,i 1477:q, INTERNATIONAL Far 0571MNIs113 PLAN & PROFILE, ANDREW LANE ESCP f SwiOOCa«.iq —� pore NOV MIN ;��� pow D.-.i+ ' , of STA. 5+00 TO 8+57 23 • ` loreI �-J mnz 7EE S -WTI' OW TEAS.at-asr / ...&Oft _ 1 I / is 3H3 I �_ ��� 9s NY fwf R.I.rA D.I.I. / ( ,., I 6.6•s.FM T» /iiv 'M / L0T If 6'oat.Vol.R Box \ _ TFA,n.[-NEV. 26 LI 6'D.I.P Y/w - -- 4� _ j I Prop.P NAP. 11 (s.D.lon,sl,..t Cr!) ill A " • $ f e Rol \\� Older 11r1 - - - I I I/ Cenn.d N.wales wb E I 1 ---- '�l , fmA .Zs�R. ( Moto ,s») I b V.Water Sank.(T7D.) 1.y r psa 1, T. 11 ,i._ / i \If d - - III 7 MV S: - - -- EIS wc:. E.rM 2) 1 ® 1 i ' - ° 1 xy.. SIG.040 Nam CL)- • / \ ' t L 54 7M S..25.71(C+.rA.K)' S' // 6'CaI.Van.Re, 1'x Tee ;/ 1 ,A/ 6'Isla AAabr 1. 1 -J .�� ' '�4 EPw f pkg./ 6'00,.Valve R� N j-------- ` MA� ]m'A'Dsd CM F l Nw-0R AsnElr En • 1 (S»D.InsA..1not) s s t1, �� `\ 1 1. Reconnect all..i.11np.al.r...ion560 M accoMana.Iln,M deo,on SMN C2.01. HU- ra Prop.R•D.IA.W/Y \ p •) RIM I NM \ TEAS wet-R65^ 2. Connacht o.rh 0Il»I.tIno ali1M,awes,'o (See SIrR1 C1.D5 ( ` IDI R a,- ...rno.non. R.1a to c..,al Mo..6.7.R 1 6 .RiSA7 TERS PG-aesr I TEAS NG-NEST' on SOO 61.02. ` 3. R.ra 10 Crrwro1 wale 22 R 23 on Sn»t 01.02. \ P E. Rel..to A600.nm»,Pon an Swot CAW. Sale 1 A25 Han. 600 _ ; ___ ________I A h A-1 600 • i L • 590 9iL--ry l'-- - 1L ;� t 590 - a L I. LA1 / \ - . -- 580 ,Ew tin.rl lwn...Ai ! AL'''''r Pt.us...) 570 _ -. 570 ____T` AC IRA OVP) _ --_- El MOO - I A! 1 -sau ..aAn 550 ------------- --------------------------- 1,P1op.leDJl.RAir Nolo - _ 550 • '- I I520 6 7 r fl Shale I APS Hors R a 76 6D 10 !� 1'.10.Val ORAPIIC SCALE:t•=25' (wan.) GRAPHIC SCALE:1'=10' (wet) EROSION AND SEDIMENT CONTROL PLAN(WP0201R00083) MIMEO 'M +. 4'o MERIWETRER HILL WATER MART REPLACEMENT PROJECT SHEET Meserle Cony `••�ac 7/2 BvNia Hauck Suite gal i R DaAA. 141 y Sa m S, I}»cn V.2}Ai' (PROJECT NO.2017-11) Service���,,;a„ =�k1,Q RMs0241 s Michael Baker • ' ESCP ��E�R�E 1J Plane 17371 Ml-A]7D 2 °EOtm ONO ; ri .wale INTERNATIONAL E,.:am.69nsn1 PLAN & PROFILE, STOWE COURT i s.aRR�..aYc. arz: 1Nv201R ones -.3A' ter' STA. 0+00 TO 7+09 24 MO a7E r • e _ ! �} ���.`�..\\ iDr. I lows 1 mre 1� n; �y 7 2EY5IL(-IIFSr i 2EM5 Mt-X[ST i 1£IS iAt-ME•' �ocemsl ml vminp r0fir woks.In ,J Rns F'% occordanw rHM IM d.bll.«Sheol C2.01. Ot 2. Contactor to wrtty all«twins Wtml..odor 1 Cll I ],t!a SM.11.1.at to Gaal Molu 6, Sb.1♦IS I 3,. Rehr 10 Waal hoer 22 A 23 r Shoe C1 6'd'SrIM it �1 I 8•Cal.VaM•Bs. I C1.02. 5 If 1 D.I.P.W/Y . blr 10 A6andonm.nf Plan on Shoot G.01. L+ '.I E X1daM Sla HN (0r a _ o I (Ss.Dealt.shoe C2.01) no Sedum 1 l SE mrnno ( 1 a re. Pd r a4J i ^ n ...- Flf A ,a.- .- n.. s.sw`7 / 0 ----.--- '2'..] J e.ee-*� 0 0 0 •0 4 • v'7-Y� �' (.owes. :� �.,.t..�� �.J �. Par.ErWls.li 2 � rfr --":`•Y tP(2'3, A- -----A -.. „ , ,� . - �'',3�s S.-.,y:VL•rner bo�G['-, -. .. / 1 ,..l X.CAURr(pies.) . _ ;. ... + 4 tern a(-CS Sta.0400 moron a)- f I^ .• I 1 1 o r�•-+e NM Sta.35463(oeene.lM N.) ( _. - _ _ - l We. Pl 4 D.I.P.DP s , 6'rasa AdalNa __ 'T... ..s?,. ':7' W`'>t et 6•Cola Vol.A Box / .ors. i ^�, ] Ora /y � 'l_A_fpA rt2G9 ° r W _ y I Prop.6'D.LP.Will � p « ;r ee no.sere `� • -;. �.. (s«s.N c1.D6) sb s11 t r �'� _ ] Plop.6'D.I.P. Comet Moor Wax Motor 1'223P IN.'S _ Pi.. .. V v Wafer M. b b.Wes.Sonia(Tn.) \n r`^r J 'I Y (Ss.Male I.Mb$iw0 ' : a4.ir 4 \ . • � ✓ Øfcoz / ! (is� I �� 13 ��rl, e- _ Al � I ',Mir Y '.` 4ib.,e. go.son \ .ec« c le.. 4're Nlal 6 1r`\ eif,,,i "-, P. + $ Wow rpm'A'bard End `\P. 3 M-011 New* P -- (6a ore.Shoe C2A2) / 6JL>7 1EM6 K( air �\R7(0� lets M(z Oar \ Rl'2o IL1K M2(J trsr ,C`V i� r.AI 3 Plan Saab:+.26•Hors. • 630 m e st - i I 630 610 I Us; L 610 ry , ' 1 ' l.r let .Ear ., re.erne) r 610 -- RA.a.++N L (2 ui mi __-- V3---'610 590 in _---- SOD _. -Cs Brett - tn N R..M4.11 I1Jr..('ne+es./ I'.-- ,1 ---- .-It r NO ,--- 600 - 1 600 580 - . 1 380 ---------------_--. ___- I a - I fee Ruum Prop.Y DJ.P.Wats,Main - _ -_ Prop.6'D.I.P.Water Mak 590 -- - 590 570 - �-v_ 570 `o 0 2 580 - - _ --_.... .-- _ _. ---_- - _ - ---_ _ ---- __-_- 580 560 _-, -- 560 1 I Pro'4'DIP. Bwtaln WRIT Yob q A+Me' c I I 550 570 I - - 570 550- 560 if;yI: -__ ------ I 1 560 540 I V' ? A_---. 540 0 1 2 3 4 S 6 Profile o n r 70 0 10 20 w Scab:1•.25•H LiW-- �^ I.-- !� 1•ot0'V. GRAPHIC SCALE:1•.25• (Ms.c) 6RAPNC!CALL:I'.10• NM.) EROSION AND SEDIMENT CONTROL PLAN(WP02018000E3) (Cady LEW. WOW 4F '4'e MERIWETNER HILL WATER MAIN REPLACEMENT PROJECT 51t¢7 6 Alcelllmlt r G`�<< .,A , on er161.Rmd Suite 4ao (PROJECT NO.2017-11) E S C P L Service •� aew. NR u 4i. 14610R4 =_ Michael Baker Kryili.O«cA 3'A 214n Phone 057)1634770 V •n mars 1150 ``'4k `fl H;a',''•• INTERNATIONAL T E N N A T I O N A L Fa.-(r5n4634503 PLAN & PROFILE, VINTON COURT s•Ya6 DM, +WA 20+6 *, •�a3• 4 ,, STA. 0+00 TO 6+27 25 Ma DAIS — i --'-- = 0443 I. R.ron0M all Mhtirp valor MM4M In I 1 I j' t'.601.Yoh. accordance Oh ih**loft on Sheol C2.01. l I ., 2. Contracts lo verify all•,i.linp Wages PM. to conal..c5en. Rohr le G.Mrai Nek•6• 1I I ` Prop.12'D.I.P.Water Ydn 7•&6 an Shoe GI.02. �lXR 1,l 3. Pets to General We 22 A 23 on Sheol yMcl .! SI..0+31 GI.02. 1 6„col' Ittt., 12'IS'Bend 4. Rohr to Abandonment Plan on S6•H C4.01. `r 1 ' (Ra1.a.Rqulr.d) sien •� �' go.046 5"455 ConnectIs Ex. / k r� ./12'2'loopg Solid Sleeve LOT, V ,�- 10115Il-Rcsr Neilrg -Ilk •• �^ 1 1 ��� _ N6VE Prop.12'DIP.Will r� (Soo Shoot C1.06) _ I 0• ✓ C� Mo. W(xakhom Dr. 1 1 y .. Ste.37.45(Owens.%Rd.) `) \ � ' /' •i5! IY.12'Tee \ 1 I t". I Mo.0421 Rap.6'DIP.Will \ it [Mown M.or R•F.d)R (Soo Shod CLOG) \ .,' !CT Y LOIS Ma SEC/16V TIE: OW Plan Som.1'.25'Hors. 640 f' IT_ —.- 640 630 l = � E= `' 630 a 'n g E Py T.6 620 _ /- -K+- — 620 610 ---- --- - GTO r 600 Id M aa..ao lsatbr a 360 _- Es 11'ROter Man 510 Prop.12-DIP.' Wa1.r 71 560 l 560 570 Eg{ 570 560 g 1 6, l : 3;_-_ 560 0 C _ — __ Profile GRAPHIC SCALE:1..25' (H,M.) Seal.:1'.25'Han. 10 20 1'.10'VM GRAPHIC SCALE:1'.10' (Wn.) 4 EROSION AND SEDIMENT CONTROL PLAN(WP0201800083) .`---�-�.�6.. o66w16e ROW • A+.' > MERIwEfHER HILL WATER MAIN REPLACEMENT PROJECTSHEET Mi�R�WWI66� i G < sp,r� zn ealdu Root S.,,AO PROJECT NO.2017-11 ••cp u •ty GRA.. NL Michael Baker Y �hvAzun ( ) ESOP Service f'W • 'A., 0.97001A F. 71757)4634770 y � ' aEaHu RN a s r a"K)ig INTERNATIONAL 6u:nsna63osro PLAN & PROFILE, HOLKHAM DRIVE 1 S:06W..0 0A16: 0 2016 0o,-.a3� e'+a/,,: STA. 0+00 TO 0+36 26 Ra GATE 1 SaMVcNV1S WfVINIW 8 S310N ... .. •' 'Eby SUN NON 31r6 J0s-4 } LZ 10a1N00 1N3W1a3S )8 N01S0213 soft/ su wd l M 011Y N 11 31 M l I1 a n "M 05tl mwc I d3S3 OLLYYvp ILSLI.1.wd y a I I w 1I=w IMS;I P -,+ _ w�w� I aea vn y>oe•P!6+s+ .12 @ 8Bl�1 x 1 i ul a•'na (II-LIOZ ON 134444 11 u ..s 3weN"Pali Eli i' K '�`*•5,j 13315 103fOtld 1N31133Y1d3tl NIYII tl31VM PIN tl3M13NJtl3n +a 1111'43• �;••• 4 MON ii0�0 (fg0008I0Z0d1A)NVId 30111NO3 1N311103S(1NV N01S083 fA6IIVOI WW01,139.01M946.41.1/$1 103.0..OMn30W.//PIA) eWM w......o c....'vaw l0 4V644 W.O•Maa W NOW 4wwume.WM•Iwwaar '1 v.13r1•' •3l ZI 031r004r 3N Ow 01 i1*0 WSW Ir316036 a IO W° pa ag,oat,laaw•w'le>aAue•W,o woaw!now.V.W.Jou 0* ',el..NI W v.P.'o W MWNdwwx w YaW uonow4a•6 3 IWO 34 L 19.03 19 01311 3S NW 33MY4W 111I N PTO4.11 3Y TM N0.IN W WY1dw.W 11.4.....0.W w w pow.q pow wawa w v o[1X4W 4w.A Pee u04..•wow, wow..Pen.... P a ww•w w.paw^411 q NP.4 wMWuwa 41.ed0A W-waw.I 644waw 01 wan IPl.elol v o.11.Mw a.4 W.P**9 la, d0...Iowaa ell, 4o a pw 444.. '4wdwd.W-Ilia r 4 6uI.o11 >./O 4.4u1w1w4 Iw W 4 PP'4W.o so.u q...P 0,'Pw0.41"awl..IuweawP Io.adw. w. w a p4Wau4 W w NOW iu•wp04..P IOIwnw1.o Mow.a'MWIw WW......4...WV P.•44 4 r'wen Supdw 1 p4wwdo O 41 Mond w aq lapµ.'a...W...ow wean.awn Pa...a .f W Woo,pew.r pop.;W Ies wwO4Wo SW...0 w41 1..13 '3 1.640ol dame,a o1 10'410044 WI "WWau41{a 1Pn nu.,w WWI W YW Plrle4 p4.4aa3 v load 3•uwa wn64p0-ewe.Moo e a Paar.P W iw.W We..W.aolpo 0444 0 P P...*a Aw 4w W dol......uow.w4 law WI...MWa p wow mow, 1 .1 10 wI nw6 cos....... Y • WI.W a S.W.1............III .N ....OWNS P.WIN w•/a4d WI o44 p4o ua{0+bo 1.....WO 4a4w W.•a1.T+e4aP W P1.14.•441d M a1:4y4 p :4Wwa 44ealw ewe q w4pW W ul papa 4W01.11W wwo w•4No'alai 0 WNW.w1 N410241 3 l.uuo0 a4gwo4 64.4.,w1 V11••w.4ow W1•wW w IW..e.4YIM P4n4A.euf.91 6ulwa4 WI a WWI•W4 w4I WI11aw41 w411w4 a.Rwd a+dn.". yea'4 s04•+'4PI44o 16a 11"...4 a W44*6 11.0P 44 N440 w P PW NI•a IIWs WWI.,46.w W/ :44M 409 6 4ea 4 wan,.WI 4W10 we,wannanea 6u Pw''Mu..WNW.4 a M6<VWP W W1 4111w1...Nu 0 man lip w '9 4l W +olio NW.....110 M W 1w••a«w..ale 4uW Iwo PW•4'SI PO4w1a Puo 0.0•.0 W.We.4ao.to.6.10.P.41aON.. • 0 46.0 .au0441...WI 6u....4W4d rl•M1••06•w ow.•11 Puo ViN Woe.6uRr.a 6u4IOWd 4u.4ue1 'I>u1 Wo'4.Ia^io..WOI 44oaldo X*'tl v{4aWa 10 4mwo.W1 u.e 1 41P.gao.{ ...1.1MI44d 'P 4111>4 W,10 4w ownµ •wpu e41 4M4 W .0•e'WlNpol 64 e • 4nW>4d ..11.1.aW w•awu4ulOu1+ol wM o d]53�W de u101aN PM:W0Y P.N..N 19W I....*MPu•uw, uglw44d Xo4 puo W0.l0alw•ya lu.1u•Mwl 110w 1Iu4 p Wo.uuola Wawl .µ1uP«de wa a I µµdo• 1 p Paw,.PWw4 y.+o9.>Iwa I+0.Wu14 'p*W°W ow-s4 4w e.04d a1V w 41•1p. Puew .puo 4•Illd.wool 4uo1nll0d 10.61pwa.lp WI 4z1wu11 a 1>ele.e Wow aW la u.NIV44 awn.,•low n• w u1•14 uw1 No.W]IV.Warwwa M wow W law aa+m>rloa S.O wYM'[I 4!4Wwwela µYoe.•6WIs4• o P1aW W IIW...Iwo w6el4PAV 14 '3 6u1Wn44p w+01•W PP 6*W4Pa W.•61.111 4 A.maw... an sou ...owe 4 Pup uo114161a4d of 414_u0 Y/4.'w1al 440 4wa wow...AN W N au4100 •4a41 •Ww) w+N4w3•149 40 do441111.q 4444^lal0 pool 04.ued.4 W.e4°e14.4o14 woe puo'4.....1 N a1104.p'4•00*400 lµwewdwl ea•Xw a ua I au.44 TW.e IIW Iu0>11edo o.wnoa pee,. 0 6uPIW IP^pI.Ip4 u0 6yp1.4d wl•141tuWw 4 4o1x4uo3 Wl'tl 'wp'R4W pn Il w•l' -pow•doa.pu01•Yawl'wlo4 uollow., •W '0 4e1 Ps.1 W Any qU uww3 1wop+olo>we 4 o uaw^4auw• +4{ 11,1*W 44o41nr '.40490 4 DuIPU^4•N01+4ow 64PI1^4 I 44naads4•W ow., '9 111a a a e .00 w.u.ap Wnop 6o0 161.......1 4P. 44'u4Yalu4uo>6u1'1n44444 .4*4*4 n W . W.+45 ann.s4P14+ea1Y WI to pay.11 Pilo Pu W411144a w••4 eu04 -.4w0.woo 4e444 puo • ao4 1•.4•'6uwa8a Iluw4d 14*4444.- • el 4ep pun, a 40IV•w .•Wd 1 V.4N 41Mav We 4 4441 W..Nw•44 aW4 4wpw u4W1 ero4o so40+410 Pvww4 W Woo low wawa 144wNwa pt.uaa4]'f1 4a14•+Puo 111wd1^4.w041.W4n11W to W4.V..• •i1Wu1, 'e J..1aW4e0.Mo4uuW•luw.wdw Muw4>1a uelMul4wea P eR4.d ">•3 al w4y W pya W11nweW wwryb 4 wawP•WI o 1. 444Jo 10 0'ZI I/M:4waY pm pu*pod.•a no44 1u.w1 • :ol.....uo1W..+4d WUMod.u1OW1041 Puo'00.44d01 .1 •pw-4w e a "oN ow. • aW al woo W-w1 61+I4.a.•W.NwW4...Wow sW 410a u1 P414.u1 W IM4•0u1Wl w44M P.ddw1 'a4*D(0S)H,W u04N.P..w.4 a4 no.wn o•w No No.., -am0441'w01••p ag041do 41•1ao wl.www w/.•.4•u4a 6Vl 'Z W nww41•W 11ww Wye 1.....1......11 swnw P.Y!•'.o NwW> Iwl4Wrd 4o.ad24 P4rvw.400 pc w•N�a MN.•Pn4W4•-0409•w•4P 1 4N40VIn*.q..5 4wWJ 4w4W4Y s.14 to!oro4d°o•W1 W14'.Mldwoa WIN.. W 41040 llww I.V.we4,W a uw4 44-44 P 4.P.1 4w we.0 e. M ...pa. ol•.usa P^4.wa 4 w'l a10.1.1....1l1Wo u0 W411M44 p-.4J all w 1 1.lion Asap 4n.o 4W0 -S'3 4 u4y0z1Mo1a 441Y WI..4P 1••e.11 le µµlb"a04o"WNW Il0 ...wow 4 owed,'ow sou ex. w44N4P.11 4 ..°"^'.we luwdg4.. e w TY M.PS w 44af1 Ill.pe w4 W lw pee saw.,maw Iwwew Pue....e...0.1'ZI •wwa44..dde WI PIP.w41P4wa.1 44.404 14W 4 rIw:w1aY 'never,ow.a wow mew,r pew; 1503 IYNOLLpOY OM 11 ONY'4013]dS111 1061NO3 1N311035 4 'NMI.AIMP n+W OWN*P ..,a1•.....1 WI wV.4411P44 0 el 44 Wd.o W14 WI....-1 -Z'3 6'44)140 I4WN•I.1W w1tl..u..0,,4e1w Iwuaa.p•wP4-Ia.wwa WIw ONY NOM013 3N1 Iq 110U3d5W N0113MIlSNOJ S.W1eN10Y 3]IM3$ puq to W(l)wP•WI al IW1 w p46Puew 4 M4e+e V1 '0 wow,en IIpW.Mau..Some.wenn op,.n v.4M 4...Weµ 11'01 11N103 311Y13/1Y 3111 AS MISS33311 0311063130 SY N0 54101110103 01311 .4n.110 4ga410o3.41 '4 _ Yw4 W1 o Vol W1 Mww•P P/N:u41>. p4Ya.d W NO 035V9 031111031 5Y N0OY4113111O3S ONr N015013 1N3436d 01•511YA4 Wau4I1w wl_ s 4 pu pl µ+el.µLey a P.4X444 n,do4a.a Ws ug44ow 4W4o 40.6wW4p•pa4W'esl Won o w41.daa.woo.wu.4P, '6 3N1 NO N.ONS 10N 1M 40Th4333N 5 1811441 IOYL.r03 l4M(MLO03 ANr I. w.41V.ugllpwa P a 4a4.Pa w wbw 'I J JO 3311,311Wn ONY NO1031V'1511 601 316KNWS36 SI 1013VN1N0]3111'11 (4.P.W1 4,..do1..•0'o•un'91-0L11-SZ3YM•P.3 w1•4e11WPY P1416414 :11W0 P.....1*WNW 1........... %1 w. ..6PWl>.p w.4 .W S1N3N13211f10321 £001-S l 'ON Wow.,0144wa N.w!.4d.e,w4Wa 644.P41e.,44Sow1•e N '3 wow way,4 w•aa r wnl, pwP4>14 w 44Ww4.lade. o .Aono w•Noun,• eon..d w41Po 1w10 Nowa.Iw e P 1eW AY �1 4.w..e Wp PP 011..Polio..no n Woo NN r ma ueop•I W.1e.Now pewWwe3 v 4 u Po6W wP PW 29 �4PS.41 *4 an.wdd4 4o y6nwW OM13P1 30NVOIf1J NOISIAIO d31VM 03O "o.>11i•nw1;q'4a'.. 04 Wawa."41e.11 10. luuey p+W0.1 ca(4 ...ad WPM.Wet. P401PW WY-MRwd•p 409 14.4 paw. WI411Vo4:°wNau4 hu'I".a '4(W1aa w)W.•0d.o Wall)W now.W1P.Wo 64mew.T w41 w4uu"ol a.u41 10 m w4puoa ss 4 WPp Wo w1 a o u1 OW 4n.1w4•VI 14W .XIW.n PW I.e.V4 IP....nee O.III.Won.. .uro ea.0.1 mow 44444 IIa.Mw4 64w..W PWw4.w M4 eedg5'.o140r ▪mul q 4•.•4044 44 Poo la^P Pue Pew la a44M w41"4o44w4.p 04 w44a 4w4-eW o Mew^I SW 44 P4o 4 aqua,eat IWI..0 Wlawwea We.....W IIeW aWW We PJ '[ ue4a 01 41144uoda4`•. 41w3 VW...•q4.5 4una3 evoked..4 I "6 41 dw..o w 11Ia 44o•uua4s MN NPW o1 11u01.+o44-u4 0 Io .n "w[INP.1 41w4 444WP•a 01{w4 •W 4 W441we W IIW,wuue4a T014_u.0 p44w1ww 4*W44d'INY (4)Z'9 .11 puadw. 114o11a.441PPwpp Nwru u1Pppuoa Wan 4�Nwa W. 4m4-1,4 lo+lu*a p n V.441w11 Iw ^a) Yu04+0 PW 1w0*W I. I0 Pelpnl4424'4bp114 a o1....Pe.I•X01 Pee PON ow 1p4a.o1W4ue3IW1 "61 .0..0 4w a4w0 IPAµ"Pow n, Owl_5Z o 44 I044 w l0 4M64u1 IPW4^••4 0'4.0 W IN 'uo o 04 4.440.44.M WI W. a pp Ww e p'NOW W+IIo1n0 1" •6w10p a WIN •N•10.. WI wo�P.MP.u411.10.ow.o so op, a, a uuge eon-o4 0 to wn•a l4 WW4w w.. 4auuwa 14ryW (°)Z'9 awe pp,M WV.u1.w wewep.a O.M.el•60.04 an...aW'.W w040*4 4 nee 14453IMOIa luwouub Dw uollwl4d 4o4oCuw1.V1 4a 1441 ul 1w 04 WI la .40ou14p 6W^4Wuea Pw 0..11.40. 11 w 1 b a 1........ 11•44I4uahw a1 4 M*W43 we, o4w 6gdd41 14•wPw w11.w1w4A W+No...011 Pa.,..O WI u1VN•aWPuo i6O1114P 1 all DwW ww•1 WO Poe PW+^MI.wall llouw W^5 '6 4o W[M.W IIW..pm4P14 6011..+W10 Puo II•I0•wd 1.15 -L 10 WIW.Y1a o40 Wol.lalal WI IW W...T NW.WWI..•I/ '131 el.W 41PP o 40.o4e powd w4{pew. pow 4w4PK '9 0......1..11.1 W1 ul wow W 1P4.4bp We 4wuo4a 110 I.4WS•VY '6 woo W.I.141wa 4w IMV4 n,o eau pop Deep e*14"44'lo W o 0 nano eft.1 pW e.V Iweow Wab.a Pea. wWM Wl p.140.w1410•eola 'u1law4na 'pawn.W NW. YIN:"WY 'unM w OW w 44 P44..W a woo a0a.049 Pp WI W1 44•4n4u W W.P.41.1W.003...41041n'/a 440 0 H..0 4WOwp4 le WI lP 61 ue14MWro Io 4 44*04...41 4gas 4....W 114- ...101 M. wp44a WId.o e4a.111 4 1IONW W1 w.•a*w0 4w401.4 44Mue.'w4W 4Wn pwW w4n4auw P.w61•..W PW 141•04 WwlPw W0 aw1 Iu44P•S 'I 1Wlgweew•41 wo 49 44u.u.Ip••to Pnuwp Pw 4•q.•p wlu.e 404.44 (d1a54)u4e*4d W4wSWM meoww^4 4u14N WI l44 99-0L9-SL31M N+o."...I p4LW9IP 4 Mow 40 WM wW.o1 ..0.r•w W1 I.aa.l..p.0.WI WIPP.ol 4pd4 Wow,.WI 'Ww 1olWw W w 1w a..P1.W nal..41wn6.P4 4W YN.1alwpwo3 'N w omenomenmen,604e...oWw-uw 4 IeMu 4P 446o. NW.a4 NW :11.114' 444444 moo ANWPww....0 PPo.....W O I014w Paw 4.14o W.'4H4u•4..ew el.,......a..•IIS wow.. Pe6.4 wp W 11..44 1u..gop4P.....1 1104u...w.ol.Palowou0] "I 4P'.wT aP Yam wNw14 Pe..a WI1ddP 4 II.saw,WWI., "S W I a4 A110P w0W.u1.4P...P...404.wow..Ia Iu10P W q w .u.4•I4 .S •40:'a1 'ugla^.14uoa y d•14 WII.41 Wino)won,awn..4*64144S R41.+M W1 M 1•-eL90444046 Y/N wee w o.4p.4-uoW l 34* MI wawa, 1/4a4 4•.4.+•3 4 444 5 4«4 421*41 4 r14:.4W., 40 w•q nW poop W PW.wnaWw 144144 luwp4 WP uga0+o W 'I VN4 ww444(4 4 4..WOO"644PI4P-W4 wall wen•Ow M1504 41a01••P.4µ2404 a4.ewe+noaLow 10w..•W pee eye 4•4]W3 Tow-leeµ 4.>qe w4•ww4NaP P.seep.we.Iwamoto Tea N peen Duo 41.i1w WPP44M W.(WWU le wJ W1 M'W.M*Zil11-1'Z9 I)4Y Iww'o4O1 Iw 40 4d.z5oa W4T wueM 14040 6 44.4p+oa4{W1 4a40.a 4e.w14 W. Su14N4p-Pwl AW ul WO WU D P 4".00.W IOW 14.41P•s awl a pop.. wow,11N 4 4u4w...new+44P•41.wuMd...W Pa1oW w owo4o4 u w4S'4.11.W4 Tr44*4 WNW.41 W.4440 4wx'lul uoN... ow.10 WO Neu,wpm'snip..V.W'bwl P.w404 1444Nr5 'e 'p01.W q 4o4e W .a41 we..W moony{0 uWIINd.o Ay.•Yl Wo'6u ' aoll al14olw Yow wNwwro 4W Pw II WI 1l a ZS:SI'11-1'L9 I l aweuwll'Y..41>e.oe -IZ N w4.1.4wM41 WP4 W.4 new...woe..4w.011 Owe WIop64(04 WWII No.1.W)WNW 1Wa wawa uolozllaa4 pw 4PWw•le.•41 .II Y,OL'4 Apr WM Wo w w4.Wo auwe.a4 'n Pao'111a4..•.4O W W a•mua41 a nip•6w4T.. 4q.•.. ...NO I+ 401 04411144 W 1 I. 4.1400 64faw,w4Yuae* 1!05 a(I)wo u°' ...0+w lu...op Ilal W g4o IW1 aw4o el owl wla4wd W YW e.«.ww°e1..T wwI uglWep 4ow.w•p4o»µ.era 61 P.P 4P+I .to'Paul P4PV•W I.(eras W N 40 9 4IKO Wlld°o W 1Wa 401o411444 4wu.4+•d '.4Pp(II)...NW u*W+e0uel+w 10 S9:S111-,'Z9 r K:S1'4-1'Z9 14 Pow.P4O61nwo.c.1OiMInW. 'Z4/4e1 4444J 11w•T•S p4a w4w,J 4 4.44 ..4 9 *0704PN P4w3,w4.Pe 1 p•u 14440 0 wowµ.04 n0.s 426 4•4WMIPu^u1ou44 III.4a10 w4'Two 1044 P•a tau W 4a144 D.+o 'V1Soo 4 W44*0 sO 4N4.W.1Dw-1r4w 4P Pao,4a,aw n.,4p o1•. :4q#4p '4Ty a*Pw p4o w44.4.4wn1 µ.4d 4 W044400 11 ...W o P.Won.a.op Ilw Vu o4 14a4 w.11Vw N+o4>a.44 P 64.01.44 of P41ddo•4 w1 44^w...PIMP.MPola II. '•N.eq.le wan.44O W.4laodo>eW all We 44411 441.4 W Y*W wp'uo a Ow saw, 4Ww4 l0 4M1we*p Del 4.44 6uwens.woo 1w w4n41p WI ^PW11ww 0*40 9 a W euwd.4,0c..W Mw.44•d lND4w W. w 1N W..Wa pu woo.+onus.lee Weep..p 4PW ewer•. 1.6..Iweuuld I 'f u0 W4.N401W•I•pw6 I.OI+4110 aPoP(L) 444 uIWl4 aw4o PWw*1D 4 W 4e 041 e4e 4un1o. ..•4I•,P44 40 4 01 1.1 M1wol Woo 0 Y 4 W1. pbe41.W IOilW 3 1 4a wWOWno W..Wp whin.wow. 11e q ueNozlp4.Ipa 404W0.1 40 luwouuW 4dd0 IPVa 4gW4WJ 1Y1 'f ul 44 N Dew Wa aW 9240•unW 11Ww aW a IWea al 1Wl Ww 40 20 +16W w.n....WWI.wan 4W 44M 40 W IIIP. 41a 0 44 4140 4AW '[/40N l4*J I4N.Nf Poe w o e el,...0.4.e81, 0o IW 4.0M1'IOnuo o.4 all eon p4e09 lea no wonder"µ Ono,..01..'Del Of WV1M w•ws+W YWa wan,141u4 W.W.I Pue uelwe 4e4Ww4 11 v1 •"` '44 wM4d.1 w41 W1.ewo4 NIwaI1u4W Xw we.wo.w W el,Yu w U 1.WOW4S uol••0 4unp]4164y1AIV Wl Puo'•uwllnB • •...poop o a•.el Sawn..4 w4 0ll Xwd e11 el p4• uo W:d..Ilw No."WW1. 014.41 no...we 4 w4 WI All PalYa04•l Io42J ww1pK Puo u01•03 awoallddo .111W M4n1'1664P041 • .�p.j .N Wo•44 waw ...We I Iupalee.sus wn4w G11ad04 W14,p4a WI•w1W..d r wIMWM IwwPos puo lownam w,.ea I.w.U4111W5 Puo w.w15 W'uo.N awl 4 leU la•4 0 4 wuo4. w-tl bl Ow'Z'S'I•II u l lea.. u4.0.5 Pw u4•.4 4 414..4100. 'low,6...01P-Wa.6+4 a W We.*owe ow,WO WM WM Ilw'...w le WM.,...1.0 "Z awlµ'µ 24 eulp4...pe410141uu+puo.WNW...•4 I1o4a.41p4e wl4w .06 ..a•.all X0•d Vaal.WIWww(III)o e:u4a,..4....I-Pr 0 II•:4o o,wa Ne0M4D WPl4Wl a 4edo IIW....Wan'wow oW 4 1wwlPw puo uolwe wow.puo 41.1•64 10'P44Pu1 w14Wlo a U. 'L O W 16u11^•w w.wpea.4 1 Papb n _L. o•lw puo p•4w4 Ipea. w N4o w•glo W IIW 6uIWw W4S'ne lea.. .. 'a 44/4..0 444410T P40 4,4J 4 4,4.n., T 00 WIw4 W wo 4 a Puo.0.4N404 .a 1a1(I) w1Pw o el lOP 420o.4 Wo&mw•a 4 6u1M.op.W• 4 p .."NO or 401 14 1 W a 40 lW• w11Wo ee,epee w1oa141a018 e 1 l0(.w0 0 puo.01.1)OEM uo11.S puo(1.0.3 1 w461w.......WI 414 w;W>Tow-uow.a 144ou P0441 44 41P44 no4•IuwlwS'4!P p p4•WI 14 IIWm+W1 Po....44110 wpm Pm... w1 4 4*4 44 4 •44440. 4.1.e4 01,+.oleo ml 140w•+0P.1..IN.IW...IW11 1w00DK Puo u01.w3)0L0Z0•..WS 4N•4u0Wo4P W W IIW4 p o 41w4 WO 41a000>alo4 e44 MI4w IIW0 wawa Tw-uow 4 e4Nw •4 0n. awed l w^W o owe p.WMu41 4 neon..a.141s 'ea414 a P4wd M W w 4Dw.. p.n..04*0 4low•W4w µLoa W 1104.44Yc4IN44M Ia4Wa 1 400441•P o ua404•IIY 'Yoe•W le a*OV4 N.4 4040 w03*444 Del*own.41414 We W4 4004 eW.W A404•w.PP.1 e/W.W.I. a044elw 6Ww41 44044.N4 1u1u0pw I.Iwew44. 41WWw 4a pow New Ilw 0.4.44.1'NM w to uomW Ado lea were•.411P.A loin'.4O Wp us. ',ono,amenwpuo new,ea4.d of wIn64 W IPV•.aW44o3 W1 'I mWw400.4 wR44d Ie.N'e IOZ'I WC aw044 Wwbo..fur .1 1 Ion Vow Ma r p4W 10w01 W.,w ao P.P.wlWww.www'L1 u1W e.40 PTwT 01 WOW W IIW.wpzY1041 me awe.,.{we4W N (op-opFSZ3YM 4po3•4•444144Y RW0114) S310N 10211NO3 1N3Y1103S ONY NOIS0213 (3AIS1110NI '61-SW HOf1021H1 1-SIN) SOMVONVIS Wf1PIINIW 10211N00 1N3MlIa3S ONV NOISO113 4 • 1 - I.SET POSTS MC OMEN A.•..• I SOOTS ERE F.O.TO THE POST. It MI DENIM-01011[ 1110101119.0.ALM RE Lit POltMa0E SMEIT FE. .. y.�,-, 6 POTS • f`E.A[ ,]-R UM,.. uf➢1 WOE .•BMW.t-POST STAFF �:1 ry 1. I w3eFR of W T-O SUF. 0111C.lt ........... MOM tlt10AATIO. m� i1i i - !.A AID �`'•..: RR M. 01011MTtl SPECIES AMuOAT.w.Mp 610 ®r (ST Yn.) � % r -..91O+ nAsnc TREE .0.1-M.13 .Y wt Mem1wwr..1.N...,a SPMB 1..... tE PARCTwmat a.1w0.cti.1.w..IR. S ATT.. RERR FORMIC 10ro •BK.-ILLuo KT SE i 9. L Po.N-4. A.........�..MMI.. Cl--- ow ro.MO TEM ER. SOaC� 'I( .... P. .A1-MST O..nW YM..M TIE i.F]iw. I �'.. .S IEELL RxC[M515 tl1 Y1 PO512 torE L♦�ER= a {ECE{ ~. i^n,1 M CMIRKTOR 99.11 MT.ME ----L.", I '~!�i M PROTECTOR RMC4/S S.A.N. •...t1>AA.�......�.,••.dT.6.,IAR..a, _ - 1L `d°r° O TREE PROTECTION •4. .w�lv..11..11.�.............wMw,LOOM 0) , AAA-- _ _ I MAE TP ea A/WL N OT.: r 6+.-E..naaa...Lem vA.Nw Tem. Ya d Te-re A ZOAE M1.s✓M•...C....II............,E..111...'i........w. Win fFR[i A Kfa.di 1.1.01.1.1010116.1.1.111.10.1.1111................ FRIT..OF FABRIC A.e 1.0 aRE INTO TOE Tn. olom AM MPi IMI E 51r"T:CEE"1 IS AA11 IOPATEBs e © ORANGE SAFETY FENCE TO TR WPM MR MCI.IS Lot 1D RATE WWI.M AREAS R OREM ROM MO MOIR arRACE Two RwdFESEi •'E SF SILT FENCING AT TOR rerl.mml•Yaenaswll.®Monale.. •; :: To Ps. OM Yw ... Rw_ 0.A.Y: P WRAP O.Y>d..1wN.1. .....e.w' TOTS.MM.. f.•Rem INK _.P.rT.nM.R (FACt s0 Ell! Tee MP...' TmA.m.. 1-;\_` h, 1 •--1 NME CURB INLET FILTER e Y. �O�O Y�Ys=E.1.PMRow .--...-------- 9ee.l�IIrwMY1 ad Ms. L - 'O ,1'_'.' IS MT.11........... ]. '� ��y yy....._. O.a.A.1L O�i+.w 0...' Br �Z�..i I I I lw V Ann utter Rd�.,S.1-•?: ♦,'-•e. 25 ...........100.....19111110.111.........(019....0 TM .T.r i; i� I �' .T CORERS _ .TT:'�. ..5.�MOY.aO.rr.M..Yv.W.I..V....r..........A..... 1 V Il ^� �Y�'t.11 Mt.N1....Yb.M1..m..E.11.M...v N.M.O..d-]d...w. V o AOT R ].P Q A] CLASS 1 A.11P :•lrrrr ..ww PF.SEIVIZ EII m.oM r RTRAR.P...,1f-NM ._.... A....I.. Tr SILT MOTE N•ITMLIC MDT 11..1'A..P...... PeY fG.00m1 MIME Si mVKID W n NC TELL001T Tr FLOW R MEM OPTY.K SIC4 ALL.e.• ]IR YE MIER MR ONTARTq. �IOO�Mp roam .� IRR Oq•L MO..r..R3.....5..r..Y dwdOID STAG Yr SECOO FILL ..,.W r.•.wsM.1..1.....wa.r.....AN.I..N.P.M.L..MY _ry _ ,..1. .P...wr...�.�......e..w�.+.M1....�.... Rrz1IDAAur 1r le IIIRN'�w, �Ar � ti- - �ilhNl ]. r) 911-Y_i ���.4.P.• 0101.1 19••••Y..M..s>Pa.A1.0.r 11AAM A Y r.' .we 2• _ rn..r..M.N.11.1.. FOR M.Or ST..A F.A MITA. RTA,,'.' •.Mp r.b..rw.�..-.�ir.Y.sr.w..NTw.w NUM APRRATAN w.MN.0...P...1..M.M.......ESRJ fl. YYO..LT.mn1.11.1Rqup.Eliezte ame sN.A..MtdY Runway FLAT R6t NIT MIOFCIIOR 6 NR1 TMC OI S 1S.[T rT S A IR 01ILL slug BILE SAME.uT R USED 13 AN MgnOOAL 11L.O5 a d Mu RAW A CRAM WM SA w ow TR NET NM IWDTNC..A MARO C MALL A.OMT oe siseeNT rnd CREME R0.1,1m RFID.e t Cf ME mica.1E RICO .e01Ma 6 r YYM r MUM°MLR II KO MAY R SI.OECT TO seal Leo RLL Rosoe 91NL AT Mai A..rT RECFIMC ID R06..d.. iT�� RA R IONIA 8/.110on OMER MO OMPASTMRS SOOAD TNT R CO MtTED N IM MET C NOAAT.FL.6 STREAM d N MALES NM I.rPE 5.POMBO.M v R.s1wr SILT FENCE DROP INLET PROTECTION SILT FENCE CULVERT INLET PROTECTION se STRAW BALE BARRIER IP INLET PROTECTION Pot To scME Nor A SCu III EROSION AND SEDIMENT CONTROL PUN(WPO201 B00083) RW]:ED wow rG` < C �]CordsRrd 5*.ap YFROVETNFR NLL WATER PAIN REPUCEYENT PROJECT 91PPT ^o} Service �. • T1AR. NEL '4,,^ Michael Baker vim•:• +.�A n+n (PROJECT No.m1�-11> 9 W. ■ce Authority ,� IRO littii,_ .74463.0 ESC P { r INTERNATIONAL F.., osn.RsowJ EROSION & SEDIMENT CONTROL sM:B.�...q dT: Nw mu 40...1+f DETAILS 28 w DATE • 1 •