Loading...
HomeMy WebLinkAboutWPO201900036 Plan - E&S 2019-05-31n )n1 q. ;tn crai p 9 i f AC ACRE ACSA ALBEMARLE COUNTY SERVICE AUTHORITY ADA AMERICANS WITH DISABILITIES ACT ARV AIR RELEASE VALVE BF BASEMENT FLOOR BM BENCH MARL BW BOTTOM OF WALL (AT GROUND LEVEL) CFS CUBIC FEET PER SECOND CG- 2 ADA ACCESSIBLE CURB RAMP (VDOT STANDARD) CL CLASS CIMp CORRUGATED METAL PIPF CO SANITARY SEWER CLEANOUT CONC CONCRETE CY CUBIC YARDS DB/PG DEED BOOK/PAGE DELL VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY DIP DUCTILE IRON PIPE DOM DOMESTIC ES EROSION AND SEDIMENT CONTROL EL, ELEV ELEVATION FSIVIT EASEMENT EW END WALL EX EXISTING FF FIRST FLOOR FH FIRE HYDRANT FM FORCE MAIN FPS FEET PER SECOND GSF GROSS SQUARE FEET GW GUY WIRE HDPF HIGH -DENSITY POLYETHYLENE PIPE VIP HIGH POINT HT HEIGHT INV INVERT IRF IRON ROD FOUND IRS IRON ROD SET L LENGTH LAT LATERAL LF LINEAR FEET LP LOW POINT LT LEFT MAX MAXIMUM IV]H MANHOLE MIN MINIMUM NSF NET SQUARE FEET OHE OVERHEAD ELECTRIC PC POINT OF CURVATURE PERF PERFORATED PL PROPERTY LINE PROP PROPOSED PSI POUNDS PER SQUARE INCH PT POINT OF TANGENCY PVC POINT OF VERTICAL CURVATURE PVC POLYVINYL CHLORIDE PIPE PVI POINT OF VERTICAL INTERSECTION PVT POINT OF VERTICAL TANGENCY R RADIUS R/cif RIGHT-OF-WAY RCP REINFORCED CONCRETE PIPE RED REDUCER RT RIGHT RTE ROUTE RWSA RIVANNA WATER SERVICE AUTHORITY SAN SANITARY SEWER SD SIGHT DISTANCE SUR STANDARD DIMENSION RATIO STA STATION SVC SERVICE SW SIDEWALK SWIVI STORMWATER MANAGEMENT T TRANSFORMER TBR TO BE REMOVED TC TOP OF CURB TP TELEPHONE PEDESTAL TW TOP OF WALL UG UNDERGROUND UGE UNDERGROUND ELECTRIC UGLI UNDERGROUND UTILITY VDOT VIRGINIA DEPARTMENT OF TRANSPORTATION VESCH VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK VSMp VIRGINIA STORMWATER MANAGEMENT PROGRAM WIVI WATER METER VVTR WATER WV WATER VALVE '41 � j � MAINTENANCE 0 I EXISTING PROPOSED n7o J GRASS DITCH LINING PER VESCI 13.32 VDOT STD. EC-3 DITCH LINING _12— CONTOUR LINE WITH ELEVATION STORM SEWER STRUCTURE IDENTIFIER SANITARY SEWER STRUCTURE IDENTIFIER BENCHMARK, TEST PIT MANHOLE WITH FRAME AND COVER 1 s., SPOT ELEVATION ADA PARKING SYMBOL 00 WATER CROCKNIETER FIRE HYDRANT WATER VALVE WATERIVIAIN SANITARY SEWER MAIN STORM SEWER PROPERTY LINT;/RIGHT-OF-WAY LIME CENTER LIFE FLNCE LINE EASEMENT LINE 0 N ITY MAP SCALE: 2"m2,000' PARCEL MAP SCALE:1"-500' Llc, No. 33028 -7Ja�v 9 SHEET lNur"'EX Sheet Number Sheet Title I COVER SHEET 2 EXISTING CONDITIONS AND DRAINAGE PLAN 3 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1. 4 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 S EROSION AND SEDIMENT CONTROL DETAILS 6 - --- EROSION AND SEDIMENT CONTROL NARRATIVE THE PURPOSE OF THIS PROJECT IS TO PERFORM MAINTENANCE OF THE EXISTING DAM LOCATED ON THE SUBJECT 11.7-ACRE PROPERTY (ZONE: RURAL AREA) AT TAX MAP 69B-46 IN THE GREENWOOD AREA OF ALBEMARLE COUNTY. THE EXISTING B,S,-ACRE POND DRAINS APPROXIMATELY 318-ACRES OF UPSTREAM DRAINAGE AREA, THE DAl'+JI IS NOT REGULATED BY UCR SINCE THE DAM HEIGHT IS UNDER 25 FEET, THE DAM MAINTENANCE WORK WILL INCLUDE RAISING THE DAM BYAPPROXIMATELY 100" AND RE -GRADING THE DOWNSTREAM EMBANKMENT TO 3H:`1V. THE APPROXIMATE 1,400 CY OF FILL NEEDED FOR THE DAM MAINTENANCE WORK WILL BETAKEN FROM AN ONSITE BORROW AREA LOCATED ADJACENT TO AND NORTH OF THE DAM. THE EXISTING 4" PRINCIPAL SPILLWAY 15 NOT OPERATIONAL AND WILL RE ABANDONED IN PLACE, AND FLOW FROM THE POND WILL RE CONTROLLED BY WAY OF A NEW COMBINED PRINCIPAL/EMERGENCY OVERLAND SPILLWAY. A VIRGINIA EROSION AND SEDIMENT CONTROL PROGRAM (VESOP) PERMIT 15 REQUIRED FOR THE WORK SINCE THE DISTURBED AREA WI L BE GREATER THAN 1 ACRE. THE WORK IS EXEMPT FROM THE REQUIREMENTS OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM PERMIT REQUIREMENTS OF 117-303 (G) OF THE ALBEMARLE COUNTY CODE. ALBEMARLE COUNTY IS A VSNIP AUTHORITY, F p\'`?nR()vE � �f �E+ cooly nr1k l��ILI� by r�eo, 0ep�r�m ESCWTION DATE 1 COUNTY COMMENTS 7/17/2019 2 COUNTY COMMENTS — - 7/22/2019 -- owner: ARIN AND L AUREN SIME „ � ® NEW YORK TRACE y€ GREENWOOD, VA 22943 01 engineer: 30 SCALE, L LC =t 871 JUSTIN DRIVE PALMYRA, VA 22953 p: 434.242.2866 e: miIKe@30scale.com y ffial ray Ljj !J2 'z x l UM 0 s %.. f g LLJ o" �s u I L r: CL , z "p, g r . 8 qg x y Uzi CC , BOOM— � r3e f�3j c a >tz «x � —1 LLI ON o� sheet tsfle: COVER SHEET SM �yl s t, `N z 10 OF 6 y u 1„=20' ' NO, d ate: �.5/31/201 C 2019 - 30 SCALE, LLC , ;,p o f tm o- 3 fgl�_1pld :.,'home r a" � i ;'t T-i.c,. SOILS MAP SCALE- 1`:1,000' Su"i d EiiST1= R 4e1 Una =_3 PRI=DOMNANT SOILS GROUP COMPOSITE CA CL � P COWOSITE yg y $ i qqy `_ I? ........ �,3 l M, R A 2 8 9 ...... ...... ......... T0 TkL d 319 ...... ,v ..... , !6 CRED11 MRCS a1 I■ IIMv�.l�.�a EXISTING PCDND WSE = 495.0 PERMANENIT POOL = 496.50 TOP OF DAIWI = 501.5 Q2=69 CFS 2-YEAR POND WSE = 497.O8 CI,10=275 CF S 10YEAR POND WSE _ 498.26 Q1OO=B50 CFS 100-YEAR POND WSE = 5OO.47 (1' FREEBORAD) w BASEFLOWV ASSUMED TO BE +- 2"-3" OVER SPILLWAY BASED ON SITE OBSERVATIONS. BASED ON A 1.5%SLOPE OF THE FEEDING STREAM CHANNEL, RAISING THE POND WATER SURFACE BY 1.5' IS EXPECTED TO INIIPACT APPROXIMATELY 100 FEET OF STREAM CHANNEL. NO MITIGATION IS REQUIRED. UTFALL STATEMENT THE NEW POND OVERLAND SPILLWAY WEIR AND EXIT CHANNEL CONNECTS TO THE EXISTING SPILLWAY CHANNEL THAT HAS BEEN CUT INTO ROCK. REFER TO SECTION B-B ON SHEET4 FOR DETAILS AND CALCULATIONS. COMPUTATIONS ON SHEET 4 INDICATE THE ADEQUACY OF THE EXISTING CHANNEL TO CONVEY THE 2, 10 AND 100-YEAR STORM FLOWS. SINCE THE SPILLWAY HAS EXISTING ROCK ASA LINER AND NO INCREASE IN STORMWATER RUNOFF IS ANTICIPATED, NO ADDITIONAL LINING IS REQUIRED AND NO SIGNIFICANT EROSION OF THE CHANNEL IS ANTICIPATED. THE EXISTING SPILLWAY CHANNEL FLOWS PARALLEL TO THE RIGHT -SIDE A 1 F EMBANKMENT FILL LINE AND FLOWS TOWARDS THE SOUTHEAST BEGINNING AT A POINT APPROXiNIATELY 40 FEET FROM THE DOWNSTREAM EMBANKMENT TOE OF SLOPE. VISUAL INSPECTION INDICATES A WELL -STABILIZED NATURAL OUTFAL L CHANNEL FROM THAT POINT DOWNSTREAM. SINCE THERE WILL BE NO INCREASE IN STORMWATrER RUNOFF FOLLOWING THIS DEVELOPMENT, NO ADDITIONAL ANALYSIS Of THE. DOWNSTREAM CHANNEL IS REQUIRED. IN THE EVENT OF A 100-YEAR STORM, THERE WILL BE AT LEAST ONE FOOT OF FREEBOARD FROM THE POND WATER SURFACE ELEVATION AND THE TOP OF DAIM. THE EXISTING SPILLWAY CHANNEL IS ADEQUATE TO CONVEY THE 100-YEAAR STORM WITHIN ITS BANKS. NO ADVERSE IMPACTS TO DOWNSTREAM PROPERTIES ARE ANTICIPATED. DRAINAGE MAP SCALE: 1 "=500' SCALE- I "g--500' REVISIONS # DESCRIPTIONDATE _-� - --- COUNTY COMMENTS - --- 7/17/2019-- 2 COUNTY COMMENTS 7J22J2O19 0wner: ARIN AND LAUREN SIME 130 NEW YORK TRACE GREENWOOD, VA 22943 engineer: 30 .SCALE, L LC 871 JUSTM DRIVE PALMYRA, VA 22963 p; 434.242.2866 e: ike@30scale.com web: www.30scale.com 1J/ /r� vc`i�f /,..� //�l��r,,, ,.. d5m 111%� Ye�b " sheet title - EXISTING 'm CONDITIO �K l AND DRAINAGE Sheet / �rl r f r: r,5 F r, o�- / ,r sz j SURI C, �r J AS SHOWN date. m C ✓z"'im /7""n— ­­ o r — u d d cn J u e4, u STD# ARBREV, SYMBOL E S PRACTICE 102 C'E —, CONSTRUCTION ENTRANCE 3.03 ( cat CONSTRUCTION ROAD STABILIZATION (OPTIONAL) 10 -)F SILT FENCE 100 DIVERSION DIKE 3.311 T o- TS - TEMPORARY SEEDING 3.32 PERMANENT SEEDING 35 MULCH 3,36 /u - SOIL STABILIZATION BLANKET/MP\TTING MUD TRAM LIMITS OF CLEARING AND GRADING EX. TRFELl N Channel R , p 0 f F,*OtmvExp as 00'e,mWii for@c. a JAjWCA0 Gv1,3rObyAut, xdok. !;' o&w,4r01m Mqy 2a,2633 Side Slopes (zl) 2. 0, 2,00 Td.taI Uenth 0 4riwd l v (f� 78,00 compute by: Known Q Known 0 (cf ); 2,00 R PEAFLOWOT I� c10 r _______._..___ SECTION A -A DITCH #1 CALCULATIONS Depth (fi} +-- im 05G fS.O� OMD CONSTRUCTION ROAD STABILIZATION (CRS CONTRACTOR HAS THE OPTION TO USE CO ROAD STABILIZATION IN THE EVENT THAT l ..,,, I"RAVELWAY FROM THE BORROW AREA TO REQUIRES STABILIZATION. `l 1 3 ek x% — EXISTING NORMAL POOL ELEV. 495,0 ' p NDTE° -ruE rlITAN rD11 j �AIVf ORl RFiP NORTH SIDE OF � NOTE: CONTRACTOR TO PROVIDE � THE DAM 15 ADEQUATE TO MAINTAIN THE POND WATER ADDITIONAL GRAVEL ALONG SURFACE THROUGH CONSTRUCTION EXISTING GRAVEL ACCESS LOAD TO DEMARCATE A 12' X 75' CONSTRUCTION ENTRANCE. ry ma gmm temm ME e, "CE EM "ANKME _ 000- 9 — 4 t APPROXIMATE LOCATION CONCRETE WASHOUT t _2Id m nn n v 1F p ' L:I'ti 1ITS OF LEARI3 G'i �4s'a,�,�s .,........../ � i \ s` ._ ..._ ._,�- ,� GR 0II SF P n APPROIMAT/ LOCATION OF �� Ir Es' ENT OF FILL ® aI � DOWNSTREAM SIDE OF � � ����� � � �� � � �! � � � I a ��) } 33 .,E t ' B i l/ �� ' � o ` ts I ^'i Y 0 s EMBANKMENT I " ;° �.. J o r 4 eA sa AL?PFOXIiVI'A'TEL f }C ;d �a-f-OCATION SPE�Y i1 A`I or CHANNEL p d P )f T e9 TREE PRESERVATION AREA __ e on a110 ppp r- U I F r ik4e `? x @.Xs Y GRADING i PROVIDE '? I.L,r@ r�'3^&i.� ie,53P "Q9J �r" 2 �"P .. , i a�SILT FENCE (AI I LOW SIDE -�� OF BORROW AREA � e MOTE: 140 CLEARING OF TREES IS TS PERMI+TED INSIDE 100' WPO - BUFFER e CONTRACTOR TO STAKE �, { 290' BUFFLIR LINE AND PROVIDE SILT FENCE Al O>NG BUFFER LINE M SHOWN. SILT FENCE IS TO SERVE AS TRF.,PROTECTION i } ga A p S P �� � � � I TREE PRE ERVATI, AREA n, ��a A a to x a�N K�' "3 i 300 � y � :..;„ _. i EX. TR EELINE Tx { J I j k4} q T EX. TREELIKE ' t4 , �k ii �y9 M1 F x 1 w p f d t e g T y �) t df j 0 30 60 00 SCALE: 1"®30' I t qqr 9 y Y USE EC-2 DITCH ►LINIUd I EROSION AND SEDIMENT CONTROL PLC - PHASE I REVISIONS DESCRIPTION DATE COUNTY COMMENTS 311712019 COUNTY COMMENTS owner: z ARID AND LAUREN SIME 130 NEW YORK TRACE 1/0 GREENWOOD, VA 22943 x engineer: g 3O SCALE, LLC IN 07 IJSTIN DRIVE PAILMYRA, VA 22003 :434.242.2866 welbo www.30scale.com //��; 3 zE � / a ��it > � l h' s � 4'r; U LLJLJ v 1 lC., � ehe /N ✓i 9 tg P; L y, F ,y r d /P' t z 31 'Ii1 JN�t �i % v r z E 05, Lu Q0/.. a 'm rz i r /o f} r y Luj F} F�� r } r r , " r , S"I° IN ry IN dry sheet title: O EROSION AND r/ I SEDIMENT a CN T R 0 L P LA y {z fz r �31 shee l� 6- 3a l OF 6 a H �s I`, ,ca9 : I 1 =30' 8 dat(e. f� lj y / / 1 f/ y C 2019 - 30 SCALE, LLC EROSION AND SEDIMENT CONTROL LEGEND ,TD-tt ABBREV, STD SYMBOL E&S PRACTICE 3 02 E A CONSTRUCTION ENTRANCE 103 its nCRl CONSTRUCTION ROAD STABILIZATION (OPTIONAL) 3.05 SI —YN—X— SILT FENCE 3.09 DIVERSION DIKE 331 TEMPORARY SEEDING 3.32 PS Ps PERMANENT SEEDING 335 MULCH 3,36 SOIL STABILIZATION BLANKET/MATTING MUD TRAP Bev( ft) PHOTOGRAPH MAY 2019 TOP OF DAM = 501.5 CONSTRUCT GROUTED RIP -RAP TO EL = 499.5 2-Y'R DEPTH —t­--­-ll----7t � mu 62' 20'LEVEL SPILLWAY —1-0-YR WSE = 498.26' —2-YR WSE = 497.08' t— SPILL kAJAY EL = 496.3 PROPOSED OVERLAND SPILLWAY CONTROL SECTION SECTION Sl-Sl Z 4 '0 8 10 12 14 lj3 '18 '20 22, 24 pworch (ft) CROSS-SECTION SECTION ®B N E- X IF R E'E"L I N X LPWTS OF CLEARING AND GRADING x NOTE- CONTRACTOR TO PROVIDE ADDITIONAL GRAVEL ALONG EXISTING GRAVEL ACCESS ROAD TO DEMARCATE A 12'X 75' CONSTRUCTION ENTRANCE. HCE APPROXIMATE LOCATION / ;,GR ADE —10" GROUTED CLASS I RIP -RAP —FILTER FABRIC —4" 21-A STONE Er�, A cnw I. Nv­i,,�, L,, AY EAR WAt VV .211fE t',P "T 14 irarA,20 'All a,ptt6l�n Width sidta, 81000S., (zll 2,60­00 pt,M Depth R) 3,00. Depth (ft), 8j)o 4M 030 0,00 N wal TREE PRESERVATION AREA 0 W-1 —as — — — — — — — — — -- 18 %kl 0 + 5 jj liff)( L TSOF CLEARING AND IMI GRADING PROVIDE AND MAINTAIN SILT FENCE ON LOW SIDE OF BORROW AND MAINTAIN C OWS ,E ),N L SIDE E\ )�JV AREA. NOTE: NO CLEARING OF TREES Is Ij T'TED INSIDE 100'WPC PERMi 9, BbFFER - CO 6 NTRACTOR TO STAKE li EX 100'BUFFt,R LINE AND PROVIDE 3,i + BUFFER LINE SI'LT FENCE ALONG P AS SHOWN. SILT FENCE IS TO 12- SERVE AS TREt,FKU I U, i lUN 0 MAINTAIN POSITIVE eSs 's"", Ts r DRAMAGE TOWARD POND �rsyIN BORROW AREA K I ol cp 2-YEAR PEAK FLOW (SEE H&H CALCS) K i Q (0s): % B OR R 'm litlWAl PfEAM" L.Owll OW AREA c"uji'mri 'sw ±,12,800 SF )N AREA TREE PRESERVATIt ,A i4 1,58 sovlom,Y-Vidlh (ft) 8�00 b�p `1 (1�1,300 CY) tP ft) 2,00, zdo r�sa (K 480�0,0 %�4 nveo. l5tev (4) P, 6, I' Val f t oxbl�lo oft t Y(; 010 A 0 4- 3: rx 3frEGL �tQ kpz + 6-10-YEAR PEAK FLOW (SEE H&H CALCS) 0 12— J" PEAKFLIOW �4 '10 Trp-�*x idal + Bodern Vvidth,(fl) ev"'If (f SF Totat Vertth 00 100 Arpp� IM63 todPliif Qin, (f t) pp 0opth, Y� ffi)pp 01 V, f d i (n) E G CIA L low oo— 100-YEAR PEAK FLOW (SEE H&H CALCS) v IN, CHANNEL CALCULATIONS i �\ N I � I AA � % ,l4 SEE NOTE A'( F`,( k, CRC CONSTRUCTION ROAD STABILIZATION (CRS) NOTE: V, CONTRACTOR HAS THE OPTION TO USE CONSTRUCTION ROAD STABILIZATION IN THE EVENT THAT THE EXISTING 7, M kRI ITRAV ELWAFROM THE I R�CUIRFSSTABILIZATIO�L 4 r fi PROP° 25 SY—\ 1, 1 11 "m CLASS I RIP -RAP W % 'k, f CUT IN PROPOSED OVERLAND SPILLWAY ,N .............. ... 4t# vto -A 4 4kf 0107 p fr 4f CONCRETE WASHOUT4 I'll ..... ..... . --------- . ..... . ....... . ........... ......... . . ............... —APPROX. 195 SY GF kOUTED .. ... ....... .. RIP -RAP k E. /-7l 77 % LIM11TS, OF CLEARING AND f 7 GRADIN(G N\ 7 ON N ECTG7j ROUTED SPILLWAY L TO EXISTING SPILLWAY 7 --z 40 CHAN N E L THAT 15 CUT I NTO 7— ........ 0 30 60 90 R06 C(1 A I NEW POND PERMANENT POOL EL = 496.5 NEW DAM HEIGHT = 24°5' RAISE EXISTING DAM BY 1.5'TO TOP ELEV = 501.5 ri TS PS, U % L r u it ul L: �ju %Jy —`--ARPrf XIMATE t6CATION SPALWAY CHANNEL PROPOSED 66-1-17 PERMAV;ENT 3'HEIG�T'CL 2 RIP -RAP DIVERSION DIKE WITH U I REV61ONS RIP-RA;P HAND PLACED 1I1s1 CL2 RIP -RAP VOIDS AS NEEDED. # DESCMPTION DATE COUNTY COMMENTS 7/17/2019 2 COUNTY COMMENTS ./2019 EROSION AND SEDIMENT CONTROL PLAN PHASE 2 ommer: ARID AND LAUREN SIME hey 130 NEW Yo RKTRACE '17 01 E, GREENWOOD, VA 22943 engineer: ,8111 30 SCALE, LLC ry 871 JUSTIN DRIVE PALMYRA, VA 22963 p° 434.242.2866 e; mil<e@30scale.com web.,yvwvv.30scaIe.com if z-om m, ECK , OR ' z "R > lVoi z u LIJ Lu stt­j AM moo sp 21fr 10 LLJ ""Noma. cy) LLI (1Y. CL N F— kgg -mop 0 M 0 CLOOM 511 "M Lu b si Ln > red "1Cl Lu EROSION AND i0o EDIMfx ENT C 0 N T R 0" L rr" L A N CHASE 2 fft sheet J# ggg OF 6 sca e. 1-11=201 cl a e 'pip, 5/31/2019 "N O 2019 - 30 SCALE, L C ilk" 31,132-41 DIVERSION R\ DIKE 'date.09 VESCH STD. 109 r2 5 g t�rig2M 3a ax ,{� �,,�,, t y -, ?a a".� a u Ar #- �+'+� pp�5 .Y� Uy�,,y,w L 4r i ✓f. ' 4 :A'd. x, k> w0umatv .."✓� m K¢ i 20 kg d e5r p ,�^ g 3 o-rt g y� R ,..a p Cyu � ;S'�+.���.J�,3 ;�'����'^�ufSfi� �.k'�Aq$ YA�� Z�}�If��,�"„+�LSs dui �� a'��&� sou n���'L.{".`:` �N>���s,+7 �.'L-;i [r f,, �,iu m�rR:� fl,s����,.��N°tj� I X �s Y ^yg W 'ut',, 'TfiP:ib ryy:�`a"G a�y�N' " '. ., , 1A 9{y vp, i. '.: kria YJi,..>A "Y .<.t 3.t. ,.,'.SN.<.. .< . a.,..a o o . ,<:'s o .. o... v .r , .9F,E,d�.',,. r°C,a v'i 7;'= y!rr q.I yN��^,,' aa. 3 .'a' st { l`..,v.' �t'z: "' +�C ,: zst'. vk, $ry ,d i.,.{ 4 .i: alx "fk d"�'u� +yY,3 ID' G:i�`€,e;ei%%k. ,l�'±=.r43E1A?L,Y a2�5? eta inkE, Tg50 ?t, ,y s;r ' Ss. 1a:.'S r... '� '' M., .s«:'-.>y, .... '., n:: 5 a r g#. 2 y�., ms y"'p .{p 'a ' C" g`3y^r. 3 `.: d',±} or .. �,?,>v.±.. �§�i� ,��`w 5'; eY,�bi, '.+°a5� %` ""','.��7i� ��:e3:�%� �#,^ 2�, 9,��,�a.Sib3 ;. 4{xs4., .aal.e,n rw`-;v'. 4� .%G'f i?SS""' Sia a-.,.. y,.,-`f-., � . ' 'y�� �� .gig r a,,. }�.a z.. 1 e .�, ori �� �b� .,�..::��'z .�is<., )5"-,.� .�,a,.s. u��i�4�".d"�.� >-� ����r.„ , i��"�.,�., ¢,di�,n �"�,, ,,�� ,,J,�z� wu�Sf�n..'+�, .? .a.a ,, .. a)":. '.� 4, ;:. __, r.,a ,tom.° "`qg„ T,, Jv . `l *' "1 p {g sx,C v�' . gv ,�^d'� �%y � �4 ✓E•: �y.d dSS ig A f,':y� a ¢ ya S " ,: Mb i* X' 9 rn• :"IT i� ,L^.J 4�'• 0,21 ���S, acre. 3 1a 3; ^{,:, .�a 35 d?�vm a77�v,1?' .:.J3 ,°ni, ,Yi. 3:c�4py. <v<d... 3 ., «L ^'ems vi2 .ai. ..'1.i .w tik,� .^ 'fel �e,�'F ,L w �,,, f,.KCnJ6ga .. ill jpf 5, PERMANENT SEEDING NOTE: CONTRACTOR MAY SELECT WARM SEASON NATIVE GRASSES OR �. 'STEEP SLOPE RIPARIAN' MIX AS FINAL STABILIZATION SINCE THE PROJECT IS ANTICIPATED TO BE ACTOR MAY SELECT COMPLETED IN THE SUIVIMER OF 29190 �. USE LOW MAINTENANCE GROUND COVER SEE® MIX FOR ANY AREAS STEEPER TH/AN : � WAX V WCQ �S) PERMANENT SEEDING SP. VESCH STD. 3.32 STONE WEIR 61 A 0 � 0 0 0 ��i��9�0 0 0®�®�a����9c)6�0�q p0pyy..�� y0y�0 CENTER M U D TRAP AT LOW POINT 0- u 0 co e a u .SILT FENCE TEMPORARY SEEDING SPECS. VESCH STD. 3.31 3 STONE FLOW — � �a ®'D 00000 —0-0.�®-02— E&S VARIANCE REQUIRED 4' CL I RIP —RAPS m VESCH STIR, 192 Vh,A)S_0IL STABILIZATIQN-- L T/MATTI N G TREATMENT ® 2 (VDOT STD. EC-3) VESCH STIR. 336 9�,�',t.f'xi✓E �. �3;Y'"'� 6 �;1Y'°`; IY k. ;,t t'9,+,r i:; i�„ �.1V,°kv, -. y J. Y, i �p4 �C Y 51y r xgs t 1..A.T i'aC FT r H �4E„ a NC;1'x, .>F �R.P4f�4�E`l y. 'Y�4<d51 e,��iYlAAC i,W L�a g 1 � VN� SILT FENCE DETAIL VESCH STD, 105 P yx 1Au i p' 9 4 C9; a€ �, o m �'� L 3 �. �- P 761gpE?! xdb� m. Flaa ; 77 r, i g<� { f 3 fir€ i is �mSULSTAMLIZATONL / I TREATMENT T - 2 (VDT STD. C-3) VESCH STD, 3.36 REVISIONS DESCRIPTION DATE 1 COUNTY COMMENTS 7/17/2019 2 COUNTY COMMENTS 722 20 9 I %%.CIS wner- - A IN AND LAUREN SIME 130 NEW YORK TRACE GREENWOOD, sf; VA 22943 engmener- 39 SCALE, I LC 871 JU aTIN DRIVE gz£ PALIVIYRA, VA 22963 r web: vrar w.30sca1e.com ` � m 121 •. "d jai y li z s r, 0 r u Lu /�; lit 7Y A r j i 6<s i l L. G �i MINI Nb �✓J j" y , !' f, L B i Xs f } Ci 1 LL , � �j I !r: y jn / ' Y 1LI �J CL rI � 41 Ct x /S rxi G V v F` 0` _j fq W F S5,,Yi y i sheet title: E Slug s SEDIMENT CONTRU'L �E DETAILS y� p f sheet 0i F /h %;y scale° NTS �s c a�a '35/31/201!j ga ® 2019 - 30 SCALE, LL C 0- u PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT IS TO PERFORM( MAINTENANCE OF THE EXISTING DAMLOCATED ON THE SUBJECT 11.7-ACRE PROPERTY (ZONE: RURAL AREA) AT TAX MAP 69B-46 IN THE GREENWOOD AREA OF ALBEMARLE COUNTY, THE EXISTING 3.5-ACRE POND DRAINS APPROXIMATELY 3100-ACRES OF UPSTREAM DRAINAGE AREA. THE DAM IS NOT REGULATED BY DCR SINCE THE .DAM HEIGHT IS UNDER 25 FEET. THE DAM MAINTENANCE WORK WILL INCLUDE RAISING THE DAM BY APPROXIMATELY 18" AND RE -GRADING THE DOWNSTREAM EMBANKIVIENT TO 3HAV. THE APPROXIMATE 1,400 CY OF FILL NEEDED FOR THE DAM MAINTENANCE WORK WILL BE TAKEN FROM AN ONSITE BORROW AREA LOCATED ADJACENT TO AND NORTH OF THE DAM. THE EXISTING 4" PRINCIPAL SPILLWAY IS NOT OPERATIONAL AND WILL BE ABANDONED IN PLACE, AND FLOW FROM THE POND WILL BE CONTROLLED BY WAY OF A NEW COMBINED PRINOPAL/Eh/IERGENCY OVERLAND SPILLWAY. A VIRGINIA EROSION AND SEDIMENT CONTROL PROGRAM (VESCP) PERMIT IS REQUIRED FOR THE WORTS SINCE THE DISTURBED AREA WIL BE GREATER THAN 1 ACRE. THE WORK IS EXEMPT FROM THE REQUIREMENTS OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM PERMIT REQUIREMENTS OF 17-303 (G) OF THE ALBEMARLE COUNTY CODE. ALBEMARLE COUNTY IS A VSMP AUTHORITY. EXISTING CONDITIONS THE PROPERTY IS CURRENTLY DEVELOPED WITH A SINGLE-FAMILY DWELLING AND IS LOCATED IN THE RURAL AREA OF ALBEMARLE COUNTY. THE SITE IS WOODED WITH A CLEARED AREA FOR THE HOUSE, YARD AND POND. WITHIN THE PROPOSED PROJECT AREA, THE SITE IS MOSTLY CLEARED, WITH SOME TREES IN LOCATIONS AS SHOWN ON THE EXISTING CONDITIONS PLAN, FLOW FROM THE SITE GENERALLY FLOWS TOWARDS THE EXISTING POND, AND THE OU9TFAILL FOR THE POND FLOWS TO THE SOUTHEAST TO AN EXISTING STREAM. ADJACENT AREAS THE SITE IS BORDERED BY ADJACENT RURAL PROPERTY ON ALL SIDES. SOIL DESCRIPTIONS THE DAM AND BORROW AREA ARE CHARACTERIZED BY 36D AND 37D3 (HAYESVILLE) SOILS PER THE MRCS ;OILS REPORT. THE HAYESVILLE SOILS BELONG TO THE B HYDROLOGIC SOILS GROUP AND APPEAR TO BE SUITABLE FOR DAM FILL MATERIAL, THE CONTRACTOR SHALL ENSURE THAT ANY EXCAVATED (MATERIALS USED TO FLATTEN THE POND EMBANKMENT MAY BE PROPERLY COMPACTED, CRITICAL AREAS GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE i iVI�r r Y AND ONE WEEK PRIOR TO THE rINA�I INSPECTION. PRIOR TO TTHECONIIMEN COMMENCEMENT OF LAND DISTURBING ACTIVITY, 2, ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BECONSTRUCTED AND MAINTAINED TO MINIMUM F 3 ,,� N REGULATIONS C ,AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGU I NIS STANDARDS AND SPECIFICATION OF THE VIRGINIA EROSION E® VR 625-02-00 EROSION AND CONTROL SEID11MENT REGULATIONS. 3, ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. E �� CONTROL I_ I I E �, A COPY OF I�IE APPROVED EROSION AND SEDIMENT �.DNTRD� PAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. E D 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, LNG BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY, 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO GRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED, DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9, THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING P, . RAINFALL EVENT, ANY � NECESSARY REPAIRS FOR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY, 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA, 11, ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA, EARTH FILE... SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1,200, 13, ALL INERT MATERIALS SMALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:00 AM TO 9:00 PNVL 15, BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MARINER THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE, 16, THE DEVELOPER SMALL RESERVE THE RIGHTTO INSTALL, MAINTAIN, REMOVE OR CONVERTTO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SAFE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. THERE ARE AREAS OF STEEP SLOPES ON THE PROPERTY AS SHOWN ON ALBEMARLE COUNTY GIS. THESE SLOPES WILL BE CONSTRUCTION SEQUENCE PROTECTED DURING CONSTRUCTION BY THE IMPLEMENTATION OF EROSION AND SEDIIIIJIENT CONTROL MEASURES DESIGNED IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCHB), ANTICIPATED START DATE: AUGUST 2019 ANTICIPATED COMPLETION DATE: SEPTEMBER 2019 EROSION AND SEDIMENT CONTROL MEASURES PHASE I WORK ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK UNLESS 1, INSTALL CONSTRUCTION ENTRANCE AS SHOWN ON PLAN. OTHERWISE DIRECTED BY THE ALBEMARLE COUNTY INSPECTIONS DEPARTMENT, THE HOLLOWING EROSION AND SEDIMENT 2> ENSURE CUT -IN SPILLWAY IS OPERATING PROPERLY AND IS CLEAR OF DEBRIS, CONTROL PRACTICES (VESCHB REFERENCE NUMBER INCLUDED) MAY BE IMPLEMENTED WITH THIS PLAN AND IS NOT AN 3. INSTALL SILT FENCE, MUD TRAPS AND STORM WATER CONVEYANCE CHANNEL AS SHOWN ON PLAN. EXHAUSTIVE LIST: 4. CLEAR AND GRUB OF THE DOWNSTREAM DAM SLOPE AND THE BORROW AREA. 5. ONCE THE PROJECT AREA IS CLEARED AND GRUBBED, THE CONTRACTOR MAY PROCEED TO PHASE 2 CONSTRUCTION. VESCH REFERENCE% 3.01- SAFETY FENCE (SAF) A PROTECTIVE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE, LOCATION AND DETAILS ARE SHOWN ON THE PLANS. 3,02 - TEMPORARY CONSTRUCTION ENTRANCE (CE) A CONSTRUCTION ENTRANCE SMALL BE PROVIDED AT THE ENTRANCE OF THE PROJECT SITE TO PROVIDE A MEANS OF REMOVING SEDIMENT FROM THE TIRES OF CONSTRUCTION VEHICLES LEAVING THE WORK SITE, THE CONTRACTOR SHALL REIVIOVE ANY MUD FROM THE EXISTING ROAD SURFACE BY MEANS OF SWEEPING AND SHOVELING, IN THE EVENTTI-IE WASH AREA IS NOT O� -ENT REMOVAL, ADEQUATE II'� SEDIMENT 103 - CONSTRUCTION ROAD STABILIZATION (CRS) THE TEMPORARY STABILIZATION OF ACCESS ROADS, SUBDIVISION ROADS, PARKING AMEAS, AND OTHER ONSITE VEHICLE TRANSPORTATION ROUTES WITH STONE IMMEDIATELY AFTER GRADING. 3.05 - SILT FENCE (SF) SILT FENCE IS TYPICALLY INSTALLED AS A FIRST STEP IN CONSTRUCTION ACTIVITIES. LOCATION AND DETAILS ARE SHOWN ON THE PLANS, 3.07 - INLET PROTECTION (IP) A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDMENT AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET TO MINIMIZE SEDIMENT FROM ENTERING THE STORM DRAINAGE SYSTEMS PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED AREA. 109 - DIVERSION DIKE (DD) A RIDGE OF COMPACTED SOIL OR LOOSE ROCK OR GRAVEL CONSTRUCTED ACROSS DISTURBED RIGHT-OF-WAY AND .SIMILAR SLOPING AREAS, LOCATION AND DETAILS OF THE RIGHT OF WAY DIVERSION ARE SHOVYN ON THE PLANS. 3.14 - TEMPORARY SEDIMENT BASIN (SP) A TEMPORARY SEDIMENT BASIN WILL BE INSTALLED BEFORE SITE GRADING BEGINS, FOUR THE PURPOSE OF DETAINING SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS. A SEDIMENT BASIN CONSTRUCTED WITH BLOCK D2 -- PHASE ONE WORK IS EXISTING AND IS LOCATED ON PHASE TWO. 3.31 -TEMPORARY SEEDING ITS) TO THE MAXIMUM EXTENT POSSIBLE, TEMPORARY SEEDING SHALL., BE APPLIED TO DEN UDED AREAS THAT REMAIN DORMANT FOR 7 DAYS. SEEDED AREAS SHALL BE LIMED WHEN NECESSARY AT A RATE OF 2 TONS/jACRE, AND FERTILIZED AT A RATE OF 600 LBS/ACRE OF 10-20-10 (14 LBS. PER 1,000 SQUARE FEET) OR EQUIVALENT. CONTRACTOR SHALL SELECT TEMPORARY SEEDING PLANT MATERIALS FROM TABLE 3,31-B OR C FROM THE VESCH. 3.32 - PERMANENT SEEDING (PS) A PERMANENT VEGETATIVE COVERING SHALL BE ESTABLISHED ON DISTURBED AREAS VSIIITHIN 7 DAYS OF BEING BROUGHT TO FINAL GRADE AND THAT WILL NOT BE PAVED OR OTHERWISE BUILT UPON, CONTRACTOR TO SELECT THE PERMANENT SEEDING MIXTURE IN ACCORDANCE WITH THE SPECIFICATIONS IN THE VESCH. 3,35 - MULCHING (MU) ALL SEEDED AREAS SHALL BE MULCHED WITH STRAW IMMEDIATELY FOLLOWING SEEDING OPERATIONS. STRAW MULCH SHALL BE APPLIED AI A RATE OF 1.5 TO 2 TONS/ACRE, OTHER ALTERNATIVES MAYBE SELECTED FORM TABLE 3,35-A OF THE VESCH, EROSION AND SEDIMENT CONTROL MEASURES - MAINTENANCE 1, THE CONSTRUCTION ACTIVITY OPERATOR OR HIS DESIGNEE, SHALL INSPECT ALL EROSION AND SEDIMENT CONTROL DEVICES IN ACCORDANCE WITH THE SCHEDULE PROVIDED IN THE GENERAL CONSTRUCTION( PERMIT, IT IS RECOMMENDED THAT DEVICES BE CHECKED EACH DAY AND CERTAINLY AFTER EACH RAIN EVENT, AND THAT REPAIRS ARE MADE IMMEDIATELY AND AREAS ARE RE -SEEDED AND MULCHED AS APPROPRIATE, 2. ALL SEDIMENT -TRAPPING (DEVICES AND FENCES SHALL BE CLEANED OUT AT 50 PERCENT CAPACITY OR HEIGHT, AND SEDIMENT SHALL BE DISPOSED OF BY PUMPING INTO A SILT -SACK OR OTHER APPROVED MEANS, 3. GRAVEL OUTLETS SHALL BE CHECKED REGULARLY FOR SEDIMENT BUILDUP AND RE CLEAVED WHEN SEDIMENT IS VISIBLY CLOGGING THE VOID SPACES. 4. DIVERSIONS SHALL BE CHECKED TO ENSURE PROPER RE-ROUTING OF DRAINAGE, DAMAGES THAT INTERRUPT THE EFFECTIVE FUNCTIONING OF THE DIVERSION SHALL BE REPAIRED IMMEDIATELY. 5. ALL SEEDED AREAS SHALL BE INSPECTED REGULARLY TO ENSURE THAT A VEGETATIVE COVER IS BEING ESTABLISHED, M THE EVENT THAT THE SEEDING DOES NOT TAKE, CONTRACTOR TO TROUBLESHOOT AND TAKE REMEDIAL ACTION UNTIL THE APPROPRIATE VEGETATIVE COVER IS ESTABLISHED, PHASE 2 WORK 1. 'BEGIN FILL OPERATIONS OF APPROXIMATELY 1,400 CY FROM BORROW AREA ON THE EXISTING 2:1 DAN ] SLOPE, 2. CONSTRUCT A DIVERSION DITCH ALONG THE TOE OF THE DAM FILL ALONG THE RIGHT ABUTMENT AND LINE WITH EC-2, (APPROXIMATELY 130-LF) 3. GRADE OVERLAND SPILLWAY AND INSTALL CONCRETE KEYWAY' FOOTER WEIR. 4. INSTALL 4" 21-A STONE, FILTER FABRIC AND GROUTED CLASS 1 RIP -RAP ON SPILLWAY CONTROL SECTION AND TO TIE GROUTED RIP RAP IN TO THE EXISTING SPILLWAY CHANNEL, 5. INSTALL 4" 21-A STONE, FILTER FABRIC AND CLASS 1 RIP RAP ON .SPILLWAY APPROACH UPSTREAM OF CONCRETE FOOTER WEIR. 6. CONSTRUCT 3' HEIGHT CL 2 RIPRAP DIVERSION DIKE PARALLEL TO DAM TIDE ALONG SPILLWAY CHANNEL, HAND PLACE CL 1 RIPRAP IN CL 2 RIPRAP DIVERSION VOIDS WERE APPLICABLE. (APPROXIIVIATEL Y 80-LFI 7. RESPREAD AVAILABLE TOPSOIL ON NEW DAM SLOPE AND BORROW AREA. SEED, FERTILIZE AND LIME (DAM SLOPE, BORROW AREA AND ANY DISTURBED AREAS WITH ADEQUATE RATES TO ESTABILISH ADEQUATE VEGETATIVE STABILIZATION, BORROW AREA IS TO BE LEFT AS A LEVEL PAD WITH A 1-2% CROSS SLOPE TO DRAIN. IVIAXI MUM CUT SLOPES IN BORROW AREA ARE TO BE NO STEEPER THAN 3:1. 8. REMOVE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ONCE ALL DISTURBED AREAS HAVE BEEN STABILIZED. ALBEMARLE COUNTY BORROW STOCKPILE/BORROW AREA REQUIREIMENTS FROM CHAPTER .32 SECTION 5.1,28fb: 1. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE MATH SECTION 13-301 OF THE CODE OF ALBEMARLE. BEFORE A TRANSPORTING VEHICLE LEAVES THE PARCEL OR PARCELS ON WHICPH THE BORROW, FILL OR WASTE AREA IS LOCATED, IT SHALL BE CLEANED SO THAT NO INERT MATERIALS OUTSIDE OF THE VEHICLE'S' LOAD -BED CAN BE [DEPOSITED ON A PUBLIC STREET, 2. THE BORROW, FILL. OR WASTE AREA AND THE ACCESS ROADS THERETO SHALL BE TREATED OR MAINTAINED TO PREVENT DUST OR DEBRIS FROM BLOWING OR SPREADING ONTO ADJACENT PROPERTIES OR PUBLIC STREETS. DEPENDING ON THE ANTICIPATED INTENSITY AND DURATION OF THE ACTIVITY AND THE CHARACTER OIF THE DEVELOPMENT OF ADJOINING PROPERTIES, THE PROGRAM AUTHORITY MAY REQUIRE SETBACK, FENCING AND LAND.'.SCAPING REQUIREMENTS AS DEEMED APPROPRIATE, BUT WHICH SHALL NOT EXCEED THE REQUIREMENTS OF SECTIONS 30.4.6, 30.43 AND 30,4.9 OFTHIS CHAPTER, 3, BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE (POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:00 A,IVL TO 9:00 P.M., EXCEPT IN CASES OF A PUBLIC EMERGENCY DECLARED PURSUANT TO SECTION 2-1003 OF THE CODE OF ALBEIVIARLE. 4, BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS LATERAL SUPPORT, IN ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 5. THE PLACEMENT OF FILL OR WASTE SHALL BE COMPLETED WITHIN ONE (1) YEAR OF ITS COMMENCEMENT, EXCEPT FOR RECLAMATION ACTIVITIES AND ANY OTHER ACTIVITIES ASSOCIATED IWITH THE FINAL STABILIZATION OF THE AREA. THE PROGRAM AUTHORITY MAY EXTEND THE DATE OF COMPLETION UPON( THE WRITTEN REQUEST OF THE APPLICANT, DEMONSTRATING THAT FACTORS BEYOND THE CONTROL OF THE APPLICANT PREVENTED THE COMPLETION WITHIN THE ONE-YEAR PERIOD. THE PROGRAM AUTHORITY I'+fiAY THEN EXTEND THE PERMIT FOR A PERIOD OF TIME 'THAT, IN ITS SOLE DISCRETION, IS DETERMINED ADEQUATE TO COMPLETE THE WORK. 6. IN LIEU OF A PLAN OR NARRATIVE, THE PROGRAM( AUTHORITY MAY ACCEPT A CONTRACTUAL AGREEMENT BETWEEN THE VIRGINIA DEPARTMENT OF TRANSPORTATION AND ITS CONTRACTOR FOR A PUBLIC ROAD PROJECT; PROVIDED THAT THE PROGRAM AUTHORITY DETERMINES THATTHE AGREEMENT SATISFIES AT LEAST TO AN EQUIVALENT EXTENT THE REQUIREMENTS AND INTENT OF THIS SECTION, EROSION AND SEDIMENT CONTROL PLAN MINHVIUM STANDARDS (PER 9VAC25-840-40) 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINIA, GRADE IS REACHED ON ANY PORTION OF THE SITE, TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS, OR 7 DAYS IF REQUESTED BY THE LOCAL INSPECTOR. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR, 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT .STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOILINTENTIONALLY TRANSPORTED FROM THE PROJECT SITE, 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION, 4, SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIIVIENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKE; PLACE, �.. ESS I E � � DAMS, � DIVERSIONS 5. STABILIZATION MEASURES �aa�lAL� B� APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS DIKES AND IMMEDIATELY AFTER INSTALLATION, I 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION, RUNOFF COEFFICIENTS USED IN 4 ® E CONDITIONS EXPECTED TO EXIST WHILE RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE IT THE SEDIMENT BASIN IS UTILIZED, T CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. �. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE, a 9, WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. 10, ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT, 11, BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE (MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL, 12 WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT CONTROL SEDIMENT � ROL E ENT TRANSPORT ANDSTABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. I E 1 I FOR E CONSTRUCTION Ea ND COFFER DAMS. EARTHEN FILL MAY BE I�GDNE��'�DlPa-m. IV�+ATEP�IA` SHALL RE USED Y��'a THE �F CAUSEWAYS AND USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS, 13. WHEN ALIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED, 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAININ9G TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED, � 16. UNDERGROUND UTILITY LINES SHALL 13� �1NSTALLEO IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A, NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL. BE PLACED ON THE UPHILL SIDE OF TRENCHES, C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING ®EVICT, OR BOTH, AND DISCHARGED IN A MAN NER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS R OFF -SITE PROPERTY. D. MATERIAL USED FOR. BACKFILLING TREN(_-HES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER, F. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH, 17, WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIIVIENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE, WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM .THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA, STREET WASHING SHALL. BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPIVIENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 (DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEIMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS. THE SITE COMPLIES WITH MS-19, REVISION DESCMPTM DATE i 1 COUNTY COMMENTS 7/17/2019 2 COUNTY COMMENTS 7/22/2019 owner: ARIN AND LAUREN SIME 130 NEW YORK TRACE GREENWOOD, VA 22943 engineer: 30 SCALE, LLC 871 JUSTIN DRIVE PALMYRA, VA 22963 p: 434.242.2866 e: mike @30scale,com web: vyww.30scalexorn ,, j,. /i o 4 �+ Fit, z D L�j j LLI ;I r "Az 11 4 p I LQ _ .. NJ ' III Iil T 1 �zz CD � LU211 �I F t ✓r; F 01 y 1 F3 %2 �x= x A-11 Fjs0 CL RIP 011 al yy� f, FI _ y ' u x zyFx ISFit Lu y, IN, i 0. :. s Al sheet title: `' 2 3 *N AND t F EDIMENT TR L DRATIVE see' / k /(X ll `c NTS �z Mate: s5/31/201 qar