Loading...
HomeMy WebLinkAboutWPO201600007 Review Comments 2016-05-13 a• Y (0 PROJECT MANAGEMENT sHimp \i„ CIVIL ENGINEERING LAND PLANNING ENGINEERINGa. L May13, 2016 Mr. Matt Wentland Civil Engineer County of Albemarle Department of Community Development Regarding: Inglewood Terrace—WPO-2016-00007 VSMP Permit Comments Dear Mr. Wentland, Thank you for your review of the preliminary site plan for Inglewood Terrace. We have revised the plans per County comments dated February 22, 2016. Please find below a detailed comment response letter describing the changes we have made to each of your comments. SWMP 1• Soil data has been added. The site is all 39D soil. 2. The director of community development has done his own study of the stream and confirmed that it is an intermittent stream. No further studies will be performed. 3. The calculations and analyses for this plan have been included with this submission. 4. Pipe profiles are correct, they just look very similar. The overflow stubout has been removed from detention pipe C. 5. The culvert will use a standard endwall, designs for this will be provided when we have a retaining wall design contractor selected. 6. Profiles have been included. 7. The channel will have a rip-rap swale for erosion protection. 8. Maintenance agreement will be provided on subsequent submissions. 9. A retaining wall design contractor has not been selected, plans will be provided with next submission. The. 100 year storm WSE was incorrect,it will flood to a maximum elevation of 518.5', safely below the wall top elevation of 526'. . ESCP 1. The erosion control plan is now staged to address this issue and for minimal disturbance during construction. . If you have any questions please feel free to contact me via e-mail at keane@shimp-engineering.com or Justin Shimp at Justineshimp-engineering.com or by telephone at 434-227-5140. Sincerely, Keane Rucker, E.I.T. Shimp Engineering Page 12