Loading...
HomeMy WebLinkAboutWPO201900015 Bond Estimates 2019-10-14Project Name: (WP0201900015) VSMP Plan for Timberwood Square WPO file number: WP0201900015 TMP(s): 046B4-00-00-007B0; 046B4-00-00-00700; Date Estimate Completed: 09-26-19 by RGA (D. Greene); checked 10-14-19 by CDD/Engineering (JA) Erosion and Sediment Control Bond Estimate Item Item Number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DID, FD, RWD) temporary slope drain (TSD) pipe length Sediment Basin earthwork for Sediment Basin #1 structures for Sediment Basin#1 Sediment Trap #1 earthwork for trap/basin structures for basin 35 ft pipe diameter height of dam at toe 7 ft height of fill at face 3 ft length of dam 0 ft L;6 top width ft urea aoove transition 37., (total width of dam) 14 ft (height below transitio 4 ft (area below transition 12 sf (total fill volume) 166.0 cy length of spillway Mftftwidth of spillway riser height ft riser diameter in barrel length 3 ft barrel diameter 18 in Added measures to comply with faircloth skimmer Enhanced E&SC measures per turbidity curtain Forest Lakes HOA request soil stabilization fabric > 4:1 slope silt fence inlet protection (IP) [gutter buddy] stone inlet protection (IP) cut at high side cut at face length of cut width of cut urea Deiow transitii (total width of cut) (depth below transit (area above transiti (total fill volume) (TOAL CY estimate (spillway stone tons in ft ft ft ft 0 sf 22 ft 11 ft 0 sf 0.0 cy 166 cy 0 tons (riser unit price) $150.00 base plate or fdn e) $40.00 barrel collars baffle length Mft sy No. Unit Unit Cost Cost installed acres $5,000.00 $20,950.00 ft $5.00 $3,800.00 44 ft $5.00 $2,225.00 ft $13.00 $13,845.00 $40.00 $1,900.00 $13.00 $2,158.00 $50.00 $0.00 $739.50 $200.00 $0 $1,440.00 $200.00 $400 $50.00 $5,250 $1,000.00 $1,000 $2,000.00 $4,000 $3.00 $4,480 $100.00 $1,200.00 $200.00 $2,400.00 10/14/2019 Project Name: (WP0201900015) VSMP Plan for Timberwood Square WPO file number: WP0201900015 TMP(s): 046B4-00-00-007B0; 046B4-00-00-00700; Date Estimate Completed: 09-26-19 by RGA (D. Greene); checked 10-14-19 by CDD/Engineering (JA) Erosion and Sediment Control Bond Estimate Item Item Number 35 36 37 38 39 40 41 42 43 44 45 46 47 48 outlet protection (OP)-Trap#1 outlet protection (OP)-Basin#1 outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance rip -rap, placed length 11.2 ft width 6.5 ft length N/A ft width 0 ft length N/A ft width 0 ft length 40 ft width 4 ft depth in channel 0 ft channel width 0 ft depth width survey and layout (price per 0.1 mi.) acres mobilization Temporary Access road Adft length -ft (tons) 0 tons 9M traps and basins - WP020i9000i5 Timberwood Square -RGA D Greene 092619_ESC_bond_est chk or419Ja.xlsx No. Unit Unit Cost Cost installed $327.60 $327.60 $0.00 $0.00 $0.00 $0.00 $208.00 $0.00 $0.00 $2,500.00 $0.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $60.00 $0.00 $3,095.00 $2,500.00 cost sum $77,418.10 contingency $7,741.81 Total $85,160 10/14/2019