Loading...
HomeMy WebLinkAboutWPO201900024 Preconstruction Form 2019-07-29 ;!^ Request for Pre-construction Meeting and Grading Permit A ! ifs from Albemarle County 1.:1410,11Pfl 47 At, Approved Plan Number: WPO- 60D2.4 t) Approved Plan Name: 1 iitire. - U'n2V /8 ov.8 Wadi/ PLC. (Plans must be approved prior to a pre-construction meeting.) Bond approved date: Ili 3 a0 l� (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber:n Print Name: I Y►o FF t)4 �x C�v��`. State Certification Number: I\L\�- 01 144 Q (o-Y1-a 0 Adt,o4k WOW 6 Address 1 .3l0 NLw 1 jZQaa - City State ll R Zip a41101 Daytime Phone(S140) Rt{3- .( 41 S E-mail ijak1.'Ko-c-r V.(,ONE - Primary Contractor: T Print Name -Mouc.i-vL b 17 1,1 -r .U41'e/1 S,/S 51 I,C. Address 31 3 M T[rr ( towC� City Lki4A4,'S� I State VA Zip ,VI5 as. Daytime Phone(5`{0 ) b to-(3%3 E-mail MM �n g(7( 1,n23" Permit Issuance and First Year Maintenance Fees: (,Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 d4 1 and less than 5 a$i93T 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. ly 7/1/14,Revised:8/29/14 Page 1 of 3 Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email i c,4 Karm f Tr. TaqouolvL Miy-(0,149n MO-t3 I3g3 f,,s1,6; %c•nt, 5•‘--1-10 of o 61541 ) 1,4C4.3e_ /i/eezispe to" The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit lamed Date By who? '". 7/1/14,Revised:8/29/14 Pane 2 of 3