Loading...
HomeMy WebLinkAboutWPO201900024 Checklist 2019-03-28 ceu'r' • • COUNTY OF ALBEMARLE `� ::: Department of Community Development 401 Mclntire Road Charlottesville,Virginia 22902 VSMP Application Completeness Check 0/9 Project Title: GUa1e51 1' d,ti��'G'�� ,�/G2' l4 File Number: Z Date: 3 � �� Reviewer: • Your application has been checked for completeness per section 17-409 of the County Code: All items must be received and correct for the application to be deemed complete. ❑ This application is complete and plan review has begun a This application is not complete. Please provide the missing items checked below. Received ' Y N Correct Y N N/A 0 Completed application ❑ ❑ ❑ 0 Signatures of the Property Owners for each parcel affected ❑ ❑ ❑ 0 0 Correct Fees Paid ❑ ❑ ❑ t ❑ Registration Statement on the official DEQ form, with correct LDA ❑ ❑ ❑ ❑ ' Erosion and'Sediment Control Plan satisfying the requirements of code section 17-402. ❑ ❑ ❑ 0 ❑ Stormwater Management Plan satisfying the requirements of code section 17-403. ❑ ❑ ❑ ❑ 0 Pollution Prevention Plan satisfying the requirements of code section 17-404. The EPA template should be used. ❑ ❑ Stormwater Pollution Prevention Plan satisfying the requirements of code section 17-405. The EPA template should be used. ❑ ❑ ❑ ❑ ,k Mitigation Plan satisfying the requirements of code section 17-406 for any proposed disturbance of stream buffers. ❑ ❑ ❑ ❑ Requested Variations or Exceptions as provided in code sections " 17-407 and 408, if applicable. (SSF,MMT,etc) 0 ❑ 0 ❑. Construction Record Drawings(as-builts)for any existing facilities in the proposal satisfying the requirements of code section 17-422. .❑ 0 ❑ Comments: