Loading...
HomeMy WebLinkAboutSDP201800063 Correspondence 2019-07-23 a Christopher Perez From: Wesley Carter <wescarterbob@gmail.com> Sent: Tuesday, July 23, 2019 1:25 PM To: Margaret Maliszewski Cc: Erin Root; Christopher Perez;Tim Miller Subject: Re:ARB-2017-57:Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor Amendment Great,thanks for the update Margaret. On Tue,Jul 23, 2019 at 1:23 PM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote: I've copied my recent correspondence with Erin, below. Margaret Vic+, Ij Reprpui !Ionia .eSst4 FoltiStalitt tMa M M Margaret Maliszewski RE-AR8,2017.57;Albemarle Countertop;SDP-7918.63:Hydraulic Root)11 C Minor Amendment INN in your re•.ssed pia,l see 31 ate Bluestein and 14 Sv stcryy ass,but the schedJle show 11I 8413 Blue-stem and 16 Sswstctsgrass.Can you please double check these? Thanks Margaret Irmo:Margaret M1Juew•slt Sent:Thursday,July 18,2019 S:03 PM To;Fttn goat+emtripvy0trerrtatl.{ rss Subject:RE:AR8-2017.57:Atbrmrte Caunt.Rop;SOP-]018-63:Hydraulic Road 11C Moot Amendment WA need to update tu5 platy wrth your rev190Mf-but wad to heir Irdrrt 1$t0,hake Sure Owe are IX,Wier tow-lgns reword Iran:Ent',Rats.enntMr,eyed�V.hm•yu,irrn„ Sent:Thursday...July 1R.2019 SW PM To:Margret Matruewsar<MMJi vewAi e'albenwie.org, Cc:Wesley talc!csggfirjrbobP,Xmall torn, Subject:Ae:Are-2017.57;Alberni,*Countertop:S4P-2016-63:Hydraulic ate*,tit M'or Arnerdnxnl Callha1 TTYnkyobl It looks as tt.ot i Tim did not apply tit..changes I made to the plan.What do we do about 1Ms7 ITln Otl Thy,Jul le,2019 at 5:00 PM Margaret Mahn e.ssk+a 'Ma:•us•.s�l e4tenerte otA'nrote: Thanla,Bk,,I,!!erred tr From:Wesley Carter<wescarterbob@gmail.com> Sent:Tuesday,July 23, 2019 12:31 PM To: Erin Root<erinintrevado@gmail.com>; Christopher Perez<cperez@albemarle.org>;Tim Miller <meridianwbe@gmail.com> Cc: Margaret Maliszewski<MMaliszewski@albemarle.org> Subject: Re: ARB-2017-57:Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor Amendment 1 Checking in with everyone to see wl.,., we sit as of today. Margaret, do you have everything you need? Chris, do you have everything you need? Let me know otherwise. Wes On Thu,Jul 18, 2019 at 5:01 PM Erin Root<erinintrevado@gmail.com>wrote: Great!Thank you! It looks as though Tim did not apply the changes I made to the plan'.What do we do about this? Erin On Thu,Jul 18, 2019 at 5:00 PM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote: Thanks, Erin. I received it. From: Erin Root<erinintrevado@gmail.com> Sent:Thursday,July 18,2019 4:08 PM To: Margaret Maliszewski<MMaliszewski@albemarle.org> Cc:Wesley Carter<wescarterbob@gmail.com> Subject: Re:ARB-2017-57:Albemarle Countertop;SDP-2018-63: Hydraulic Road LLC Minor Amendment Margaret, I'm going to send it to you via WeTransfer. Will you confirm that you've received it? Best, 2 A ' Erin On Thu,Jul 18, 2019 at 9:30 AM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote: Erin, I am able to open the plant schedule attachment, but the site plan document link is not working for me. From: Erin Root<erinintrevado@Rmail.com> Sent:Tuesday,July 16, 2019 3:54 PM To: Margaret Maliszewski<MMaliszewski@albemarle.org> Cc:Tim Miller<meridianwbe@gmail.com>; Christopher Perez<cperez@albemarle.org>; Wesley Carter <wescarterbob@gmail.com> Subject: Re: ARB-2017-57: Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor Amendment Margaret, 2019_7_16_ACC Site Plan_1"=10'_pg 2.pdf I've made changes to both documents. Please review to make sure I've done so correctly. Thank you, Erin On Thu, May 30, 2019 at 2:57 PM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote: Erin, I'm confused by your questions.The plant schedule identifies the required planting size and quantity.The schedule must correspond to the drawing. If the drawing size or scale do not allow you to illustrate each individual plant, you could employ a drawing convention that uses one symbol to indicate a particular quantity of one plant in a particular location. Since the plan limits you to a required planting size,the quantity represented by the symbol would not need to change. If you use a symbol to indicate more than one plant (for example, one cross-hatched circle represents 20 sedge together in one location)then you will need to identify on the plan the quantity that each symbol represents(in this example, 20 sedge). Margaret 3 A, From: Erin Root<erinintrevado,_,,..iail.com> - Sent:Thursday, May 30,2019 10:37 AM To: Margaret Maliszewski<MMaliszewski@albemarle.org> Cc:Tim Miller<meridianwbe@gmail.com>; Christopher Perez<cperez@albemarle.org>; Wesley Carter <wescarterbob@gmail.com> Subject: Re:ARB-2017-57:Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor Amendment Hi Margaret, Regarding#2.Yes,the symbols are intended to depict several plants,as the amount depends on current sourcing size. Can the note saycthis or does it need to say something specific? Best, Erin On Tue, May 28,2019 at 10:45 AM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote: Tim, I have reviewed the site plan submitted by Meridian Planning Group with revision date of 5/7/19. I have the following comments: 1. My emailed comments from May 3 requested that a note be added to the plan indicating that the new monument sign and sign lighting are shown only for information and are not approved with the site plan; a separate sign application is required.This note was not added to the plan, but it is needed. 2. The plant quantities in the plant schedule do not appear to correspond directly with the plant symbols drawn on the plan. Please explain these discrepancies/revise the landscape plan accordingly. (The rendering of the landscape plan makes it difficult to read and to distinguish the various plant symbols. I realize this may be contributing to the apparent inaccuracies.Also, if a single symbol is intended to represent multiple plants,this will need to be noted on the plan/in the schedule.) a. 60 white heath aster noted in schedule; 13 drawn on plan b. 10 poppy mallow noted in schedule; 23 drawn on plan c. 100 Pennsylvania sedge noted in schedule; 16 drawn on plan d. 26 Big bluestem noted in schedule; 31 drawn on plan e. 63 Little bluestem noted in schedule;36 drawn on plan f. 11 switchgrass noted in schedule; 14 drawn on plan g. 6 Ginkgo noted in schedule; 8 drawn on plan Thanks. 4 A - . Margaret Margaret Maliszewski,Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org Erin Intrevado Root • WHIL Innovations Post-doctoral Fellow 2014 Master of Landscape Architecture 2013 Master of Architecture 2011 • University of Virginia Erin Intrevado Root WHIL Innovations Post-doctoral Fellow 2014 • Master of Landscape Architecture 2013 Master of Architecture 2011 University of Virginia 5 Erin Intrevado Root WHIL Innovations Post-doctoral Fellow 2014 Master of Landscape Architecture 2013 Master of Architecture 2011 • University of Virginia Erin Intrevado Root WHIL Innovations Post-doctoral Fellow 2014 Master of Landscape Architecture 2013 Master of Architecture 2011 University of Virginia 6