Loading...
HomeMy WebLinkAboutSDP201800063 Correspondence 2019-07-16 Christopher Perez From: Wesley Carter <wescarterbob@gmail.com> Sent: Tuesday,July 16, 2019 4:11 PM To: Erin Root Cc: Margaret Maliszewski;Tim Miller; Christopher Perez Subject: Re:ARB-2017-57:Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor Amendment Hi all, In addition, I would like to call a meeting for this Thursday or Friday at the county office building so that Tim and myself can get clear on what info he is missing.We are so close here and I absolutely need to keep moving forward. Margaret and Chris, do you have availability those days? Wes Carter On Tue,Jul 16,2019 at 3:54 PM Erin Root<erinintrevado@gmail.com>wrote: Margaret, _ =2019_7_16_ACC Site Plan_1"=10'_pg 2.pdf I've made changes to both documents. Please review to make sure I've done so correctly. Thank you, Erin On Thu, May 30,2019 at 2:57 PM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote: Erin, I'm confused by your questions.The plant schedule identifies the required planting size and quantity.The schedule must correspond to the drawing. If the drawing size or scale do not allow you to illustrate each individual plant,you could employ a drawing convention that uses one symbol to indicate a particular quantity of one plant in a particular location.Since the plan limits you to a required planting size,the quantity represented by the symbol would not need to change. If you use a symbol to indicate more than one plant(for example,one cross-hatched circle represents 20 sedge together in one location)then you will need to identify on the plan the quantity that each symbol represents(in this example,20 sedge). Margaret From: Erin Root<erinintrevado@gmail.com> Sent:Thursday, May 30,2019 10:37 AM To: Margaret Maliszewski<MMaliszewski@albemarle.org> Cc:Tim Miller<meridianwbe@gmail.com>;Christopher Perez<cperez@albemarle.org>;Wesley Carter 1 <wescarterbob@gmail.com> Subject: Re:ARB-2017-57:Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor Amendment Hi Margaret, Regarding#2.Yes,the symbols are intended to depict several plants,as the amount depends on current sourcing size. Can the note say this or does it need to say something specific? Best, Erin On Tue, May 28, 2019 at 10:45 AM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote: Tim, I have reviewed the site plan submitted by Meridian Planning Group with revision date of 5/7/19. I have the following comments: 1. My emailed comments from May 3 requested that a note be added to the plan indicating that the new monument sign and sign lighting are shown only for information and are not approved with the site plan; a separate sign application is required.This note was not added to the plan, but it is needed. 2. The plant quantities in the plant schedule do not appear to correspond directly with the plant symbols drawn on the plan. Please explain these discrepancies/revise the landscape plan accordingly. (The rendering of the landscape plan makes it difficult to read and to distinguish the various plant symbols. I realize this may be contributing to the apparent inaccuracies.Also, if a single symbol is intended to represent multiple plants, this will need to be noted on the plan/in the schedule.) a. 60 white heath aster noted in schedule; 13 drawn on plan b. 10 poppy mallow noted in schedule;23 drawn on plan c. 100 Pennsylvania sedge noted in schedule; 16 drawn on plan d. 26 Big bluestem noted in schedule; 31 drawn on plan e. 63 Little bluestem noted in schedule; 36 drawn on plan f. 11 switchgrass noted in schedule; 14 drawn on plan g. 6 Ginkgo noted in schedule; 8 drawn on plan Thanks. Margaret 2 Margaret Maliszewski,Chief of Planning/Resoi lanagement Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 434-296-5832 x3276 mmaliszewskiPalbemarle.org Erin Intrevado Root WHIL Innovations Post-doctoral Fellow 2014 Master of Landscape Architecture 2013 Master of Architecture 2011 University of Virginia Erin Intrevado Root WHIL Innovations Post-doctoral Fellow 2014 Master of Landscape Architecture 2013 Master of Architecture 2011 University of Virginia •