Loading...
HomeMy WebLinkAboutSDP201800063 Review Comments 2019-05-30 Christopher Perez From: Christopher Perez Sent: Thursday, May 30, 2019 2:32 PM To: Adam Moore Cc: 'tmiller@meridianwbe.com'; Deel,Justin Subject: SDP201800063 Hydraulic Road, LLC - Minor Amendment ' Attachments: SDP201800063 Plan - Revision Minor Amendment 2019-05-07.pdf Adam, RE: SDP201800063 Hydraulic Road,LLC -Minor Amendment I am reviewing a revised version of the above ref site plan. I received your approval of this plan on 09-4-18; however, the plan has been modified from being served by a private well to now being served by public water. As proposed the new design relies on a 1"private water line lateral within the VDOT r/w. The proposed lateral connects to the existing ACSA public water line in the r/w(see attached highlighted sheets). Does this private lateral require an easement from VDOT to locate in the r/w? Also, while discussing it, do you anticipate this private lateral being permitted in the r/w? Christopher Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Christopher Perez Sent:Thursday, May 30, 2019 2:16 PM To:tmiller@meridianwbe.com Subject: RE:SDP201800063 Hydraulic Road, LLC- Minor Amendment. Tim, RE: SDP201800063 Hydraulic Road,LLC-Minor Amendment The 1"waterline is a new private lateral.I believe an easement is needed to locate the private lateral in the R/W.Thus VDOT would be the owner of the land that this line is going through and would need to grant this site the easement. VDOT has not reviewed this new version of the plans with the waterline because I planned on having them review the easement plat. Let me email VDOT a copy of the plans and get their comments on it. Christopher Perez I Senior Planner Department of Community Development(County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:tmiller@meridianwbe.com<tmiller@meridianwbe.com> Sent:Thursday, May 30, 2019 1:22 PM To:Christopher Perez<cperez@albemarle.org> Subject: RE: SDP201800063 Hydraulic Road, LLC-Minor Amendment Chris, I do not understand comment 10. Utilities located within a public r/w does not require an easement plat. Can you explain what is it you need? >_ Thanks, Timothy Miller, P.E., L.S. Principal 434-882-0121 www.meridianwbe.com m e i i 0. • • dlan Planning Group 2 Christopher Perez From:; Erin Root <erinintrevado@gmail.com> Sent: Thursday, May 30, 2019 10:37 AM To: Margaret Maliszewski Cc: Tim Miller; Christopher Perez;Wesley Carter Subject: Re:ARB-2017-57:Albemarle Countertop; SDP-2018-63: Hydraulic Road LLC Minor Amendment Hi Margaret, Regarding#2.Yes,the symbols are intended to depict several plants, as the amount depends on current sourcing size. Can the note say this or does it need to say something specific? Best, Erin On Tue, May 28, 2019 at 10:45 AM Margaret Maliszewski<MMaliszewski@albemarle.org>wrote: Tim, I have reviewed the site plan `submitted by Meridian Planning Group with revision date of 5/7/19. I have the following comments: 1. My emailed comments from May 3 requested that a note be added to the plan indicating that the new monument sign and sign lighting are shown only for information and are not approved with the site plan;a separate sign application is required.This note was not added to the plan, but it is needed. 2. The plant quantities in the plant schedule do not appear to correspond directly with the plant symbols drawn on the plan. Please,explain these discrepancies/revise the landscape plan accordingly. (The rendering of the landscape plan makes it difficult to read and to distinguish the various plant symbols. I realize this may be contributing to the apparent inaccuracies.Also, if a single symbol is intended to represent multiple plants,this will need to be noted on the plan/in the schedule.) a. 60 white heath aster noted in schedule; 13 drawn on plan b. 10 poppy mallow noted in schedule; 23 drawn on plan c. 100 Pennsylvania sedge noted in schedule; 16 drawn on plan d. 26 Big bluestem noted in schedule; 31 drawn on plan e. 63 Little bluestem noted in schedule; 36 drawn on plan f. 11 switchgrass noted in schedule; 14 drawn on plan g. 6 Ginkgo noted in schedule; 8 drawn on plan Thanks. Margaret 1 Margaret Maliszewski,Chief of Planning/Resourc....,o,�agement Albemarle County Department of Community Development 401 McIntire Road •Charlottesville,VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org Erin Intrevado Root WHIL Innovations Post-doctoral Fellow 2014 . Master of Landscape Architecture 2013 Master of Architecture 2011 University of Virginia 2