HomeMy WebLinkAboutSDP201800074 Application 2018-10-01 Community Dev elopment Department
Itle', Albet arle Gc 'Pity McIntire Road Charlottesville,VA22902-4696
Voice: (434)296-5832 Fax:(434)972-4126
!,; kf Planning Application
PARCEL j OWNER INFORMATION
IMP 09000-00-00-03100 Os-,ner(s): BELLEVUE REAL ESTATE LLC
Application# SDP201800074
PROPERTY INFORMATION
Legal Description !ACREAGE
Magisterial Dist, Scottsville L_s:I Land Use Primary Residential -- Single-family (incl. modular homes]
Current AFD ;Not in A/F District ,Tir Current Zoning Primary Planned Residential Development
APPLICATION INFORMATION
Street Address 1960 AVON STREET EXT CHARLOTTESVILLE, 22902 Entered By
_Buck_Smith[j
Application Type Site Development Plans 10/201B
Project Avon Park II- Initial
Received Date 10/01/18 Received Date Final Submittal Date 10/02/18 Total Fees 2542
Closing File Date Submittal Date Final Total Paid 2542
Revision Number
Comments
Legal Ad
SUB APPLICATION(s)
Type Sub Applicatio Comment
Initial Site Plan 10/02/18
APPLICANT / CONTACT INFORMATION
ContactType Name Address CityState Zip Phone PhorteCell
Oro-ertapplcart BELLEVUE REAL ESTATE LLC 16 PINEY GLEN CT POTOMACMD 20954
Appicsnt STANLEY MARTIN HOMES 404 PEOPLE PLACE,SUITE 303 CHARLOTTESVILL 22911
Primary Contact COLLINS ENGINEERING 200 GARRETT STREET,SUITE CHARLOTTESVILL 22902 4342933719
Signature of Contractor or Authorized Agent Date
Application for tok
Initial Site Plan or Final Site Plan or Site Plan Exception ; ® x
Project Name:Avon Park II
Tax map and parcel(s): 09000-00-00-03100 Zoning: PRD
Contact (who should we contact about this project)Collins Engineering
Street Address 200 Garrett Street,Suite K
City Charlottesville State Virginia Zip Code22902
Phone Number 434-293-3719 Email scott@collins-engineering.com
Owner of Record Bellevue Real Estate LLC
Street Address 16 Piney Glen Court
city Potomac State MD Zip Code20854
Phone Number Email
Applicant Stanley Martin Homes
Street Address 404 People Place,Suite 303
CityCharlottesville State VA Zip Code 22911
Phone Number Email
Type of Development
❑ Residential ❑ Non-residential
Type of unit(s): SFA and SFD units ❑ Commercial
❑ Industrial
#of building(s):
❑ Quasi-Public
Sq.ft.of building(s): Sq.ft.of building(s):
#of units per building: Acreage of site:
Total#of units: 30 Acreage in open space:
Resulting density: 5.7 Acreage in roads:
Acreage of site: 5.26 Average gallons of water used per day:
Acreage in open space:
Acreage in roads:
Average gallons of water used per day:
FOR OFFICE USE ONLY SDP#0).0/i'ea'> fit/
U' l l y �c1 �_ /i/? ! Aeceipt Jl J ..l Ck#/i5 t]By: Qal1f�
Fee Amount$ Date Paid who. l�s,✓< 4-Fee i ecei t#
County of Albemarle
Department of Community Development
401 McIntire Road Charlottesville,VA 22902 Voice: (434)296-5832 Fax: (434) 972-4126
REVISED 4/23/2018 Page 1 of 2
Intended use or justification for t t:
Comments/Attachments:
FEES
SITE DEVELOPMENT PLAN SITE PLAN EXCEPTION
Initial Site Plan Final Site Plan Exception to drawing of site
plan under section 32.3.5(a)
Approved No
Prcapplication plan Preapplication plan
❑ S752 plus$16/dwelling ® $1,290 plus$16/dwelling ❑ $1,613 ❑ $1,613
unit and/or$0.016 per unit and/or$0.016 per + Fire Rescue Fee of$100 +Fire Rescue Fee of
square foot of square foot of $100
nonresidential structure nonresidential structure
$ +Fire $1,770.00 +Fire
Rescue Fee of$100 Rescue Fee of$100 $1,7 7 0 + $10 0 = $1, 8 7 0.0 0
16 folded copies of the plan #of copies required for submittal will be noted with 8 folded copies of the plan
plus an additional 6 copies If within an Entrance Corridor your initial approval letter. Copies of the plan should
he folded and in blue or black ink.Also provide 1
reduced copy of the plan no larger than Il by 17 in.
❑ The initial site plan has a parking structure. ❑ The final site plan has a parking
❑ Included arc architectural elevations,drawings, structure.
photographs or other visual materials showing any U Included arc revised architectural elevations,
parking structure proposed on the site and surrounding drawings,photographs or other visual
structures and land uses. materials submitted with the initial site plan.
The elevations shall be part of the approved
final site plan.
GROUNDWATER ASSESSMENT
(Required for all non-residential site plans not serviced by public water)
❑ If the plans shove a use using less than 2,000 gallons/day(average) Tier 3 Groundwater Review=$548
❑ If the plans show a use using greater than 2,000 gallons/day(average) Tier 4 Groundwater Review=$1,183
C� Special Exception=$457 Variation to a Previously Approved Planned Development
This application may require additional review by the Fire Marshal. Fees in addition to those shown on this application may be required by
the Fire Prevention Code Fee Schedule. A copy of the schedule is available from the Fire Marshal.
Total Fees: $1,870 + $457+
Notices required by Section 32.4.2.1(f)
Preparing and mailing or delivering up to fifty(50)notices=$215.00 plus the actual cost of first class postage. $215 = $2,542.0 C
Preparing and mailing or delivering,per notice more than fifty(50)=$1.08 plus the actual cost of first class postage.
Owner/Applicant Must Read and Sign
This site plan as submitted contains all of the information required by Section 32.5(Initial Site Plan)or Section 32.6(Final Site Plan)of
Chapter 18 of the Code of the County of Albemarle. I understand that plans which lack information required by said sections shall be
deemed incomplete and shall be denied by the agent within ten(10)days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.1
of Chapter 18 of the Code as the case may be.By signing this application I am consenting to written comments,letters and or notifications
regarding this application being provided to me or my designated contact via fax and or email. This consent does not preclude such
written communication from also being sent via first class mail.
For Final P Only:To the best of my knowledge,I have complied with Section 32.4.3.1(a)of Chapter 18 of the Code.
t 9 f-at91
Signa of Owner,Contract Purchaser,Agent Date
I
revv, 6A �� 1 ci I-
Print Name Daytime phone number of Signatory
Site Plan Application REVISED 4/23/2018 Page 2 of 2
Fee Received
1G2 OO
Rl of 1eceive((Dce
RECEIVED Received By
OCT 1 - 7fl1
COMMUNITY
DEVELOPMENT