Loading...
HomeMy WebLinkAboutSDP201800084 Review Comments 2019-08-29 Christopher Perez From: Christopher Perez Sent: Thursday, August 29, 2019 1:47 PM To: 'John D. Borgie' Cc: Margaret Maliszewski Subject: RE: SDP201800084 Parking Lot and Apron Expansion - Minor Amendment John, RE: SDP201800084 Parking Lot and Apron Expansion - Minor Amendment The recently slip sheeted pages appear to addresses the comments from August 23; however, I also need to allow Margaret to sign off on them as they are with regards to the site lighting. Once the recently revised sheet C133-2 has been slip sheeted into the plans I'll send Margaret the plan set for her final sign off. Christopher Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:John D. Borgie<JBorgie@deltaairport.com> Sent:Wednesday, August 28, 2019 3:57 PM To: Christopher Perez<cperez@albemarle.org> Subject: RE: SDP201800084 Parking Lot and Apron Expansion - Minor Amendment Good afternoon Chris, From what you could see from the three inserted sheets into our plan set, do you think we've addressed the comments below? Is there a timeline for official approval/review at this stage? Thanks for your help, John John D. Borgie, PE DELTA AIRPORT CONSULTANTS, INC. Office 804.275.8301 From: Christopher Perez<cperez@albemarle.org> Sent:August 23, 2019 4:19 PM To:John D. Borgie<JBorgie@deltaairport.com> Cc: Margaret Maliszewski<MMaliszewski@albemarle.org> Subject:SDP201800084 Parking Lot and Apron Expansion - Minor Amendment Mr. Borgie, RE: SDP201800084 Parking Lot and Apron Expansion-Minor Amendment As discussed over the phone the recently submitted plan set is not approvable as submitted.Please make the required revisions we discussed over the phone;either through a slip sheet scenario or a revised set.Below I offer the following required changes prior to approval: 1)Revise sheet E102-3 photometric label to"Phase 3"so it matches the phasing sheet C103-1 label for this phase. 1 2)Provide the other half of the photomet...,elan for the above ref parking lot,which was p iusly sheet E 103-3 on the last set. 3)Revise sheet E501-3 to provide the correct cutsheets for lighting and all lighting information for all lighting fixture types(A,B,BI, C,D).The last set provided the correct information. I'd like to backtrack on one comment we discussed over the phone,which was correcting sheet L101-4 phase label for the landscaping associated with the new pavilion.Last we spoke I suggested you remove and relocate this landscaping island to the plan that will propose the future pavilion or modify the phasing label.On second thought,this landscape island and the proposed landscaping may remain as depicted with a phase 3 label.Whenever the pavilion plan comes in if you want to modify that landscape island that will be the time for that to take place. Hope this helps. Christopher Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 2 Christopher Perez From: Christopher Perez Sent: Thursday, August 29, 2019 1:39 PM To: Campbell Bolton Cc: Amy M. Ferrell;Jason Devillier; Mike VanMerlin; Mark Clinedinst; Richard Nelson;Travis Ridky;William M. Eschenfelder; Katherine L. Conlon;Alexander Morrison; Margaret Maliszewski Subject: RE: SDP2018-84 Parking Lot and Apron Expansion—Waterline Revision Attachments: 19 0828 - CHO Parking &Apron - C133-2 -Waterline Revision.pdf Campbell, SDP2018-84 Parking Lot and Apron Expansion—Minor Site Plan Amendment While ACSA has approved this item in an email, the modification still changes the site plan. Submit 4 full-sized hard copies of the revised sheet C133-2 for inclusion in the site plan. I'll leave the plans downstairs for you to slip sheet these items into the current plan set. Christopher Perez I Senior Planner Department of Community Development(County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Alexander Morrison <amorrison@serviceauthority.org> Sent:Thursday,August 29, 2019 11:59 AM To: Campbell Bolton<cbolton@daa.com> Cc:Amy M. Ferrell<AFerrell@deltaairport.com>;Jason Devillier<JDevillier@gocho.com>; Mike VanMerlin <mvanmerlin@sargent-corp.com>; Mark Clinedinst<mclinedinst@serviceauthority.org>; Christopher Perez <cperez@albemarle.org>; Richard Nelson<rnelson@serviceauthority.org>;Travis Ridky<tridky@sargent-corp.com>; William M. Eschenfelder<beschenfelder@deltaairport.com>; Katherine L. Conlon<kconlon@deltaairport.com> Subject: RE: SDP2018-84 Parking Lot and Apron Expansion—Waterline Revision Campbell, I have reviewed the plan and it is approved.You may proceed with the work. Alexander J. Morrison, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 1 From:Campbell Bolton<cbolton@daa.com> Sent:Thursday,August 29, 2019 7:21 AM To:Alexander Morrison<amorrison@serviceauthority.org> Cc:Amy M. Ferrell<AFerrell@deltaairport.com>;Jason Devillier<JDevillier@gocho.com>; Mike VanMerlin <mvanmerlin@sargent-corp.com>; Mark Clinedinst<mclinedinst@serviceauthority.org>; Christopher Perez <cperez@albemarle.org>; Richard Nelson<rnelson@serviceauthority.org>;Travis Ridky<tridky@sargent-corp.com>; William M. Eschenfelder<beschenfelder@deltaairport.com>; Katherine L. Conlon<kconlon@deltaairport.com> Subject: RE:SDP2018-84 Parking Lot and Apron Expansion—Waterline Revision Good Morning Alexander, It is my understanding Sargent spoke with Mark Clinedinst yesterday morning regarding removing and replacing a section of waterline adjacent to the storm sewer system for worker safety. A plan change was requested to show this revision prior to beginning the work. Please see the attached plan sheet noting the change and let me know if this satisfies the requirements so Sargent can continue on with the water pipe removal/replacement. Thanks E. Campbell Bolton, P.E. Project Manager Draper Aden Associates Engineering•Surveying•Environmental Services Lasting Positive Impact' Phone:434.295.0700 • Direct Line:434.284.4782 • Mobile 434.906.3892 Web • Blog • Facebook • Twitter • Linkedln From:Travis Ridky<tridky@sargent-corp.com> Sent:Thursday, August 22, 2019 8:27 AM To:Alexander Morrison<amorrison@serviceauthority.org>;William M. Eschenfelder <beschenfelder@deltaairport.com>; Christopher Perez<cperez@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org> Cc: Moniratha Moung<ratha@deltaairport.com>; Campbell Bolton<cbolton@daa.com>;Amy M. Ferrell <AFerrell@deltaairport.com>; Scott Krebelder<skrebelder@serviceauthority.org>;Jason Devillier <JDevillier@gocho.com>; Mike VanMerlin<mvanmerlin@sargent-corp.com>; Mark Clinedinst <mclinedinst@serviceauthority.org> Subject: RE: SDP2018-84 Parking Lot and Apron Expansion—Minor Site Plan Amendment(a PDF copy) IATTENTION: Email sent from outside DAA. Great!Thank you for the help. Travis Ridky I Project Manager SARGENT CORPORATION I Mid Atlantic Region - 11139 Air Park Road, Suite 1, Ashland,VA 23005 Phone: 804.368.7118 I Fax:804.368.7387 I Cell: 804.240-3382 I Sargent-corp.com Sargent Corporation is an Equal Opportunity,Affirmative Action Employer 2 • Women and Minorities are encouraged to ap,_ From:Alexander Morrison<amorrison@serviceauthority.org> Sent:Thursday,August 22, 2019 8:13 AM To:Travis Ridky<tridky@sargent-corp.com>; William M. Eschenfelder<beschenfelder@deltaairport.com>; Christopher Perez<cperez@albemarle.org>; Richard Nelson<rnelson@serviceauthority.org> Cc: Moniratha Moung<ratha@deltaairport.com>; Campbell Bolton<cbolton@daa.com>;Amy M. Ferrell <AFerrell@deltaairport.com>; Scott Krebelder<skrebelder@serviceauthority.org>;Jason Devillier <JDevillier@gocho.com>; Mike VanMerlin<mvanmerlin@sargent-corp.com>; Mark Clinedinst <mclinedinst@serviceauthority.org> Subject: RE: SDP2018-84 Parking Lot and Apron Expansion—Minor Site Plan Amendment(a PDF copy) Travis, I received your voicemail. I have spoken internally to our maintenance department about this product and the old approved product that is no longer made. It appears that we have utilized this new product for some of our internal jobs and I am working on updating our approved products. With that said, please proceed with use of this product for insulation. Alexander J. Morrison, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F) 434-979-0698 in tri From:Travis Ridky<tridky@sargent-corp.com> Sent:Thursday, August 22, 2019 7:53 AM To:Alexander Morrison<amorrison@serviceauthority.org>;William M. Eschenfelder <beschenfelder@deltaairport.com>; Christopher Perez<cperez@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org> Cc: Moniratha Moung<ratha@deltaairport.com>; Campbell Bolton<cbolton@daa.com>;Amy M. Ferrell <AFerrell@deltaairport.com>; Scott Krebelder<skrebelder@serviceauthoritv.org>;Jason Devillier <JDevillier@gocho.com>; Mike VanMerlin<mvanmerlin@sargent-corp.com>; Mark Clinedinst <mclinedinst@serviceauthority.org> Subject: RE: SDP2018-84 Parking Lot and Apron Expansion—Minor Site Plan Amendment(a PDF copy) Hi Alex: I left you a vm this morning trying to close the loop on this insulation, but thought I would follow up with an email as well. We are trying to track down more info. about underground application use, but haven't had any luck yet.To try and make this quick and easy—is there another product that the Service Authority uses since the therma-cell product is no longer produced? 3 Thanks, • Travis Travis Ridky I Project Manager SARGENT CORPORATION I Mid Atlantic Region - 11139 Air Park Road,Suite 1, Ashland,VA 23005 Phone: 804.368.7118 I Fax: 804.368.7387 I Cell: 804.240-3382 I sargent-corp.com ® @ Sargent Corporation is an Equal Opportunity,Affirmative Action Employer Women and Minorities are encouraged to apply From:Alexander Morrison<amorrison@serviceauthority.org> Sent:Tuesday,August 20,2019 3:30 PM To:Travis Ridky<tridky@sargent-corp.com>; William M. Eschenfelder<beschenfelder@deltaairport.com>;Christopher Perez<cperez@albemarle.org>; Richard Nelson<rnelson@serviceauthority.org> Cc: Moniratha Moung<ratha@deltaairport.com>; Campbell Bolton<cbolton@daa.com>; Amy M. Ferrell <AFerrell@deltaairport.com>; Scott Krebelder<skrebelder@serviceauthority.org>;Jason Devillier <JDevillier@gocho.com>; Mike VanMerlin <mvanmerlin@sargent-corp.com>; Mark Clinedinst <mclinedinst@serviceauthority.org> Subject: RE: SDP2018-84 Parking Lot and Apron Expansion—Minor Site Plan Amendment (a PDF copy) Travis, Can you confirm that this product is rated for underground application? If so,you may proceed with this product. Let me know what you find out. Alexander J. Morrison, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 6 II � From:Travis Ridky<tridky@sargent-corp.com> Sent:Tuesday, August 20, 2019 2:27 PM To:Alexander Morrison<amorrison@serviceauthority.org>;William M. Eschenfelder <beschenfelder@deltaairport.com>; Christopher Perez<cperez@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org> Cc: Moniratha Moung<ratha@deltaairport.com>; Campbell Bolton <cbolton@daa.com>; Amy M. Ferrell <AFerrell@deltaairport.com>; Scott Krebelder<skrebelder@serviceauthority.org>;Jason Devillier <JDevillier@gocho.com>; Mike VanMerlin <mvanmerlin@sargent-corp.com>; Mark Clinedinst <mclinedinst@serviceauthority.org> Subject: RE: SDP2018-84 Parking Lot and Apron Expansion—Minor Site Plan Amendment(a PDF copy) Hi Alex: 4 • Following up from our site meeting last week- I have been back and forth with Ferguson trying to obtain the specified Nomaco:Therma-Cell (1/2" min. thickness), but they have concluded that Nomaco no longer makes this product. Attached is a substitute product that Ferguson has in stock that we would like to use. We can wrap this insulation around the pipe and tape it in place. Would this be acceptable? Thanks, Travis Travis Ridky I Project Manager SARGENT CORPORATION I Mid Atlantic Region- 11139 Air Park Road, Suite 1, Ashland,VA 23005 Phone: 804.368.7118 I Fax: 804.368.7387 I Cell: 804.240-3382 I sargent-corp.com o 0 @o Sargent Corporation is an Equal Opportunity,Affirmative Action Employer Women and Minorities are encouraged to apply From:Alexander Morrison<amorrison@serviceauthority.org> Sent:Tuesday,August 13, 2019 4:42 PM To:William M. Eschenfelder<beschenfelder@deltaairport.com>; Christopher Perez<cperez@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org> Cc: Moniratha Moung<ratha@deltaairport.com>; Campbell Bolton<cbolton@daa.com>; Amy M. Ferrell <AFerrell@deltaairport.com>; Scott Krebelder<skrebelder@serviceauthority.org>;Jason Devillier <JDevillier@gocho.com>;Travis Ridky<tridky@sargent-corp.com>; Mike VanMerlin <mvanmerlin@sargent-corp.com>; Mark Clinedinst<mclinedinst@serviceauthority.org> Subject: RE:SDP2018-84 Parking Lot and Apron Expansion—Minor Site Plan Amendment(a PDF copy) Chris, Please input an ACSA approval for SDP201800084. Mike, Our inspector, Mark Clinedinst, is CC'ed. He can be reached at 434-531-0724. I have updated him on this project. He will need 3 days' notice on the proposed work. Prior to exposing the water main he will isolate the 12" water main by closing 2 valves. Once the main is exposed and he can see joint locations he will advise if temporary supports will be needed. We will require the exposed water main to be insulated prior to backfilling due to the 12" of vertical separation. Our approved product is as follows: Nomaco:Therma-Cell (1/2" min.thickness) Once the backfill reaches the springline of the pipe he will put pressure back on the line to ensure no leaks.Once confirmed,you can finish backfilling. While the main is isolated the only impacted meter is an irrigation meter for CHO.This should not cause an issue as irrigation usually does not run during the day. Let me know if you have any questions. Alexander J. Morrison, P.E. 5 Senior Civil Engineer • Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 -6 Li tr From: William M. Eschenfelder<beschenfelder@deltaairport.com> Sent: Monday, August 12, 2019 3:12 PM To:Alexander Morrison<amorrison@serviceauthority.org>; Christopher Perez<cperez@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org> Cc: Moniratha Moung<ratha@deltaairport.com>; Campbell Bolton <cbolton@daa.com>;Amy M. Ferrell <AFerrell@deltaairport.com>;Scott Krebelder<skrebelder@serviceauthority.org>;Jason Devillier <JDevillier@gocho.com>; 'Travis Ridky'<tridky@sargent-corp.com>; Mike VanMerlin <mvanmerlin@sargent-corp.com> Subject: RE:SDP2018-84 Parking Lot and Apron Expansion—Minor Site Plan Amendment(a PDF copy) Alexander, Sargent Corporation,the parking lot contractor, located and surveyed the waterline last week. They are currently compiling their results. A copy of the complete survey will be forwarded once completed. Travis Ridky is their Project Manager and Mike VanMerlin is their Field Superintendent. Both are copied on this message. Bill William M. Eschenfelder, P.E. Project Manager Delta Airport Consultants, Inc (804) 275-8301 weschenfelder@deltaairport.com From:Alexander Morrison<amorrison@serviceauthority.org> Sent: Monday,August 12, 2019 2:27 PM To:Christopher Perez<cperez@albemarle.org>; Richard Nelson<rnelson@serviceauthority.org> Cc: Moniratha Moung<ratha@deltaairport.com>; William M. Eschenfelder<beschenfelder@deltaairport.com>; Campbell Bolton<cbolton@daa.com>;Amy M. Ferrell <AFerreil@deltaairport.com>; Scott Krebelder <skrebelder@serviceauthority.org> Subject: RE:SDP2018-84 Parking Lot and Apron Expansion—Minor Site Plan Amendment (a PDF copy) Chris, Thank you for getting these plans so quickly. I have reviewed the plans and there is only 1 item that I have concern with. There is a proposed 48" storm crossing under an existing 12" high pressure water main near a bend and thrust block (based on the location on the plans).The as-built plan I have is old and does not call out these bends. Regardless, my concern is protecting the 12" water main while the storm is installed.There have been many changes to grade in this area since the water main was originally installed so a test hold to confirm depth at the crossing should be completed by the contractor. Once it is confirmed the crossing can be installed with the required separation I can have a discussion on 6 • constructability. I have left the app ,,,...,t CC'ed on this e-mail so they can coordil ICI Le directly with me to get the test dig scheduled and information reviewed. I would also like to ask that the crossing location be field marked. I would like my locator to follow up on the location and confirm the alignment and bends. I know the contractor is mobilizing so I am proposing to work directly with the applicant and contractor in the field to verify this information and determine if any adjustments are needed. Alexander J. Morrison, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C) 434-981-5577 (F)434-979-0698 ID tri From: Christopher Perez<cperez@albemarle.org> Sent: Monday,August 12, 2019 1:52 PM To:Alexander Morrison<amorrison@serviceauthority.org>; Richard Nelson<rnelson@serviceauthority.org> Cc: Moniratha Moung<ratha@deltaairport.com>; William M. Eschenfelder<beschenfelder@deltaairport.com>; Campbell Bolton<cbolton@daa.com>;Amy M. Ferrell<AFerrell@deltaairport.com> Subject:SDP2018-84 Parking Lot and Apron Expansion—Minor Site Plan Amendment(a PDF copy) Alex/Richard, SDP2018-84 Parking Lot and Apron Expansion—Minor Site Plan Amendment Below is an email from the applicant with the electronic copy of the plans. Please utilize these for your review. If they don't open or you have issues, please utilize the hard copy of the plans I just placed in your physical mailbox. thanks Christopher Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Moniratha Moung<ratha(cadeltaairport.com> Sent: Monday, August 12, 2019 1:45 PM To:Christopher Perez<cperez@albemarle.org> Subject: Project: CHO-Surface Parking Expansion- File Transfer- Parking Lot and Apron Expansion (a PDF copy) 7 • IMPORTANT: Click a link below to access files associated with this transmittal that....le in through the Delta Airport Consultants, Inc. Info Exchange web site.The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: CHO-Surface Parking Expansion Project Number: 17019 From: Moniratha Moung (Delta Airport Consultants, Inc.) To: Christopher Perez(County of Albemarle) CC: William M. Eschenfelder, P.E. (Delta Airport Consultants, Inc.); Pamela J. Wise (Delta Airport Consultants, Inc.) Subject: Parking Lot and Apron Expansion (a PDF copy) Purpose: For your use Sent via: Info Exchange Expiration Date: 9/11/2019 Remarks: Good afternoon Mr. Perez, Please find a linked in this email to download a PDF plan set. Should you have any question, please don't hesitate to contact our office. Thank you. Transferred Files NAME TYPE DATE TIME SIZE 17019 Site Plan 2019-07- Adobe Acrobat 7/15/2019 12:50 26,010 15.pdf Document PM KB Moniratha Moung, CADD Technician DELTA AIRPORT CONSULTANTS, INC. 9711 FARRAR COURT,SUITE 100,RICHMOND,VIRGINIA,23236 O.804.275.8301 D.804.955.4529 I WWW.DELTAAIRPORT.COM 8 / • •R•/ /' 1\ A III E __�/ BANA.6M' / \ �` - • 6 �'"�1 T IIIIIIII / - \ I ( / __ / y3i;+T_' Y PHASE 2 F _ d • \ �RFF FACILITY �/ / 1 �e�,� I*�;�c �� - IyNN,d T_•xs, (q � /SEE SHEETC135-2 �• • 3 xw•_E,xr f EK, BUILDING NG wee u n / Ji 1�1�A�B11ir ' • : :r 1 „r AFC ..- .___ t ` y e 1 \_ •"CONTROL TONER ,.. /�� \\"- \ �JL \.., AMVEST H` it B^ WORRELL 1 i 2 41 I .. a°s,1`g ,1 .0I I I ` a..''li► ~. YY.�.a.• _ ,4...• i 1c l " N IIIII• 11 "S: a jJ W<� .�� u I I�_� . ulmaAA�. IMP" a MRlloll ...:�"(1 ,t 3i� s ®�✓ i z`o /f l'Ci•. \ ..I II ' w a"u*•0'.m.i np % \�\ - I 1 1 /• i ( •••,-, - r i i 1.: 'n --'�.73:faYa.� JI L I II Iry�'� - - B� i;�i a- l „il • F• 'I \e�rv'- �__ I °.>♦�a: .rr+ s 1 e7lw„d r/ Air ,4il� _ _ � - `•S'1111 {• '.�x ■�.. OG/ w�Ap rt1"�'�y�r.ate �, -:�� ,:� rI � // / / /u�i � � \ �. �� // c E��3~C� 4' �C==�� t �-.......:.._2;. , ems_ ' � '@a�A iU�� � � \�p\ \ ��/ 7.* \\. i I witew�■w■■w■■w■� 10 • '` o\� ,%/j, / yew:,..)/ 1 is• •la li. .` A _ y 1 f "a(r nIli t " _ .. ■ r ��11� ■. 1 1`mil_, \► :iInIIIpIpIIlAu�rry//�i!/I\ ,,,-1.- \I►/ .` 5\ i :aa : i / y� i GI . 111hp1Iuu4h11U411u 1 II r nary q a �` / / iz, _ �� wN ^�' / II JIIII;,,,IIII,.ii,s1lllihlll! IU ,i I^l i'I11i1I'l I ' a'- - � _ � \ .,IIIIIII II IIIIIIIIIII/ %/'/j/I I //lllf f II 11I 11l ..%1 (Ii ' \\ I I II II II I I ! _ / - I I I I / I l N I 1 I �� -r 4n- . ,1,.. .: • D. .� , i ._, `• •l 1 11 . Bolo Ilil i Ij11100,r ,14411 11111\\\\\i\\� \5rl`i I I , 9. C.,. 1 > RS 1!' 1 C .�� ullhluyyiulyllgpin ! I qi �w�v v /r 7 ��� / / D II III nli I \ 9 �,�� ! �... �� - ' 9 s ' II I u 1 ,011 11 I 1 l \ \ \ \ \ a -,, _ .D � I� nl / nl \\ /I :"? �il�ih7R •lrilli: 11 • r i, ,i, ,»u u l u u j/ • ., —I 6'i`/ ! - /".8 5xxay°301,�.' ar g _ 4. ; ��p..,:// 0,/1 t ;II \\\ I ° .�.• ,'N•,i% l/, it It \ / xv.WV.Riryl€)®,-/ _ _ -- _ ,-,4,, ♦..� �R. 111 ©, . i, r /// \ `4 s_ "� '? +SRt 11?S1d■•r■i+lana-. Iriii •inijr_ ...�.s • _ - --- — _ _ -1..x„E. E E. . I \ -SEE SPIFFY C134-2 r'/! • e L;.. .`.• Vim_ t _ � _ OR ROAD z��^ l _ --.• /'i/ / ///� /Ci \. �-I y� -� ` \1` \ 71 - S,- - -�`? • .. \_ • Y DREPLACE• •- l / \ \• ':J:�i� ! / N%%• / ii$t ' Ir•..\..4 x f,;�.. \\\�\�' ^\�\\\\\ - J W//� _ V-...7,...,r.i� tv $�^- =`�M-�- _ < —__-/ '.' w�TEANIECsEE NoiE\ All�:i/ __ -\_h y i i,///J/'/-' /-/ \ ' \�\\\\ \ \91 sM'/G///. IIU�18—__ a _ sx.. ill ;; 'E�I/ / ! �r)t \. ,\\\4.1:\ u , r ,Ad VA\\ , 1 V'�i v� Ar' ;11;111� V A0 /..-''--- \uoDEr Ewsnnc — - // !!!/,/ , A 'rti 1 I �rll' Cr` \ V A 1 1 1 I pyyy/ . 11 ;1111 A V \ d cRSNeci cwiEz ++,, ''++yy{{ /ij / I v' • II I' \pl II11 I/,,,,-- BOA L��- M1j1� \\ \ ITT r� �Y/f• f -�' 's / 1 rl r I \ \ L \ A \ 111 I I / Vyp•. 1 1111 \ \ \ �.�..)�h/ BASIN d t�� _ I / -"�._ _ - �: 1\1\ 1 I // /I II l\tl ,d' 1 I \\ �_r _ _ .3 ^^•E . — _ !I 1 1 \ '\ 1 A V I I 1 9� 4 111 IV v � 1 I \ 11 III // n \��- l I - _` __ -t \p 1 / r Id II I t 'L^ 4 AcsA To sNur ors rATERUNE rc�L«Anw or s*DaY PPE SCALE \ ®• ��. 1\1\\1 I 1 1{!///�//.111\l _ `z: _ '�`1 fY.f+-�0.jr_,yi t. ME N�. I51 SLIME AS REOU REOCONTRACTOR TREYO SAFELY INSTALL REPLACE ME STaR� b_.�__�'-- "- \ �l• _� - ortt�J Z\ 1 `~ Lit 1r ��—- SYSTEM T 5 ESTIMATED APPROXIMATELY 60 Lf MLL REPLACED. • -- - F-=T �- A.- 4 �t� tx-GATE K MEGA-LUGS TO%NSTALLED AL VEST \ \ \ i.. Z�f\'-'' ":::".'- - _ _V-6• „��-- I = 'CONNECTION PONT PPE SNALLMEET CARE COATED REQUIREMENTS ZINC `-R � ) / qI ` I ^� � � - O/ \ ) \ \ �t'4 fit — ` \ \i COATED r1i1RIC5/4EEVES TO N ACSA ON PREYENIS.ACSA IC c. - `T `` _ ' NSiALLAi ON PRESSURE TEST • DELTA AIRPORT , APRON/PARKING EXPANSION 70 4•�Y A.Ro. NON-ALP 17019 � .. =u,,Draper,, Aden Associates cote��/ DRAWN Br- LM YIHT CONSULTANTS, INC. o4. GRADING 8 DRAINAGE PLAN KMJ C133-2 9 mr. DESNRIFD BY: aaoL exACE•AIIBILre o—..,n.r..o—..+.o...- ..•+...-•• ohDnR2'18DAI775 rkway • Id •I1.1ma�:•Drl3com a8'raxAti.' � CNARLOTTESVILLE-ALBEMARLE AIRPORT• . I°'MY20,9 so REVISIONS BY ARP. DATE