From: Christopher Perez
Sent: Friday,August 23, 2019 4:19 PM
To: jborgie@deltaairport.com'
Cc: Margaret Maliszewski
Subject: SDP201800084 Parking Lot and Apron Expansion - Minor Amendment
Mr.Borgie,
RE: SDP201800084 Parking Lot and Apron Expansion-Minor Amendment
As discussed over the phone the recently submitted plan set is not approvable as submitted.Please make the required revisions we
discussed over the phone;either through a slip sheet scenario or a revised set.Below I offer the following required changes prior to
approval:
1)Revise sheet El 02-3 photometric label to"Phase 3"so it matches the phasing sheet C103-1 label for this phase.
2)Provide the other half of the photometric plan for the above ref parking lot,which was previously sheet El 03-3 on the last set.
3)Revise sheet E501-3 to provide the correct cutsheets for lighting and all lighting information for all lighting fixture types(A,B,B1,
C,D).The last set provided the correct information.
I'd like to backtrack on one comment we discussed over the phone,which was correcting sheet L101-4 phase label for the landscaping
associated with the new pavilion.Last we spoke I suggested you remove and relocate this landscaping island to the plan that will
propose the future pavilion or modify the phasing label. On second thought,this landscape island and the proposed landscaping may
remain as depicted with a phase 3 label.Whenever the pavilion plan comes in if you want to modify that landscape island that will be
the time for that to take place.
Hope this helps.
Christopher Perez I Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443