Loading...
HomeMy WebLinkAboutSDP201800084 Review Comments 2019-08-21 1010 DELTA AIRPORT CONSULTANTS, INC. August 21, 2019 . -nror Planner Planning Department County of Albemarle 401 McIntire Road Charlottesville,VA 22902 Subject: SDP201800084 Parking Lot and Apron Expansion—Minor Amendment Charlottesville-Albemarle Airport Dear Mr. Perez: Please find enclosed the revised plans for the above referenced project at the Charlottesville-Albemarle Airport. In Response to the August 16, 2019 comments, Delta offers the following: Comment: [32.52(C), 36.6.2 (a)] Phasing: The landscaping island fronting the pavilion can remain; however, if it is not proposed to be installed either remove the proposed plantings or provide a phase line around these plantings to indicate phase 2 and provide an estimated date of beginning and completion for this phase. Additionally, sheet L101-4 depicts proposed replacement plantings throughout the existing parking lot; however, in follow-up emails it has been stated that these improvements will be pushed to a future date. Either remove the proposed plantings or provide a phase line around these plantings to indicate phase 2 and provide an estimated date of beginning and completion for this phase. Rev 2. Comment not addressed. I offer the following clarification: If the landscaping is to be removed now but not replaced till Spring of 2020, revise all reference to "Phase 3" for this landscaping and replace with reference to "Phase 1". Additionally, be aware that this landscaping will be required to be bonded with the County for a 1-year period to allow the replacement of the landscaping to be postponed.This shall take place with the final inspection of the phase 1 parking lot expansion. If the landscaping is to be removed in the Spring of 2020 and replaced in the Spring of 2020,then the "Phase 3"label is appropriate, provide the following note next to the phasing: "Phase 3 landscaping is to be removed in the Spring of 2020 and replaced in the Spring of 2020". Response: The landscaping sheets L101-4 through L103-4 have been revised. "Landscape Phase Note: Phase 3 Landscaping is to be removed in the Spring of 2020 and replaced in the Spring of 2020" has been added to the bottom of each sheet. 2700 POLO PARKWAY, MIDLOTHIAN VA 23113 P. (804) 275-8301 F. (804) 275-8371 WWW.DELTAAIRPORT.COM t41. I. Building Inspection Comments: Add the following notes to the general notes page: 1. Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. Walls require inspections as outlined in the USBC. 2. Accessible parking spaces and access isles shall not have a surface slope greater than 1:48. Access isles shall be at the same level as the parking space they serve. 3. ALL water lines, sewer lines, and fire lines from the main to the structure MUST have a visual inspection performed by the building department. 4. All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks. Response: The requested notes has been added to the General Layout, Critical Slopes, and Project Notes Sheet C101-1. Thank you for your review. Should you have any questions, please call our office. Sincerely, rVjaketifivu William M. Eschenfelder, P. . Enclosures: Cc: Jason Devillier,CHO w/o encl Delta Project No. 17018/17019