HomeMy WebLinkAboutSDP201800084 Correspondence 2019-08-09 Christopher Perez From: Amy M. Ferrell <AFerrell@deltaairport.com> Sent: Friday,August 09, 2019 2:09 PM To: Christopher Perez Cc: William M. Eschenfelder;Amy M. Ferrell Subject: RE: SDP201800084 Parking Lot and Apron Expansion - Minor Amendment Chris- I just left you a voice mail, but wanted to follow up with an email. The contractor is ready to working on Erosion and Sediment control measures on Tuesday following their E&S pre- construction meeting with Community Development,for the Parking Lot Expansion project at the Charlottesville- Albemarle Airport. Do we have your permission to give them the ok to begin rior to the site plan approval? They were not aware that this was not approved, and have materials being delivered,their crew, a d sub consultants lined up for next Tuesday and Wednesday. Can you please let me know today if you have concern so that I can coordinate with them? The Airport is quite anxious to get the project started so that it can be completed in October in time for their heavy travel season, and would appreciate if these early E&S tasks can h Ip expedite the construction schedule. Feel free to give me a call. / A Thank you ,al e � .� W�� r ,�� A Amy M.Ferrell,Project Assistant I tok„, P� , � //_ DELTA AIRPORT CONSULTANTS,INC. . '! J l'� I_' C `� -r Q.(-� G� �g'��/�,,j/ 20545 Center Ridge Rd,Suite 450 P -3 / ii � l� Cleveland,OH 44116 1-12— 5,, r (804) 275 8301 'rG.. it AFerrell@deltaairport.com From:William M. Eschenfelder Sent: Friday,August 09, 2019 9:31 AM To: Christopher Perez<cperez@albemarle.org> Cc:Amy M. Ferrell<AFerrell@deltaairport.com> Subject: Re:SDP201800084 Parking Lot and Apron Expansion- Minor Amendment Chris, Thank you for update. FYI the construction Contractor has scheduled a E&S preconstruction meeting with Community Development on Tuesday. What can we do to make sure that the site plan is finalized ASAP? Thank you, Bill 1 On Aug 8, 2019 4:22 PM, Christcr_-_r Perez<cperez@albemarle.org>wroL. ' Bill, RE: SDP201800084 Parking Lot and Apron Expansion-Minor Amendment I received your voicemail seeking a status update. I plan to finish up my review of the plan sometime next week, aside from that I am waiting on ARB's review,they also hope to have it completed sometime next week. In the meantime, I offer the following reviewer comments (please don't make any changes till you receive all review comments). thanks Michael Dellinger—Building Inspections (comments provided below) 1. Add the following note to the general notes page: Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. Walls require inspections as outlined in the USBC. 2. Add the following note to the general notes page: • Accessible parking spaces and access isles shall not have a surface slope greater than 1:48. Access isles shall be at the same level as the parking space they serve. 3. Add the following note to the general notes page: ALL water lines, sewer lines, and fire lines from the main to the structure MUST-have a visual inspection performed by the building department. 4. Add the following to the general notes page: All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks. Matthew Wentland—Engineering 1.No objection Christopher Perez I Senior Planner Department of Community Development'County of Albemarle,-Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 • 2