Loading...
HomeMy WebLinkAboutSDP201800084 Review Comments 2019-08-08 Christopher Perez From: Christopher Perez Sent: Thursday, August 08, 2019 4:22 PM To: William M. Eschenfelder Subject: SDP201800084 Parking Lot and Apron Expansion - Minor Amendment Bill, RE: SDP201800084 Parking Lot and Apron Expansion-Minor Amendment I received your voicemail seeking a status update. I plan to finish up my review of the plan sometime next week,aside from that I am waiting on ARB's review,they also hope to have it completed sometime next week. In the meantime, I offer the following reviewer comments(please don't make any changes till you receive all review comments).thanks Michael Dellinger—Building Inspections(comments provided below) 1.Add the following note to the general notes page: Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. Walls require inspections as outlined in the USBC. 2.Add the following note to the general notes page: Accessible parking spaces and access isles shall not have a surface slope greater than 1:48.Access isles shall be at the same level as the parking space they serve. 3.Add the following note to the general notes page: ALL water lines, sewer lines, and fire lines from the main to the structure MUST have a visual inspection performed by the building department. 4.Add the following to the general notes page: All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks. Matthew Wentland—Engineering 1.No objection Christopher Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1