HomeMy WebLinkAboutSDP201800084 Review Comments 2019-07-12 Christopher Perez
From: Christopher Perez
Sent: Friday,July 12, 2019 7:43 AM
To: Campbell Bolton
Cc: Matthew Wentland
Subject: RE: CHO Parking Lot - Storm Pipe Rev.
Campell,
Matthew is correct,the site plan needs to depict the changes. Please revise the site plan to show the latest layout. Based
on your description of the changes the only reviewers who will need to review the revised plan set are Engineering and
Planning, unless for some reason these changes effects other aspect of the plan that other reviewers are involved with,
then I'd also transmit it to them for review. For example, if landscaping is being moved or modified with these changes
then ARB will also need to review the revisions. If travelway layout is being modified,then Fire and Rescue will also need
to review it. Please submit a minimum of 5 revised plan sets and provide a short write up of what is being modified from
the previous version of the plan.
Thanks
Christopher Perez i Senior Planner
Department of Community Development 1County of Albemarle,Virginia
401 McIntire Road l Charlottesville,VA 22902
434.296.5832 ext.3443
From: Matthew Wentland
Sent: Friday,July 12, 2019 6:44 AM
To:Campbell Bolton<cbolton@daa.com>
Cc: Christopher Perez<cperez@albemarle.org>
Subject: RE: CHO Parking Lot-Storm Pipe Rev.
Campbell,
That looks good.Just turn the plans back in with that change.The site plan should also show those changes, but you'll
have to check with Chris on how he wants to handle it.
Have a good weekend!
Matt
From:Campbell Bolton<cbolton@daa.com>
Sent: Wednesday,July 10, 2019 6:08 PM
To: Matthew Wentland <mwentland@albemarle.org>
Subject:CHO Parking Lot-Storm Pipe Rev.
Hey Matt,
I'm working with the contractor to make a minor change to the storm pipe as it enters the basin at the CHO
Airport Parking Lot Project. I believe this has at least been mentioned to you previously, so not sure how much
background you have. Basically, we've added a new structure to direct the line around an existing guy wire.
There are no revisions to drainage areas, and the LOD line has been updated, but is within 50 sf of the previous
submittal. Before finalizing everything, I wanted to provide the attached sketches for reference. If you generally
agree there aren't any issues with this alignment, I'll go ahead and get the pipe calcs and full plans updated.
i
I'd also like your input on the best way to get these revisions approved without holding up the approval and
permit. The contractor is anxious to get started, so I'd really like to avoid delaying that as much as possible. I'm
not sure if that would be trying to submit something back to you ASAP, or if it would be better to hold off until
after the permit is in hand and issue it as a field change type revision. I appreciate the assistance.
I'll be out of the office on and off in meetings tomorrow, but please try my cell phone if you'd like to discuss.
Thanks
E. Campbell Bolton, P.E.
Project Manager
Draper Aden Associates
Engineering•Surveying•Environmental Services
Lasting Positive Impact"
Phone:434.295.0700 • Direct Line:434.284.4782 • Mobile 434.906.3892
Web • Blog • Facebook • Twitter • Linkedln
2
Review Commer for SDP201800084 rlinorAmendmentLI
Project Flame: Parking Lot and Apron Expansion
Date Completed: Friday: July 12 2019 Department'Division?Agency: Review Status:
Reviewer:[Shawn Maddox HI Fire Rescue No Objection
Fire Rescue has no objections SNM