Loading...
HomeMy WebLinkAboutSDP201800041 Review Comments Initial Site Plan 2018-07-12Short Review Comments Report for: SDP201800041 ]- BELVEDERE PHASE 5 - INITIAL SubApplication Type: I Initial Site Plan Date Completed: 06-14-2018 Reviewer: Michael Dellinger Division: CDD Inspections Review Status: No Objection Reviews Comments: Date Completed: 07-01-2018 Reviewer: Shawn Maddox Review Status: Reviews Comments: Requested Changes Division: Fire Rescue 1. Cul-de-sac must be a minimum of 96' diameter. 2. Hydrant spacing appears to exceed 250' from any point on street or road frontage to a hydrant. 3. Developments of one- or two-family dwellings where the number of dwelling units exceeds 30 shall be provided with two separate and approved fire apparatus access roads. 4. Building heights are proposed to be 35'. If this is the case then the required unobstructed width of the travel lane shall be 26' to allow for aerial fire apparatus access. 5. The street as shown would be required to be marked no parking on both sides. 6. A fire flow test will be required before final acceptance. Date Completed: 07-06-2018 Reviewer: Adam Moore Division: VDOT Review Status: Requested Changes Reviews Comments: Date Completed: 06-29-2018 Reviewer: Richard Nelson Division: ACSA Review Status: Requested Changes Reviews Comments: 2018-06-29: 1 recommend SDP201800041 Belvedere Phase 5 — Initial for approval with the following conditions: 1) Submit 3 copies to ACSA for water/sewer review. 2) RWSA sewer capacity certification will be required. 3) RWSA's comments will need to be addressed before final approval as well. Date Completed: 06-28-2018 Reviewer: Victoria Fort Review Status: Requested Changes Reviews Comments: Division: RWSA 2018-06-28: RWSA has reviewed the initial site plan for Belvedere Phase 5 as prepared by Roudabush, Gale & Associates, Inc. and dated May 21, 2018 and has the following comments: General Comments: 1. An RWSA sewer flow capacity certification will be required prior to final site plan approval since the overall Belvedere Development produces sewage flow in excess of 40,000 gallons per day. 2. Include the RWSA General Notes on the plan (attached). Sheet 05 of 08: 1. Label RWSA manhole as "RWSA RVI-MH-50" and call out invert elevations 2. Label RWSA sewer main as "RWSA 48" Sanitary Sewer Main" 3. The ACSA easement should extend beyond the RWSA sewer main (the two easements will overlap) 4. Include a sanitary sewer profile in the final site plan showing the proposed 8" sewer Page: 1 of 2 County of Albemarle Printed On: October 15, 2019 Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed Reviewer: connection. 5. Include the following RWSA sanitary sewer connection notes this sheet: a. All connections to RWSA manholes shall be watertight and made with a flexible rubber boot. b. All coring methods, the coring contractor and all materials for construction shall be approved by RWSA in writing prior to construction. C. RWSA Engineering Staff shall be present for all cores into the manholes. d. Bypass pumping may be required at the sole discretion of RWSA staff. e. Grouting of the manhole bench or interior may be required, at the sole discretion of RWSA staff, for a smooth transition of flow. f. Existing manholes shall be backfilled to original grade to the satisfaction of RWSA. g. Contact RWSA Engineering a minimum of 3 business days in advance to schedule a core of a manhole. 6. RWSA as -built drawings indicate that the base of the manhole may be 16-17' below finished grade. Please note that RWSA does not allow internal drop connections. External drop connections should conform to RWSA Detail Sewer 3 (see attached). Note that for an existing manhole, the invert of the 8" connection should match the top of the bench (not the invert of main line, as shown). All other requirements for a drop connection are as shown. 06-26-2018 Division: Health Department No Objection 07-11-2018 Patricia Saternye Division: CDD Planning Requested Changes 2018-07-11: Draft comments sent to applicant. This site plan requirea significant changes and therefore a resubmission addressing specific issues must be provided or the site plan will be denied. 06-14-2018 Elise Kiewra Division: CDD E911 Review Status: No Objection Reviews Comments: 1per site plan dated 5/21/18 Date Completed Reviewer: Review Status: Reviews Comments: 07-03-2018 Emily Cox Requested Changes Division: CDD Engineering Page: 2 of 2 County of Albemarle Printed On: October 15, 2019