Loading...
HomeMy WebLinkAboutSUB201800178 Checklist - Project Closeout (Administrative) 2019-05-20 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC and staff• I el. CDA will forward to the Imaging Center r digital oseout. SDP/.UB# 7e39 PROJEC TITLE 0v• /A^ St tiff FULL 'AME OF LEAD REVIEWE FINAL ACTION DATE: C—/p 77 untyView — ►i Application,Page 2 Data Entered ■ Staff Report,Ground Water Assessment,or other documents placed in"Docs&Pies" H rdcopy— File Folder Closeout: All items listed should be placed in project folder, in reverse c m s nological order(latest on top). i I Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" ne t to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide c1.1 ity to the file,please indicate that item on the"Other" lines provided. D gital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the do ument; or, if the document is already in digital format,can be saved to LaserFiche. Please provide the digital to•ation(path/name) of the document in the space provided. • Engineering Folder Information/documentation El Scan El Saved location El Application(signature copy) El Scan El Saved location ❑ Public Notification records/Abutting Owner correspondence ❑ Scan ❑ Saved location El Applicant Correspondence(to/from, memos/emails) El Scan El Saved location ❑ Complete set of printed Review Comments ❑ Scan El Saved location El Approved plan/plat(signed,or stamped"Approved"with Planner/Engineer name) El Scan El Saved location • Action Letter(Administrative Approval) ❑ Scan El Saved location White Envelope-PC/BOS Meeting Package- Staff Report(include plan/plat presented,PC/BOS Action Letter) ❑ Scan El Saved location ■; Ground Water Assessments El Scan ❑ Saved location •I Other(Please explain—i.e. Studies) ❑ Scan ❑ Saved location II Other(Please explain—i.e. Studies) El Scan ❑ Saved location 1• At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. El Scan ❑ Saved location Additional Information on this project: _ ! • Planning Commission Minutes—may be obtained online or by contacting PC Recording Secretary • Board of Supervisor Minutes—may be obtained online or by contacting the Clerk of BOS • Construction Documents—will be added to this folder after completion of project. Prior to completion, documents may be obtained by contacting the County Engineer. NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Folder has a typed status label(same font&label color as project label)placed under the project label to reflect current project status and date; 3) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents on top); 4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the Chief of Planning for corrective action. Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012