SDP201900050 Longhorn Steakhouse - Final Site Plan
The County of Albemarle Planning Division will recommend approval of the plan referenced above once the
following comments have been satisfactorily addressed (The following comments are those that have been identified
at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each
comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise
specified.]
1. [Conditions of Variation Approved 7-17-191 The final site plan shall comply with the following conditions:
1. The final site plan must provide a shared use path, at least 10 feet wide, along the
entire expanse of the eastern boundary of the lease area. The path must:
a. Connect to the required sidewalk along the southern egress for the site.
b. Include a 6' wide landscape strip between the shared use path and
the mall "ring road" travelway, planted with street trees meeting
the requirements of Section 32.7.9.5.
Final: Comment not addressed. The 10' wide shared use path width shall be measured from the
back of the curb to the edge of the shared use path. Currently the shared use path is only 9.5' wide
with a'/2' curb. Revise the shared use path to be 10' wide. Additionally, the 6' wide landscape strip
shall be measured from the back of the curb to the edge of the landscape strip. Currently the
landscape strip is only 5.5' wide with a'/2' curb. Revise the landscape strip to be 6' wide.
Also, parking spaces abutting the 10' shared use path shall not be permitted a 2' overhang into the
shared use path. For the 14 parking spaces affected provide bumper blocks to prevent parked
vehicles from overhanding into the shared use path.
2. If VDOT does not approve a connection of the northernmost proposed shared use path to the existing
sidewalk on Rte. 29, then the applicant must provide in place of the required sidewalk along the southern
egress of the site either a 10' wide shared use path and a 6' wide landscape strip OR a 10' wide sidewalk
and a 6' wide landscape strip for the duration of the southern egress road. In either case the landscape
strip must abut the road and be provided the required street trees pursuant to Section 32.7.9.5 to buffer
pedestrians. The total width of these improvements shall be 16' wide.
Final: Comment not addressed. VDOT has not received the required information from the
applicant to review/approve a connection of the northernmost proposed shared use path to the
existing sidewalk on Rte. 29.
2. [33.44, 32.7.2.3(a), 32.7.2.3(b), 32.7.2.3(c)] Provide a 5' wide sidewalk along the southern egress road south of
the site. Ensure it connects to the existing sidewalk along Rte. 29 and the required shared use path discussed
above. The pedestrian connection shall meet ADA standards.
Final: The use of a 5' sidewalk in this location is contingent on condition 1.2 of the variation being satisfied.
VDOT has not received the required information from the applicant to review/approve a connection of the
northernmost proposed shared use path to the existing sidewalk on Rte. 29.
3. [33.44, 32.7.2.3(b), 32.7.2.3(c)] The 8' wide shared use path along the northern boundary of the lease area shall
be revised to be 10' wide.
Final: The 10' wide shared use path width shall be measured from the back of the curb to the edge of the
shared use path. Currently a portion of the shared use path, nearest the striping, is only 9.5' wide with a'h'
curb. Revise the shared use path to be 10' wide.
4. [32.7.9.5(e)] Provide a single row of 12" tall evergreen shrubs along the perimeter of the parking area adjacent
to Rte. 29 and the southern egress road where there is currently a large opening being produced by the uneven
spacing of the street trees.
Final: Comment not fully addressed. There are three parking spaces abutting Route 29 which are not screened.
Either continue the evergreen shrubs to fill this area or provide another large shade tree in this area.
5. [32.5.1(c), 32.6.2(a), 32.6.2(g), 32.7.5.1, 4.1] Offsite storm sewer and sanitary sewer easements are required on
TMP 06100-00-00-13000. This property is not owned by the same owner as the subject property. All required
off -site easements must be approved and recorded prior to final site plan approval. Recordation information of
this action shall be provided on the final site plan.
Final: Comment not addressed. Submit easement plat and applications for County review.
6. [32.6, 32.4.3.2, 32.4.3.3, 32.4.3.6, 32.4.3.2] The final site plan shall not be approved until all SRC reviewers
have approved the plan. Their comments are referenced below and attached.
Final: Comment still relevant.
7. [32.6, 32.6.1, 32.6.21 The final site plan shall meet all the requirements of section 32.6 of Chapter 18 of the
Code.
Final: Comment still relevant, I offer the following review comments.
8. [32.6, 4.121 The plan depicts 43 shopping center parking spaces; however, the calculations on sheet C2.1 work
out to 38 spaces remaining for shopping center if 85 spaces are provided the restaurant use out of the total 123
parking spaces. Revise general note P on page C2.1 to match the parking being allocated in the plan. I offer the
following suggested calculation:
71 spaces required for the restaurant use x 1.2 = 85 spaces provided for the restaurant use
+ 38 provided for the shopping center use
Total = 123 parking spaces
9. [32.5.2(a)] Sheet C1.2 is missing from the site plan, revise to include it. Additionally, please provide a total
number of sheets.
10. [32.5.2(a)] Provide the source of the topography.
11. [32.5.2(k)] Provide flow arrows in all storm drainage pipes.
12. [32.5.2(1)] Depict, label, and dimension all utility easements, including gas.
13. [32.6.2(d), 32.6.2(g)] a. Depict and clearly label all existing and proposed utility easements as required, both
onsite and offsite.
b. Provide water line profiles and depict all utility crossings on water and sewer profiles. Depict and label
existing water and sewer facilities to which proposed water and sewer piping to be connected; include sizes.
c. Clearly label all facilities and easements to be dedicated to public use.
d. Provide a statement identifying all water and sewer facilities and easements that are to be dedicated to the
Albemarle County Service Authority.
14. [32.6.2(e)] Depict all symbols and abbreviations used on the plan.
15. [32.6.2(i), 4.12.181 Dimension and label the proposed loading area onsite. Minimum loading space size is 12'
wide, 25' long, and 14 'h clearance.
16. [36.6.2(k), 4.17] Lighting. ARB has extensive required lighting plan changes. Revise the lighting plan to meet all
ARB review comments.
17. [36.6.2(k), 4.171 Lighting. For all fixture types provide cut sheet labels coordinated with lighting schedule and plan.
18. [36.6.2(k), 4.171 Lighting. Provide total lumens for all proposed light fixtures.
19. [36.6.2(k), 4.171 Lighting. Provide manufacturers cutsheets for all lighting fixtures.
20. [36.6.2(k), 4.171 Lighting. Revise the lighting plan to limit the spillover to 0.5 foot-candles at the property line
along the Route 29 right-of-way.
21. [36.6.2(k), 4.171 Lighting. Replace all lighting that is non full cutoff fixtures over 3,000 lumens with full cutoff
fixtures. Ground lighting is not permitted.
22. [36.6.2(k), 4.17] Lighting. Eliminate all light fixtures that are not needed for safety/security from the lighting plan,
including but not limited to the LED cove lighting and ground -mounted lighting.
23. [Comment] Revise the cover sheet to remove reference to the Initial Site Plan and include the site plan application
#: "SDP201900050".
24. [32.6.20), 32.7.9.5(d)] Landscaping. The plan depicts temporary construction easements along the property's Rte.
29 frontage which were granted to VDOT; however, within these easements are required plantings. VDOT shall
approve the plantings in these easements. If VDOT approval is not received the planting islands shall be expanded
and the required trees shall be planted outside the easement.
25. [32.6.2(j), 32.7.9.81 Tree Canopy. Revise the landscape schedule on sheet Ll.l to provide canopy SF counts for all
plantings above 5' at 10-year maturity. These figured will enable staff to determine if the canopy calculations for the
site are met. Canopy calculation information can be found in the County's Approved Plant Canopy List.
26. [32.6.2(j), 32.7.9.51 Street Trees. Add 1 large street tree to the frontage of the property to meet the minimum
street tree calculations required.
27. [32.6.20), 32.7.9.6] Landscaping within Parking Area. The internal landscaping calculations are based on 184
parking spaces; however, the plan only provides 124 parking spaces. Revise the calculation to utilize the
correct parking amount.
28. [32.5.2(a)] Special Exception. Provide the following note on the plan that references the special exception approval
by the BOS: "SDP2018-66 Longhorn Steakhouse —Special Exception to Vary SDP1979-7 Application Plan,
approved by the BOS on July 17, 2019 with the conditions".
29. [Albemarle County Engineering Policy, 32.6.2(a), 32.5.2(n)] Label the maximum height of all retaining
walls.
30. [32.7.2.11 Vehicular Access to Site. VDOT approval is required prior to final site plan approval.
31. [32.6.2(a), 32.5.2(a)] A WPO plan must be approved prior to final site plan approval.
32. [32.6.2(a), 32.5.2(a), 4.201 Setbacks. Revise the setbacks on sheet C2.1 as follows:
Front Minimum: 10 feet from the right-of-way
Front Maximum: None because the lots abut a principle arterial highway.
Side and Rear Minimum: Primary structure shall be separated in accordance with the current edition of the
Building Code.
Side and Rear Maximum: None
Parking Setback: Front Minimum — 10' from the public street right-of-way
33. [32.6.2(h)] Provide a signature panel for signature by each member of the site review committee.
APPROVALS DATE
DEPARTMENT OF COMMUNITY DEVELOPMENT
PLANNER/ZONING
ENGINEER
INSPECTIONS
ARB
DEPARTMENT OF FIRE RESCUE
ALBEMARLE COUNTY SERVICE AUTHORITY
VIRGINIA DEPARMENT OF TRANSPORTATION
Albemarle County Architectural Review Board (ARB) — Margaret Maliszewski
See attached review.
Virginia Department of Transportation (VDOT) -Adam Moore
See attached review.
Albemarle County Department of Fire Rescue - Shawn Maddox
See attached review.
Albemarle County Service Authority (ACSA) - Richard Nelson
See attached review.
Albemarle County Engineering Division - Matthew Wentland
See attached review.
Albemarle County Information Services/E911 - Andrew Walker
See attached review.
Albemarle County Building Inspections - Mike Dellinger
See attached review.
Sincerely,
Christopher Perez
Senior Planner
Reviewer comments provided on subsequent pages
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
October 8, 2019
Mr, Scott Collins
Collins Engineering
200 Garrett Street
Charlottesville, VA 22902
RE: ARB-2019-90 Longhorn Steakhouse Final (06100000013200 partial)
DearApplicant,
The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on
Monday, October 7, 2019. The Board unanimously approved the request, pending staff
administrative approval of the following conditions:
1. Revise the architectural elevations to show the previous larger size of the two shuttered
windows on the south (right) elevation.
2. Provide renderings of the proposed pedestrian connection in the northwest comer of the site
as seen from the EC.
3. Indicate on the site plan the material, manufacturer and color of the retaining wall material.
Provide a sample for review.
4. Revise the guard rail detail for a more coordinated appearance with the railing at the
retaining wall and with the overall development.
5. Correct all inconsistencies in the lighting information. Revise the lighting plans included in
the site plan set as follows.
a. Limit spillover to .5 fc at the property line along Rt. 29.
b. Provide legible lighting cut sheets in the site plan.
c. Provide cut sheet labels coordinated with lighting schedule and plan.
d. Provide total lumens in the schedule for all fixtures with LED lamps.
e. Provide lamp type and wattage in the schedule for all non -LED lamps.
f. Provide complete catalog numbers in the schedule, coordinated with the cut sheets.
g. Provide the proposed color temperature for each light fixture. Provide a consistent
color temperature throughout the development.
h. Specify the finish/color for all proposed exterior light fixtures in the luminaire
schedule.
i. Limit photometric diagrams to those specifically associated with the proposed
fixtures and proposed options. Make the diagrams legible.
j. Coordinate the lighting shown in the architectural plans with the lighting shown in the
site plan.
k. Eliminate all light fixtures that are not needed for safety/security from the
architectural plans and the site lighting plan, including but not limited to the LED cove
lighting and ground -mounted lighting.
6. Provide additional landscape area to ensure that proposed street trees along the EC
frontage will not conflict with easements. Alternatively, provide documentation that
the conflicting easements have been abandoned.
7. Add one large shade tree in the parking island near the southwest corner of the site or
substitute a smaller tree along the frontage with a large shade tree at the south end of the
frontage.
8. Revise the plant schedule to show that the planting size of the Entrance Corridor shade
trees is 3Y2" caliper.
9. Shift the GD further away from the water line at the eastern entrance to the site and shift the
FPAA further away from the sanitary line.
10. Consider an alternate species for the Ash trees.
Please provide:
1. One full set of revised drawings addressing each of these conditions. Include updated ARB
revision dates on each drawing. (Please note that PDF files on a flash drive are welcome in
addition to the paper copy.)
2. A memo including detailed responses indicating how each condition has been satisfied. If
changes other than those requested have been made, identify those changes in the memo
also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate
review and approval.
3. The attached "Revised Application Submittal" form. This form must be returned with your
revisions to ensure proper tracking and distribution.
When staffs review of this information indicates that all conditions of approval have been met, a
Certificate of Appropriateness may be issued.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Margaret Maliszewski
Chief of Planning/Resource Management
434-296-5832 x3276
mmaliszewski@albemarle.org
cc: Jack DeGagne
LDRA, Inc.
105 Trout Lilly Drive
Covington, VA 24426
CV Associates
PO Box 7019
Indianapolis, IN 46207-7019
File
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution.
County staff has indicated below what they think will be required as a resubmission of revisions.
If you need to submit additional information, please explain on this form for the benefit of the
intake staff. All plans must be collated and folded to fit into legal size files, in order to be
accepted for submittal.
TO: DATE:
PROJECT NAME: ARB-2019-90 Longhorn Steakhouse Final
Submittal Type Requiring Revisions () indicates County Project Number # Copies
Submittal Code
Erosion & Sediment Control Plan E&S
Mitigation Plan MP
Waiver Request WR
Stormwater Management Plan SWMP
Road Plan RP
Private Road Request, with private/public comparison
PRR
Private Road Request — Development Area PRR-DA
Preliminary Site Plan PSP
Final Site Plan or amendment FSP
Final Plat FP
Preliminary Plat PP
Easement Plat EP
-Boundary Adjustment Plat BAP
Rezoning Plan REZ
-Special Use Permit Concept Plan SP-CP
Reduced Concept Plan R-CP
Proffers P
Bond Estimate Request BER
Draft Groundwater Management Plan D-GWMP
Final Groundwater Management Plan F-GWMP
Aquifer Testing Work Plan ATWP
Groundwater Assessment Report GWAR
Architectural Review Board ARB
Other: Please explain
(For staff use only)
Submittal
Code
#
Copies
Distribute To:
Submittal
Code
#
Copies
Distribute To:
ARB
1
Margaret
Maliszewski
Stephen C. Brich, P.E.
Commissioner
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper Virginia 22701
October 7, 2019
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Christopher Perez
Re: Longhorn Steakhouse
SDP2019-00050
Review #3
Dear Mr. Perez:
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as submitted by Dynamic Engineering, revised
6 August 20I9. The comments are re -printed here as neither have been addressed in the current
version.
1. Provide details concerning the proposed retaining wall modification. Details will be sent
to the Culpeper District Structure & Bridge Section for review.
2. It appears that runoff will concentrate on the proposed pedestrian connection from both
sides. This will have to be properly managed; please provide detail.
If further information is desired, please contact me at 434422-9782.
However, note that a VDOT Land Use Permit will be required prior to any work within the right-
of-way. The owner/developer must contact the Charlottesville Residency Transportation and
Land Use Section at (434) 422-9399 for information pertaining to this process.
Sincerely,
Adam J. Moore, F.E.
Area Land Use Engineer
Charlottesville Residency
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
Review Comments for SDP201900050 iSite Plan
Project Name: LONGHORN STEAKHOUSE - FINAL - DIGITAL
Date Completed: Sunday, September 22, 201 DepartmentlaivisionlAgency: Review Status:
Reviewer: Shawn Maddox 7-1 Fire Rescue Requested Changes
1 _ Will the building height exceed 30'? If so the designated travel lanes around the building must be 6' on one contiguous side
of the
structure-
_ A hydrant needs to be added in the vicinity of the building-
3- If the building is going to be sprinklered then the FDO location must be shown and the hydrant placed within 100' of the FDC_
4_ A knox box will be required_ Please add a note indicating the requirement and that placement can be coordinated with the fire
marshal's office-
5- Afire flow test will be required prior to final acceptance_
Page: County of Albemarle Printed On: 11011512019
Review Comments for SDP201900050 I.Site Plan
Project Name: LONGHORN STEAKHOUSE - FINAL - DIGITAL
Date Completed: Monday, September 23, 201 DepartmentlaivisionlAgency: Review sus:
Reviewer: Richard Nelson ACSA Pending Nd
From: Richard Nelson <rnelson serviceauthority_org>
Sent: Monday, September 23, 2019 4:06 PM
To: Christopher Perez <cperezalbemarle_org>
Cc: Megan Nedostup <mnedostupalbemarle_org>
Subject: RE: SDP201900060 Longhorn Steakhouse - Final Site Plan
Chris,
Below are comments for Longhorn Steakhouse:
Show existing water main_
Provide fixture counts to determine meter size_
Confirm with Fire/Rescue if a fire hydrant will be required_
Show existing sewer_
Submit 3 hard copies to ACAfor review_
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434) 9774611
n
Page: County of Albemarle Printed On: 11011512019
Review Comments for SDP201900050 iSite Plan
Project Name: LONGHORN STEAKHOUSE - FINAL - DIGITAL
Date Completed: Wednesday, September 18, 2019 DepartmentlDivisionlAgency: Review Status:
Reviewer: Matthew Wentland 7-1 CDD Engineering Requested Changes Nd
1_ The VMP plan will need to be
approved-
_ Provide the Deed Book and page of all offsite easements_
A
Page: County of Albemarle Printed On: 11011512019
Review Comments for SDP201900050 IS.ite Plan
Project Name: LONGHORN STEAKHOUSE - FINAL - DIGITAL
Date Completed: Thursday, September 19, 201 DepartmentlaivisionlAgency: Review sus:
Reviewer: Michael Dellinger CDD Inspections Requested Changes Nd
Add the following note to the general notes page: A
Building or structures built before January 1, 1985 must have an asbestos survey performed in order to apply for a permit_
Asbestos removal permits are required if positive for such_ Contact VDOLI for additional requirements and permits for
demolition projects_
Add the following note to the general notes page:
ALL water lines, sewer lines, and fire lines from the main to the structure MUST have a visual inspection performed by the
building department_
Add the following to the general notes page:
All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks_
Add the following note to the general notes page:
Retaining walls greater than 3 feet in height require a separate building permit_ Walls exceeding 4 feet in height require a
stamped engineered design also_ Walls require inspections as outlined in the UBC_
Edit all ADA language to reference the 2009 ICC All i_1 Accessibility Code_ We do not regulate ,FDA
Page: County of Albemarle Printed On: 11011512019
Review Comments for SDP201900050 iSite Plan
Project Name: LONGHORN STEAKHOUSE - FINAL - DIGITAL
Date Completed: Tuesday, September 03, 2019 DepartmentlaivisionlAgency: Review Status:
Reviewer: Andrew Slack CDD E911 I No Objection Nd
No objection_