Loading...
HomeMy WebLinkAboutWPO201700036 Certified Engineer's Report 2019-06-20 S C S ENGINEERS Environmental Consulting &Contracting June 20,2019. File No.02216108.01 • Ms. Emily Cox, PE Civil Engineer II Department of Community Development • 401 McIntire Road Charlottesville,VA 22902 Subject Ivy Materials Utilization Center-Transfer Station Permit-By-Rule(pBR) 132 Modification Design and Construction Certification Dear Ms. Cox: On behalf of the Rivanna Solid Waste Authority,SCS Engineers(SOS) is submitting the following certification statement regarding the design and construction of the Ivy Solid Waste Transfer Station. In accordance with VSWMR 9 VAC 20,81-410.A42.e.(1),this statement is provided to certify that the applicable design and construction standards of 9 VAC 20-81-330.B have been met for the subject transfer station. Certification indicates a professional opinion based upon professional experience,a review of applicable regulations in effect at the time of this certification, interpretation of the intent of the design/construction requirements, review of construction submittals,and site observationa. Based on review of as-built information provided on June 20. 2019,the transfer station still meets the applicable design and construction standards mentioned above. If you have questions or require additional information, please contact the undersigned at 757-466- 3368. Sincerely; . • 0 0100, _ __ • _kg+ •'I* - . • 0.,1) ci0 ANTHONY S.TOMLIN A hony S.TO lin,'PE 4c.No.03397? tt$ Project Maria et SCS Engineers 1:14, • ORAL-6' cc: Michelle Simpson/RSWA 2877 Guardiah cane,Ste. 1-F,Virginia Beach, VA 23452 I 757-466-3361 9::$ Lincoln Surveying 632 Berkmar Circle Charlottesville, Virginia 22901 1-434-974-1417 Tuesday, February 26, 2019 12:24:43 PM PROJECT: ect files\data9\117\117007900 IVY LANDFILL\117007900 ASBUILT_19052.pro Point Coordinates Listing Point North East Elev Name 20077 614179.35500 1955245.24400 696.00 Al 20078 614206.50700 1955436.10700 725.00 A2 20079 614236.18427 1955419. 97121 720.34 A4 20080 614308.70543 1955620.82561 704.58 A3A 20081 614301. 61804 1955625.57664 704.59 A3B 20082 614287.21100 1955470.33300 720.07 A5 20083 614314.27500 1955459. 61400 724.36 A6 20084 614330. 67464 1955452.27466 723.00 All 20085 614285.81200 1955378.02200 728.86 A7 20086 614415.45000 1955307.75400 738.77 A8 20087 614441.27943 1955363.30546 738.37 A9 20088 614380.03315 1955425.24609 735. 64 A10 20089 614315.43100 1955471.48200 * BUILDING 20090 614354.80200 1955563.54400 * BUILDING 20091 614462.04100 1955517.36800 * BUILDING 20092 614422.55300 1955425.31200 * BUILDING 20093 614423.58550 1955425.15050 * TRENCH DRAIN 20094 614467.73600 1955528.14400 * TRENCH DRAIN 20095 614520.91950 1955505.16300 * TRENCH DRAIN 20096 614476. 69200 1955402.30800 * TRENCH DRAIN 20097 614356.22700 1955703.00300 704.07 A15 20098 614420.98600 1955706.45300 706.08 A14 20099 614394.65600 1955579.99900 722.25 A13 20100 614491.15644 1955531. 61121 738.55 Al2 20101 614244.19600 1955662.78100 * WL 20102 614244.59943 1955603.09865 * WL 20103 614225.26500 1955552.71700 * WL 20104 614323.00500 1955513.03400 * WL 20105 614365.54300 1955613.86000 * WL 20106 614443.06050 1955623.33300 * WL 20107 614449.84716 1955648.17040 * WL 20108 614474.49200 1955679.70400 * WL 19164002 614484.27500 1955527.95200 738.87 INV 8"PVC `_ .-J