HomeMy WebLinkAboutWPO201700036 Review Comments 2019-04-16 of nry�
I d �►-v,l 1? Cox =�®=- op - •
c
Fro w M l: I `el I S, _pS�►'l r
F
c
/ �w5A Department of
OF ALBEMARLE
of Community Development
(� € ' -I I ( I I q401 McIntire Road,Room 227
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
VSMP Permit plan review
Project title: Rivanna Solid Waste Authority New Ivy Solid Waste Transfer Station
Project file number: WPO20 1 700036—Amendment 1 (AS-BUILT REVIEW)
Plan preparer: design: SCS Engineers—Anthony Tomlin [ttomlin@scsengineers.com]
As-built: Lincoln Surveying
Owner or rep.: RSWA—Phillip McKalips [PMcKalips@rivanna.org]
Barry Hertzler—Project Manager[BHertzler@lantzcc.com]
Plan received date: 28 Nov 2018
Date of comments: 11 Dec 2018
Reviewers: Emily Cox
Mr.Hertzler-
We received as-built drawings for the above referenced plan. In order to process these as-builts
and close out the DEQ general construction permit,the items below need to be addressed. It is our
understanding that some items have been shared with the County inspector,John Yerby,however,
please provide all items in one,concise package for review.If you have any questions,feel free to
contact me. R VAL5 I.-e_5 o b
1. Provide a bond inspection request form. Since this is a County project,there is no fee
associated,but the application is still necessary.Form can be found here:
http://www.albemarle.org/upload/images/forms center/departments/ ommu ity Develop
ment/forms/bonds/Bond Inspection Request Form.pdf Al}GkC Cd dated 113I 119
2. Termination form:
https://www.deq.virgin}a.gov/Portals/0/D Q/Water/Publications/CGPNoticeofTerminatio
n2014.pdf. At t e d c ocf-e4 Z/ 1 '9
•
3. Ensure all applicable items in the following checklist are provided:
http://www.albemarle.org/upload/images/forms center/departments/Community Develop
ment/forms/applications/WPO VSMP Construction Record Drawings Policy 23May20
14.pdf
It appears the following items are still necessary: SQe � � e►ra [�
a. Inspection records.WQ I Y e d by CO(.t ra\1eci
b. Geo-coordinates of all facilities. Alta_C{�p4 C2.c o?le-6
c. Verified drainage area maps. R o i reps Co u h y,s t--f-e. V i s t.f a
d. As-built profiles(as-built plan-view was provided).2..-F III s tze Se,-I-5 attacked Q U
e. Computations or verification/certification that as-built is equivalent or better thap S1Y
/ft
design.(Per County code 17-422-D....."...certifying that the stormwater S LS '' n�e� `4ru(`�i
management facility has been constructed in accordance with the approved lan f„,�`'"`-I-t o h 0.110.C�eo�
f. Ditch lines on as-built . 2 �u s I Qs-bu' If so-.5c tr0.Ci.eol
owe.✓
•
Engineering Review Comments
Page 2 of 2
g. Material layers.De(j Ye_y v '}�C�-�5 -Po r 3ah c ct ricl
`I pea 3 rave. I a I cxd- c(
M 0.ter t o is wore i•hstct I I LC 2cc,o1 ct o n
w,'th y e14rt 5