Erosion & Sediment Control-Stormwater-Management
Preconstruction Conference Checklist
Name of Plan: /ktcd-) / 50,)4r" 54)4' .S
Plan No.: 2.6)7 - (2OO,.
Date: 60- /0 - /�
1)Copies of approved plan given to: Owner or Authorized Agent Contractor
2) Have all the conditions been met? )/FS
3) Responsible Land Disturber: J t/icJ 5-14.4�5A
Cert ic.No.: 1)% t o 7.0) Type:
Address/Phone/Mobil Phone: 9U aK Q J Jt VA- 2.2.5f fAS-
053-906
4) Name of Prime Contractor: 1441.3 eZ Cc cIr.t41.0,-) ro,.y,e,/
Address/Phone/Mobil Phone: 53 S' SI,A4t1., ST R-e -
/ /
Name of Subcont
ractor: �Y4Cl/GG �tv
5) Persons in Attendance:
Name Firm
,0 306).. - A 1hg,kith CcL
e65ie _114e-mayeir C
.04
wtt
1., -- r..`�
(6) Date Permit Issued: _/b -Jo -/7-
(7)Talk about"First Steps" (Perimeter E&S controls and Tree Protection first), Erosion and Sediment Control
Narrative and Sequence of Construction
(8) Enforcement and Fees: Warnings, NTC and SWO in that order with re-inspection fees of$250 for NTC's
and SWO's. (Mud in the roadway will have a NTC issued without a warning)
(9) Review Frequency of Inspections: Every 4 business days or every 5 business days and within 48 hours of
a major rain event. Major rain event is .25" or more. Less frequent in areas of non-impaired waterways (5 days
or every 7days and within 48hours of a major storm event).