Loading...
HomeMy WebLinkAboutWPO201700036 Checklist 2017-10-10 07111., a' L. - fftcxr'� Erosion & Sediment Control-Stormwater-Management Preconstruction Conference Checklist Name of Plan: /ktcd-) / 50,)4r" 54)4' .S Plan No.: 2.6)7 - (2OO,. Date: 60- /0 - /� 1)Copies of approved plan given to: Owner or Authorized Agent Contractor 2) Have all the conditions been met? )/FS 3) Responsible Land Disturber: J t/icJ 5-14.4�5A Cert ic.No.: 1)% t o 7.0) Type: Address/Phone/Mobil Phone: 9U aK Q J Jt VA- 2.2.5f fAS- 053-906 4) Name of Prime Contractor: 1441.3 eZ Cc cIr.t41.0,-) ro,.y,e,/ Address/Phone/Mobil Phone: 53 S' SI,A4t1., ST R-e - / / Name of Subcont ractor: �Y4Cl/GG �tv 5) Persons in Attendance: Name Firm ,0 306).. - A 1hg,kith CcL e65ie _114e-mayeir C .04 wtt 1., -- r..`� (6) Date Permit Issued: _/b -Jo -/7- (7)Talk about"First Steps" (Perimeter E&S controls and Tree Protection first), Erosion and Sediment Control Narrative and Sequence of Construction (8) Enforcement and Fees: Warnings, NTC and SWO in that order with re-inspection fees of$250 for NTC's and SWO's. (Mud in the roadway will have a NTC issued without a warning) (9) Review Frequency of Inspections: Every 4 business days or every 5 business days and within 48 hours of a major rain event. Major rain event is .25" or more. Less frequent in areas of non-impaired waterways (5 days or every 7days and within 48hours of a major storm event). 1 of Revised 11/29/2011 C:\Users\gelsie\Desktop\Preconstruction Conf Checklist 9-21-17.doc