Loading...
HomeMy WebLinkAboutWPO201900015 Plan - VSMP 2019-10-17(WP0201900015) V MP PLAN FOR TIMBERiNOOD SQUARE TAX MAP 46B4, PARCELS 7, 7A, 7B & 7C RIV NN ISTRICTL EM RLE COUNTY, VIR INIA 7W, 32 Par 37 VIRGINIA ELECTRIC AND POWER COMPANY goS USE: UTILITY ZONING: R15, R1 The 46-B4 Par 7C Tm 46-B4 Par 7B HIGHLIFE LLC, C/O DOWNER REALTY HIGHLIFE TOWNHOUSE, INC �1 Tm 46 Par FOREST LAKES COMMUNITIT Y ASSOCIATION USE: POND ZONING: R4 O Tm 46-B4 Par 7 HIGHLIFE TOWNHOMES INC. TM 46-B4 Par 7A O HIGHLIFE OFFICE INC r t� T. 46-B4 Pmr BI FOREST L4A2'S COMMUNITY ASSOCIATION, INC. USE: SOCCER FIELD ZONING: R4 I. 46-B3 Par B FOREST LAKES COMMUNITY ASSOCL4TION, INC. USE: CLUBHOUSE ZONING: R4 PRIOR PLAN REFERNCE THIS VSMP PLAN IS VIRTUALLY IDENTICAL WITH THE WP0201500032 PLAN THAT WAS WITHDRAWN DUE TO INACTIVITY. THE WP0201500032 WAS NEAR APPROVAL. -6zM IZE!�4 TM`l f y J 0000wSI TE, _ TYPE I 5/8 IN. POLYPROPYLENE ROPE 1/4 IN. TIE ROPE A Ito] Ielm 0];1'IVAIJNl�9C.l:7�el� H ACCORDING TO NEED dt I 4u f >9 4--8 of 14 Cover Sheet Jimmy L. Taggart Uc. No. 22841 .e SZONAL 2 of 14 Notes, Abbreviations, & Legend 3 of 14 Existing Conditions / Demo Plan 4 of 14 Erosion & Sediment Control Plan 1 5 of 14 Erosion & Sediment Control Plan II 6 of 14 Erosion & Sediment Control Plan III 7 of 14 Erosion & Sediment Control Plan Details 8 of 14 Stormwater Management Plan Details 9 of 14 Storm Sewer Profiles and Calculations 10 of 14 Biofilter Installation and Maintenance 11 of 14 Inspection Checklist and Dam Narrative 12 of 14 Storm Sewer Drainage Areas 13 of 14 E&SC / Biofilter Drainage Area Maps 14 of 14 Arbor Lake Drainage Area Map / As-Bullts TY P E III FLOATATION 22 OZ. NYLON REINFORCED VINYL STRESS BAND FLOATATION \ P\/r CI nT - rMINFCTnR ECONOMY FABRICS AVAILABLE 18 OZ. 300 LB/IN. STANDARD ALL SEAMS HEAT SEALED 1/4 IN. CHAIN (BLOW—UP OF SHACKLE CONNECTION) 0 TYPE II GALVANIZED #24 SAFETY HOOK WATER TOP LOAD LINE SEE ALSO WP0201500032, S D P201800087, S D P201 100042, SDP 198800003, PVC SLOT —CONNECTOR SEAL 5/16 VINYL COATED CABLE AND ALBEMARLE COUNTY WATER RESOURCES FILE SWF-056 FOREST LAKES STRESS PLATE PRESSURE FROM (TO REMOVE\LOATATION M FLOATS) VARIANCES REQUESTING A BERM WIDTH OF & INSTEAD OF THE REQUIRED 8'. THE HEIGHT OF THE EMBANKMENT IN THE FINAL CONDITION WILL BE LESS THAN 3' AND THE DESIGN HIGH WATER FOR THE SEDIMENT BASIN REACHES 477.1'. THE SIDE SLOPES ARE 3:1 FOR ADDED STABILITY. THE SHORTER BERM WIDTH ALSO HELPS DITCH 1 FLOW THROUGH BETTER. REQUESTING 9" OF UNDERDRAIN GRAVEL FOR THE BIOFILTER INSTEAD OF 12" SO THAT THE BIOFILTER MAY EMPTY THROUGH THE EXISTING CULVERT STRUCTURE IN ALL STAGES OF CONSTRUCTION. NYLON REINFORCED VINYL 18 (OR 22) OZ. VINYL COVERED NYLON \ 100 FT. STANDARD LENGTH DFPTH ACCORDING TO NEED STRESS BAND STRESS PLATE TUREIDITY CURTAIN DETAIL NOT TO SCALE FOLDS EVERY 6 FEET 5/16 IN. CHAIN BALLAST & LOAD LINE 5/16 VINYL COATING CABLE #24 SAFETY HOOK STRESS PLATE LAP LINK 5/16 IN. (ON BOTH SIDES OF CURTAIN CHAIN TO REDUCE STRAIN) TYPICAL LAYOUTS: STREAMS, PONDS & LAKES (PROTECTED & NON -TIDAL) STREAMI FLOW ONr"nR PT \ i ANC;HUK P I . 100'* TYP. q DITY/CURTAIN STAKE OR ANCHOR, EVERY 100' (TYPICAL) ® FILL AREA y:rl:�aaiu: * THIS DISTANCE IS VARIABLE ir911:4 =m:Iwo CURRENT DEVELOPMENT ENGINEER NOTE PLAN PROPOSES 2.82 LB. OF NUTRIENT / PHOSPHOROUS CREDITS APPROVED by the Albemarle County Community Development Department Date 10/17/2019 File WP02019-00015 I1 A Ua 0 � O C" N � � z o 1--i U �� o r LL 'C^ V1 Q Q W wz J J_ a2 c\ >Q W W vQ Ooo W v2 Cr N U p� rn N XQ 0 LL aW Coo _j w (n U z o W r; 0rn cY) rn� w � � z O 0 REVISIONS COUNTY COMMENTS 2/15/19 COUNTY COMMENTS 3/27/19 COUNTY COMMENTS 8/23/19 DATE NOV 30, 2018 SCALE AS SHOWN w Ir Q Q z D 00LL -> E- w Q 0 EZ �O::) 0 0 D_ > J O U Q w W m J j Q FILE NUMBER 13.0124 SHEET 1of14 SITE DATA & GENERAL NOTES ABBREVIATIONS LEGEND SITE DATA GENERAL CONSTRUCTION NOTES: GENERAL OWNER / DEVELOPER 1. Prior to any construction within any existing public right-of-way, including connection to EXIST PROP DESCRIPTION EXIST PROP DESCRIPTION any existing road, a permit shall be obtained from the Virginia Department of HIGHLIFE, LLC Transportation (VDOT). This plan as drawn may not accurately reflect the requirements of ABAN ABANDON(ED) MAX MAXIMUM PO BOX 17 the permit. Where any discrepancies occur the requirements of the permit shall govern. PROPERTY LINE x 12° TIC TOP OF CURB ELEVATION CHARLOTTESVILLE, VA 22902 2. All materials and construction methods shall conform to current specifications and ADJ ADJUST MIN MINIMUM standards of VDOT unless otherwise noted. ADJACENT PROPERTY LINE x 12BC BOTTOM OF CURB ELEVATION 3. Erosion and siltation control measures shall be provided in accordance with the approved AHD AHEAD MON MONUMENT CONCRETE LEGAL REFERENCE & SOURCE OF TITLE: DB 2775 PG. 734 erosion control plan and shall be installed prior to any clearing, grading or other - - - - - VACATED PROPERTY LINE x 12FL FLOW LINE ELEVATION construction. 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. APRX APPROXIMATE NIC NOT IN CONTRACT MAGISTERIAL DISTRICT: RIVANNA MAGISTERIAL DISTRICT 5. The maximum allowable slope is 2:1 (horizontal: vertical). Where reasonably obtainable, - - EASEMENT x 165 EOP x ll t EOP EDGE OF PAVEMENT ELEVATION lesser slopes of 3:1 or better are to be achieved. BC BACK OF CURB NTS NOT TO SCALE SOURCE OF BOUNDARY SURVEY: DOMINION ENGINEERING, JULY 2014 6. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of the BUILDING SETBACK x 165 x it SPOT ELEVATION County Engineer, or designee, it is deemed necessary in order to stabilize a drainage BFE BASEMENT FLOOR ELEVATION OC ON CENTER SOURCE OF TOPOGRAPHY. SURVEY BY ROUDABUSH, GALE & ASSOCIATES, APRIL 1989, FIELD VERIFIED BY ROUDABUSH, DEC 12, 2018, DATUM NGVD 29. 7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic BIT BITUMINOUS OH OVERHEAD BUILD TO LINE x 165TW x 12°TW TOP OF WALL ELEVATION Control Devices. THIS PROPERTY DOES NOT APPEAR TO BE LOCATED WITHIN A FLOOD PLAIN. IT APPEARS TO LIE IN ZONE X 8. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe -Class III. ZONING LINE x 165BW x 12°BW BOTTOM OF WALL ELEVATION AS SHOWN ON FEDERAL EMERGENCY MANAGEMENT AGENCY FIRM MAP #51003CO140D DATED FEBRUARY 4, 2005 9. All excavation for underground pipe installation must comply with OSHA Standards for gK BACK PE POLYETHYLENE THIS PROPERTY IS NOT LOCATED WITHIN A RESERVOIR WATERSHED. the Construction Industry (29 CFR Part 1926). 10. All retaining walls are subject to separate permit approval. BM BENCHMARK PERF PERFORATED 6 TEST PIT LOCATION/BORING LOCATION LIMIT OF DISTURBANCE BENCHMARK(S): BENCHMARK 513.84 CHISELED SQUARE ON TOP OF CURB AT SOUTH END OF MEDIAN AT THE GENERAL CONSTRUCTION NOTES FOR STREETS: BS BOTTOM OF SLOPE PROP PROPOSED BENCHMARK INTERSECTION OF TIMBERWOOD BOULEVARD & WORTH CROSSING. NGVD 29. 1. Prior to any construction within any existing public right-of-way, including connection to FLOODPLAIN LIMIT any existing road, a permit shall be obtained from the Virginia Department of CB CATCH BASIN PRVD PROVIDED • IRON FOUND WATER SOURCE: ALBEMARLE COUNTY SERVICE AUTHORITY Transportation (VDOT). This plan as drawn may not accurately reflect the requirements ez BUFFER ZONE of the permit. Where any discrepancies occur the requirements of the permit shall CG12 ACCESSIBLE CURB RAMP PWW PAVED WATER WAY SEWER SERVICE: ALBEMARLE COUNTY SERVICE AUTHORITY govern. 2. Construction inspection of all proposed roads within the development will be made by the Mvit RMA RMA - RESOURCE MANAGEMENT AREA - UD uD UNDERDRAIN ALL WATER AND SEWER FACILITIES TO BE DEDICATED TO THE ALBEMARLE COUNTY SERVICE AUTHORITY. County. The contractor must notify the Department of Engineering (296-5861) 48 hours CENTER LINE RCP REINFORCED CONCRETE PIPE RPA RPA in advance of the start of construction. RPA - RESOURCE PROTECTION AREA DRAINAGE LINE THIS PROPERTY IS ZONED: R-15; SUP (SP-94-16), AIA 3. All materials and construction methods shall conform to current specifications and CL CHAIN LINK REM REMOVE standards of VDOT. All excavation for underground pipe installation must comply with ROOF DRAIN CURRENT USE: MEDICAL OFFICE BUILDING ON PARCEL 7C, OTHERWISE VACANT OSHA Standards for the Construction Industry (29 CFR Part 1926). CMP CORRUGATED METAL PIPE REQD REQUIRED - - EDGE OF GRAVEL 4. Erosion and siltation control measures shall be provided in accordance with the approved PROPOSED USE: EXISTING CLUB ON PARCEL 7C. PROPOSED OFFICE BUILDING ON PARCEL 7A AND erosion control plan and must be installed prior to any clearing, grading or other CONIC CONCRETE RET RETAIN - a"s - SEWER LINE PROPOSED RESIDENTIAL TOWNHOMES ON PARCEL 7 construction. 5. Upon completion of fine grading and preparation of the roadbed subgrade, the contractor CY CUBIC YARDS RT RIGHT CG-2 CG-2 EDGE OF PAVEMENT m TRENCH DRAIN GROSS RESIDENTIAL DESNSITY: RESIDENTAIL AREA: 3.64 ACRES (PARCEL 46-134-7) shall have CBR tests performed on the subgrade soil. Three (3) copies of the test results STANDARD 6" CURB 32 TOWNHOME UNITS PROPOSED shall be submitted to the County. If a subgrade soil CBR of 10 or greater is not obtainable, a revised pavement design shall be made by the design engineer and C/C CENTER TO CENTER R/W RIGHT OF WAY CG-3 CG-3 w WATER LINE 32 UNITS 3.64 ACRES = 8.80 UNIT / ACRE SETBACK REQUIREMENTS PER ALBEMARLE ZONING CODE 18-4.19 / submitted with the test results for a royal STANDARD 4" CURB MAXIMUM RESIDENTIAL BUILDING HEIGHT. 35' MAXIMUM COMMERCIAL BUILDING HEIGHT: 40' MINIMUM LOT SIZE FOR R-15 ZONING: 2,904 sqft PARKING SETBACKS 10' FROM PUBLIC STREETS 20' FROM RESIDENTIAL AREAS UNDISTURBED BUFFER 20' FROM RESIDENTIAL RECREATIONAL AREA REQUIRED PER Z.0 4.16 IS 200 SF/UNIT REQUIRED RECREATIONAL AREA: 6,400 SF RECREATIONAL AREA PROVIDED: 22,115 SF AND 1 TOT LOT (SEE SHEETS SP9 AND SP10 FOR LOCATION OF RECREATIONAL AREA) LAND SCHEDULE: POST -DEVELOPMENT (SF) % LOTS 117,336 SF 45.9 COMMON AREA/OPEN SPACE (RESIDENTIAL) 22,115 SF 8.6 ADJUSTED TMP 46-64-7C 31,828 SF 12.5 TMP 46-64-7A 11,950 SF 4.7 COMMON AREA/OPEN SPACE (COMMERCIAL) 53,315 SF 20.9 RIGHT OF WAY 18,984 SF 7.4 PP 6. All slopes and disturbed areas are to be fertilized, seeded and mulched. The maximum C&G CURB AND GUTTER R&D REMOVE AND DISPOSE CG-6 CG-6 -4"FP FIRE PROTECTION LINE allowable slope is 2:1 (horizontal: vertical). Where reasonably obtainable, lesser slopes of COMBINATION 6" CURB & GUTTER 4:1 or better are to be achieved. DIA DIAMETER R&R REMOVE & RESET CG-7 CG-7 2"ow WATER SERVICE LINE 7. Surface drainage and pipe discharge must be retained within the public right-of-way or within easements prior to acceptance by VDOT. All drainage outfoll easements are to be EL ELEVATION SD SIGHT DISTANCE COMBINATION 4" CURB & GUTTER extended to a boundary line or a natural watercourse. The contractor shall field verify the o GAS LINE length of all storm drainage pipe. ELEV ELEVATION SQ SQUARE �X�Mo, M�MM, FIRE LANE STRIPING 8. Guardrail locations are approximate. Exact length, location and appropriate end OHW OVERHEAD ELECTRIC WIRE treatments will be field determined at the time of construction. Additional guardrail may be required at locations not shown when, in the opinion of VDOT, the Director of ES END SECTION STA STATION uc Engineering, or the Director's designee, it is deemed necessary. When guardrail is t� BUILDING ENTRANCE UNDERGROUND ELECTRIC required, it shall be installed four (4) feet offset from the edge of pavement to the face of EW END WALL SW SIDEWALK guardrail, and roadway shoulder widths shall be increased to seven (7) feet. LLD LOADING DOCK a"T OVERHEAD TELEPHONE LINE Albemarle County Engineering & Public Works Policies July 1998; Revised 30 January 2003 EX EXISTING SWEL SOLID WHITE EDGE LINE 9. Where urban cross sections are installed, all residential driveway entrances shall conform BOLLARD UGT UNDERGROUND TELEPHONE LINE to VDOT CG-9(A,B or C). EXIST EXISTING SWILL SOLID WHITE LANE LINE 10. Where rural cross sections are installed, all residential driveway entrances shall conform I DUMPSTER PAD c"N- CABLE TV to VDOT standard PE-1. FDN FOUNDATION TBA TO BE ABANDONED 11. Paved, rip -rap or stabilization mat lined ditch may be required to stabilize a drainage channel when, in the opinion of VDOT, the Director of Engineering, or the Director's FIFE FINISHED FLOOR ELEVATION TBR TO BE REMOVED SIGN designee, it is deemed necessary. DRAIN INLET 12. A minimum clear zone of ten (10) feet from the edge of pavement shall be maintained on all residential subdivision streets. Additional clear zone may be required depending on GTD GRADE TO DRAIN TIC TOP OF CURB r r STEEL GUARDRAIL 0 DRAIN MANHOLE the category of road design. 13. Compliance with the minimum pavement width, shoulder width and ditch sections, as IFIRON FOUND TS TOP OF SLOPE C shown on the typical pavement section detail, shall be strictly adhered to. The cross slope fl WOOD GUARDRAIL PLUG OR STUB shall be maintained as shown on the plans. Exceptions will not be allowed. IS IRON SET TYP TYPICAL 14. All required signs (stop, street name, speed limit signs, etc.) are to be furnished and FLARED END SECTION installed by the developer prior to acceptance. Signs and their installation shall conform "Albemarle LA LANDSCAPE AREA UG UNDERGROUND - - - PATH to County Road Naming and Property Numbering Ordinance and Manual" HEADWALL and the Virginia Manual for Uniform Traffic Control Devices. The locations of all signs LOD LIMIT OF DISTURBANCE VESCHVA. E&S CONTROL HANDBOOK are shown on the plans. The developer shall be responsible for maintenance of the signs TREE LINE TOTAL 255,528 SF. (5.866 ACRES) 100% until the roads have been accepted into the state secondary road system. The speed limits SETBACK REQUIREMENTS PER ALBEMARLE ZONING CODE 18-4.20 to be posted on speed limit signs are to be determined by VDOT prior to acceptance. The LF LINEAR FEET YDS YARDS -.--.- FENCE SEWER MANHOLE PROPOSED IMPERVIOUS AREAS: TOTAL EXISTING IMPERVIOUS AREA: 1.16 ACRES speed limit is to be posted 5mph below the design speed. PAVED PARKING/TRAVELWAY. 0.75 ACRE EXISTING IMPERVIOUS AREAS TO REMAIN: CONCRETE WALKS / PAVED PATHS: 0.16 ACRE EXISTING PARKING/TRAVELWAY : 0.80 ACRE PROPOSED RES. BUILDINGS: 0.64 ACRE EXISTING WALKS/PAVED PATHS: 0.07 ACRE PROPOSED OFFICE BUILDING: 0.13 ACRE EXISTING BUILDINGS: 0.29 ACRE TOTAL PROPOSED IMPERVIOUS AREA: 1.68 ACRES PARKING TABULATION FOR TOWNHOUSES: REQUIRED PARKING: 2 SPACES PER UNIT PLUS 1 SPACE PER 4 UNITS FOR GUEST PARKING 32 TOWNHOUSES X 2 SPACES + 32 TOWNHOUSES X (1 SPACE/4 UNITS) _ 72 PARKING SPACES REQUIRED 74 PARKING SPACES PROVIDED PARKING TABULATION FOR OFFICE USE: REQUIRED PARKING PER APPROVED PARKING REDUCTION REQUEST = 65 SPACES PROVIDED PARKING = 65 SPACES INCLUDES 9 ADA SPACES LOADING SPACES REQUIRED = 1 SPACE LOADING SPACES PROVIDED = 1 SPACE PARKING NOTE: REFER TO SEPARATE INSTRUMENT FOR PARKING AGREEMENTS FOR OFFICE AND TOWNHOUSE USE. GRADING: FOR GRASS STABILIZATION ON CONSTRUCTED SLOPES, THE MAXIMUM STEEPNESS IS 3:1. SLOPES STEEPER THAN 3:1 MUST BE PERMANENTLY STABILIZED WITH LANDSCAPING VEGETATION HARDIER THAN GRASS, WHICH WILL NOT REQUIRE MOWING. APPROVED PRELIMINARY PLAN SQUARE FOOTAGE OF COMMERCIAL SPACE: 18,090 SF EXISTING SQUARE FOOTAGE OF OFFICE SPACE: 12,424 SF PROPOSED SQUARE FOOTAGE OF OFFICE SPACE: 5,666 SF TOTAL SQUARE FOOTAGE OF OFFICE SPACE: 18,090 SF PROPOSED SQUARE FOOTAGE OF RESIDENTIAL SPACE: 27,928 SF PROPOSED RESIDENTIAL DENSITY. 8.8 UNITS/ACRE 32 UNITS OPEN SPACE IS TO BE OWNED AND MAINTAINED BY A HOMEOWNERS ASSOCIATION. 1. CRITICAL SLOPES AND UNDISTURBED BUFFER WAIVERS WERE GRANTED WITH THE PRELIMINARY SITE PLAN REVIEW (SDP201100042). (PRIOR APPROVALS) 2. SP 1994-16 - ALLOWED PROFESSIONAL OFFICES Side and Rear - Maximum Stepbacks Front Side and Rear For each story that begins above 40 Feet in height or for each story above the third story, whichever is less, the minimum stepback shall be 15 feet None 3. SP 2008-52 - ALLOWED STAND ALONE PARKING *NOTE: REVISED AREAS WILL NOT BE APPROVED UNITL A SUBDIVISION APPLICATION IS SUBMITTED FOR REVIEW. SITE AREA TABULATIONS EXISTING TM -PARCEL AREA (ACRES) 46-134-7 3,64 46-134-7A 0,27 46-B4-713 1.23 46-B4-7C 0.73 TOTAL 5.87 ACSA GENERAL WATER & SEWER CONDITIONS 1. WORK SHALL BE SUBJECT TO INSPECTION BY ALBEMARLE COUNTY SERVICE AUTHORITY (ACSA) INSPECTORS. THE CONTRACTOR WILL BE RESPONSIBLE FOR NOTIFYING THE PROPER ACSA OFFICIALS AT THE START OF THE WORK. 2. THE LOCATION OF EXISTING UTILITIES ACROSS THE LINE OF THE PROPOSED WORK ARE NOT NECESSARILY SHOWN ON THE PLANS AND WHERE SHOWN ARE ONLY APPROXIMATELY CORRECT. THE CONTRACTOR SHALL, ON HIS OWN INITIATIVE, LOCATE ALL UNDERGROUND LINES AND STRUCTURES, AS NECESSARY. 3. ALL MATERIALS AND CONSTRUCTION SHALL COMPLY WITH THE CURRENT EDITION OF THE GENERAL WATER AND SEWER CONSTRUCTION SPECIFICATIONS, AS ADOPTED BY THE ACSA. 4. DATUM FOR ALL ELEVATIONS SHOWN IN NATIONAL GEODETIC SURVEY. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING MISS UTILITY 1-800-552-7001 . 6. ALL WATER AND SEWER PIPES SHALL HAVE A MINIMUM OF THREE (3.5) FEET OF COVER MEASURED FROM THE TOP OF PIPE OVER THE CENTERLINE OF PIPE. THIS INCLUDES ALL FIRE HYDRANT LINES SERVICE LATERALS AND WATER LINES ETC. 7. ALL WATER AND SEWER APPURTENANCES ARE TO BE LOCATED OUTSIDE OF ROADSIDE DITCHES. 8. VALVES ON DEADEND LINES SHALL BE RODDED TO PROVIDE ADEQUATE RESTRAINT FOR THE VALVE DURING A FUTURE EXTENSION OF THE LINE. 9. TREES ARE NOT PERMITTED IN THE ACSA EASEMENT. 10. THE CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH THE NO -LEAD REGULATION EFFECTIVE JANUARY 4, 2012. 15. Road plan approval is subject to final subdivision plat validation. Should the final plat LT LEFT °co CPO SEWER CLEANOUT for this project expire prior to signing and recordation, then approval of these plans shall UTILITY ----------- STONE WALL be null and void. 16. Traffic control or other regulatory signs or barricades shall be installed by the developer _ _ _ _ _ _ RETAINING WALL when, in the opinion of the Director of Engineering, or the Director's designee, they are ARV AIR RELEASE VALVE MH MANHOLE ev ® WATER VALVE & BOX deemed necessary in order to provide safe and convenient access. 17. Use VDOT standard CD-1 or CD-2 underdrains under the subbase material at all cut and BOA BLOW OFF ASSEMBLY PVC POLYVINYL CHLORIDE - - - - STREAM /POND WATER COURSE AV FIRE HYDRANT ASSEMBLY fill transitions and grade sag points. 18. A video camera inspection is required for all storm sewers and culverts that are deemed CO CLEANOUT RIM RIM ELEVATION - - - - DETENTION BASIN wM wM inaccessible to VDOT inspections and are to be accepted into VDOT's maintenance ® ® WATER METER program and ownership. The video inspection shall be conducted in accordance with x SILT FENCE VDOT's video camera inspection procedure and with a VDOT and/or County inspector CTV CABLE TELEVISION SAN SANITARY @, WATER WELL present. In addition, if high -density polyethylene (HDPE) pipe or pipe system is installed, the contractor and a representative from the pipe manufacturer should hold a preconstruction DI DROP INLET SCC STORMWATER CONVEYANCE CHANNEL meeting for installation training. 12 - CONTOUR o ° C4 DIP DUCTILE IRON PIPE SD STORM GAS VALVE C.F.NFRAI. C"NCTR1TfTinN NnTF.0 FnR FR(lfilnN ANII CF.11iMFNT rnNTRni, PI,ANC• 1. The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. 2. All erosion and sediment control measures will be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. 3. All erosion and sediment control measures are to be placed prior to or as the first step in clearing. 4. A copy of the approved erosion and sediment control plan shall be maintained on the site at all times. 5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. 6. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. 7. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. 8. During dewatering operations, water will be pumped into an approved filtering device. 9. The contractor shall inspect all erosion control measures periodically and after each runoff producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. 10. All fill material to be taken from an approved, designated borrow area. 11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert materials only, free of roots, stumps, wood, rubbish, and other debris. 12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning Ordinance section 5.1.28. 13. All inert materials shall be transported in compliance with section 13-301 of the Code of Albemarle. 14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to the hours of 7:00am to 9:00pm. 15. Borrow, fill or waste activity shall be conducted in a safe manner that maintains lateral support, or order to minimize any hazard to persons, physical damage to adjacent land and improvements, and damage to any public street because of slides, sinking, or collapse. 16. The developer shall reserve the right to install, maintain, remove or convert to permanent stormwater management facilities where applicable all erosion control measures required by this plan regardless of the sale of any lot, unit, building or other portion of the property. 17. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75 Ibs/acre, and in the months of September to February to consist a 50/50 mix of Annual Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approval by the County erosion control inspector. 18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch. Agricultural grade limestone shall be applied at 90lbs/1000sf, incorporated into the top 4-6 inches of soil. Fertilizer shall be applied at 1000lbs/acre and consist of a 10-20-10 nutrient mix. Permanent seeding shall be applied at 180lbs/acre and consist of 95% Kentucky 31 or Tall Fescue and 0-5% Perennial Ryegrass or Kentucky Bluegrass. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approval by the County erosion control inspector. 19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage or clogging to structural measures is to be repaired immediately. Silt traps are to be cleaned when 50% of the wet storage volume is filled with sediment. All seeded areas are to be reseeded when necessary to achieve a good stand of grass. Silt fence and diversion dykes which are collecting sediment to half their height must be cleaned and repaired immediately. 20. All temporary erosion and sediment control measures are to be removed within 30 days of final site stabilization when measures are no longer needed subject to approval b the 9 � 1 PP Y Count erosion control inspector. Y P 21. This Ian shall be void if the owner does not obtain a permit within 1 year of the date of P P Y approval. (Water Protection Ordinance section 17-204G.) 22. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commences. (Water Protection Ordinance section 17-207B) ELEC ELECTRIC FH FIRE HYDRANT FM FORCE MAIN F&C FRAME AND COVER F&G FRAME AND GRATE GT GREASE TRAP GV GATE VALVE HDPE HIGH DENSITY POLYETHYLENE INV INVERT 300 00 - INDEX CONTOUR STIR DRAINAGE STRUCTURE TSV TAPPING SLEEVE & VALVE AA PARKING COUNT UP UTILITY POLE I I I I I I CROSSWALK WL WATER LINE /F� ACCESSIBLE CURB RAMP WM WATER METER �� HANDICAP PARKING WV WATER VALVE C k, VAN-ACCESSIBLE HANDICAP PARKING 6"V 6" VALVE VAN v OM o? GAS METER 0 0 ELECTRIC MANHOLE ® ® ELECTRIC METER + + LIGHT POLE 0 0 TELEPHONE MANHOLE ❑T If TRANSFORMER PAD • CONCRETE PAVEMENT / SIDEWALK UTILITY POLE RIPRAP ♦ GUY POLE 0 0 NEW ASPHALT • GRASS STORMWATER MANAGEMENT NOTE: EC-2 BLANKET MATTING STORMWATER MANAGEMENT (QUANTITY) CONTROL FOR THIS DEVELOPMENT IS PROVIDED VIA ARBOR LAKE LOCATED ADJACENT TO THE SITE AT THE SOUTHEAST CORNER. REFER TO COUNTY SWM #56-01. EC-3 TYPE A STORMWATER MANAGEMENT (QUALITY) IS PROVIDED VIA PURCHASE OF OFFSITE PHOSPHOROUS CREDITS. EC-3 TYPE B WETLAND CONTRACTOR'S COORDINATION RESPONSIBILITIES MATCHLINE NOTES: 1. THE SIZE OF THE SYMBOLS MAY VARY FROM THOSE SHOWN. 2. ALL ABBREVIATIONS AND SYMBOLS SHOWN MAY NOT BE USED. 11. THIS PROJECT DISTURBS MORE THAN ONE ACRE OF LAND AND FALLS WITHIN THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP), GENERAL 1. THE CONTRACTOR IS REQUIRED TO OBTAIN ANY/ALL PERMITS REQUIRED FOR CONSTRUCTION OF THESE PLANS. CONSTRUCTION PERMIT GCP PROGRAM AS ADMINISTERED BY THE VIRGINIA DEPARTMENT OF CONSERVATION AND RECREATION DCR UNDER THE ( ) ( ) JURISDICTION OF THE EPA. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL FILE A GCP NOTICE OF INTENT WITH THE DCR AND 2. ANY TIME WORK IS PERFORMED OFF -SITE OR WITHIN AN EXISTING EASEMENT, THE CONTRACTOR IS TO NOTIFY THE HOLDER OF SAID EASEMENT AS TO PREPARE A STORMWATER PREVENTION PLAN IN ACCORDANCE WITH THE VSMP REGULATIONS. THE NATURE OF PROPOSED WORK AND TO FOLLOW ANY GUIDLELINES OR STANDARDS WHICH ARE ASSOCIATED WITH OR REFERENCED IN THE RECORDED EASEMENT. 12. CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. 3. THE CONTRACTOR IS TO CHECK THAT ALL EASEMENTS, LETTERS OF PERMISSION, ETC, ARE RECORDED/OBTAINED PRIOR TO THE START OF ANY 13. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA CONSTRUCTION. STANDARDS AND LOCAL REQUIREMENTS. 4. CONTRACTOR TO VERIFIY ALL SITE PLANS AND PROFILES AND DETAILS FOR CONSISTENCY AND IF CONFLICTS EXISTS, CONTACT ENGINEER FOR 14. ONTRACTOR SHALL DISPOSE OF DEMOLITION DEBRIS IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, ORDINANCES AND CLARIFICATION AND/OR DIRECTION. INTERPRETATION DETERMINED BY CONTRACTOR SHALL BE DONE AT HIS/HER OWN RISK. STATUTES. 5. THE CONTRACTOR IS TO VERIFY THAT THE RELOCATION OF ALL EXISITING UTILITIES IN CONFLICT WITH PROPOSED WORK HAS BEEN COMPLETED INCLUDING 15 EXISTING UTILITIES SHALL BE TERMINATED, UNLESS OTHERWISE NOTED, IN CONFORMANCE WITH LOCAL, STATE AND INDIVIDUAL UTILITY COMPANY UTILITY POLES. STANDARDS SPECIFICATIONS, AND DETAILS. THE CONTRACTOR SHALL COORDINATE UTILITY SERVICE DISCONNECTS WITH THE UTILITY REPRESENTATIVES. 6. CONTRACTOR SHALL COMPLY WITH FENCING AND TREE PRESERVATION SIGNAGE REQUIRED BY ALBEMARLE COUNTY CODE. 7. CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS, SPECIFICATIONS, AND DATA FILES THAT ARE OBTAINED FROM THE GENERAL CONSTRUCTION NOTES FOR STORMWATER MANAGEMENT PLANS: DESIGNERS, BUT SHALL VERIFY LOCATION OF PROJECT FEATURES IN ACCORDANCE WITH THE PAPER COPIES OF THE PLANS AND SPECIFICATIONS THAT 1. All dams and constructed fill to be within 95% of maximum dry density and 2% of optimum ARE SUPPLIED AS PART OF THE CONTRACT DOCUMENTS. moisture content. All fill material to be approved by a geotechnical engineer. A 8. CONTRACTOR SHALL COMPLY WITH ALL WETLAND PERMIT REQUIREMENTS, IF A PERMIT EXISTS. 0 eotechnical engineer is to be resent during construction of dams. 9 9 P 9 2. Pie and riser joints are to be watertight within stormwater management facilities. P 1 9 9 9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS UNLESS OTHERWISE NOTED ON PLANS INCLUDING BUT NOT LIMITED TO ALL UTILITIES . ( ) 3. For temporary sediment traps or basins which are to be converted to permanent stormwater P Y P STORM DRAINAGE SIGNS TRAFFIC SIGNALS & POLES ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING AUTHORITIES Q management facilities; conversion is not to take place until the site is stabilized, and REQUIREMENTS AND PROJECT SITEWORK SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. ALL COST SHALL BE INCLUDED IN BASE BID. permission has been obtained from the County erosion control inspector. 10. CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OFF SITE AREAS, AND SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY, AT NO COST TO OWNER. $IlliyTS Og p� 1 p Q 1. Jimmy L Taggart Ltc. No. 22841 far. 9� 19 1 ~ S410NAL A Ua 0 y O v1 W �. N m j� N 0 2 20 U� �0 LL �O VS Q�W_ O CtLU J J_ a2 Cr \ > Q W Oy W Q Ue O N Wpcc ` Q C- Q LO U rn N , C) r F� v �LL`I y C9 Z a It , u. fr j °(t (�Q. 4! b� -JILL I j Lo O r�l �w Q l_- c) W O r- W �rn �It CO Z O O REVISIONS COUNTY COMMENTS 2/15/19 COUNTY COMMENTS 3/27/19 COUNTY COMMENTS 8/23/19 DATE NOV 30, 2018 SCALE N/A W Z Q Q Z W � O w > z C) 7- C:)O E- 0 J U < PQ W 4 MW JJ UD CWC N G FILE NUMBER 13.0124 SHEET 2 of 14 /EX. STORM MH 1 / TOP=507.48' EX. SAN MH 6 I /��I 54" RCP INV OUT 480.08' TOP=509.48 18" PVC INV IN=491.70'- 18" PVC INV OUT=491.62 r i; EX1 y°h EX. STORM MH 2C EXISTING ASPHALT PAVEMENT TO REMOVED i \� /' ,' / /�, ' ,a" °9s ,_ r � � EX2C TOP=497.90' 21 RCP INV IN=493.00 21" RCP INV OUT=489.44' EXISTING PAVEMENT TO BE RETAINED STORM MH/2B \/ TO THE MAXIMUM EXTENT POSSIBLE. ACTUAL//TOP=492.81' LIMITS OF REMOVAL TO BE DETERMINED IN / �� - / 21 "/IRCP INS/ IN=4; /8.85' E 2X B THE FIELD AS WORK PROGRESSES. , /�� \• ' / \ / 21/' RCP4NV OUTS 488.70' H5 ,' ' °° PORTION OF PAVED \ PATH TO B� REMOVED EXISTING 20' DRAINAGE EASEMENT AND RELOCATED DB 1548 PG 299 (PLAT) co �3 � /', EX/SAN H 5 / / EX2A EX. STORM MH 2A � TOP=492.87 SOP=503.67 ----- - I 5j ,/ / "r �% / 18"TO PV�'INV=490.09' - i - --- 92 21" RCP INV IN=487.69' / ' �� %� 18" PVCINV O17T=489.94' I / 21" RCP INV OUT=487.65' co� / //j3�, EXIST. MA, AGED SLOPES \ TO REMAIR UNDIgTURBED / Ii '1z �Q� / •/�� / '/ �' ,/ �� / PORTION OF EXISTING 54" I Site Benchmark is tied to USGS disk Z-155 EX. ST�RM MH 2 NGVD 29, Elev. 552.71 / / / , _ - l PIPE TBR FOR DOGHOUSE MH ' /' I TOP=4�1.96 / Tm 32 Par 37 Located at the NW corner of Route 29 North and i Rt. 649, Proffit Road at old Crenshaw Garage. \ Q I ' \,9 VIRGINIA ELECTRIC AND POWER COMPANY Current status of Disk is unknown, % r, j� i ii /EX.�9A1\yM1 4 ` I 54 RCP INV IN=4'8.06 0 T �493.96-' �� II II 21 RC� INV IN=485.18 \ USE: UTILITY �le P�VE'INV IN-484.10' �� I �\ �I 54 RC0 INV OUT 477.70 / ZONING: R15, R1 1,8�'PVC INV OUT_484.05' _ - - I I / �_ �` - PORTION OF SANITARY I % III SEWER TO BE FILLED I I r -V - -AWITH-FLOWABLE FILL PORTION OF CURB EXISTING LIG�WT, \ \PORTIO\N OF �URB %-TO-BE /REMOVED_ � ` � TO BE REMOVED I I / \ EX. STORM MH 7 I 'POLES (TBR) % % \ ` \ I I / / \ ROWS / h' ,/ / �' i I I \ \ / \ TOP=487.54' CRp$SIN�, 1 i \ \ 54 RCP INV IN=476.16 TR S TbR) I / / I \ , �` soy EX. S1QRM MPI�3AI 1 54 RCP INV OUT=476.10 � I TMP 46-�4-7 TOP=46.84 2.76 ACES 1 / v > 15" RCP INV (�UT I�90.94' I I EX7 u \ \ EXISTING 50 STORM SEWER EASEMENT 6 / 5tORM SbUb INLgT / I v DB 1071 PG 495 (PLAT) / EX3A1/ TO BED REMNED / / // � � / � , _ _ _ ` 7� DB 1071 PG 562 (PLAT) vPORTION OF PAVEMENT i I \ BE REMOVED /EX. L6ND0 PLOETREfE (TBR) I I 2 1 ❑ i / / / i � l ❑ � � � � � / , , � , �ROPERJ�' LINE/TO TO f 1 Ex� heat �i v X. LO ON / / // /' /� � /BE VACATED,�TYP.)/ I / �umps e ` /PLANET EE (TB T1 P 46/-B4-78 / / // 1.10/ACRES EX. BOLLAR S (9 / / /� �/ \ TO BE REPL ��� APPROXIMATE LOCATION / ' ' ' OF EXISTING SEWER 0A2� / ,/ / / / , PORTION OF STORK( SEWER �h� ' '� m+e,'TO BE,REMOVE� I I LATERAL ) --- ---\ EX./ Ii1 EX./STORM Mai 4A /'� v E NDON TOP=463.41 / ___---- AETREE / / I 15i' R�P IOV Ii�=4W36' 1 Z OOV�� '► , /� \,/� / 1 15�' RCP 1NV�0 T 48819' '/ � - -- N\ - PORTION OF EXISTING 54" 1 ol� heat / ' --- ` PIPE TBR FOR DOGHOUSE MH rn Z � Existing / � q / X, LO�IDON � , � / �/ ,' i' - - � \ \� mps Brick Medical .� / V gtorY I J- -f- / d�yC / \ 0�� i i i / P�A�I�TREE (TBR) , /� �� �' POF�TION OF PAVE _ ❑ 1- ptfice Building C / P"�� G b 12424 sf `S\`/ ' ' ' PATH TO BE -REMOVED Tm 46 Par �AND'� _ FELOCATEDhX4 FOREST LAKES COMMUNITY Y ASSOCIATION USE: PONDTMP 46-B4-7C I , //'/"r-I ZONING: R41.74 ACRES NDO N /ICP, ///�% _ PORTION OF STORM --SEWER , / \ \ EX. JAPANESE / I CUR NE / / �/ `% 1 v / / -'TO B 1�EMO�E i \ HOLLIES 0 0 /' EX. I�/OTNRDON �/ \ B o ' CP PORTION OF CUtVER� T �� �\ r'Ex �4'= R P � 1 \ PLANETREE \TNV 4$12' _ - T�BE'F�EMOVED 1 / I /EX. IN ERRJ�S / r l �STORM M 4 / / / I / / / / YOP =492.2 EX. B RNUM (3)EXIST. MANAGED SLOPES / R£P INV IN1�87.1~� TO BE GRADED FOR NEW / A EX5A / / I /' ��/� / / `� BUILDING PAD. / I T P\46� 4-7A / \ r. I \ \ iu IN=85.45 \ 9 \ //// , ' 1 Ex. 4" EW-2 \ 0.2 ACRE \ \� C BRB / r l i <� l �(� \4 R�P INV OU�48�28' // /m I I 1 \ nv. . Out=473.1 t I EX. LONDON� PLANETREE \ \\ \ \ \ \ \ I EX. SAN MH \ \ \ EDGE OF ARBOR LAKE / r• p9 TOP=49�.�0 .� � \ � / / \ R> X. TRESS (TBR) 18 PVC IN��IN=481.81 18 PVC INV OUT=481.78 \�X. CRE'RE MYRTLES`\(3) Tm 46-B4 Par B 1 FOREST LAKES COMMUNITY ASSOCIATION, INC. USE. SOCCER FIELD s �$ �, E TING 20' ACSA SANITARY SEWER EASEMENT Ex Side"a'k - / ZONING: R4 �s �H� -� � �� � �s �\ DB 1 PG 495 (PLAT) EX. EVERGREEN TREES `�\ �S �s �, DB 1071 P (PLAT) -W 6-o1C�ti e i / / / �0�_ EX. SAN M� ter I P� �� �� ��,, �S �s �, DB 1071 PG 213 (PLAT) tid�sye�� TOP=492.64' 18" PVC INV IN=476.58' ' �s I water 18" PVC INV OUT=476.38' Ex. 8" D assumed tion only / / / �0� �S Ex 8 _ S & V yo - Exist. WateWM r I Meter to Remainsp Eler xism' DBk1548 Ph 2/9 I I r I 1 I m 46-B3 Par B FORESJ' IS COMMUNITY ASSOCIATION, INC. USE: CL UBHO USE ZONING: R4 MH1 EX. SAN MH 1 TOP=482.35' 18" PVC INV IN=472.31' 18" PVC INV OUT=472.13' EXISTING PARCEL SUMMARY 46134-7 3.64 AC. 46134-713 1.23 AC. 46134-7C 0.73 AC. 46134-7A 0.27 AC. 5.87 AC. 5W111 Op Jimmy L. Taggart Lic. No. .e 22841 y z_*#0810NAU g�/1g ati A Ua 0 y O Cq CD W co m cc N N d 2 ZO U g z� o O 0)LL V. Z CC LU �j Q LLI J J 2 O Ci (t2 ww Oy Q 2 QQ ° N Q -Z fr� WCo prt U rn �� CO� , N CO Q It V �? °a °t Ll x j Qc aW o wLo o o U LU O� U �rn M w 2 z O O REVISIONS COUNTY COMMENTS 2/15/19 COUNTY COMMENTS 3/27/19 COUNTY COMMENTS 8/23/19 DATE NOV 30, 2018 SCALE 1"=40' w fr a Q 0 O 0 Q LL U \ z p O O O 0- p U E-I J Z Q O �' > W LU � W j Z Q E- W FILE NUMBER 13.0124 SHEET 3of14 TER ENTRY UNIT H TRASH SCREEN ORIFICE OPENING INSIDE THE HORIZONTAL TUBE WITH A CONSTANT HYDRAULIC HEAD SCHEDULE 40 PVC PIPE (BARREL OR ARM) LEXIBLE HOSE FLOAT MIIIE GRATETOP VIEWPVC VENT - GENERAL NOTES: 1. PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE PIPE. 2. PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS IN CORRECT AMOUNT OF TIME. MODIFICATIONS MAY BE REQUIRED IF FIELD CONDITIONS WARRANT A CHANGE. 3. EMBANKMENT MUST BE COMPACTED TO DESIGN SPECIFICATIONS. 4. EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION INSTALLED. 5. EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT THE DISCHARGE END OF THE PIPE. 6. INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT MANNER. EMBANKMENT OUTLET PIPE\ 4" 40 PVC PIPE TER ENTRY UNIT FLEXIBLE HOSE MUST BE SECURELY FASTENED TO THE DEWATERING ORIFICE HOSE 1C VENT PE -FLOAT SCHEDULE 40 PVC PIPE (BARREL OR ARM) L = 2.4' 3" 40 PVC PIPE SHALL BE USED FOR HOSE END VIEW SIDE VIEW - (NO SCALE) DRAWN BY T. R. EVANS 10/10 FAIRCLOTH SKIMMER° DISCHARGE SYSTEM WITH OUTLET W. FAIRCLOTH & SON INC. WWW.FAI RCLOTHSKI MMER. COM TELEPHONE: (919) 732-1244 STRUCTURE FAX: (919) 732-1266 EMAIL: WARRENOFAIRCLOTHSKIMMER.COM 1. RIP RAP - CLASS fA KEY IN FILTER CLOTH 6"-9' SCC-A Channel Calculation: n=0.035 for RIP RAP IA s=2.4% Q(2)=4.92 cfs Q(10)=5.83 cfs V(2)=3.4 fps d(10)=0.91 ft SCC-A A=3.68 Ac. C= 0.60 Tc = 10 Min GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. 2. All erosion and sediment control measures will be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. 3. All erosion and sediment control measures are to be placed prior to or as the first step in clearing. 4. A copy of the approved EROSION AND SEDIMENT CONTROL PLAN shall be maintained on the site at all times. 5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. 6. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. 7. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. 8. During dewatering operations, water will be pumped into an approved filtering device. 9. The contractor shall inspect all erosion control measures periodically and after each runoff producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. 10. All fill material to be taken from an approved, designated borrow area. 11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert materials only, free of roots, stumps, wood, rubbish, and other debris. 12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning Ordinance section 5.1.28. 13. All inert materials shall be transported in compliance with section 13-301 of the Code of Albemarle. 14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to the hours of 7:00am to 9:00pm. 15. Borrow, fill or waste activity shall be conducted in a safe manner than maintains lateral support, or order to minimize any hazard to persons, physical damage to adjacent land and improvements, and damage to any public street because o slides, sinking, or collapse. 16. The developer shall reserve the right to install, maintain, remove or convert to permanent stormwater management facilities where applicable all erosion control measures required by this plan regardless of the sale of any lot, unit, building or other portion of the property. 17. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75 Ibs/acre, and in the months of September to February to consist a 50/50 mix of Annual Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approved by the County erosion control inspector. 18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch. Agricultural grade limestone shall be applied at 90lbs/1000sf, incorporated into the top 4-6 inches of soil. Fertilizer shall be applied at 1000lbs/acre and consist of a 10-20-10 nutrient mix. Permanent seeding shall be applied at 180lbs/acre and consist of 95% Kentucky 31 or Tall Fescue and 0-5% Perennial Ryegrass or Kentucky Bluegrass. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approved by the County erosion control inspector. 19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage or clogging to structural measures is to be repair immediately. Silt traps are to be cleaned when 50% of the wet storage volume is filled with sediment. All seeded areas are to be reseeded when necessary to achieve a good stand of grass. Silt fence and diversion dykes which are collecting sediment to half their height must be cleaned and repaired immediately. 20. All temporary erosion and sediment control measures are to be removed within 30 days of final site stabilization, when measures are no longer needed, subject to approval by the County erosion control inspector. CONSTRUCTION SEQUENCE 1. Construction entrance will be constructed as shown. 2. Provide Inlet Protection for EX6, EX5A, EX5, EX4A, EX4. 3. Install double Turbidity Curtain. 4. Install Super Silt Fence. 5. Install sediment basin and diversion will be installed as indicated 6. Install storm sewer pipe from existing DI-2 "EX4" to proposed structure 1. Inlets tops 2 and 3 shall be blocked until the site is stabilized. Splitter structure 1A to Biofilter shall be plugged until site is stabilized. 7. Existing 54" stormpipe inlets EX2 and EX7 will be blocked with inlet protection initially. There will be no need for inlet protection once new top elevation. Both structures will have MH-1 tops. 8. Install Inlet Protection for structures 5A, 6, 6A, 8, 9, 10, 11, 12, 13, 14, 1. Culvert inlet protection for 2A. 9. The grading, road parking, and utilities will be constructed. 10. Dust control measures and permanent seeding along the graded areas of the site shall occur where indicated. 11. Sediment basin 1 will be removed once the county inspector approves upland stabilization and the remaining site work for lots 25-32 shall take place. 12. Install storm 1A to 1 B with EW-1. Keep structure 1A plugged until the site is stabilized. 13. Install sediment trap as indicated on sheet 6. 14. After Albemarle County E&SC inspector confirms site stabilization convert sediment trap to biofilter and unplug Structure 1A to 1B. LEGEND 3.01 SAFETY FENCE SAF 3.02 CONSTRUCTION TRANCE ENCE 3.05 SILT FENCE SF 3.05 SUPER SILT FENCE SFF STORM DRAIN 3.07 INLET PROTECTION IP 3.08CULVERT LET PROTECTIONCIP 3.09 D VERO )NI DIKE DD 3.13 SEDIMENT TRAPST 3.14 SEDIME T BASIN SB T 3.17 STOR CHAONNEI ANCE SCC El TC ---- TURBIDITY CURTAN 3.31 TS TS T SEEDORN GY 3.32 P SEED ERMANENNG T PS PS 3.35 MULCHING MU EE *NOTE: EX1 1. The contractor shall install a double // - turbidity curtain and verify its adequacy 50 - - 40 , and upgrade or replace as needed to /� \ ',/ �,o° °°P s prevent silt from entering the main portion " 4 /' of the lake. �� / ' /'//'//// Xx 2. Silt from construction in the lake will be " removed by contractor. j/ 3. Fuel storage tanks to use secondary containment pallets with spill kits readily available. 4. Matting shall be installed when seeding -4 slopes in excess 41H.1 V. 5. A faircloth skimmer shall be used in the sediment basin to assist in the filtration and removal of fine particles and colloidal �,1 / %� / soils. _` �Q//' / `ice%�� j/�/' \\J ��° /�� 9 EX2B O` / / / to / SGS disk Z-155 er of Route t Old Crenshaw9Ga °�h and known, age. �el j �1 I -I--� -T 1 ac i 11 \ I --- I I - \ I I I I `4 I ESMT TO BE VACATED SS TO BE FILLED WITH PLOWABLE FILL I / \ I of CONTR ICTO� TO/ REMOVE INLET AND PROVIDE /CURB UT TO LOW RUNOFF FROM PARKING I I ; E3 / I I ,/ ,/ LOT TO FL W 4LONG [ IVERSION TO SEDIMENT BA`. I Ex. heat I I I I pumps SOIL STOCKPILE DID I I o / I I 0)O 6 o� o I I I �R Aa2� I E� heat / / I / / / / 0�0���/' Ilpumps I Existing/ I ❑ i-Story Brick Medical // ` // / v / C3 ), I I ❑ Office12.424us ding / \ / N // / �P( RAG � I j I ❑ beBrwo Timod - 24'_ _ �''�� // `/� " / / 0�� �GO�QS 3�P`'N s��-�% /'' 1 STALL-2-4 PIPE / I Blvd. ( �I P&� �S ( E�� EM�� �Q I. RUN 1-1A-2-3-E�4 G�- N�G�- S\MoRP�� oJ/ AND PROVtD-E SIN SSF ��' _' -OVER DURING _--- / I CONSTRl1ETtON, _WHEFRE POSSIBLE l\ I w 10 / 18' 18' / / �/ �Itin / \ I I / - o 10 "(� / I P19' Na\. / 88 8IP or 7 84� 6" DEPRESSION AREA NEAR DIVERSION TO PREVENT DIKE SCOURING. �dt,TS OF A Jimmy. L Taggart Uc. No. 22841 �►4 ;POa• 9/25/19 1411 SSSrONAL S�3 \ 9 \ \ I \ \ 1 \ \ 1 \ II S PS \ 0 1 1 1Z SB-1 DRAINAGE AREA Ex sidewal v1 � 5.78 AC v \ _ _ _ v� v v `\ �v v V v v FAIRCLOTFI w w -w -�- �I I W / \ \ / I SCC-A\\\� \\ \ \ SKIMMER ARBOR // 3.68 AC `y \ _ / LAKE I _ \ _ / // (SEE SHEET 11 FOR FULL DA) `�`\ \ �/ 1 1 I 1 1 -----rt--- � _- �.� / / / � \ � -- , , // I I I 1 1 EDGE -xist- Cs"Ducti e - Water I /�' / / / LIMITS OF DISTURBANCE s. I /// / // / l I 4.19 ACRES \\ ��\ \\\ \ \ // i ! S x TC assumed location Water one ' / \ location only / / Ln \ *PROPOSE D \F. Ex. DOUBLE.x6.TS sD A(CESS TURBIDITY TRAIL ESMT CURTAIN ---- � / �6 SCALE: 1" = 30' EX6 A'X B IP \ \ I X5 ` \\ \\ \\ \ \\\ \` \\ \\ �\ \ \ 117.5 / I P ► \ \ \ I ` 9 \ \ 4$ MISER �I Ua 0 � O vs '^ v, ()) m C\1 d Q�2 QD z o �--i U o kc) o 0) Q > LL Z �C)� Q Ct W J _1J_ rVS vi kZt CC \ � Q w 0 O w I "V VQ Oo W �J ? Q 10 cc pCr. (O Urn I CV � co ` p CO QIt �Q LL CIO�co W IQ:-J a W w Lf o vw O Z (] W 0rn � co co �W w 2 L z O O a - REVISIONS COUNTY COMMENTS 2/15/19 COUNTY COMMENTS 3/27/19 COUNTY COMMENTS 8/23/19 DATE NOV. 30, 2018 SCALE AS SHOWN W ICE a g j z P4 0 - O zo J O o w w J Q W Q \� / m m J � O O W FILE NUMBER 13.0124 SHEET 4 OF 14 LEGEND [3.0]1 SAFETY FENCE SAF [3.0 2] COTRANCETION CE [3. 0 5] SILT FENCE SF [3.0 5] SUPER SILT FENCE SFF [3.07 IP STORM DRAIN INLET PROTECTION [3.0 8] CIP LET CULVERT PROTECTION [3.0 9] DD T TEMPORARY DIVERSION DIKE [3.13] ST SETDIAPNT [3.14] SB S EDIMT gASEN [3.17] SCC STORMCHAONNEL ANCE [3.2 7] TC TURBIDITY CURTA N [3.3]1 TES M P DR G Y TS [3. PERMANENT PS PS [3. 3 5] MULCHING MU M 1992 I GENERAL CONSTRUCTION NOTES 1. Prior to any construction within any existing public right-of-way, including connection to any existing road, a permit shall be obtained from the Virginia Department of Transportation (VDOT). This plan as drawn may not accurately reflect the requirements of the permit. Where any discrepancies occur the requirements of the permit shall govern. 2. All materials and construction methods shall conform to current specifications and standards of VDOT unless otherwise noted. 3. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and shall be installed prior to any clearing, grading or other construction. 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. 5. The maximum allowable slope is 2:1 (horizontal: vertical). Where reasonably obtainable, lesser slopes of 3:1 or better are to be achieved. 6. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of the County Engineer, or designee, it is deemed necessary in order to stabilize a drainage channel. 7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices. 8. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe - Class III. 9. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR Part 1926). 3.14 DETAILS OF CORRUGATED METAL ANTI -SEEP COLLAR IN COLIAR WIIH Go I/17I11(x OOULAR TO BE OF SAME GAGE AS THE RPE WITH WHICH IT IS USED ODNINUOUS WF10_�7 1/Y X Y SLOTTED HOLES FOR 12' MIN. 3/0' DIAMETER BOLTS. 1 +R ATr D WELD BOTH SIDES BAN`MMNUOUS WOD AT 61 ED HOLES CORRUGATED NTO "T g °'` SECTIOSHEErN B-B CENTER wDDEA N° CENTTR OF BAND ELEVATION OF UNASSEMBLED COLLAR 3. UNASSEMBLED COLLARS SHALL BE MARKED BY NOTES FOR COLLARS: PAINTING OR TAGGING TO IDENTIFY MATCHING PAIRS. 1. ALL MATERIALS TO BE IN ACCORDANCE WITH 4. THE LAP BETWEEN THE TWO HALF SECTIONS CONSTRUCTION AND CONSTRUCTION MATERIAL AND BETWEEN THE PIPE AND CONNECTING BAND SPECIFICATIONS. SHALL BE CAULKED WITH ASPHALT MASTIC AT 2. WHEN SPECIFIED ON THE PLANS, COATING OF TIME OF INSTALLATION. COLLARS SHALL BE IN ACCORDANCE WITH 5. EACH COLLAR SHALL BE FURNISHED WITH TWO CONSTRUCTION AND CONSTRUCTION MATERIAL 1/f DIAMETER RODS WITH STANDARD TANK SPECIFICATIONS. LUGS FOR CONNECTING COLLARS TO PIPE. DETAIL OF HELICAL PIPE ANTI -SEEP COLLAR WELD 1 1/B' X 1 1/r X 1 1/8' ANGLES TO COLLAR OR BEND A 80' SIZE AND SPACING OF SLOTTED ANGLE I I/e WIDE AS SHOWN N DRAWING. OPENINGS SHALL BE THE SAME NOTE FOR BANDS AND COLLARS: AS SHOWN FOR CM COLLAR. MODIFICATIONS OF THE DETAILS USE RODS AND LUGS TO CLAMP SHOWN MAY BE USED PROVIDING BANDS SECURELY TO PIPE. 1 1/4f EQUAL WATERTIGHTNESS IS MAINTAINED AND DETAILED 12' MIN. DRAWINGS ARE SUBMITTED AND APPROVED BY THE ENGINEER PRIOR 2 TO DELIVERY. BAND OF HELICAL PIPE ISOMETRIC VIEW SHE NEGL COLLAR SHALL BE CUI TO FIT CORRUGATIONS OF HELICAL BAND. AND ROD AND LUG WELDED WITH A CONTINUOUS WEIR. NOTE: FOR DETAILS OF FABRICATION DIMENSIONS, MINIMUM GAGES, SLOTTED HOLES, AND NOTES, SEE DETAIL ABOVE. MELD caT OF BE WEIDED To TO NOTE: TWO OTHER TYPES OF ANTI -SEEP COLLARS ARE: CEI HELICAL PPE BA,D 1. CORRUGATED METAL, SIMILAR TO UPPER, EXCEPT SHOP WELDED TO A SHORT (417T.) SECTION OF THE PIPE AND CONNECTED WITH CONNECTING BANDS TO THE PIPE. PARTIAL ELEVATION 2. CONCRETE, SIX INCHES THICK FORMED AROUND THE PIPE REF.' ENCR. FIELD -UAL WITH #3 REBAR SPACED 15" HORIZONTALLY AND VERTICALLY. Source: USDA-SCS III - 109 ANTI SEEP COLLAR DETAIL Plate 3.14-13 30 0 30 60 9 SCALE: 1" = 30' syT of \ o L)7 Jimmy L. Taggart Lk. No. / \ +\ / / �/ i' 41 '�� 22841 1► / / /g / / / / � 4 �8ZONAL /4 Z 09 f a / / I 0 ` s g0 IP 9 5 /ol IP I / / ' 91 10 o lu/�'S ^ t�15� Lod 3 i / / 3� as i 1`I '1 �pf IOU 6 3 Opp INC G SN �%0' RO I I6 \I22, Pub5 MPH) 1 g33 / c � _W Lg � lk Si. oQ• 6 i / / , �� f 41 / / / /' /ou 2\ / / / I TC t of TS PS � I I '1.2TC/� // / 9.0 / 0 41 / Q, �K I / / DDL°I S S�' 99.38 / 6 01 IvT \ . / \ / f 6 / � 99F � \ CX � x Sg.�9 O � 'x f � Ex. heat I x 99.E 9 / / f \4 / 91 q L) 91 / /' puamps // \ / �� ' 0 // / TI I I �,J' I I 99.E I y x 8.37 QI I I I ' ' N SA \ I a / / / '4g0 +.7 /' / O / t5rl� IP IP / s5 /' I/ ci G I JJI I x 99.34 / ` \ / 1a� / /�/ I t heat . 2 / FUELS S7 / I I P ° R� 1jg I �/i O z 88 S!r AGE / �J� / SECONDARY ❑ Existing 9 1$ � / � / .�pFz� / � / }+ 1-Story Brick Medical nfFF_' // / / //�O `\ �/ I I I ❑❑ / - _- GP�S�L CONTAIN Office Building i sf 'es89X T #1800Mou Timberwood 4' PS Blvd. 90,� / / w I / _0 II co SCC-A IP W 18'--__24' / 18 \*. 24 HDPE I P14 , 3 III I I \ \ x l $$ 70 $4 -- BAF // '1 SS j\ \ 117.5L x ><1 N, / Q \ P \ \ \ \ \ \\sue\ v s Ix to �c� z I vvv vvw �v\po v� �v V v v v o v 48" RISER '/ LOTS 25-32 WILL BE Ex sidewal a R \ \ \ \s\ - ��j % / / RESTRICTED FROM \ \ \ \ \ \ / I /"\ -- i �I RECEIVING BUILDING �� F\A-I-RCLOTH / W -W - -W W -W +� I w \\ '/ / ' PERMITS UNTIL THE SITE \� \\�\\ \ \ SDI �� i IS STABILIZED AND THE -------r--- ` - �� / \ \ -- E&S INSPECTOR CAN e f' / / / / RELEASE THE BASIN - Water = LIMITS OF DISTURBANCE \ \ \ / I /' / / } FOR BUILDING 8' \\\ / Ex. -$O6- ----- / / / 4.19 ACRES assumed D1 water I // CONSTRUCTION. I t'on on 1y I Ex // // / // //moo ����`� SB-1 DRAINAGE AREA \\\ \S\9 s 5.78 ACRES \ \ s\ ° RELOCATED �' / / ti�\�\ \\ �s TRAIL Y�/ I A�CESS !,' ESM T I / / LIMITS OF DISTURBANCE 4.19 ACRES I EIir'WAD • um 1 ,e-85 \ ISM / I / / I / I ARBOR LAKE I II EDGE 1 I� A 1 L *PROPOSED DOUBLE TURBIDITY CURTAIN Ua 0 y O L- N m U N d Q::) zo o C> > LL. z �Q V1 Q- Q rcLU L J J_ aZ Cc UQ CO_LU O CO LU �y O C) Q 00 W K Q L0 U pac rn ` co Q -;I- v La Q � °Q > w cc QZ o LL PA LLI �i CO Q w Lr) o �w c) F+��1 W 2i rn C0 A C3 6, LU Z Z O Q L a_ W REVISIONS COUNTY COMMENTS 2/15/19 COUNTY COMMENTS 3/27/19 COUNTY COMMENTS 8/23/19 DATE NOV. 30, 2018 SCALE AS SHOWN I --I I --I Z W a Q z o 0 C) z Cl O z Qo z E- _jO O ° � �W Q U) LJJ w z \ m CD FILE NUMBER 13.0124 SHEET 5OF14 IF, , * * „ 24 MIN. GRAVEL *(18"MIN. DEPTH) 70' Min 1. SET POSTS AND EXCAVATE A 4"X4" TRENCH UPSLOPE ALONG THE LINE 2. STAPLE WIRE FENCING TO THE POSTS. ** Stone 3" SM-2A Asphalt OF POSTS. RUNOFF WATER WITH SEDIMENT Construction Existing AccessSlo e--N.- -2% Slope �Q 2% Pavement �- L6" Nall Li Lj 21A Aggregate Base Filter Cloth Existing III - 11a DIII- SEDIMENT WIRE MESH Grade SECTION B-Baao Existing g A Pavement B FILTERED SPECIFIC APPLICATION WATER FLOW -IIIII II _IIII l / r 2'* Min 0 4„ THIS METHOD OF INLET PROTECTION IS APPLICABLE 2% Slope Pe WHERE HEAVY CONCENTRATED FLOWS ARE EXPECTED 1 f 3. ATTACH THE FILTER FABRIC TO THE WIRE 4. BACKFILL AND COMPACT THE BUT NOT WHERE PONDING AROUND THE STRUCTURE Stone--//IVPositive Drainage FENCE AND EXTEND IT INTO THE TRENCH. EXCAVATED SOIL. MIGHT CAUSE EXCESSIVE INCONVENIENCE OR DAMAGE Construction A To Sediment *Must extend full GRAVEL FILTER 18» TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. Access Trapping Device ingress width g RUNOFF WATER WIRE MESH * GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE and egress operation PLAN VIEW I f ' ! � FILTERED WATER AGGREGATE. o d **INLET PROTECTION DESIGN PARAMETERS ADDS 6" 12' Min Positive Drainage OF AGGREGATE FOR DESIGN ABOVE AND BEYOND AS REQUIRED. To Sediment z, � /III 2% Slope Trapping Device / r 412a _ GRAVEL AND WIRE MESH � ,�, _ 1= FLOW �� �- / - - a a FF �T DROP INLET LET PROTECTION (1p) �!�����% ��,��,��,www���,www��,����,��,� ����i�� ��i?:ii�l� %� �i�i � ii�!:�4�vi i�i�i � ���!� _ SEDIMENT D a .� _ - (IIII III"' -_- I11 1 EP`7 NOT TO SCALE Filter Cloth CONCRETE GUTTER " *$ CURB INLET SECTION A -A EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. Compacted Soil SPECIFIC APPLICATION NOTE: A minimum water tap of 1" diameter must be installed FILTER FABRIC Op with a minimum 1" ballcock shutoff valve supplying a wash hose SZ,TH M Flow $ Pry with a diameter of 1.5" for adequate constant pressure. Wash THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE PONDING IN FRONT OF THE STRUCTURE AT CURB INLETS IS NOT LIKELY TO CAUSE O G> ,y r water must be carried away from the paved construction -�I W RET IH 111LI- INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED entrance to an approved settling area to remove sediment. All AREAS. /,• sediment shall be prevented from entering storm drains, ditches, Jimmy L Taggart or watercourses. * GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE. 4.5' M N "°• N°• A ��1 ,t,'4► **INLET PROTECTION DESIGN PARAMETERS ADDS 6" 9/95/19 (3 SUPER T�� Tl� T 1 �A� OF AGGREGATE FOR DESIGN ABOVE AND BEYOND AS REQUIRED. 5 DtVERStON Dt KE(DD)s&91ONA16 Paved Construction Entrance CE 4 �]�AVEL CURB INLET PROTECTION DETAt �]P EP'7 NOT TO SCALE EP7 Not to Scale EP7 NOT TO SCALE ]EP7 Not to Scale *Impervious core and cutoff trench *ADD 1.5' TO RISER SECTION FROM TEMPORARY SEDIMENT BASIN PRINCIPAL SPILLWAY DESIGN shown for informational purposes SEDIMENT BASIN TO SEDIMENT TRAP. only. Final design to be provided 15. REQUIRED SPILLWAY CAPACITY: ANTI- VORTEX DEVICE DESIGN b eotechnical engineer, y g * g ADD 0.5 TO RISER SECTION FROM PROJECT TIMBERWOOD PROJ NO. 13.0039 EMERGENCY SPILLWAY? (Y/N) N 6.6' - BASIN # SEDIMENT BASIN SB-1 DATE 9/25/2019 SEDIMENT TRAP TO BIOFILTER• LOCATION BY DEG REQUIRED SPILLWAY CAPACITY: 17.9 CFS PRESSURE RELIEF MH-1 Dam Elev = 480.10' 16. ASSUMED AVAILABLE HEAD: HOLES 1/2" DIA. TOP=478.5' INPUT ELEV. OF CREST OF E.S. IF USED: N/A j DRAINAGE AREA 5.78 ac ASSUMED AVAILABLE HEAD= 0.50 ft O Design High Water = 477.1' BASIN VOLUME DESIGN WET STORAGE 17. RISER DIMENSIONS: RISER DIAMETER: 48.00 in ACTUAL MAX. ELEV.: 476.50 ft (From Plate 3.14-8 or Cads) (From Ca�s'If appropriate) A A O O TOP STIFFENER IF REQUIRED IS-X-ANGLE WELDED EXIST 13.41' 1. MINIMUM REQUIRED VOLUME 387.26 cy TO TOP AND ORIENTED PER - 1 CMP Anti -Vortex 30" RCP @ 2.41 % 2 Collars @ 2.75' x 2.75' Device 2. AVAILABLE BASIN VOLUME ACTUAL HEAD: 1.00 ft 18. BARREL LENGTH: (From Plate 3.14-8orCalcs) O O PENDICULAR TO CORRUGATIONS. Crest Elev = 476.5' AVERAGE END AREA- BASIN VOLUME ESTIMATES BARREL LENGTH: 35.15 ft 48"RCP Riser ELEVATION AREA VOLUME VOLUME TOTAL BARREL INVERT OUT: 474.55 ft HEAD H ON BARREL: 1.95 ft (From Plate O O O O TOP IS -GAGE CORRUGATED METAL OR 1 8" STEEL PLATE. O Dlume Elev = 474.8'= 3" Orifice ft sf cf c c 473 6,918.00 19. BARREL DIAMETER: PRESSURE RELIEF HOLES MAY BE OMMITTED, IF ENDS OF 18" RCP @ 2.5% 35.15' I I Wet Volume 6'Gxl.5', 5,798.40 214.76 473.8 7,578.00 214.76 BARREL DIAMETER: 18 in 20. TRASH RACK AND ANTI -VORTEX DEVICE: (From Plate 3.14A or 3.14B) TACKwELD PLAN VIEW CORRUGATIONS ARE LEFT FULLY OPEN WHEN THE TOP IS Inv.=473.25' Concrete � Faircloth skimmer @ 474.8' 8,159.00 302.19 DIAMETER: 72 in (From Plate3.14D) ALL AROUND ATTACHED. NY . Base see below for detail Arbor Lake 1 474.8 8,740.00 516.94 16,240.10 601.49 HEIGHT: 21 in EMERGENCY SPILLWAY DESIGN - D _ �/ WE DED CYLINDER IS GAGE CORRUGATED 1� - CAT C Elev. - 473.0' - 476.5 10,366.00 1,118.43 5,457.50 202.13 21. REQUIRED SPILLWAY CAPACITY: - METAL PIPE OR FABRICATED FROM 477 11,464.00 1,320.56 Qe = Q(25)-Qp = N/A CFS H STEEL PLATE. EP'7 NOT TO SCALE 12,163.50 450.50 22. DIMENSIONS: BOTTOM WIDTH (b): N/A ft (From Table3.14C) 478 12,863.00 1,771.06 28,714.00 1,063.48 SLOPE OF EXIT CHANNEL (s): N/A Wit MIN. LENGTH EXIT CHANNEL x : N/Aft () (From Table 3.14-C) (From Table 3.14-C ) aMIN. " NOTES: 1. THE CYLINDER MUST BE 480 15,851.00 2,834.54 ANTI -SEEP COLLAR DESIGN FIRMLY FASTENED TO THE TOP OF THE RISER. REQUIRED WET STORAGE VOLUME 387.26 cy 23. DIMENSIONS: WATER ENTRY UNIT WITH TRASH SCREEN GENERAL NOTES: APPROX. ELEVATION 475.50 DEPTH WATER @ CREST OF P.S. (Y): 3.50 ft SUPPORT BAR SIZE REBAR MIN.) 2. SUPPORT BARS ARE WELDED 1. PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE PIPE. SLOPE UPSTREAM FACE DAM (Z): 3.00 :1 (#6 TO THE TOP OF THE RISER 2. PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS IN CORRECT AMOUNT OF TIME, MODIFICATIONS MAY BE REQUIRED IF FIELD 3. EXCAVATE CUBIC YARDS SLOPE P.S. BARREL Sb : 2.50 % ( ) OR ATTACHED BY STRAPS BOLTED TO TOP OF RISER. CONDITIONS WARRANT A CHANGE. 3. EMBANKMENT MUST BE COMPACTED TO DESIGN SPECIFICATIONS. 4. EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION 4. AVAILABLE VOLUME BEFORE CLEANOUT REQUIRED 193.63 cy LENGTH BARREL IN SAT. ZONE (Ls): 25.00 ft (From Plate 3.14-11) RISER DIAMETER ORORIFICE OPENING INSIDE THE INSTALLED. IZONTAL TUBE WITH A 5. EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT THE CONSTANT HYDRAULIC HEAD DISCHARGE END OF THE PIPE. 5. ELEVATION CORRESPONDING TO CLEANOUT LEVEL 473.80 FINAL DESIGN ELEVATIONS #6 X 12�� SPACER BAR (TYPICAL) 6. INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT SECTION A -A ISOMETRIC MANNER. 25. ELEVATIONS: 6. DISTANCE FROM DEWATERING ORIFICE TO C/O LEVEL 1 TOP OF DAM: 480.10 ft SCHEDULE 40 PVC PIPE (BARREL OR ARM) ARTHEN EMBANKMENT INVERT DEWATERING ORIFICE R'QD 474.50 INVERT DEWATERING ORIFICE USED 474.80 DESIGN HIGH WATER: 477.10 ft EMERGENCY SPILLWAY CREST: N/A ft PVC VENT APPROX. VOLUME AT INVERT USED 496.94 cy PRINCIPAL SPILLWAY CREST: 476.50 ft LEXIBLE HOSE PIPE DISTANCE FROM INVERT TO C/O LEVEL 1.00 ft DEWATERING ORIFICE INVERT: 474.80 ft J O ANTI VOR`�'EX DETATT ti1V ll V ll 11 1 1L FLOAT LOAT DISTANCE ACCEPTABLE CLEANOUT ELEVATION: 473.80 ft WET STORAGE VOLUME ACCEPTABLE Silt Fence EP'7 NOT TO SCALE =11I-11 GRATE FLEXIBLE HOSE MUST BE SECURELY FASTENED ro THE THE DEWATERING ORIFICE TOP VIEW -III DI DRY STORAGE 7. MINIMUM REQUIRED VOLUME 387.26 c Y ENDWALL PVC VENT PIPE -_ = 17 8. TOTAL AVAILABLE VOLUME AT CREST OF RISER '____PVC LEXIBLE HOSE CREST OF RISER 476.50 - OUTLET PIPE\ _ 4" 40 PVC PIPE SCHEDULE 40 PVC PIPE ES APPROX. AVAILABLE TOTAL VOLUME 1118.43 cy ADEQUATE DRY STORAGE VOLUME TOE OF FILL CULVERT a"°RF O (BARREL OR ARM) = DRY STORAGE o '" �``"GM 474.8 9. DIAMETER OF DEWATERING ORIFICE -WET STORAGE L=2.4' Q 0.56 cfs nl ••. d 5.14 in rilllllll WATER ENTRY UNIT I 3" 40 PVC PIPE SHALL BE USED FOR HOSE USE d 3 in N .., I END VIEW SIDE VIEW = _ 10. DIAMETER OF FLEXIBLE TUBING **(FAIRCLOTH SKIMMER USED INSTEAD OF FLEXIBLE TUBING)** 4 in nn II , O (NO SCALE) STANDARD SIZE �1 DRAWN BY T. R. EVANS 10/10 O FAIRCLOTH SKIMMER°DISCHARGE SYSTEM WITH OUTLET J. WW. FIRCLOTH MERSON mM WWW. FAIRCLOTH SKI M MER. COM PRELIMINARY DESIGN o STRUCTURE ELER"°NE: c2 FAX: (919) 73 732-1-1266 66 EMAIL: WARREN@FAIRCLOTHSMMMER. COM 11. PRELIMINARY DESIGN ELEVATIONS: o o -TOE OF ILL CREST OF RISER 476.50 ft o TOP OF DAM 480.10 ft SILT FENCE *DISTANCE IS 6' MINIMUM IF DESIGN HIGH WATER 477.10 ft *design of high water assumes a peak flowrate FLOW IS TOWARD EMBANKMENT I' UPSTREAM TOE OF DAM 473.00 ft of 8.9 cfs storage volume is not considered. BASIN SHAPE FLOW !! IIII SHEETS OF 4' X 8' X 1 /2" EXTERIOR PLYWOOD OR 12. LENGTH OF FLOW / EFFECTIVE WIDTH: SURFACE AREA OF NORMAL POOL 8740 sf Stan Combinat on POLYETHYLENE FABRIC l= LINE POST EQUIVALENT 6" Above Riser Crest LENGTH OF FLOW PATH 54 ft EFFECTIVE WIDTH 76 ft , � O 9 1 5 s (ATTACH TO jjI POSTS WITH METAL TIE WIRES.) j 10' MAX. ;I;I �-� GROUND LINE Elev. = L/We 0.71 BAFFLES REQUIRED 5 6' MAX. CONVENTIONAL BRACING FOOTING E OR 5' MIN. (u APOSTS RUNOFF g (RATIONAL METHOD CALCULATION) PERSPECTIVE VIEW PERSPECTIVE VIEW USE MAXIMUM C VALUE DURING CONSTRUCTION AND MINIMUM Tc VALUE FLOW PLASTIC FENCE METAL FENCE 13. FLOW FROM 2-YEAR STORM s C: 0.60 8 Tc: 16.0 I: 3.4 in/hr Q= 12.2 cfs 14. FLOW FROM 25-YEAR STORM *VDOT #3, #357, #5, #56 OR #57 COARSE AGGREGATE TO REPLACE CLASS I RIPRAP POSTS MIN. SIZE 4 SQUARE C: 0.60 OR 5" ROUND. SET AT Tc: 15.0 I: 6.7 in/hr SILT FENCE IN "HORSESHOE" WHEN LEAST 3' INTO THE GROUND Q= 17.9 cfs HIGH VELOCITY OF FLOW IS EXPECTED. f t SAFETY JL FENCE CE DETAtL SAJL ) WOODEN BAFFLES DETA1 9 SEDIMENT BASIN SB1 CALCULATIONS CULVERT INLET PROTECTION (CI P) EPA NOT TO SCALE EPA NOT TO SCALE NOT TO SCALE 4P� NOT TO SCALE , • Ua 0 rn O U al co N m -CC LLJ N � 2 20 U g °� ^ Z CO)Q v1 Q �W LL I J_ � Q� Q� �2 J CC -, > Q w o w r U e I 00 I N WCopz ` Q Z fY N U rn N r h� V �LL`I 4j C9 4.2 Q frQ ) rc O3: Ix W V c' Q w o U � W Z0 �"T - 2 ;I co w W Z O O w REVISIONS COUNTY COMMENTS 2/15/19 COUNTY COMMENTS 3/27/19 COUNTY COMMENTS 8/23/19 DATE NOV. 30, 2018 SCALE AS SHOWN I- 1 I --I W Q Q Z j O �_ �\ a / NN H-I--I zo z o O o " O U z J W r m < (f) W W m m Q O I --I W FILE NUMBER 13.0124 SHEET 7OF14 r STORMWATER MANAGEMENT NARRATIVE N ORDER TO QUALIFY FOR 9VAC25-870-48 GRANDFATHERING IN THE CODE OF VIRGINIA : 1. A PROFFERED OR CONDITIONAL ZONING PLAN, ZONING WITH A PLAN OF DEVELOPMENT, PRELIMINARY OR FINAL SUBDIVISION PLAT, PRELIMINARY OR FINAL SITE PLAN, OR ANY DOCUMENT DETERMINED BY THE LOCALITY TO BE EQUIVALENT THERETO (1) WAS APPROVED BY THE LOCALITY PRIOR TO JULY 1, 2012, (II) PROVIDED A LAYOUT AS DEFINED IN 9VAC25-870-10, (III) WILL COMPLY WITH THE PART II C TECHNICAL CRITERIA OF THIS CHAPTER, AND (IV) HAS NOT BEEN SUBSEQUENTLY MODIFIED OR AMENDED IN A MANNER RESULTING IN AN INCREASE IN THE AMOUNT OF PHOSPHORUS LEAVING EACH POINT OF DISCHARGE, AND SUCH THAT THERE IS NO INCREASE IN THE VOLUME OR RATE OF RUNOFF; 2. A STATE PERMIT HAS NOT BEEN ISSUED PRIOR TO JULY 1, 2014; AND 3. LAND DISTURBANCE DID NOT COMMENCE PRIOR TO JULY 1, 2014. A PRELIMINARY SITE PLAN WAS APPROVED 10-25-1 1 WITH A PROPOSED IMPERVIOUS AREA OF 2.44 AC. THE PROPOSED MODIFIED PLAN HAS ADDED 0.40 AC OF IMPERVIOUS AREA ABOVE THE PRELIMINARY PLANS 2.44 AC, THEREFORE, THE PROPOSED PLAN MUST PROVIDE ONSITE BMP'S THAT RESULT IN NO INCREASE IN THE AMOUNT OF PHOSPHOROUS LEAVING EACH POINT OF DISCHARGE, AND SUCH THAT THERE IS NO INCREASE IN THE VOLUME OR RATE OF RUNOFF. A BIOFILTER HAS BEEN PROPOSED TO REDUCE THE ADDED PHOSPHOROUS AND RATE OF RUNOFF THAT 0.40 AC OF IMPERVIOUS AREA CREATES. PLEASE SEE THE SUMMARY CALCULATIONS ON THIS SHEET AND SUPPLEMENTAL INFORMATION IN THE HYDRAULIC AND HYDROLOGIC CALCULATIONS FOR CLARITY OF THIS SCHEMATIC. 9VAC25-870-48 * Preliminary Proposed Treated by Biofilter Impervious Acreage 2.4447 2.84 0.76 Impervious % 41.7 48.4 26.6 Pollutant RR (I bs/yr) 2.95 1 3.76 1 0.94 * = SDP201100042 (Approved 11 /4/11) THE COMPARISON OF THE RATE OF RUNOFF IS BEING PROVIDED BY SHOWING THAT THE POST -DEVELOPED CONDITION DROPS THE 2YR AND 1 OYR PEAKS BELOW THE DIFFERENCE IN THE PRELIMINARY AND PROPOSED PLAN. Q2 PRELIM = CIA = 11.34 CFS (HYD 93, SHEET 21) Q10 PRELIM = CIA = 14.72 CFS (HYD 93, SHEET 22) C = 0.55 A = 5.87 AC Tc= 15MIN C = 0.59 A = 5.87 AC Tc= 15MIN Q2 PROPOSED = CIA = 12.16 CFS (HYD 94, SHEET 23) Q10 PROPOSED = CIA = 15.79 CFS (HYD 94, SHEET 24) REQUIRED REDUCTION FROM THE PRELIMINARY PLAN TO THE PROPOSED PLAN BEFORE ARBOR LAKE IS 0.82 CFS FOR THE 2YR STORM AND 1.07 CFS FOR THE 1 OYR STORM. SINCE THERE WAS NO PROPOSED STORMWATER CALCULATIONS FOR THE PRELIMINARY PLAN IT IS NECESSARY TO RELATE THE WATER QUANTITY ASPECT OF THE MODIFIED PLANS. THE BIOFILTER IS PROVIDING MORE RUNOFF REDUCTION THAN THE DIFFERENCE IN THE 2YR AND 1 OYR FOR THE PRELIMINARY TO THE PROPOSED PLAN THUS QUALIFYING FOR GRANDFATHERING. PLEASE SEE BELOW FOR CLARITY AND THE HYDRAULIC & HYDROLOGIC CALCULATIONS FOR ROUTING SCHEMATICS. PROPOSED POST -DEVELOPED SITE + OFFSITE, WITH NO BIOFILTER** (HYD 96, SHEET 140,141) ** = VALUES INCLUDE OFF -SITE RUNOFF (BENEATH SITE) TO ARBOR LAKE, VIA 54" PIPE 2YR Q = 33.25 CFS 1 OYR Q = 52.00 CFS PROPOSED POST -DEVELOPED + OFFSITE WITH BIOFILTER (HYD 91, SHEET 138, 139) 2YR Q = 27.74 CFS 10YRQ=43.18CFS 2YR Q - 33.25 CFS - 27.74 CFS = 5.51 CFS > 0.82 CFS OK 1 OYR Q - 52.00 CFS - 43.18 CFS = 8.82 CFS > 1.07 CFS OK FLOWS ARE FROM THE SPLITTER STRUCTURE (HYD 47) (SHEET 91,92) ME 1 DITCH SURFACE TYPE DITCH I Channel Calculation: n=0.035 for EC-2, type 1 s=2.4% Q(2)=5.35 cfs Q(10)=6.32 cfs V(2)=3.45 fps d(10)=0.93 ft 1.0' 1� 2 DITCH 2 A=1.84 Ac. C= 0.33 Tc = 15 Min (HYD 86) (SHEET 128,129) EC-2 TYPE 1 a1 2 "$stiza of of�� ')7 Jimmy L. Taggart Uc. No. Z-N-022841 810NAL 9/25/19 1'�'~ Sib STAPLE TO DITCH SURFACE DITCH 2 Channel Calculation: n=0.035 for EC-2 Type 1 s=5.0% Q(2)=2.13 cfs Q(10)=2.77 cfs V(2)=3.65 fps d(10)=0.60 ft HATCH LEGEND -7 EC-2, TYPE 1 \ \ \ \ 10 0 10 20 30 \ \ \ \ E�O�"IIJTER �IJAI� VIEW SCALE: 1" = 10' RIP RAP TYPE All o 0 0 BIOFILTER PLANTING REQUIREMENTS = 1000 TREES AND SHRUBS PER ACRE 830 SF = 0.02 ACRES * 1000 = 20 TREES AND SHRUBS TOTAL BIOFILTER PLANTING SCHEDULE TABLE BIOFILTER LANDSCAPING SPECIES Cal Size Shrub Ht. #1 10YR CANOPY 10YR TOTAL O River Birch (BN) Pin Oak (QR) Sycamore (PO) 2.0" 2.0" 2.0" 1 1 1 258 90 460 258 90 460 Total Trees provided 3 3 3 Spicebush (EB) Winterberry (WB) Spicebush (EB) I I 36" 6 6 6 I 23 I 14 23 138 84 138 36" 36" Total Shrubs provided 1g 1,168 NOTE: SWM MAINTENANCE TO BE ACCESSED FROM ARBOR LAKE TRAIL WHICH LIES ON THE APPLICANTS PROPERTY. ACCESS EASEMENT HAS BEEN PROVIDED SO THAT FOREST LAKES CAN REACH WORTH CROSSING AND TIMBERWOOD BOULEVARD. FILTER FABRIC GEOTEX 351 OR EQUIVALENT (APPLY ONLY TO THE 6 SIDES AND OVER THE UNDERDRAIN. ) STR-15 Dam Elev = 480.0' STR-16 *TAKEN FROM VA DEQ BMP CLEARING TOP=478.5' HOUSE DESIGN SPECIFICATION No.9 FOR BIORETENTION J. 100YR ELEV = 478.89' *GENERAL FILTER 10YR ELEV = 478.82 EXIST 13.41' 2YR ELEV = 478.79 MEDIA COMPOSITION: 30" RCP @ 2.41 % Crest Elev = 478.5' 85% to 88% SAND Biofilter Surface = 478.0' _ _ 8% to 12% SOIL FINES 48"RCP 3% to 5% ORGANIC MATERIAL Riser c�i 475.33'=BOTTOM OF BIOFILTER MEDIA 35.15' - 18" RCP @ 2 5% 474.55' 6'0x1.5', Inv.-473.25' � Concrete 2" SHREDDED BQSe HARDWOOD MULCH Arbor Lake �� UNDERDRAIN IN BIOFILTER SE 1 SCHEMATIC3 4" SCHEDULE 40 PVC WITH g INCH PERFORATIONS AT 6" ON CENTER EP7 NOT TO SCALE UNDERDRAIN (10' SPACING MAX.) 9" GRAVEL SUMP SLOPE OF UNDERDRAIN SHALL BE AT 0.5% VDOT #57 OR EQUIVALENT ADD 1.5' TO RISER SECTION FROM SEDIMENT BASIN TO SEDIMENT TRAP. r BIOFILTER CROSS SECTION FROM SEDIMENT TRAPS ER TO BOFILOTER. NOT TO SCALE Sizing for Bioretention Filter Facility: Surface Area Required = 2.5% of the impervious area for drainage areas EX-4, DA-2, DA-3 and the back of townhouse lots 25-32. Biofilter Area Required = 0.76 AC impervious area * 0.025 = 823 SF Biofilter Area Provided = 830 SF A Ua 0 o U W o �CO j_ N d 2 z0 U o O � o) � LL V1 Q Q W Lu z J J QLz y� >a ww Q Oy r , UQ Oo Jj cr N W OC pCa O U rn N p TF� V yC� Q 't ) �2 xx ILL x cc r Q.W co(CZ')U w U-) coQ Z� W o� LU 2� M �LU w W z o O REVISIONS COUNTY COMMENTS 2/15/19 COUNTY COMMENTS 3/27/19 COUNTY COMMENTS 8/23/19 DATE NOV. 30, 2018 SCALE AS SHOWN E_ W w Q Q Z D z_ a O 0 '._4 U) > E- z z z 0 O o Q ULU Z L.L J W � Q Q U) mw DJO Q Z 0 I� w FILE NUMBER 13.0124 SHEET 8 OF 14 20 515 510 505 500 495 490 485 480 475 470 465 460 455 450 9 HOW 1 E7 5 OEX2 E1 520 515 510 505 500 495 490 485 480 475 470 465 460 455Z 450 505 5 6 60A 505 w w CV J _ = c - r7 N �' ``' w LL 00 w rnw 500 o� Ix+ w Q ^ o_ - 0 0 0 0 495 495 N _ x--- Z o ^ - 490 ----- 490 w X GRADE- - - �-EXIST. 485 485 " HDPE - HDPE ® 2.18% / 480PROPOSED 480 475 475 - 470 470 - - - - - _ _ - O O - - vv C. " 465 C14 465 " O r` M _ Co OD - - Ui O Op r` 00 N " + 460 460 11 Z Z I Ft Z 455 cn _ _ _ N _ _ cn _ 455 9 50 10+00 11+00 N STORM SEWER PROFILE STRUCT. 5-6A HORIZ. SCALE: 1"=30' tis�`�'VERT. SCALE: 1"=10' ,yo o A 30 0 30 60 90 JimHORIZ. SCALE: 1" = 30' ��a�a10 0 10 20 30 DVERT. SCALE: 1" = 10' O 00 00 VC) vv vv v co o N CO N O to F, r` Pi CA r` O LIJ O r` ao r- r- N r` 00 r7 ao rn r, z z Z Z z z Z N- N--- N--- N--- N- - N- 50 10+00 11+00 12+00 13+00 14+00 15+00 16+00 EXISTING STORM SEWER PROFILE STRUCT. EX1-HW VERT. SCALE: V=t0' 500 2 2q 500 510 505 500 495 490 485 480 475 470 465 460 455 9 E7 11 12 13 14 510 505 500 495 490 485 480 475 470 465 460 455 500 01A _ 495 0 490 485 480 - 475 '� EXIST. . O 470 r` `� 00 465 z 460 N - -- 10+00 STORM SEWER PROFILE HORIZ. SCALE: 1"=30' VERT. SCALE: 1"=10' 1B - 0 a'Ly N - STRUCT. 500 495 490 485 480 475 470 465 460 1A 1B 515 510 505 500 495 490 485 480 475 470 465 460 9 OEX 7 8 9 10 515 510 505 500 495 490 485 480 475 470 465 460 - - - rld- - - CV 2 _ _ CM rn 0 � w II a ~ ~ ¢ CD 00 0 0 0. o Wo 0 ifI— - ``' ``' ``' w "' 495 - 495 x J J J ,, J w J O Z N CL a X Qn a a 0 EXIST; GRADE-'--N 490 - 490 N • CDR N cliP. ~ -- PROPOSED GR 0 -- -- - _ ----- -_ __� o o 485 _ 485 J -_-- _ - ' - - - - - - _ - 480 --HG1_ LINE480 - Lbuzo-1Z HIJIJ® 2.62q 12 31' _ " • _ " ° 475 475 - ° - = 470 04 CIDLO 470 N .. O 05-5 0 � O L + 465 465 1 0 0 z z v .. v v 0 r`.,.. o C co � co A 460 V) I cn_ 1400 L6 00 9 9010+00 11+00 o ao r`� 00 ao N Cl 00 + + + STORM SEWER PROFILE STRUCT. 2A-2 HORIZ. SCALE: 1"=30' VERT. SCALE: 1"=10' N o ~ ~ 11 Zz z z z z z O a �� cn___cn__ -- cn-- cn_ z_z_z_ zz cn__ cn__ cn_ 50 10+00 11+00 12+00 75 10+00 11+00 STORM SEWER PROFILE HORIZ. SCALE: 1"=30' VERT. SCALE: 1"=10' STRUCT. EX7 14 STORM SEWER PROFILE HORIZ. SCALE: 1"=30' VERT. SCALE: 1"=10' STRUCT. EX2-10 Inlet DnStm Drng Inlet Tc i Flow Invert Invert Line Line Line Capac Vel Pipe O 5A 510 1 (1A� 2 3 EX4 510 ID ID Area Time Sys Rate Dn Up Length Slope Size Full Dn Travel 505 505 500 495 490 485 480 475 470 465 460 on dub i H F02 4i �i h11101111111111111 1111101 OMEN II(((■ I■1�� ��Irlrw� • • • IIIIIIIIIII■ �ii■'"�ii� MEM 1 11 500 495 490 485 480R 475 470 505 500 495 490 485 480 475 470 CV 2 505 500 495 485 480 475 470 (ac) (min) (min) (inlhr) (cfs) (ft) (ft) (ft) (%) (in) (cfs) (ftls) (min) 2 l w 00 - - " 7 8 9 1A 2 3 EX4 2A 6 6A EX2 7 8 9 1 1A 2 3 2 5 6 0.00 0.16 0.34 0.38 0.00 0.49 0.05 0.35 0.00 0.35 0.24 0.0 5.0 5.0 5.0 0.0 5.0 5.0 5.0 5.0 5.0 5.0 6.9 6.7 6.3 5.0 7.3 7.2 5.2 5.0 5.0 6.4 5.0 6.12 6.18 6.28 6.70 6.02 6.05 6.64 6.70 0.00 6.25 6.70 2.31 2.34 1.94 1.09 23.36 23.38 19.73 19.50 1.31 2.80 1.34* 1 1 482.06 482.90 485.58 486.91 479.65 481.75 482.30 483.50 482.30 483.39 486.41 482.66 485.48 486.81 491.17 482.20 483.40 486.00 484.50 486.21 488.37 12.310 40.460 57.300 110.690 15.720 45.970 115.140 57.730 96.260 35.410 89.880 4.87 6.38 2.15 3.85 0.98 0.96 4.33 2.29 7.96 2.18 12 12 12 12 24 24 24 24 18 15 15 8.52 9.74 5.65 6.99 87.40 24.24 23.95 50.99 17.20 19.74 9.54 8.16 7.70 4.36 2.83 7.44 7.44 6.28 6.21 0.74 2.28 3.04 0.07 0.22 0.37 1.32 0.03 0.10 0.31 0.16 2.16 0.25 1.43 - - U - 0 17 o 0 ino - rn o (70i 4 ^ U-)10 U)490 1E, °0, 1 - - - - - - - - - - " - - - - - -- - -- -- ----- ---- ° " RGP .. a to N - ,� m = Line No. Inlet ID Drng Area (ac) Inlet Time (min) i Inlet (in/hr) Runoff Coeff (C) Incr Q (cfs) Q Carry (cfs) Q Capt (cfs) Q Byp (cfs) Inlet Eff (%) Curb Len (ft) Junct Type Gutter Slope (ft/ft) Gutter Width (ft) Cross SI, Sw (ft/ft) Cross SI, Sx (ft/ft) Gutter Depth (ft) Gutter Spread (ft) 1 7 0.00 0.0 0.00 0.00 0.00 .... .... .... MH 2 8 0.16 5.0 6.70 0.43 0.46 0.00 0.46 0.00 100 .... Dp-Grate Sag 3.00 0.500 0.500 0.09 3.35 3 9 0.34 5.0 6.70 0.43 0.98 0.00 0.98 0.00 100 .... Dp-Grate Sag 3.00 0.500 0.500 0.14 3.57 4 10 0.38 5.0 6.70 0.43 1.09 0.00 1.09 0.00 100 .... Dp-Grate Sag 3.00 0.500 0.500 0.15 3.62 5 2 0.49 5.0 6.70 0.85 2.79 0.52 3.31 0.00 100 8.00 Curb Sag 2.00 0.083 0.020 0.25 6.13 6 3 0.05 5.0 6.70 0.72 0.24 0.00 0.24 0.00 100 6.00 Curb 0.024 2.00 0.083 0.020 0.11 1.37 7 EX4 0.35 5.0 6.70 0.73 1.71 0.00 1.71 0.00 100 3.00 Curb Sag 2.00 0.083 0.020 0.23 5.36 8 2A 0.00 5.0 0.00 0.00 1.31 0.00 1.31 0.00 100 .... Hdwall .... .... 9 6 0.35 5.0 6.70 0.73 1.71 0.00 1.71 0.00 100 8.00 Curb Sag 2.00 0.083 0.020 0.16 1.93 10 6A 0.24 5.0 6.70 0.80 1.29 0.00 1.29 0.00 100 12.00 Curb 0.040 2.00 0.083 0.020 0.19 3.31 11 12 0.13 5.0 6.70 0.35 0.30 0.00 0.30 0.00 100 .... Dp-Grate Sag 4.00 0.500 0.500 0.07 4.26 12 13 0.12 5.0 6.70 0.38 0.31 0.00 0.31 0.00 100 .... Dp-Grate Sag 4.00 0.500 0.500 0.07 4.26 13 14 0.15 5.0 6.70 0.38 0.38 0.00 0.38 0.00 100 .... Dp-Grate Sag 2.00 0.500 0.500 0.06 2.25 14 5A 0.54 5.0 6.70 0.75 2.71 0.00 2.19 0.52 81 8.00 Curb 0.011 2.00 0.083 0.020 0.23 5.25 11 E7 0.00 0.0 8.6 5.70 5 480.70 481.10 41.690 0.96 12 3.78 1.08 0.57 465 0 0 0 0 0 0 0 * STORM INLET CALCULATIONS * See sheet 11 for yard 12 11 0.13 5.0 8.3 5.76 o.s3 481.20 481.60 17.770 2.25 12 5.79 1.09 0.24 --�- .. �-�- �- drain performance chart. 00 460 465 O o N r7 M m coo 465 0.50* o 13 12 0.12 5.0 7.1 6.07 481.70 482.60 63.650 1.41 12 4.59 0.79 1.23 o r` rr ao co Oo 0o r` 0o M STORM SEWER PROFILE STRUCT. 5A-5 460 11 460 14 5A 1A 13 5 113 0.15 0.54 0.00 5.0 5.0 0.0 5.0 5.0 7.4 6.70 6.70 6.00 0.38 2.71 5.83 482.70 483.56 480.75 484.30 482.85 480.50 61.120 5.28 39.890 2.62 14.32 0.63 12 15 12 6.24 18.89 0.80 4.13 3.90 2.10 0.08 0.05 z zRRZ 25 Z Z ? 3.06 455 cn _ _ _ _ _ cn _ _ _ N _ _ V) _ 455 9 50 10+00 11 +00 12+00 15 16 16 AL Routed Routed - - - - STORM - - DRAIN 17.90 473.67 474.55 17.90 473.25 473.57 CALCULATIONS 35.150 2.50 18 17.99 10.28 13.410 2.41 30 68.98 14.15 `SPLITTER 'FLOW WILL STRUCTURE BE HIGHER THAN CAPACITY 0.20 0.10 Yard drains 14, storm event to failure of inlets 13 and DI-7 12 have been routed using a 100-yr show overland flow relief. Flows to inlet 2A assume 12, 13 & 14. , STORM SEWER PROFILE STRUCT. 1-EX4 HORIZ. SCALE: 1"=30' VERT. SCALE: 1 =1O HORIZ. SCALE: 1"=30' VERT. SCALE: I -1 O Ua 0 � 0 W �m N 0 2 Q� z0 U g �� o O C O� LL z V1 4 r,cW w J J Z az CC\ Cf) Q Ww OCO r , U . Oo W Q 'K Q n co pQt Urn N C0 T F•� t O 0 CcQ QLL cc cc IxW co Q LJ Ln o U W z� 0� U CO LU W Z z 3E O W a W REVISIONS COUNTY COMMENTS 2/15/19 COUNTY COMMENTS 3/27/19 COUNTY COMMENTS 8/23/19 DATE NOV 30, 2018 SCALE AS SHOWN O W �_4 Q U z �_4 LL V) > Z z p J z O S w �3: J O Q a Wm w w Q W O E- 0� FILE NUMBER 13.0124 SHEET 9 of 14 _j r VA DCR STORMWATER DESIGN SPECIFICATION NO. 9 BIORETENTION down the slope_ Dsigners may also want to terrace a series of bioretention cells to -manage runoff across or drawn a slope. The drop in slcapu bc(%vccn ccIIsl 4shc old be Iirniled to I foot and sbouId be armored with river stone or a suitable equivalent. 7.4 Cold Climate and Winter Pierformance Bioretenflon areas can be Used for snew storage as long as an overflow is provided and they are platted with salt -tolerant. non -woody plant spm ies_ iOTE, Dffigners may want io evaluate Chesapeake Bay wetland plant species that tolerate slightly brackish water, or consult [lie Minns-rta SmTnwatcr I anua1 for a list cf sallHolcrant grass species (MSSC, 2005.) Trcc and shrub locations s houId not conflict with pIowing and piling of mow into storage Areas. Whiie several stud itr}s have shown rhai bioretentiori facilities; operate effectively ill vania fi and r cst V rgirua winters, it is a good idea to c-ciend [lie filter bed and underdrain pipc below the frot 11ne and/or ovcrs17c the undcrdratn by one pipe size to reduce the fre-ezing Potential. 7.5 Linear Highway Sites Bioreten#ion is a preferred practice ror constrained highway right of ways when designed as. a scrics oI`individmtl on-line or oft=line cells. In thesc situations, the final design eIosely resemblcq that of dry swales. Salt tolerant spec its should be selected ifsalt compounds wiI I be used io de-ice the: contributing loadway in the winter. SECTIO-N -8: CONSTRUCnON 8.1. CanStruction Sequemcc rCansr'ruedia r Stage EAS Conlrols. Micro-bioraention anti sm;ali-scale bi-DretL:ntion areas should be fully protected by silt fence or construction fencing, particularly if they will rely on iinlfiltration (i.c., have no undcrdrains)_ Ideally, bioretention should retarmin outside the limit of distur nee during cons miction to prevent soil cornpaction by heavy equipment. Hioretention basin locations may be u d as small wdirncnt traps or ha,sins during construction. However, these roust he accompanied by motes and graphic details on the ESt`: plan specifying that { I) the maximum excavation dgth at the cons"etion stage nu st be at least I foot above the post-constnlction maxirlium excavatiun, (2) tllc lacilily must contain an undurdrain, and (3) the plan must also show the proper procedures for converting the temporary sediment control practice to a pennanernt biorctcntiun facility, inc Iuding dc4wawfing, c:leanout aiid stabiI ization. 8.2 I311atet-ention installation Time following is a typical construction scquenx e. to properly install a h*nr tcndon basin. Thv installation of a bioretention basin wiIl include intennecliatte inspections at critical stager' of construction with inspector sign -off that the particular eleinents of the bicretention are construe ied according (lic approved plans and speci f icat ions. As an altc;rnative, if allowed by the VSMP Authority}. the contractor iiiay reiv on the engineer of r�ecnrd or ether qualified individual to condnt VA DCR STORMWATER DESIGN SPECIFICATION NO. 9 SIORETI NMON the intermediate insre.rLtions and certifications of compliance_ The construction sequence for micru,-bioreten(ion is more simplifled. Those steps 'Imlay be modif(ed to rcllcci different bioretention applications or expected site conditions: Sfep 1. Cams truction of the bioretention area may only begin after the entire contributing drainage area bas bec`n stabilized with vegetation. it may be necessary to block, ocrGain curb or other inlets while the hioretent i on'area is being constructed. The proposed site should be checked for existing utilities prig to any excavation. Seep 2. The designer and the installer should have a preconstructioji sleeting, checking the boundaries oFthc contribming dra inngc area and the actual inlet elevations L (o ensurc ihcy con form to original design. Sind other core t-actors may be responsible for constructing portions of the site. it is quite common io Find subtle differences in site grading, drainage and paving elevation; that can produce liydraulic;aIly important differcns For the prtmposcd biorcicntion area. the designer should cleaTIy communicate, in Nxr'Ixing, any preject uhangck delemnnM during the preccrostruction meeting to th-c installer and the }plan revitm?inspecti-on authority. .step 3. Teiztporary F& S controls are needed during construction ofIhe bioreteritictn area tea divert stormwatcr away fix)m thor bioretention area until it is coinpleted- Special protection inca.surcs ,each as croN ion convol fabri-cs may be nccdcd tea prtAuo vulTicutble ride sIopvs from erosion du fing the construction process. Step 4. Any pre treatment cells should be excavated first and then sealed to trap sediments. Mep 5. Excavators or backhoes should work from the sides to excavate the bioretention area 10 its - appropriate design depth and dimensions. Excavating equipment should have scoops. with adequate reach so they do not have to sit inside the foo(*n( of the bioretentirni areas. Con(r-actors should use a cell construction appmach in larger bioretention baMns. whereby the basin is split into 500 to 1.00014. 0. 1Cmporury ccIIs with a 10-15 lboI car lh bridge in belwc:en, so IN collIs can be excavated from the side. Step 6. 1( may be necess-any to rip the bottom soils to {i depth o1' 6 to 12 inches to proniote greater i�tiiiltraticarr_ Step 7. Place gootextile fabric on the sides of the biore-ten.tion area with a 6-inch overlap on the sides. If a stone storage layer 111 be uscd. plaice (hc appropriate dcplh of 957 stcme on the boo( m. install the perforated underdrain pipe, pack #57 stone to 3 inches above the underdrain }ripe, and add approxiniaiell y 3 inches of chokc;r stono pza gra Yd as a 1-1hur beiween the underdrain and (lie soil media layer. if no stoke storage layer is mied_ start with 6 inches ❑f 457 stone on the bottom, and proceed with ilia layering as described above. ,Vep S. 0bMin soil the mdla from a qualified vendor, and store it on an adjacent inipervieus area ter plastic sheeting, AilervtrHfying that the media► meets the specifications, apply fhe media in 12- iitch 11M until the desired top elevation of the bioretention area is achieved. Fait a few days to chock for sc iftc�mcnt, and add add itionatl media. as needed, to atchizve the design clev;Mion. VA DCR STORMWATER DESIGN SPECIFICATION NO. 9 BIORETtENTiON Dep 9, Prepare planting holes for any try and shrubs, install the vegetation, and water accordingly, 1wall any lernporarry irrigation. Step 10. Plac:r~ the surface cover in both calls (mu Ich, river. stoma or Mrfl, depending on the design. If coir or jute matting v411 be used in lieu of rnatich. the matting will need to bo installed prior to planting (Step 19), and bolas or slit will have to be cut in the matting to install the plants, Step ,I L Install the pi ant tmmaterials as shown rim the I andzicap1-ng plan, and water them during weeks of no rain for the tint Iwo rnoll111S. 8.3 Construction inspection Inspections during and immediately after construction are needed to ensure that all the elements of bioretern(ion Basins are bunt in accordame With thesc spcciflcations. Use a detalIed inspection checklist that requires sigii-offs by quattified individuals at critical stages ofcons(ntction and to ensure that the corth~aclor's 1nterpretatian ofihe plain is cons isteni %vIth the designer's 'Intent. The following identifies the c:ritieal stages of conslrue(i,on where an in(ermediate irt_speciion and sib off by a qualified individual is recoimended sgnec the items can't be verified after construction is comp lulcd. A curimruclic 1i 1nspcc1ion cheekiisl that inc Iwkt s certifications of in,,;pcc1ion at critical stages is provided at the end of this specification. The fol tcry6ing represents items that are frequently overlooked during construction inspection but repivsent irrmpotuoil cicrxments for ensuring the success of the biormnt-1on facility during the initial break-in period. * Verify the proper coverage and depth of m0ch. vegetation, or soil matting ha~s been achieved fallowing consllucfi6n, both on the li Irer bed and the side -slopes. * inspect the pre-ti-eairm-,vt farbays and biter strips to vrrrify that t1iey a.r� properly installed, stabilised, and work i11g effectively befote opening the faciiiiv to rouoff. • 'heck that outfa.lI proteenoWenergy diss i pation measures at concentrated inflow and outtlow point's are stable. Upon tinail acceptance of the facility. log the prametice's GP coordinates and submit. them for entry into the VS P Authority's 13IMP maintennance tracking database. SECTION 9: MAINTENANCE 9.1. Manrtenasnec Agreements The Virginia StormwaterManagemeirtregulatiuns (4 VAC. 30-60) specify the circumstances under which Sri maintenance agreement must be executed Wween she uwncr at d the VSMP authority, and sets forth inspection requirements, compliance procedures it' rnai ntenauce is neglected, notrficatinri cif the Iocul program upon tram fer of t Ticr�hIp, and right -of try for local program pmonnel. VA DCR STORMWATER OESIGN SPECIFICATION NO. 9 BIQI TENTION • All bloreterrtiort practices must ineludir a long term im$intcmance a4reervents consistent witlm the provisions ofIhu VSMP regulations. and mus}t include the recommended maintenance (.asks and a copy of an annual inspection checklist_ 9 When micrc�-sealc; bioretention practices [ire atpplicd oft private residcnlial Irat,s, honi-commcrs shoWd be educated regarding their rautine maintenance nee& by being provided a simple document that expiains their pit rpose and routine maintenance meads, . • A deed tressniction, drainage easement or other mechanism enforceable by the VSMP authority must be in pla-:e to help pure that rain gardens and biomtcntion filters are maintained xW not converted or disturbed, as wel.I as to pass the knowledge along to any subsequent ow-mrs. * The mrcchani.sm should, if ppsssiblc, grant authonity for the VSMP arathonity to aceem the property for inspection or corrective action 9.2. First Year Mainten&nee operations Successful establishment of bioretention areas requires that the following tasks be undertaken in the first year following installation- 9 Initial rzrspectiotfr. For the first 6 me iiths foliowing construction. the site should be inspected at least va ice after storm events that exceed 112 inch of rainfall. 9 Spot Reseeding. inspectors should look for bare cat c,•roding areas in the eontribuLing drainage area or around the >b ioreternion area, and make sure they are immediately stabilized with grass Cover. * Ferdlizati(M One-time_ spot fertilization rnaY be needed for initial plantings. * Waterirrg. W snaring is nuedud once a week during flit` tint 2 months. anal iben ass needed during first growing seas(mi (AFrd-Octobvr), depending on rainfall. * Rent~ and replerc a deadplaats. Since up to 10'fa of the plant mck may die off in the first year.. construction contracts should include a care and rcp1acerncnt -warranty to ensure that vegetation is pre pcdy established and survives during The first growixtig season following construction. The typical thresholds belovw which replacement is required are 85% survival of plaint material and i W/o survival -of trees. 9.3. Maintenance Inspe-e ions It is highly recommended that a spring ma3intenanc:e inspection and cleanup be conducted at each blore l naun urrca. The roilo img is a list of 6omc of the key rrmaint ncc problems to locals for; 9 Check to see if75a& to 90P,-a cover (mulch plus vegetative cover) has been achieved in the bed, and =as= the depth of the remaining mulch. It Whack for sediment Buildup at ciub cuts, gravel diaphragms or pavement edges that prcvcnis flow from getting into the: bad, and check for other signs of bypassing. 41 Check for any %inter- or salt -killed vegetation, and replace it with hardier species. * Note pmc:senee of accumulated sand, sod imen i and trasih in this pm-trea mont cell or filter be& and removc it. 4 Inspect bioretention side slopes and grass filter strips for evidcrice of any rill or gully erosion, and repair it. * Check the: bioraentiun bed for ekfiduncc of mulch flotatiorm, excessive ponding, &jd plants or concentrated flows, and take appropriate remedial action. VA DCR STORMWATER DESIGN SPECIFICATIi N NO, 9 BIORETENTiON 4 Cheek inflow pointy for clo gin& and remove any sedirnelmt, 9 Look for any bare sail or sediment sources in the cantributing drainage Brea, and stabilize them immediately. 9 Check for cJngged or saint -draining soil media, a crust formed tin the top layer, inappmpiiate soil media, or other causes of insufficient filtering tune, and restore proper filtration chara ctci istic"S. ExampIG rnaintetnance inspecI-ton check -lists for Bilm(ention areas van be acc-essed in Appcnd_1X C of Chapter 9 of the Virginia Starmwaler,Manageoneirt Handbook (2010). 9.4. Routine and Non -Routine Maintenance Taslcs Maintenance of biore(enliari areas should be integrated into routine hindscape mnisltenanc:e Usks. If landscaping, contractors gill be crxi ected to perferrn maintenance, their contracts should contain spocffictr un 4rni4Lic boorutentiou landscaping needs, such as malilitaining clevattion dlMm-nces needed for ponding., proper mulching, sediment and trash removal. and limited use of fertilizers and pesticide. A cwtotnized maintenance schedule must be prepared for each bioretention facility, since the rnagntenance tasks witl differ depending on the scale of bimetention, the landscaping It i mplate chosen. and thin type of srirface cover, A generalized summary of com1non maintenance tasks and their frequency is provided in Table 9X The most colnmon non-routinc maintenance probiem involvc,; standing water. if wafer remains on the sut.-Face for more than 4S hours after a storm, adjustments to the grading may tH-- needed or tinderrdrain rcrpairs mzLy bc needcd. The surface of the filter bail should also be chccked for accurnidated sediment or a f me crust that builds up. after the first several storm events. There are s-c�vcral ttmelhoda that can be, used to rehabilitate the ftltex (try the easiest 111rip first. as listed below): • Open the undudr-ain ob rval:ion well err cle. rnout and pour in water to vmfy that the underdra3ins are functioning and not clogged or otherwise in need ofrepair. The purpose of this check is to see if there is standing water a I i the way down ibrough the ;soiI. Ifthm is standing vwaltev on top. but rioi its the underdrain, then there isr a clogged soil layL-r. If the underdrain alnd stand pipe indicates standing water, then the Luiderdrain must be clogged and wilI need to be snaked. • R=ovt, accumulated . cdirnent and till 2 to 3 inches of sand into the upper 8 to 12 inches of scai 1. a Install sand tricks from 3 inches bt!inw the surface to [lie undr~rdrails ]aver. Sand wick can be installer) by excavating or augering (LISing a, tree auger cat` similar tool} down Ian the gravel storage zone to create vertical columns which -are then filled with a cican opt~n-graded coarse s"nd niateri-al (coarse sand rnx sinmilar to kyle gradation used for the s}coil media). A sufficient number of wick drains of suffic fern dimension should be i nstal ied to meet the design dewateritmg tirrrtr for the facility, 9 Last restart - remove and replace some oral] of the soil media. COUNTY OF ALBEMARLE _1 Department Of Cc>mmunity Development .i� Lila Construction Record Drawings (As -built) for VSMP The following is a list of information required on construction record drawings for stormwater facilities reference Water Protection Ordinance 17-422 . It is preferable that the construction record drawing be prepared by someone other than the designer. Please do not provide design drawings as construction record drawings. A. A signed and dated professional seal of the preparing engineer or surveyor. W The name and address of the firm and individual preparing the drawings on the title sheet_ l i h i v' C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following: 1. Inspection Records and photographs for pipe trenches and bedding, including underdrains. 2. Video Pipe Inspection for any pipes which are not accessible or viewable. d Location i - f li 3. U atedwith eo coordinates o all facilities. A>; 4. Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities. 5. Current physical and topographic survey for all earthen stmctures_ Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design. Corrections may he required for alterations from the design_ b. Plants, location and type. 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the installed type of drainage structures, colvertfpipe size, weirs, m atet-als, inlets or end treatment(s), inlet and outlet protection, alignment and invert elevations compared to design. 8. Computations: For significant deviations from design, provide sealed computations verifying that the as -built condition is equivalent or better than design. 9_ Ditch lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Easements - Show all platted easements with dead hook references labeled. Facilitles and drainage must he within platted easements. Provide copies of recorded documents. 11. [guardrail, Tences or other safety provisions - Display the constructed location of all safety provisions: fences, guardrail, including the type, length and applied end treatments, compared to design. 12. Material layers - biotilter media, stone layers, sand layers, keyways and cores must be verified as to material types and depths. Include inspection reports, boring or test pit reports and materials certifications. Bintilter media must be an approved state mix. 13. Access roads - show location of access roads, surface treatment, drainage, etc, as applicable. 14. Compaction reports are required to verify till compaction its dams. 15, Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. VA DCR STORMWATER DESIGN SPECIFICATION NO.!9 BIORETENTiON Ta b1on 9-K RnertxpstAr! Annual MainfonAnnue Ar`livitios fe`r Rion WIffart Maintenance Tasks Fre uenc 4, Movan ,jf Qrass filter slri s and bicretelitiorl lt.:rf Cosner At least 4 times a year + Sat weed�rt em-EJon re ria it tras h re movall. ac d mulch Fdkin I'mc-a during ro%j n q s ea son i tide reinforcr ement planthng to waiMain densked the vegetation den-s t + Renege invasive plants using recommended daritrol methods A� tti�eded Stabilize lhn ciontributing drainage area to prevent erosion Spring in s pQctlarn and rlleanu P • Supplement mulch to maan(airt a 3 Irtcb layer Anrivally * Prune trees and shrubs • Ramave sediment an -P re -treatment Deis and inflow points Or*ce every 2 to 3 years Re Mate the mulch In ar EYeFV 3 -Oaf$ �$SyTR Op p r Jimmy L Taggart uc. No. N 22841 4 �o.+► 9/25/19 1 *' SZONAL b A Ua 0 y O U CV C) 2 g::) 20 U ZO m 0 @) O �: � O Z C V 1n Q O ac W J J J Cc w w Oto (a Q Oo J W Q Q? Q LO 20rc U rn CV V �O LLICO Q It L ? Ir Q w j rt cco y aW wLo Qy (nw U Z o U O� W a' CY) w Z � z O 0 a W REVISIONS COUNTY COMMENTS 2/15/19 COUNTY COMMENTS 3/27/19 COUNTY COMMENTS 8/23/19 DATE NOV. 30, 2018 SCALE AS SHOWN w wIr W Q E- Z Z LL tr > z zo � Z z J O ::) o_ O E- C(n Cl E- w w �i-' > m m J Q - E- C) t� FILE NUMBER 13.0124 SHEET 10 OF 14 I Virginia Stormwater Management handbook, Chapter 9 July 2013 9-C.10.0, BIORETENTION PRACTICES. O&M CHECKLIST Inspection Date Project Site PianfPermit Number Location Date BMP Placed in Service Date of Last Inspection Inspector. OwnerlOwner's Representative As -Built Plans available: Y 1 N Facility Type: Level 1 FaCllity Location: ,3 Surface G Underground Filtration Media: ❑ No filtration (e.g., dry well, permeable pavement, infiltration facility, etc. ❑ Sand ❑ Bioretention Sail ❑ Peat 17 Other: Level 2 Hydraulic Configuration: ❑ On-line facility ❑ Off-line facility Type of Pre -Treatment Facility: ❑ Sediment forebay (above ground} ❑ Sedimentation chamber ❑ Plunge pool ❑ Stone diaphragm ❑ Grass fitter strip ❑ Grass channel ❑ Other: ideally,Bioretention facilities should be inspected and cleaned u annual[ eferabi durin the Spring. . DuO the frsi P P Y. A Y 9 A 9 rt9 6 months fallowing construction of a bioretention facility, the site should be inspected al leasf twice after storm avenL that exceed ill -inch of rainfall. Waterin is needs once a week durirt the first 2 months "lowing installation, n g d g g ro,ac then as needed during the first growing season (April -October). depending upon rainfall. If vegetation needs to be replaced. one-tirne spot fertilization may be needed preferably using an organic rather than a chemical fertilizer. Eact p � p Y �P Y 9 g facility should have a custofnized routine maintenance schedule addressing issues such as the following: grass mowing, weeding, trash removal, _mulch raking and mainfopance, erosion repair, reinforcement plantings, tree arc shrub pruing, and sediment removal, z z Element of �• w r'• Who Will BMP Potential Problem E # How to fix problem Address an,mer.€s m Problem 4 ' 7 a a =� Adequate vegetation Supplement as necessary Owner or rof 3ssional There is excessive Rernove immediately Owner or trash and debris professional There is evidence of Owner or erosion and I or bare Stabilize immediately professional Contributing or exposed soil There are excessive Remove immediately and recycle Owner or Drainage Area landscape waste ar of compost professional rd clt in s Oil, grease or other Identify and control the source of unauthorized substances ara this pollution. It may be necessary Owner or professional entenn the fac11iLy to erect fences, signs, etc Pre -Treatment There is adequate Establish adequate access professional access to the re- and, perhaps.. Virginia 5tormw'ater Management Handbook, Chapter 9 Virginia Sturmw'ater Management Handbuok, Chapter 9 July 20I., z z Element of r C'ti Who Will BMP Potential Problem E m How to fix problem Address Comments m Problem ° N a ; = ar � Replace Contaminated mulch_ It There is evidence of problem persists, test sails for hydrocarbons or other hydrocarbons and other toxic deleterious materials_ substances. If excess levels are resulting in foutld, th6 soils, plahts and mulch Profgsttbnai unsatisfactory plan may all need to be replaced in growth or mortality. accordance with the approved construction plans. Invasive species or Remove invasive species and weeds make up at excessive weeds immediately and Owner or o least 10 /o of the replace vegetation as needed- professianal Vegetation facility's vegetation (monthly) Mow within a week. Grass (continued) species should be selected that have dense cover, are relatively owner or The grass is too high slow growing, and require the professional least mowing and chemical inputs. Glass should he from 6-10 inches Koh. Vegetation is Remove and replace. Increase diseased, dying or watering, but avoid using Professional dead chemical fertilizers, unless absolutely necessary. Winter -killed or salt- Owner or killed vegetation is Replace with hardier species. professional resent. Raise the level, loosen and amend or replace the media, as needed, to be consistent with the The filter media Is too state design criteria for law, too compacted, Bioretention (85-58% sand 8-12% or the composition is soil fines 3-5% organic matter in Professional Inconsistent with form of leaf compost). Othef design specdications remediation options are described in the maintenance section of the state design criteria for Bioretention 1-he mulch is older than 3 years or is The mulch must be replaced Prollessionai otherwise in poor every 2-3 years condition Filter Media There is evidence that Remove undesirable chemicals (Arnua+fy) chemicals, fertilizers, from media and Facility andlor olllgrease are immediately, and replace mulch Professional present or media as needed Remove trash and debris immediately_ Check plant health There is excessive and, without damaging plarns' Owner or trash, debris, or manually remove the sediment, professional sediment especially it the depth exceeds 20% of the facility's design depth - There is evidence of Identify the source of erosion concentrated flows. damage and prevent it from recumrg. Repair the erosion Professional erosion or exposes damage and reseed or otherwise soil restaN1ae wth vegetation July 2013 Virginia Sturmw'ater Management Handbook, Chapter 9 z zz Element of t~• w fi Who Will BMP Potential Problem m How to fix problem Ad di es Comments ;, -� l'rolalc�in a y G treatment facility the locality Excessive [rash, Remove immediately Owner or debris, or sediment. professional There is evidence of clogging (standing Identify and eEiminate the source water, noticeable of the problem, if necessary, odors, water stains_ remove and clean or replays the Professional algae or floating clogged material. Pro -Treatment aquatic vegetation, or (continued) oiE! cease There is evidence of Owner or erosion and I or Stabilize immediately professional exposed salt There is dead and revegetaty 8s Owner or yegetstion or exposed necessary necessary professional soil in the grass filter Check for sediment build-up at curb cuts. gravel diaphragms or Remove sediment and correct pavement edges that any other problems [hat block Owner or prevent flow from inflow. professional getting into the bed, and check for bypassing - There is excessive Owner or lntets trash, debris, ur Remove immediately professional sediment_ There is evidence of Repair erosion damage and Owner or erosion al of around reseed or otherwise restabllize professional the inlet with vegetation Remove woody vegetation from Inflow is hindered by points of inflow and directly above Owner or trees oodles shrubs. underdrains. (Trees and shrubs professional may be located closer to the e hmeter. ) Identify the source of erasion There is evidence of damage and prevent it from Owner Or rill or gully erosion or recurring. Repair erosion damage professional bare soil and reseed or otherwise Side Slopes restabiI ze with vegetation There is excess Owner or (Annuaify. aRer rrrajorstorms) sediment Remove immediately rofessional professional Arirrnal burrows must be Side slopes support backfilled and compacted. Professional nuisance animals- Burrowing onimals should be huMMOY removed tram the area. Plant composition is betefm1ne if existing plant consistent with the materials are at least Consistent approved plans and with general Bioretention design Professional any stakes orwfres criteria and replace inconsistent Vegetation are in good condition_ Species - There should be 75- (monthly) 90 le cover (mulch plus vegetatlon), and Supplement wegetEiUon and mulch the mulch cover as needed. should be 2-3 inches des . July 2Gt3 z z Element of N ti Who WiII BMP Potential Problem E R m How to fix problem Add;-ess Comments m `m Pigt)iCin a = tcc The filter bed is clogged andiorfllied Redistribute the soil substrate and Prafessianal na ro natel remove sediment within 2 weeks - Ensure a 3-inch surface depth of Filter Media The topsoil is in poor topsoil consistent with the state (Artnvahy) condition (e-g-, the pH design criteria for Biarelention (continued) level is not the (loamy sand or sandy loam Professional composition Is s texture, with less than 5°% clay nappropriate. etc-} content, and organic matter content of at least 2%I . If the pH s less than 6.5. spread limestone. Determine if the pipe is slogged The perforated pipe is with debris ar 9 woody roots have not conveying water pierced the pipe. Immediately Professional as designed dean out or replace the pipe, as necessary. Measure the draw -down rate of the observation well far three days Wowing a storm event in excess of 112 inches in depth. After three days, if there is The underlying soil standing water on top but not in interface is clogged the underdfain, this indicates a erdraint (there is eviden rice on clogged soil layer. If standing Pro r the surface of sail water is both on the surface and Drainage crusting, standing in the underdra1n, then the water, the facility does underdrain is probably clogged. sat r between This should be promptly Professional rns. or stomts. investigated and remediated to n the swater ponds on the surface restate proper fillration. Grading 4f basin for more than changes may be needed or hours after an underdrain repairs made. The ev event)_ filler media may need to be raked. excavated and cleaned or replaced to correct the problem. Holes that are not consistent with the design and allow water to #tow directly through a planter to the round must be plugged. The planter is unable to receive or detain stonnwater prior to Identify and corre-t sources of Infiltration. Watef clogging. Topsoil and sandipeat Owner or does not drain #rem layer may need to be amended professional the reservoir within 3- with sand or replaced all together. 4 hours of after a Planters storm event. The planter has structural deficiencies, including rot. cracks, and failure, or the Make needed repairs Owner or planter is unable to Immedlately. professional contain the filter media or vegetation outlets are ohstNrted outletl or erosion and sell Remove obstructions and Owner or Overflow exposure is evident stabilize eroded or exposed Professional Spillway below the outlet_ areas- ?zz Element of s• o- Who Will BMP Potential Problem m m How to fix problem Address Comments .M .a Prablern � CL m a y C Outlet! There is excessive Remove immediately, and keep owneir or Overflow trash, debris, or the contributing area free of trash professional Spillway sediment at the outlet and debris. Any grates present Repair or replace as necessary Owner of (continued) are ir1 900d CDndltlan professional observation Is the observation WeII Repair, as necessary. Professional Well still ca ed T Establish adequate access, Access to the Remove woody vegetation and Professional Infiltratlon facility cr Its debris that may block access. and, perhaps, components is Ensure that hardware can he the locality adequate opened and operated. There i5 avic of Fill in low spots and stabilize; nor or standing water correct flow problems causing professional pf ondin Eliminate stangant pools and establish vegetation; treat for Overall mosquitoes as needed. If sprays Mosqui[p proli -'NAVIi are considered, then a mosgLido Owner or larvicide, such as Baclllus professional thurendensis or Altoside formulations can be applied anty if absokitely nacessaiy. Complaints from local Correct real problems Owner or residents rofessiaml Encroachment on the hiorstention area or Inform involved property owners Owner or easement ray of BMPs status ; clearly mark the professional buildings or other boundaries of the receiving (and perhaps structures pervious area, as needed the lacallty) Applied Technology and Engineering, P.C. P.O. Sox 62.17 Charlottesville, Virginia 22906 (8()4) 977-1498 Stcve Cresswcll, P. E. Albemarie County Department of Engineering 401 McIntire Road Charlottesville, Virginia 22901 March 15, 1989 Rc: Forest Lakes D.ail,5 % C & D Dear Stowe: We have received the Ictter from Dan Roosevelt (by Jeff Echols) to you dated March 3, 1989 regarding the outflow calculations for the subject dams. I have talked with Jeff Echols and Mike Vitt in order to better understand their concerns. Mike Vial said that he feels comfortable that the roads are not in danger of flooding or being washed nut, but would like some record of our conversations and calculations rcgardmg the hydraulics of the outflow structures. We also observed that the impoundment structures are not the road impoundment structures and that we have provided emergency spillways that lead to sepanitc storm sewers under the road impoundments that have the same flow capacity as the primary spillways for the dams, which were desigrncd to handle a 100 year flow. As you know, we made the same observations that VDOT did regarding the simplifying assulmptioris and limitations of the flood routing model before we subtaiitted the flood routing calculations to you. As discussed at that time, we believe that the computer toodcl results are completely within the tolerances and accuracies of the process of pre -dicing hydrological conditions. There are no exact rriethads to predict rainfall or runoff. The initial assumptions in the Rational method of computing; rainfall runoff are critical to [lie reasonablcncss of the predictions derived from that base. For instance, we computed a weighted runoff coefficient of 0.3631 but rounded it off to 0.4. This dalle can affect the peak rate of runoff by 10%. The tinic of concentration can also affect the peak rate. So, iAie need to keep this in mind when we preform more accurale engineering calculation on the data. I do not have; to remind you or VDOT people of this lout it needs Eu be pointed out to the uninitiated, Iri order to test our belief that the R0U7' calculations are within reason, we have reviewed the hydraulic profile, the peaking time for the various flood stages, and have doge hydraulic calculations for the individual pond -to -pond piping for the four pond system. ROUT, the flood routing model„ analyzes each component of the outflow structure individually acid uses the controlling component to calculate pond outflow. In the case of the horizontal pipe, ROUT uses the equation from which the nomog.,rraphs for Outlet control, found in the VDOT Drainage Manual, were derived. In the four pone] system, pond A is the only one that as indicated to operate with the horizonlatl pipe in outlet con[rol, Therefore, the first check we madc was on darn A outflow pipe in suhmergM nutlet control according; to Chart 9, VDO'I' Drainage Manual. In order to do this the assumption was made, as in ROUT, that the 48" riser has no affect nn the horizontal pipe. A copy of Chart 9 with the lines marked on it is attached. This Chart is lirnited to 20' of head, but indicates that abom 95 cfs can be passed through a 30" concrete pipe with a 20' head. This conflirnlS the ROUT calculation, As another check, we analyzed the riser and pipe as a hydraulic pipe system with the elevation difference between the water levels in the two pond as the driving force, Here we assumed that the two ponds reach maximum flood level a r the sam--c. time, .as a worst case situation, when they actually occur about 21D minutes apart. We modeled the 48" riser inlet two ways, one as a 30" orifice and Second as as a 48" oxilice. The 30" orifice model watt done because the riser has art anti -vortex, precast concrete top with a DI-7 inlet grate, and lhesc two cases should givo, a range froth worst to best situation. These two eases were min on a spread sheet progrrarn developed for this type of pipe flow analysis wi21 1rang;e of flows to compute the corresponding head. The two crises were gaphed and actual heads were plotted on the curves. The calculation sheets and graph are attached. Case 2 is similar to the ROUT assumptions, and with the assumed tail water at one half the pipe diameter (which gives a driving head of 24.32 feet), the flow of 96.5is exactly what ROUT predicted, However, the actual head is about 21.8' and the flow for that is 85 cfs. Case 1 is the worst case and at 21.8' of head the flow is 81.5 cfs, or about 85% of the best case situation. As with all such calculations many simplifying assumptions must be made, but looking; at the outside parameters, the ROUT calculations seem to be reasonable. The outflow pipe fc)r dam B does not become submerged, cvcn if the 100 year flood level occur at the saute time. The outflow pipe from pond C would become submerged by about one font in worst case, but would not substantially affecr the system. J'he outflow pipc from po nd D is not expected tf7 be submerged under any anticipated situations, Eased upon Lite above calculations, we believe that the dams will function as predicted, within the accepted limitations of the current state of the art of hydrology. If you have questions, please call, Thank you for your help on this matter. Sincerely, 9't�� obis VIA. Greene, P. E. enclosures r copy: Demise Etheridge, The Kessicr Group p�4o.0 9 Op pf�� ')7 Jimmy L. Taggart Uc. No. 22841 �a.► 9/Z6/19 1' �.SggroNwL ti�a` A Ua 0 U O m N Q� 2 Q� z O MMrU--'ill o to - o il CA Q � i LL Z V j Q cc J J J_ a2 Cc\ >a WCO Q 0 r W �V v � O N W Q K— Q LO pCa O Urn r C\1 p LL.? 0: Q QJ LL u j•iT� Cc � y a W CO w Lo O w (/� Q U z o U_'1 J O� U W :2O� (0 M CY) I;t W U Z O O REVISIONS COUNTY COMMENTS 2/15/19 COUNTY COMMENTS 3/27/19 COUNTY COMMENTS 8/23/19 DATE NOV. 30, 2018 SCALE AS SHOWN i--i W E� Ir m I..L Q Q z�-i O Ir r0 J V� Q z o^ J z O 0 p o � L C M O Q E— U w FILE NUMBER 13.0124 SHEET 11 OF 14 E ORM MH 1 OP= 7.48' �R P I IN I � / I i DA-9 DA-8 / // h , /�'%A,o; 0.34 Ac. 0.16 Ac. �d �/ //';'�'�%� - - - C= 0.43 C= 0.43 EX. RM MH 2C TOP=49. 0' /4 / ' / �0CPIN -493.00 8944' \\\ \\V \\\ TH Op \ 9a1 I 1 / 1 +� , / -10 & /// / 4 , / II 0.38 Ac. ijl .Q�� .F / /' i i i / \ / ��h l �� / Lot 1y$ . $ 9� EX. OR MH 2B 1 / C=0.43 ��,��'' . / / /i i/ yi A f1,2 9� /' " RCPIN=88.85' RCP IN OUT=488.70' \ V � O�j 'r1 11 Jimmy L Taggart - - I / ' ' i' / i /' 1t / 9� / ro - \ \ iio. No. °�t $�' ' ' APPROXIMATE AREA TO EXIST ` \ e \ 22841 �~ a 21 " RCP PIPE SYSTEM - 6 /' i i i% /'/ii' / // �y' 0���0 I c=0.55 \\ vv v 810N�L ilk T � min / � � � %i � i i i'/ / '' / �a� e A \ / � X I� 10, 017.85c \ 0. ----- / 211 RCP2INV 21" RCP INV OUT=4 5' / / ♦ / / / / / 95n �� ---- �� 95 96 L°�g5) iu ley Lg4651P. TOP s1 / 92.88 / / / /' / j / / % /' /' / / / y I g8 9s Logy $�.I v •O / 54" RCP' INV IN=478.06' 21° YiCP INV IN=485.18' H CROSSI N G�0' R OUT 477.70' �? (Route1�22,Pub11� 35 r/ r' ��.9�a/ /,' // / I I I \\\` -� -- �= -- - --Lot sS• \ a9 I I µ I / I \ \ \\ Lte$i o _ 91 o \ \\ 00. z �y \ Lg1h 9w \\ \ '• o I I r \\ \\- - - - - - - - - i 4nd,�,e � 0 / v�ti t I I 5 vv DAB .e tee C=0.36\\ / DA-06 I E / O 99.38 \I I I t 22 SA EX. STORM MH \ 1 1 E.VISTI DI-3B 1 O 99.28 ° / [� / 97 �' OP-483.98' • 1 FC 'C. E �_ / 97 / r Z1 ,� / / /g7n \ �m W TOP = 490.40' 1.05 Ac. 1 / $ O j Z / Lot merit / /° RCP INV IN=476.16' 1 heat I Handi 7 99.19 , s FDA-6A /i'' / 54, RCP INV OUT=476.10' 0.66 ImPs P � �c=="5 min. igns , 2 I / 0.24 Ac. Go I I i 1 1 / I e C=0.80 9a / / at sQ / /�� / 11 \\ --- / 1 v I s °.S`°_ sa / 18 fl / / e7p ' 0------- I - - 9.08 Q_ S ��1�toP / L°t�/ 13 DA- / J^ 1 ee �� / a9 0.29 Ac. ) I I / I vol,,JJ I 1 1 \ /l jI / ss.DA-E 4A C=0.35 III L r / / TMP / EXI, DI 3�4 DA-13 // , 9y ' �'/ I 46-B4-7C 40,65 Ac. I 31,828 Sf. I s.3a - - 3 I EIS. heat 0.73 Acre ° / ,' C= 0.75 / / i �� // m� c �iA -14- v I II ❑ Existing e� 1 �g3 G �' ^ s. / / / / �* ' /} Variable Q\ / I 1-Story Brick Medical / / / s. 0.15 Ac. / / / / ,� private 1 / / I ❑ Office Building �' /'�.�• /' / a I I ❑ 1#18002,424 5f o - - -' /� /' 12 cf Q li =0.38 I O I Timberwood _ v° ®� I Blvd. l // / / / 90� +' _k?$fret`' -A , 85 \ � / / - - - - - - g �0 D �EYIST. DI-W I I X w 0.25 Ac. /, // / / •• / / ' • • / /' /'' �oLas Lan� - / // / X4 \ 1 / / /' / Variable Bvdth �� /�89- - - - - - - - - - \ \ \ \ \ 0 Uc O5 Min. //❑ DA-EX4\ / / �, / / // 5� /'RDB"DA-2 - _ \ ,a' ' / E �ST. / ,%DA-3 I l / ��� 0.49 Ac. ea 2 0� • 0`' _ _ --'\\ `, \\\ za' /�18' / C 5 0./�S5 Ac.// //\ 0. 05 Ac.1/r� Il � C=_ 0.85 Prop. CG-12 e=0.73 C=O.72 Te=5 \ Alin.. EX. DI-38/ 46-B4- \ > oe / / ' / v 89 \ - _ - 1`1, 950 f. \ _ I / e / i / / / / / 1 � Lot zs Lot 3o 0. 7 A e \ / ' ' l /' "°ti ' '/' / / rar zy Lot 28 \ I !• / I ' s7 \,ot zs Lot zs� �+9sao , \ e� // �.I61AD4m \ I 1 B /' \OFFICEeu II I I 1 I I \ 5AMSF II l I I \ II \FF-500.20 1 1 Pos\ �v . 4P \ ° I\ I \\ \\\\\ \\ \ \\\\\ \ \\ \ \\ \ aan\ aan a4n _��\\ \ -1 I-1-1 \80. \ I / -w I I I ' 'Exist Pony \\\ \\ \ \\\\\\\\\ \\ \\ \ //// BSB = 474.0 \ \ \ \ \\ I I Ex. g,, J1 Wat only / /� % j // I \\ \\\ EX1 \ \\\\\ \\\ \ I I I /Ex.B„x 6„ rs DA-EX,S/ EXIST. DI -$A rl ,dry/ i ✓ ti��� Q \\ \� \ \ I I I I I \\ I/ WM Meter 6.14 Ac. / i /% FLOW FROM EXIST \ / C=0.69 / / / / 24- RCP = 10.02cfs \ \ PER STORM CALCULATIONS \ `\ \ Exist. Sprinkler \\ / Eaesment DB 1548 P� 219 / / BY GLOECKNER, SMITH, \ \ / / COLEMAN, INC.It \ \ \ \ \ \ \ \ `\ l DA-OVERLAND \ \ f BIOFIL TER 1.84 Ac. \ \ C= 0.33 \ Tc=15 Min. `\ ' I \ 1� vv 40 01-, 40 80 120 SCALE: 1 4i3'v vvv U a 0 U v, L a) m N C) 2 <D ZO U ��-� o a> CL Q +� > LL Z coV O Cc 41 J J J_ aZC/)Q CC\ W Q O y W I "V VQ Oo W � ? Q � CO (.6 p(a U N p ° cc O� a aW oLL W LI) �y viw vo Z M� F+1 W rn W /0 W 2 L z O O REVISIONS COUNTY COMMENTS 2/15/19 COUNTY COMMENTS 3/27/19 COUNTY COMMENTS 8/23/19 DATE NOV 30, 2018 SCALE 1"=40' W Q < Z � j LL z p z z Q J O o Q O Q4 w J > W U) < W W m m < Q4 0 FILE NUMBER 13.0124 SHEET 12 of 14 r 20' WATERLINE \\ 11\1 \! \1\ \\ �, //�/// EASEMENT DB 2775 PG 734 \ \ \ \\�i\ \vN TOTAL BIOFILTER DA A=2.84 Ac. t\ \ \I\\ Tc = 15 Min _ \ OVERLAND FLOW \\ X \ TO BIOFIL TER A=1.95 Ac. 1 C=0.33� Tc = 15 Min I \\\\I Ison Iwo I I 1 1 I I N. 50 0 50 100 150 SCALE: 1" = 50' i Q = 1.09 cfs Q = 0.98 cfs Q = 0.88 cfs Q = 0.66 cfs Q = 0.46 cfs Nyloplast 18" Drop In Grate Inlet Capacity Chart 2.50 2.25 2.00 1.75 1.50 V 1.25 3 1.00 0.75 0.50 9 25 ■ 0 ■ 0 ■ 0 ■ 0 ■ KIDIVA 0 m a 0.90 8.00 0.05 0.10 0.15 0.20 0.25 0.30 6.35 D.40 0.45 0.50 0.55 9.60 0.65 0.70 0.75 029 015 0.90 0.95 1.00 1.05 t.10 0.13 ft 0,28 ft HeadM) 0.15 ft 0.23 ft 0.18 ft STORM INLET 10YR (CFS) DEPTH (FT) 8 0.46 0.13 9 0.98 0.23 10 1.09 0.28 13 0.68 0.15 14 0.88 0.18 15" Drop In Grate Performance Chart Ny�opYas# 3130 Verona Avenue • Buford. CA YJ518 (86fxl 888-84791 f770) 932-2443- Fax (779) 932-2490 9 Nyloplast Inlet Capacity Charm June 2012 NYLOPLAST DRAIN BASIN WITH DOME GRATE (1.2)INTEGRATED DUCTILE IRON FRAME & GRATE TO MATCH BASIN O.D. 0 MINIMUM PIPE BURIAL DEPTH PER PIPE (5) ADAPTER ANGLES VARIABLE (3) VARIABLE INVERT HEIGHTS MANUFACTURER RECOMMENDATION AVAILABLE (ACCORDING TO RING (MI /0°-360°ACCORDING TO PLANS PLANSrrAKE OFF) REQ. SAME AS MIN. SUMP) , (4) VARIOUS TYPES OF INLET& OUTLET ADAPTERS AVAILABLE: 4'- 30' FOR CORRUGATED HOPE (ADS N-121HANCOR DUAL WALL, ADS/HANCOR SINGLE WALL), N-12 HP, PVC SEWER (EX: SDR 35), PVC DWV (EX: SCH 40), PVC C9001C905, CORRUGATED & RIBBED PVC WATERTIGHT JOINT (CORRUGATED HOP�E��� SH(\JOWN) 1 - 8"-30-DOME GRATES SHALL BE DUCTILE IRON PER ASTM A535 GRADE 70 -5. 2 - 8" & 10' DOME GRATES FIT ONTO THE DRAIN BASINS WITH THE USE OF A PVC BODYTOP. SEE DRAWING NO.7001-110M5. 3 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS. RISERS ARE NEEDED FOR BASINS OVER M' DUE TO SHIPPING RESTRICTIONS. SEEDRAWINGN0. W-110.055. 4 - DRNNAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212 FOR CORRUGATED HOPE (ADS N-12MANCOR DUAL WALL), N-12 HP, & PVC SEWER H--24-). 5 - ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0' TO W. TO DETERMINE MINIMUM ANGLE BETWEEN ADAPTERS SEE DRAWING NO.7001-11 M12. 6 - 8"-30' DOME GRATES HAVE NO LOAD RATING. (3) VARIABLE SUMP DEPTH ACCORDING TO PLANS (13" MIN. ON 8" - 24", 10" MIN. ON 30' BASED ON MANUFACTURING REQ.) THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS II MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE PLACED &COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321. NYLOPLAST YARD DRAIN DETAILS Not To Scale A U a 0 y Q U �T. a)m W N C) 2 ZO a M > LL TT^^ V1 Q QCCW wZ i J as CC'ww >a Q Oy r I O W -4 rr p� U rn N C) Q CO °Q o� x �� a W o� w L0 Qy Uo o z co \ rvR co w w 2 1W11 z O � REVISIONS COUNTY COMMENTS 2/15/19 COUNTY COMMENTS 3/27/19 COUNTY COMMENTS 8/23/19 DATE NOV. 30, 2018 SCALE AS SHOWN w i� W Q Q � O /', i �/� z z 0 z Q O o 12:4 O w -j �' a 5� G Q O w Lu W / '� �y W 00 \ Q W FILE NUMBER 13.0124 SHEET 13 OF 14 a Ah