Loading...
HomeMy WebLinkAboutSDP201900013 Review Comments Final Site Plan and Comps. 2019-10-17GIRtGSL��4' County of Albemarle Department of Community Development Memorandum To: Ryan Perkins, P.E. (ryan.perkinspkimley-hom.com) From: Andy Reitelbach, Senior Planner Division: Planning Services Date: October 11, 2019 Subject: SDP2019-00013 — Wawa at Pantops — Final Site Plan; 2°d Submittal The Planner for the Planning Services Division of the Albemarle County Department of Community Development will recommend approval of the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] Comments Related to SDP2018-00089 (Pantops Corner) that Still Pertain to SDP2019-00013: 1. [General Comment; Chapter 14, Subdivision Ordinance] An easement plat is currently under review for Pantops Corner (SUB2019-00059). Any easements on this plat that affect TMP78-5A will have to be shown on the site plan, with deed book and page numbers referenced. The dedication of land for the widening of Route 250 is also included on this plat, so the reference for this plat will be required for that dedication shown on the site plan once the plat is approved and recorded. 2. [General Comment] Please be aware that existing conditions and boundary lines will change, as the site plan and road plan for Pantops Corner have not been approved yet. These elements will have to be revised on this Wawa site plan to reflect what is included in the final approved versions of the Pantops Corner plans. 3. [General Comment; 4.15] Signs are not approved with the site plan. Signs, such as the monument signs depicted, are reviewed and approved through a separate sign application process, which includes ARB review as this site is within the Entrance Corridor. 4. [32.5.2(k)] Please show the location of all proposed sewer and drainage easements. Label as "proposed" with a size/width measurement. 5. [32.5.2(1)] Please show the location of all proposed utility easements. Label as "proposed" with a size/width measurement. 6. [32.7.91 There is a gray dashed line extending from Route 250 along Pantops Corner Way to Travelway B, approximately 5 feet off the property line. There is also no clear label of this line on the site plan. It appears that this line may be the access easement for Pantops Corner Way (SUB2019-00059). Please clarify if this is the case. In addition, as previously mentioned, there is an easement plat under review for Pantops Corner. Please continue to be aware of these proposed easements, as landscaping may not be able to share space with these easements. 7. [General Comment] SDP2018-00089, Pantops Corner, must be approved prior to approval of this site plan. As SDP2018-00089, is still under review, elements may continue to change. Those revisions will also have to be reflected in the site plan for Wawa. 8. [General Comment] A boundary line adjustment plat will have to be submitted and reviewed by County staff regarding the Wawa parcel, as the property lines shown on this plan differ from existing conditions. Staff acknowledges that the BLA may not be submitted until the location of the proposed road and improvements has been approved. This boundary line adjustment plat has been submitted for review by the County but not yet approved (SUB2019-00129), pending approval of the easement plat (SUB2019-00059). 9. [32.5.2(i)] As Pantops Comer Way and the access road to the north of the property are required for development of the Wawa parcel, these proposed streets need to be shown on the proposed site plan. They need to be included as integral parts of this site plan, not shaded grey with the expectation that they are already in place. There is no final site plan approved yet for the other two parcels, and the construction of the entire road network in this area, so the timing of development is not yet known. In addition, the widening of U.S. Route 250 to accommodate a turn lane must also be included on this plan. All other required improvements must also be shown, including sidewalks and landscaping along both sides of the two new streets (Pantops Corner Way and the access street to the north of the Wawa property), and along the turn lane of Route 250. These improvements must be shown on this site plan, as this site plan must be able to stand on its own, in case a final site plan for the adjacent properties does not get approved, or if this project moves toward construction prior to the project on the adjacent parcels. Please be aware that elements may change until SDP2018-00089 is approved by the County, and any such changes will have to be reflected in this site plan for the Wawa, if applicable. 10. [32.5.2(n)] Please provide the location of all existing and proposed improvements, including the new roads and sidewalks that extend onto the adjacent properties. The full set of improvements for the adjacent properties (SDP201800039) should be shown on a new sheet, not the existing conditions sheet. Comment still applies until SDP2018-00089, Pantops Corner, is approved, and all improvement shown on the approved plan are reflected on the Wawa plan. 11. [32.5.2(n)] Sidewalks must be provided along both sides of the two new streets, as well as along 250. Please show them. Final location will be determined with the approval of SDP2018-00089. This site plan must reflect the improvements as shown on that approved site plan. 12. [32.7.91 The landscape plan, CP-101, indicates that the "walls and landscaping [along Pantops Corner Way are] to be constructed/installed with the Pantops Corner development." However, the most recent submittal of that site plan, SDP2018- 00089, indicates on sheet C8 of 20 that the required 13 interior streets trees along Pantops Corner Way are shown for reference only and the landscape design will be on this site plan, SDP2019-00013 (in the required landscaping calculations). Please clarify on which site plan the required interior street trees along Pantops Corner Way are to be shown for installation. 13. This landscape plan indicates that the existing canopy (from Pantops Corner development) is 6,742 square feet. However, SDP2018-0009, the Pantops Corner plan, indicates only 5,184 square feet of total canopy for TMP 78-5A. Please clarify this discrepancy. Remaining Comments from Previous Reviews: The original comments from the review and action letter for SDP2018-00078 are in gray font. Follow-up comments from the review of the final site plan, SDP2019-00013, are in bolded black font. Please address these follow-up comments as well. 1. [32.5.2(a)] The Overlay District note on the cover sheet should include "Steep Slopes — Managed," as well as the overlay districts found on the other two parcels, which include "Steep Slopes — Preserved" and Floodplain Hazard Overlay District." These various overlay districts should be identified by which parcels they are located on. These overlay districts should also be shown on each sheet where the property is shown, including the Existing Conditions, Site and Utility Plan, and Landscape Plan, as well as the requested new sheet from comment #2. In addition, all other aspects of the Project Data should include information for all three parcels, as a portion of this project does extend on the two adjacent parcels as well. The site data for Pantops Corner (78-G1, 78-5B, etc.) also needs to include Steep Slopes — Managed. The Steep Slopes — Managed overlay district needs to be included in the overlay zoning districts note in the site data table. It appears that only the Preserved Steep Slopes are included. 2. [32.5.2(n)] Reduce the height of the canopy, as requested by the County's Architectural Review Board. Current development review staff defers to ARB on this comment. Canopy height must meet requirements of the ARB. 3. [32.5.2(p)] The landscape plan must show all landscaping that is currently shown on the approved initial site plan, SDP201800039. Please be aware that landscaping shown on the plan may change depending on what is included in the final approved version of SDP2018-00089. 4. [32.7.9] Please provide individual landscaping schedules for required landscaping in accordance with Sections 32.7.9.5, 32.7.9.6, 32.7.9.7, 32.7.9.8 of the Zoning Ordinance. Each schedule should state the Botanical Name and Common Name of each species proposed, the proposed caliper and height at time of installation, and the canopy coverage area per plant species. The canopy area for each species can be found on the Albemarle County Recommended Plants List and Albemarle County Plants Canopy Calculations tables. PDFs of these documents can be accessed through the Department of Community Development webpage: LINK. Additional comments may be provided regarding landscaping once a more complete landscape plan has been submitted. a. [32.7.9] Indicate what landscaping is being used to fulfill the requirement for the required parking lot landscaping. Provide calculations showing how the "maximum amount of paved parking and vehicular circulation" of 5% requirement for landscaping is being met. Provide the square footage of the individual parking lot planting areas so staff can calculate the required amount. New Comments from Second Review: 1. [General Comment] The Landscape Plan, CP-101, is missing from the sheet index on the cover sheet. Please contact Andy Reitelbach in the Department of Community Development at areitelbachgalbemarle.org or 434- 296-5832 ext. 3261 for further information. Comments from Other Reviewing Divisions and Agencies: Albemarle County Engineering Services (Engineer) — John Anderson, janderson2nalbemarle.org-- Requested changes; please see the attached memo. Albemarle County Building Inspections — Michael Dellinger, mdellingerkalbemarle.org — Requested changes; please see the attached memo. Albemarle County Architectural Review Board (ARB) — Margaret Maliszewski, mmaliszewskikalbemarle.org — Requested changes; please see the attached memo. Albemarle County Service Authority (ACSA) — Richard Nelson, rnelson e,serviceauthori , .org — Requested changes; please see the attached memo. Virginia Department of Transportation (VDOT) — Adam Moore, Adam.Mooregvdot.vir ig nia.gov — No objection; please see the attached memo. 4 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Project: Wawa Pantops Corner — Final Site Plan Plan preparer: Ryan Perkins, Kimley-Horn Associates, 1700 Willow Lawn Drive, Suite 200 Richmond,VA 23230 [ryan.perkinsgkimley-horn.com ] Owner or Rep: Pantops Corner LC, 12704 Crimson Court, Suite 101; Henrico,VA 23233-7657 Applicant: Paul Sprouse, The Rebkee Company, 2800 Patterson Ave, Suite 200 Richmond, VA 23221 [psprousegrebkee.com] Plan received date: 6 Mar 2019 (Rev. 1) 29 Aug 2019 Date of comments: 23 Apr 2019 (Rev. 1) 24 Sep 2019 Reviewer: John Anderson Project Coordinator: Andy Reitelbach SDP2019-00013 (Comments below from ISP, SDP2018-00078) MEMO, 1. Provide 1" =2,000 (or less) scale vicinity map. (FSP) Addressed. 2. Include SDP201800078 in revised initial site plan title. (FSP) Addressed. As fbllow-up: With assignment of FSP file identifier, please revise next submittal to ref. SDP2019-00013. (Rev. 1) Addressed. 3. Engineering recommends include ZMA201300002 proffer on title sheet. (FSP) Addressed. 4. Ref. WPO201800088 (Pantops Corner VSMP Plan) as well as WPO201400028, Mass Grading and Erosion & Sediment Control Plan for Pantops Corner, approved 6/11/14, with estimated area to be disturbed =7.01 Ac. (FSP) Addressed. 5. Note: Site under development does not have an existing stormwater management plan. A Mass Grading and ESC Plan was approved, 6/11/14. No development layout is shown with the Mass Grading and ESC Plan. Grandfathering (9VAC25-870-48) would not apply in this instance, for this reason. VAR IOE170 (VSMP Program VPDES) permit was issued for mass grading on 9/9/14. Grading has been performed, and site should be stabilized. If mass grade operations are complete, and site stabilized, it is time to terminate VARIOE170, and apply for a new VSMP permit for never - reviewed proposed development on this parcel. Further, VDEQ SWCGP database lists Construction Activity Operator (VARI OE170) that does not match Initial Site Plan Owner information. Albemarle does not accept the position that this development is eligible for grandfathering, but views development subject to stormwater quality and quantity requirements at 9VAC25-870-65 and 9VAC25-870-66. (FSP) Review error. Comment withdrawn. CV- 101 (Existing Conditions) 6. Do not show: (FSP) Item 6 Addressed. a. Proposed development on TMP 78-58G1, which does not exist. b. Any proposed development features on TMP 78-5A, unless they exist. C. Show existing features only. If Applicant arranged with Planning Division to represent proposed features on CV-101 (Existing conditions), provide whatever elements were requested as an Exhibit or separate ISP sheet with appropriate title. Engineering Review Comments Page 2 of 7 7. Do show: (FSP) Item 7 Addressed. a. Full width of U.S. Rt. 250 where it fronts TMP #78-5A. Show existing travel lanes, turn lanes, traffic signs, median, etc. b. Steep slopes (Ref. County GIS Critical Resource layer). Managed steep slopes exist on this parcel. C. Proposed RW for private road Pantops Corner Way. (FSP) Addressed. Applicant response: `The proposed public access easement for the Pantops Corner Way is shown on Sheet CV-102 and CS- 101. There is no proposed right-of-way for this road.' 8. Add Note stating that all known existing easements are shown, or that none exist on TMP# 78-5A. (FSP) Addressed. 9. Provide Ownership information for parcel under development, and adjacent parcels: provide TMP#, owner name, DB/PG. (FSP) Addressed. CS- 101 (Site and Utilitv Plan 10. Transfer proposed development features from CV- 101 to CS- 101, including: a. For FSP approval (submit /respond to comments until approved): i. Retaining wall design, since proposed retaining walls support necessary infrastructure (engineered plans, not generic manufacturer's details). Consider county retaining wall plan review checklist. (FSP) Not addressed. See proposed plan view information, Final Site Plan checklist (Attached). Engineering restates requests for design to consider retaining wall plan review checklist. Specifically: 1. Provide complete retaining wall design specific to site design and site geotechnical parameters sealed by a geotechnical PE, for all walls that support infrastructure, roads, parking lots, drive aisles, or in close proximity to a property line. Final Site Plan checklist for reviewers states: `Retaining Wall Plans checklist. Any walls supporting roads or necessary infrastructure require engineered plans (not generic manufacturer's details) and computations. ,Design Manual, section 8} This will also be required where walls are close to property lines and there is the danger of affecting neighboring property, either during construction, with later failures, or with pedestrian or vehicle safety. These concerns can be alleviated with layout spacing also. In any case, retaining walls will require building permits at construction.' (Rev. 1) Addressed. 2. Delete reference labels that appear to transfer design responsibility to Pantops Corner Development. Engineering requires retaining wall design checklist items for retaining walls integral to Wawa site development. (Rev. 1) Addressed. 3. Provide private easements for retaining walls (Access /maintenance). (Rev. 1) Withdrawn. Plan review checklists (site /retaining wall) do not explicitly reference RW easements. Also, it is late to request retaining wall easements with Pantops Corner final plat (SUB201900059). Walls will be built with the Pantops Corner Development, not Wawa. 4. Label all six sets of retaining walls shown on plan sheet CV-102 (including a 2-tier wall, and a 3-tier wall). Label 1 - 6, or A - F. (Rev. 1) Addressed. 5. Only the 5' segmental block retaining wall is exempt from requirement to provide detailed, PE -sealed plan /profile design. (Rev. 1) Addressed. Retaining Wall Design: 5/28/19, Michael R. Circeo/PE. Ref. Laura Anderson, KHA, 8/22/19 email Attachment. WALL A v',:��,I. � A E N 5 W WALL B 1,F1-i-smnr not[i ` IS,lYl4iWT" l8180 _ '• �I I . 122 VIRgNL Engineering Review Comments Page 3 of 7 _ S 0 St.. 331, St 0_ _ ... WALL F s o _ WALL 6 �— WALL H i =.«�c • Sta. 237 �,.. 'St. 12WALL E 1 MA FLOW NI LL �11fI11Nllh%''_ l� DRAWING INDEX 5-1i r' = 100 FT SITE PLAN � Sheet o 50 00 1 Site Plan 2 General Notes/ Design Parameters Anchor Diamond Pro Segmental Retaining Walls 3-4 Details 5 Wall A - Ste. 0 to Ste. 184.5 Pantops Corner 6 Wall B - Ste. 0 to Stu. 187.5 7 Wall C - Ste. 0 to Stu.136 Albemarle County, Virginia 8 Wall D - Ste. 0 to Ste. 120 Site Plan Adapted From the Grading Plan, Sheet No. C6 of 19, Dated December 7, 2018 9 -10 Wall E - Ste. 0 to Ste. 237 11- 12 Wall F - Ste. 0 to Ste. 283.5 (Rev. 6 - 4/12/19), Prepared by Shimp Engineering, P.C. 13 - 14 Wall G - Ste. 0 to 5ta. 331.5 Site Plan For Illustrative Purpose. 15 - 16 Wall H - Stu. 0 to Stu. 366 Approx. Scale: I" = 100 FT Drainage plans. Consider county drainage plan review checklist, including: 1. Drainage structure typ. details. (FSP) Partially addressed. As ollow- M: Please include 2016 VDOT R&B Std. details (Site Details); including: (Rev. 1) Items a_e., addressed. a. Drop inlets, DI-1, DI-3B/C b. MH Safety steps, SS-1 C. Pipe bedding, PB-1 d. Inlet shaping, IS-1 e. Manhole, MH-1 Please also include commercial entrance detail: f. CG-11 (2016 R&B Standards) (Rev. 1) Not Addressed. Engineering Review Comments Page 4 of 7 2. Pipe and inlet type, length, diameter, material, slope, etc. (FSP) Addressed. 3. Calculations (LD-204, LD-229) a. Velocity /Capacity /Inlet spread and depth. (FSP) Partially Addressed. As,follow-uR: Provide LD-204 Inlet computations. (Rev. 1) Partially addressed. As follow-up: 8. V spread at LD-204 Table Str. ID 7 appears excessive since located at site entrance. Please lengthen throat opening, this structure. 4. Profiles, all elements labeled. (FSP) Addressed. As follow-up: In profile (CG-103), label Str. B7 and A13 as BY OTHERS, since not existing. Also, Engineering recommends increase pipe slope from minimal acceptable 0.5% to 0.55%, for example. Often, designing to a minimum introduces issues during construction. This is a recommendation, not a requirement. (Rev. 1) Addressed. 5. Label inlets, pipes, and structures (FSP) Partially Addressed. As .follow-up: Please revise plan sheet CG-101 to Grading and Drainage Plan. (Rev. 1) Addressed. iii. Water and sewer line profiles. (FSP) Addressed. (Note: Water Line N/A) iv. WPO201800088, Pantops Corner, must be approved (prior to Wawa at Richmond Road and Stores Point Road FSP Approval). (FSP) Comment persists as noted, elsewhere. (Rev. 1) Addressed. WPO201800088 (Pantops Corner) was approved 7/23/19. V. Include Exhibit for o -site (TMP #78-58G1) SWM facilities required to meet stormwater quality and quantity requirements. (FSP) Not addressed; nor to be immediately addressed. Applicant (KI-IA) should coordinate with Pantops Corner LLC (hotel) design engineer (Shimp Engineering) to obtain at least conceptual stormwater management design information to address water quality and quantity requirements. At present, Wawa and Pantops Corner, LC (hotel) sites are owned by a single entity. That site plan application processes are pursued by distinct entities with Wawa site plan that includes direct /indirect reference to work to be performed by others (Pantops Corner LC), but there is a single owner (Pantops Corner, LC) at this time. The VSMP plan, WPO201800088, which amends WPO201400028, must be approved and bonded, with Wawa site properly registered with DEQ before SDP201900013 can be approved. Given current single ownership with sale pending to separate entity, this site plan should include an Exhibit consistent with WPO201800088 design at point of VSMP approval that ties SWM compliance requirements and compliance responsibility to the current owner of TMP #78-5A (Wawa site). Engineering recommends plan sheet images that capture salient specific SWM facility design information, titled SWM Exhibit Lor reference P!UN. Subtitled: Ref. WPO201800088 for approved VSMP plan. (Rev. 1) Addressed. Also, see item 33.b., below. vi. WPO201800088 must be bonded. (FSP) Comment persists. (Rev. 1) Comment may persist. Will confirm with Management Analv�t if bond posted. (Revl-rev.) Addressed. Email, A. Kilmer (8/2/2019 4:44 PM): `$450,440 water protection performance bond has been posted and approved [WPO201800088]. The stormwater agreement has been approved and it needs to be recorded at the clerk's office. The nutrient credits were approved 7/18/19.' vii. Pantops Corner Way must be (built or) bonded to limits required by Planning Division, as defined by ZMA201300002 proffer. (FSP /Rev. 1) Comment persists. Applicant response: `Comment noted.' (Rev. 1) Additional: Planning has no Engineering Review Comments Page 5 of 7 objection to road plan (comment d. 9/6/19). Engineering will coordinate with Planning to determine limits of road required to be bonded for FSP approval. 11. Note: Provide Road Plan under separate Application to County at earliest convenience. Ensure road plan design for Pantops Corner Way considers Road Plan checklist for plan reviewers, and includes a temporary turnaround meeting VDOT, Fire Rescue, and ACDSM needs, unless fully con ' -en U.S. Rt. 250 and R. 20 with Wawa. ' SUB201900024 is under review. (Rev. 1) Comment persists. Nearly all Road Plan review comments addressed. 12. Light grayscale indicates Pantops Corner Way is existing. Revise to show Pantops Corner Way is proposed and is to be constructed with Wawa site plan to limits defined by Planning. Provide turnaround sufficient to meet multiple agencies temporary turnaround requirements. (FSP) Partially addressed. Applicant response: `The Pantops Corner Way is shown as proposed on Sheet CV-101 and shaded as existing on Sheet CS- 101 as it will be existing during the construction of the Wawa parcel.' As follow-up: Label Pantops Corner Way `to be constructed BY OTHERS' on plan sheet CS- 101. (Rev. 1) Addressed. 13. Loading width is less than 12', if exclude area occupied by bollards. Revise to provide min. loading space width of 12'. (FSP) Addressed. 14. Delete note stating `Terraced Retaining Wall ...is to be designed and constructed as part of Pantops Corner Development plans.' The terraced retaining walls are intrinsic to site development. Include engineered PE -sealed retaining wall design plans with FSP. (FSP) Not addressed. Also, item I O.a.i., above. Cormnent persists. Applicant response: `Once available the retaining wall plans will be inserted into this plan set. It should be noted that the wall will be constructed by the current landowner as part of the Pantops Corner Way plans and not by Wawa. It is a condition in the purchase contract for this wall to be installed by the seller (current landowner).' Engineering welcomes this explanation. Please submit detailed PE -sealed design for 5 of 6 retaining wall locations shown on CV-102, if CV- 102 remains part of Wawa FSP. If CV-102 is removed from this FSP (as Engineering recommends), then provide detailed PE -sealed design for all retaining walls on TMP #78-5A prior to FSP approval. (Rev. 1) Addressed. Ref. 5/28/19 Circeo Design, sheets 7-8. Also, Applicant response (8/27/19): `As discussed, the retaining walls that are shown on the plans are all designed as part of the Pantops Corner Development Plans (SDP2018-00089) and are not proposed with the Wawa parcel development. Therefore, the call outs for the "retaining walls to be designed and constructed as part of Pantops Corner Development Plans" will remain on CS-101.' Engineering understands /accepts this position. 15. Provide VDOT GR-4- 2 (guardrail) for parking spaces fronting retaining wall; ensure sufficient parking space depth, once guardrail is installed. (FSP) Addressed. 16. Proposed SS line appears discontinuous. Revise to show connection with Ex. SS, or extend proposed SS to a logical endpoint. (FSP) Addressed. 17. If proposed retaining wall fronting Pantops Corner Way coincides with managed steep slopes, ensure design meets (retaining wall) design standards at 18-30.7.5. (FSP) Comment persists. Applicant response: `The wall plans will be submitted once available.' (Rev. 1) Addressed. Walls C, D, fronting Pantops Corner Way appear to meet 18-30.7.5 stds. Ref. 5/28/19 Circeo Design, sheets 7-8. 18. Likewise, storm drain pipe from DI at third southernmost parking space facing Pantops Corner Way is discontinuous. Clarify connection with downgradient elements of storm system. (FSP) Addressed. 19. Review proposed bike rack to ensure adequate clearance between typ. bike and proposed sidewalk (1'-2' clearance, recommended). (FSP) Addressed. 20. Show proposed easements, including: a. Drainage (FSP) Partially addressed. As follow -lip: Show drainage easements on CG- 101, since CG-101 is a Drainage and Grading plan. CS-100, titled boundary plan, shows drainage easements, and resembles a plat. Easements need to be shown with pipe /inlet structures (and SWM facility) if they are to be evaluated. (Rev. 1) Addressed. i. Ref. ACDSM, pg. 15 Engineering Review Comments Page 6 of 7 b. Sidewalk (FSP) Withdrawn. Sidewalks appear to be within public access easement. C. ACSA (FSP) Partially Addressed. CS-100 resembles a plat. Show ACSA easements on CS-101. Same rationale as above: Engineering cannot evaluate easements against invisible structures. (Rev. 1) Addressed. d. Sight (FSP) Addressed. e. RW (FSP) Addressed. Public Access Easement shown on CS-101. 21. Provide entrance sight lines, north -south, for vehicles exiting Wawa. (FSP) Addressed. 22. Label commercial entrance using VDOT nomenclature (CG-9a, etc.). (FSP) Addressed. 23. Label corner clearance distance from site entrance to U.S. Rt. 250. Engineering defers to VDOT. (FSP) Addressed. Note: Engineering defers to VDOT on corner clearance distance. 24. Label any spilling curb and gutter. (FSP) Addressed. 25. Label entrance curb radius. (FSP) Addressed. 26. Show trench drains. (FSP) Partially addressed. As follow-up: South and East ends of trench are labeled with elevations, which is helpful. Please provide additional trench, oil -water separator elevations. Provide profile from the point where the two trenches join and a single pipe departs fuel canopy, to Str. 7. (Rev. 1) Partially addressed. Asfollow-up: Please confirm INV. 1N /OUT for Stormceptor, which appears inconsistent with detail, sheet CG-501 FS FS 396.29 395.46 OIL WATER TC FS SEPARATOR SEE STORMCEPTOR DETAIL INV. IN: 393.27 ON SHEET CC-501 INV. OUT: 383.15 CS-502 27. Provide concrete specification; provide 3000 psi strength at 28 days. (FSP) Addressed. 28. Provide dumpster pad detail. (FSP) Addressed. 29. Provide CG-6 detail. (FSP) Partially addressed. Asfollow-up: 6" depth of `spilling' gutter must match VDOT (CG-6) 7" gutter depth. Revise CS-501 Spilling Curb and Gutter detail depth to 7". (Rev. 1) Addressed. CG-101 30. Recommend spot elevations at entrance. (FSP) Partially addressed. Engineering recommends spot elevations at entrance EP. (Rev. 1) Addressed. 31. Ensure spills from filling UG fiiel tanks reach trench drain. Check west -most UG tank, in particular. (FSP) Withdrawn. 32. Show steep slopes, this sheet. (FSP) Addressed. Shown on CG-101. 33. Stormwater Management Narrative (Also, items 5, 10.a.iv, above): (FSP) Not addressed. a. There is no evidence at this point that -2.45 lbs. of phosphortis credits purchased 40M a nutrient bank will satisfy stoFm ^*^r mama-^ :n ents. Delete specific reference to 2.45 lb. credit from site plan; instead, reference WPO201800088. Transfer specific, detailed SWM Narrative and design information to WPO201800088. (Rev. 1) Partially addressed. As follow-up: Remove CG-102 from Site Plan. SWM approved 8/16/19 w/ WPO201900026. b. Please note that WPO201800088 references 8.3 lb. purchase. W° Fti_,rmaTien-has nat been -eviewed in detail; presentation and integration of TMP #78-5A and 78-58G1 SWM requirements into a single WPO requires care. (FSP) Comment persists. VSMP plan under review. (Rev. 1) Addressed. WPO201900026 Plan (Wawa at Pantops Corner) was approved 8/16/19. WPO201800088 (Pantops Corner) was approved 7/23/19. Note: Amendment to WPO201800088 is under review; this review does not affect WPO201900026 approval. CP-101 34. Provide note for vegetative ground cover hardier than grass for areas between discrete individual plantings north of retaining wall on north side of site (2:1 slope). Mulch may suffice. (FSP) Addressed. Engineering Review Comments Page 7 of 7 35. Remove proposed street trees within drainage easement/s. Recommend show drainage easement/s on Landscape plan. (FSP) Addressed. 36. Street trees appear to obstruct sight distance. Provide sight lines. Also, item #21 above. (FSP) Addressed. New 37. CV-102: It is unorthodox to include site information for separate parcel with separate site plan application under review with Albemarle County (SDP201800089). This separate site plan may be referenced, but detailed information shown with separate final site plan should not be included with SDP201900013 Final Site Plan (Wawa), as Wawa FSP approval would then in effect approve SDP201800089 site plan elements. Engineering defers to Planning. (Rev. 1) Comment persists. Applicant response: `It is understood that the final site plans will not be approved until SDP2018- 00089 plans [Pantops Corner Final Site plan] have been approved.' 38. Note /Reminder: All roadway (Pantops Corner Way /U.S. Rt. 250 /SR 20) elements shown with FSP201900013 must be consistent with Road Plan design at point Road Plan is approved (SUB201900024). In other words, Road Plan approval is required prior to FSP approval. (Rev. 1) Comment persists. Applicant response: `It is understood that the final site plans will not be approved until Road plans FSP2019-00013 [SUB2019-00024] have been approved. 39. , � 01 /Site Legend: There is no concrete sidewalk detail on CS-501. Please provide concrete sidewalk detail or revise title of Mountable curb/island and stamped concrete detail (CS-502), if this detail may serve two purposes (stamped /plain). (Rev. 1) Addressed. CS-101 40. Label sidewalk along U.S. Rt. 250 `by others.' (Rev. 1) Addressed. 41. Label sidewalk along Pantops Corner Way `by others.' (Rev. 1) Addressed. 42. Provide bumper blocks for all 18' L parking spaces adjacent to GR-2. (Rev. 1) Withdrawn. Applicant response: `Wheel stops are not proposed adjacent to the retaining wall and GR-2 as Wawa does not allow them on their sites due to safety/tripping hazards.' Although withdrawn, Engineering recommends wheel stops as an additional safety measure for parking spaces adjacent to GR-2. There is slight likelihood pedestrians exiting vehicles will walk in direction of either GR-2 or retaining walls. 43. Provide /show detectable surface at ramp on west side of stamped asphalt crosswalk. (Rev. 1) Addressed. Please call if any questions: 434.296-5832 —x3069 Thank you SDP201900013 Wawa Pantops_FSP_092419revl Review Comments for SDP201900013 Final Site Development Plan Project Name: Wawa @ Pantops Corner - Final Gate Completed: Friday, September 06, 2019 Department/Division/Agency: Review Status: Reviewer- Michael Dellinger (- nn IncnF-rtinnc Requested Changes Add the following note to the general site utility page: ALL water lines, sewer lines; and fire lines from the main to the structure MUST have a visual inspection performed by the building department. Other than this no objection. mad Review j']''jm nt for SDP201900013 Final Site Development Plan Project blame: Wawa @ Pantops Corner - Final Date Completed: Friday, September 20, 2019 DepartmentJDivision/Agency- Review Status: Reviewer Margaret Maliszewski r°nn APR �I Requested Charges Review Comments for SDP201900013 Final Site Development Plan Project blame: Wawa @ Pantops Corner - Final Gate Completed: Monday, September 30, 2019 DepartmentIDivisionfAgency: Review Status: Reviewer-. Richard Nelson E-�� � LRequested Changes Include Pantops Corner site plan number when referencing water installation_ Show water meter vault to scale_ Maintain 5 feet of separation between irrigation meter and vault_ Remove cross and install meter at end of line with threaded plug. 10 feet of easement will be required on all sides of meter vault. Include typical meter box and setter detail Submit an irrigation application AT FN_ Richard Nelson - Call out 1-inch irrigation meter.. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Fload Culpeper Virginia 22701 Stephen C. Brich, P.E. Commissioner September 26, 2019 Andy Reitelbach County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SDP-2019-00013- WaWa at Pantops Corner — Final Site Plan Dear Mr. Reitelbach: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Kimley and Horn, dated August 27, 2019 and offer and find it to be generally acceptable. If further information is desired, please contact Willis C. Bedsaul at 434-422-9866. A VDOT Land Use Permit will be required prior to any work within the right of way. The owner/developer must contact the Charlottesville Residency land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Mo re, P.E. Area Land Use Engineer Charlottesville Residency WE DEEP VIRGINIA MOVING