Loading...
HomeMy WebLinkAboutWPO201600021 Plan - VSMP WPO VSMP 2016-03-25COUNTY OF ALBEMARLE, VIRGINIA SITE DATA: TAX MAP PARCEL: TM 44-12W (D13 1937 PG 255) AND TM 44-12F (DB 1937 PG 255) ZONING: RA MAGISTERIAL DISTRICT: JACK JOUETT PROJECT AREA: 23.011 ACRES SOURCE OF BOUNDARY AND TOPOGRAPHY: TIMMONS GROUP. 2815 N AUGUSTA ST SUITE C STAUNTON, VA 24401 (540) 885-0920 COMPLETED ON NOVEMBER, 23 2015 DATUM: HORIZONTAL: BASED ON NAD83, VIRGINIA STATE GRID SOUTH ZONE. VERTICAL: BASED ON NAVD 88, ESTABLISHED THROUGH LEICA SMARTNET. BUILDING SETBACKS: FRONT: 75 FT FROM EXISTING PUBLIC ROAD FRONT - LOTS 1, 3, 4, 7 & 8: 25 FT FROM INTERNAL ROADS FRONT - LOTS 5 & 6: 65 FT FROM INTERNAL ROADS SIDE: 25 FT REAR: 35 FT LOT FRONTAGE: EACH LOT MUST HAVE AT LEAST 150' OF FRONTAGE ALONG THE PROPOSED ROAD AND/OR 250' OF FRONTAGE ALONG WOODLANDS ROAD. ALLOWABLE DENSITY: TM 44-12W CONTAINS 3 DEVELOPMENT RIGHTS) + TM 44-12F CONTAINS 5 DEVELOPMENT RIGHTS TOTAL LOTS ALLOWED: 8 LOTS DEVELOPMENT RIGHTS REMAINING: LOTS 1, AND 3-8 ARE ASSIGNED 1 DEVELOPMENT RIGHT EACH AND MAY NOT BE FURTHER DIVIDED. THE RESIDUE OF TAX MAP/PARCEL 44-12W (LOT 2) IS RETAINING 1 DEVELOPMENT RIGHT AND MAY NOT BE FURTHER DIVIDED. PROPOSED USES: 8 SINGLE FAMILY UNITS MAXIMUM GROSS DENSITY ALLOWED: 0.5 D.U. / ACRE. GROSS DENSITY PROVIDED: 8 LOTS / 23.011 ACRES = 0.348 D.U. / ACRE:. LOT SIZE: 2.0 ACRE MINIMUM LOT SIZE (BY RIGHT DEVELOPMENT) PARKING: ALL PARKING SHALL BE LOCATED OFF STREET IN DRIVEWAYS AND GARAGES. PHASING: PROJECT SHALL BE BUILT IN ONE PHASE. BUILDING SITES: LOTS 1-8 MAY NOT BE FURTHER DIVIDED. ONLY 1 DWELLING UNIT PER LOT SHALL BE ALLOWED. BURIAL SITES: NO CEMETERIES FOUND ON SITE. WATER SUPPLY WATERSHED: THIS SITE LIES WITHIN THE ALBEMARLE COUNTY SOUTH FORK RIVANNA RESERVOIR WATER SUPPLY WATERSHED. WETLAND IMPACTS: NONE WATER SUPPLY AND UTILITIES: UNDER CURRENT COUNTY POLICY, PUBLIC WATER AND/OR SEWER WILL NOT BE AVAILABLE TO THIS PROPERTY. ALL LOTS WILL BE SERVED BY INDIVIDUAL DRAIN FIELDS AND WELLS. STORMWATER: WATER QUALITY REQUIREMENTS AND FLOW ATTENUATION WILL BE ACHIEVED THROUGH AN ONSITE DETENTION SYSTEM. AGRICULTURAL/FOREST DISTRICT: NONE FLOOD PLAIN: BASED ON FEMA FLOOD INSURANCE RATE MAP (FIRM), MAP NUMBER 51003CO260D, EFFECTIVE 4, 2005, THE PROPERTY SHOWN LIES IN UNSHADED ZONE 'X', AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN. BUILDING SITE NOTE: EACH PROPOSED LOT CONTAIN A BUILDING SITE THAT COMPLIES WITH SECTION 4.2.1 OF THE ALBEMARLE COUNTY ZONING ORDINANCE. ALBEMARLE COUNTY EXCEPTION: ON MARCH 11, 2016 THE SUBDIVISION AGENT GRANTED LOT 2 AN EXCEPTION TO SECTION 14-404(A) TO CONTINUE UTILIZING THE EXISTING DRIVEWAY ACCESSING WOODLANDS ROAD (SR 676) WITH A CONDITION THAT ADEQUATE SIGHT DISTANCE FOR THE PRIVATE ENTRANCE SHALL BE DEPICTED ON THE ROAD PLAN. PARCEL AREA SUMMARY: PUBLIC R/W: 0.971 AC PUBLIC R/W DEDICATION FOR WOODLANDS ROAD: 0.425 AC PROPOSED LOTS: 21.615 AC TOTAL SITE AREA: 23.011 ACRES ALL PROPOSED STORMWATER MANAGEMENT FACILITIES ARE TO BE OWNED AND MAINTAINED BY A HOME OWNERS ASSOCIATION. TRAFFIC GENERATION AVERAGE DAILY TRIPS FOR SINGLE FAMILY RESIDENTIAL (ITE 210) = 10 ADT WOODLAWN ROAD: 80 ADT (8 SINGLE FAMILY RESIDENTIAL UNITS) 03/25/2016 VICINITY MAP SCALE: 1" = 21000' OWNER: MARJORIE M. PAUL 2163 BONAVENTUIRA DRIVE VIENNA, VA 22181 DEVELOPER: WOODLAWN DEVELOPMENT, LLC 2180 OWENSVIILLE RD. CHARLOTTESVILLE„ VA 22901 CONTACT: JUSTIN BEIGHTS TELEPHONE: (434) 531-1899 EMAIL: JUSTINBEIGHTS@GMAIL.COM ENGINEER OF RECORD: TIMMONS GROUP 919 2ND STREET, S.E. CHARLOTTESVILLE, VA 22902 CONTACT: CRAIG KOTARSKI, PE TELEPHONE: (434) 327-1688 EMAIL: CRAIG.KOTARSKI@TIMMONS.COM Sheet Index Sheet Number Sheet Title C0.0 COVER C1.0 NOTES & DETAILS C2.0 EXISTING CONDITIONS AND DEMOLITION PLAN C3.0 OVERALL LAYOUT PLAN C4.0 EROSION AND SEDIMENT CONTROL NOTES & DETAILS C4.1 EROSION AND SEDIMENT CONTROL NOTES & DETAILS C4.2 EROSION AND SEDIMENT CONTROL PLAN C4.3 EROSION AND SEDIMENT CONTROL PLAN C5.0 SITE LAYOUT C5.1 SITE LAYOUT C6.0 CULVERT PROFILES AND CALCULATIONS C7.0 PRE -DEVELOPMENT DRAINAGE AREA MAP C7.1 POST -DEVELOPMENT DRAINAGE AREA MAP C7.2 STORMWATER MANAGEMENT PLAN DETAILS & CALCULATIONS TOTAL: 14 SHEETS APPROVED by the Albemarle County Community Development Department Date t7�1'��Jlp File f4 /lk iJ CIRf? f{zW 3. KgKATZSKI f io.'No, 0401204830'7 71191IG fir, j (' E 0 y vi N � O O �, E w N E F- W Q 3 Q LL O 3 UO = w�^i Q W M p J i' 00 w U Uj U w M z r — d- _j � Opt+-;'d- _ (n N L9 I— N Ln O� d' M It _l w O 0 O x 0 w > _w Q z O U) > O C� Z _O U (/7 LU r) z 0 V7 > w ry W�W DATE 03125116 DRAWN BY C. SHIFFLETT DESIGNED BY C. SHIFFLETT CHECKED BY C. KOTARSKI SCALE N.A. OQ (H� > V / W J H < OC > LU LU H m <0 ® o U W r Z o JOB NO. 37545 SHEET NO C0.0 GENERAL NOTES: 1. ALL MATERIALS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH CURRENT VIRGINIA DEPARTMENT OF TRANSPORTATION'S SPECIFICATIONS AND STANDARDS. 2. PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL CONSULT THE ENGINEER AND VERIFY THE APPROVAL OF THE PLANS BY ALL FEDERAL, STATE AND LOCAL AGENCIES. 3. LAND USE PERMITS (LUP-A) MUST BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO BEGINNING ANY CONSTRUCTION WITHIN THE EXISTING STATE MAINTAINED RIGHT OF WAY (INCLUDING ACCESS). 4. VDOT IS TO RECEIVE WRITTEN NOTIFICATION 48 HOURS PRIOR TO COMMENCING WITH INITIAL CONSTRUCTION ACTIVITIES. 5. THE CONTRACTOR SHALL VERIFY THE ELEVATIONS OF ALL POINTS OF CONNECTION OR PROPOSED WORK TO EXISTING CURBS, SANITARY LINES, WATERLINES, ETC, PRIOR TO CONSTRUCTION. 6. UPON DISCOVERY OF SOILS THAT ARE UNSUITABLE FOR FOUNDATIONS, SUBGRADES, OR OTHER ROADWAY CONSTRUCTION PURPOSES, THE CONTRACTOR SHALL IMMEDIATELY CONTACT THE OWNER. THESE AREAS SHALL BE EXCAVATED BELOW PLAN GRADE AS DIRECTED BY THE OWNER, BACKFILLED WITH SUITABLE MATERIAL AND COMPACTED IN ACCORDANCE WITH CURRENT. 7. ALL STORM SEWER DESIGN AND CONSTRUCTION TO BE IN ACCORDANCE WITH VDOT I AND I LD-94 (D) 121,13. 8. ALL STORM SEWER PIPE SHALL. BE REINFORCED TONGUE AND GROVE CONCRETE PIPE IN ACCORDANCE WITH ASTM-C-76. PIPE WITHIN THE RIGHT OF WAY SHALL BE MINIMUM CLASS III OR GREATER IN ACCORDANCE WITH CURRENT VDOT STANDARDS AND SPECIFICATIONS. 9. IF PRE -CAST UNITS ARE TO BE USED, VDOT SHALL BE NOTIFIED AND THE MANUFACTURER SHALL SUBMIT DRAWING DETAILS FOR REVIEW. CERTIFICATION AND VDOT STAMP WILL BE REQUIRED ON ALL UNITS. 10. ALL CONCRETE SHALL BE A3-AE (AIR ENTRAINED 3,000 PSI), UNLESS OTHERWISE NOTED, 11. ALL ENTRANCES ARE TO BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH CURRENT VDOT STANDARDS, 12. DESIGN CHANGES, SPECIFIED MATERIALS CHANGES AND/OR FIELD CHANGES FROM THE APPROVED PLANS NEED TO BE RESUBMITTED TO THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. A LETTER OF EXPLANATION SHALL ACCOMPANY THE REVISED PLANS AND/OR THE DRAINAGE CALCULATIONS, WHICH MUST BE SUBMITTED AND APPROVED BY THE ENGINEER. 13. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF CONSTRUCTION PRIOR TO STARTING WORK. CONTACT ENGINEER IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON PLAN. IF THERE APPEARS TO BE A CONFLICT, AND/OR UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON THIS PLAN, CALL MISS UTILITY OF CENTRAL VIRGINIA AT 1-800-552-7001, THE OWNER SHALL BE RESPONSIBLE FOR THE RELOCATION OF ANY UTILITY WITHIN EXISTING AND/OR PROPOSED RIGHT -OF -'WAY REQUIRED BY THE DEVELOPMENT. 14. CASING SLEEVES SHALL BE PLACED AT ALL ROAD CROSSINGS FOR GAS, POWER, TELEPHONE AND CABLE TV SERVICE TRUNK LINES. (N/A) 15. THE INSTALLATION OF SEWER, WATER, AND GAS MAINS (INCLUDING SERVICE LATERALS AND SLEEVES) SHALL BE COMPLETED PRIOR TO THE PLACEMENT OF AGGREGATE BASE COURSE. 16. VDOT & ALBEMARLE COUNTY APPROVAL OF CONSTRUCTION PLANS DOES NOT PRECLUDE THE RIGHT TO REQUIRE ADDITIONAL FACILITIES AS DEEMED NECESSARY. 17, VDOT SHALL HAVE APPROVED THE AGGREGATE BASE COURSE(S) FOR DEPTH, TEMPLATE AND PERFORMED THE REQUIRED FIELD INSPECTION (PROOF ROLL) PRIOR TO PLACEMENT OF ANY SURFACE COURSE(S). CONTACT THE OWNER FOR INSPECTION FOR THE AGGREGATE BASE COURSE(S) 48 HOURS PRIOR TO APPLICATION OF THE SURFACE COURSE(S). 18. A PRIME COAT SEAL BETWEEN -THE AGGREGATE BASE AND BITUMINOUS CONCRETE WILL BE REQUIRED AT THE RATE OF 0.30 GALLONS PER SQUARE YARD (REC-250 PRIME COAT) PER VDOT STANDARDS AND SPECIFICATIONS. 19, THE SCHEDULING OF AGGREGATE BASE INSTALLATION AND SUBSEQUENT PAVING ACTIVITIES SHALL ACCOMMODATE FORECAST WEATHER CONDITIONS PER SECTION 315 OF THE ROAD AND BRIDGE SPECIFICATIONS. 20. THE OWNERS REPRESENTATIVE SHALL HAVE APPROVED THE AGGREGATE BASE COURSE(S) FOR DEPTH, TEMPLATE AND PERFORMED THE REQUIRED FIELD INSPECTION (PROOF ROLL) PRIOR TO PLACEMENT OF ANY SURFACE COURSE(S). CONTACT THE OWNER FOR INSPECTION FOR THE AGGREGATE BASE COURSE(S) 48 HOURS PRIOR TO APPLICATION OF THE SURFACE COURSE(S). 21. A GEOTECHNICAL ENGINEER IS TO ASCERTAIN CAUSE AND CERTIFY RECOMMENDED METHOD OF REPAIR FOR ALL PAVEMENT STRUCTURAL FAILURES PRIOR TO STATE ACCEPTANCE. (N/A) 22. ALL VEGETATION AND ORGANIC MATERIAL MATERIAL IS TO BE REMOVED FROM THE PROPOSED PAVEMENT LIMITS PRIOR TO CONDITIONING OF THE SUBGRADE, 23. CERTIFICATION AND SOURCE OEr MATERIALS ARE TO BE SUBMITTED TO THE OWNER FOR ALL MATERIALS AND BE IN ACCORDANCE WITH THE ROAD AND BRIDGE SPECIFICATIONS, AND ROAD AND BRIDGE STANDARDS. 24. APPROVAL OF A DETAILED CONSTRUCTION SEQUENCING/MAINTENANCE OF TRAFFIC NARRATIVE FOR THE WORK ZONE IS A PREREQUISITE FOR ISSUANCE OF A LAND USE PERMIT ALLOWING ACCESS TO AND CONSTRUCTION WITHIN VDOT MAINTAINED RIGIHT OF WAY. (N/A) 25. GRADE LINES ON PROFILES DEMOTE FINISHED GRADE OF CENTER LINE OF ROAD. 26. ALL APPROACH GUTTERS TO SAG INLETS SHALL MAINTAIN A MINIMUM SLOPE OF 0.004 ft./ft. 27. WHERE A TYPE "B" NOSE IS SPECIFIED ON AN INLET IN CONJUNCTION WITH ROLL FACE CURB AND GUTTER OR CG-7, THERE SHALL BE A 20' TRANSITION ON EACH SIDE OF THE INLET. (N/A) 28. CONTRACTOR SHALL PROVIDE A SEQUENCE OF CONSTRUCTION/MAINTENANCE OF TRAFFIC PLAN IN ACCORDANCE WITH THE STANDARDS AND GUIDELINES CONTAINED IN THE 2011 EDITION OF THE VIRGINIA WORK AREA PROTECTION MANUEL FOR REVIEW BY THE ENGINEER, SCHOOL OFFICIALS, AND VDOT PRIOR TO STARTING WORK THAT IMPACTS TRAFFIC ON STATE ROADS. 29. ALL NEW HANDICAP ACCESSIBLIE REQUIREMENTS ON -SITE AND WITHIN ALL NEW STRUCTURES SHALL COMPLY WITH THE 2006 UNIFORM STATEWIDE BUILDING CODE, 2006 VIRGINIA CONSTRUCTION CODE, AND ICC/ANSI A117,1-03. 30. THE CLEAR ZONE IS TO BE FREE OF STORED MATERIALS AND PARKED EQUIPMENT. 31. HORIZONTAL AND VERTICAL SIGHT DISTANCES SHALL BE FREE OF PARKED VEHICLES. 32, ALL EXCAVATED AREAS WITHIN THE CLEAR ZONE THAT HAVE A DEPTH GREATER THAN 6" SHALL HAVE A 6:1 STONE WEDGE PLACED AT THE END OF THE DAY 33. SOME LOTS MAY EXPERIENCE WATER PRESSURE GREATER THAN 80 PSI. ALBEMARLE COUNTY ENGINEERING GENERAL CONSTRUCTION NOTES: 1. PRIOR TO ANY CONSTRUCTION 'WITHIN ANY EXISTING PUBLIC RIGHT OF WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERIMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT. 3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL (PLAN AND MUST BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED. 5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL:VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION 0 THE COUNTY ENGINEER, OR DESIGNIEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. 8. UNLESS OTHERWISE NOTED ALL- CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE - CLASS III. 9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). BLASTING NOTES: 1. BLASTING SHALL NOT BE PERMITTfED ON THIS PROJECT. ALBEMARLE COUNTY STORMWATER MANAGEMENT NOTES: 1. ALL DAMS AND CONSTRUCTED FILL TO BE WITHIN 95% OF MAXIMUM DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL TO BE APPROVED BY A GEOTECHNICAL ENGINEER. A GEOTECHNICAL ENGINEER IS'TO BE PRESENT DURING CONSTRUCTION OF DAMS. 2. PIPE AND RISER JOINTS ARE TO) BE WATERTIGHT WITHIN STORMWATER MANAGEMENT FACILITIES. 3. FOR TEMPORARY SEDIMENT TRAPS OR BASINS WHICH ARE TO BE CONVERTED TO PERMANENT STORMWATER MANAGEMENT FAICILITIES; CONVERSION IS NOT TO TAKE PLACE UNTIL THE SITE IS STABILIZED, AND PERMISSION HAS BEEN OBTAINED FROM THE COUNTY EROSION CONTROL INSPECTOR. i MUTCD STOP SIGN DETAIL No Scale 2' ROAD CROSS SECTION STARLIGHT VIEW LANE (25 MPH DESIGN SPEED) 40' R/W STREET PARKING IS NOT PERMITTED C%L 10' (TRAVEL LANE) 2$ COMPACTED SUBGRADE 4' MIN. GRASS 4" UNTREATED AGGREGATE SHOULDER NOTE: ROAD CROSS SECTION COMPLIES WITH VDOT SSAR DESIGN STANDARDS. ROAD CROSS SECTION No Scale alt 200 - r TC 240.5 1" SM-9.OA LEGEND 10' (TRAVEL LANE) 2' 2% --- 8% 2.5" BM-25.OA 4' MIN. GRASS SHOULDER 4'FORESLOPE STORM PIPE EXISTING CONTOUR PROPOSED CONTOUR PROPOSED SPOT ELEVATION y kl?"14 Via CRARIV4 J. {OTARSKI � Lk. No. 0402048507 IV t ` �cfrIA1, E O N 5 C:) E (n c w N E N a=+ H H > 3 ¢LL aa'3 LL = 0 G > aJ a-�., oMo Q9 W u M z � _ �r � _j LL Ui o=U)N =vein I- r4 Lr) rn °' rn ro M J w F- Ln O x U O F- 0 w _w U z O U) H O 0 z O H U V) w 0 z O U) w Of O O (i U zz :73 Z) UO C) �0 ko w ¢ o 0 0 DATE 03125116 DRAWN BY C. SHIFFLETT DESIGNED BY C. SHIFFLETT CHECKED BY C. KOTARSKI SCALE N.A. z o ai U C 0 ro ^ 3 LL N o Q ro o d H > Cu (^ W Q cu VJ J a >mn Cu CL ~ � � .2 d 0LL0 3 O S co W �� � z � �o o (� O OCL 2()z (' o � E ro `o aa) O N ro N C a-O D U O O z N O 0 �x 0 3 o >0 �Cu 3 0 U O N O O U 2 � N ro o � U N E � 7 O U Co O 6 io C c6 Q U JOB NO. 0 o cII U 37545 C N O O O SHEET NO. a-2 ro-0 C1.0 .- -- E CIUT a i l T. KOTAid M »� L,ic. No. 0,402048507 F A 711911G �'4-' ,5 A - 0 V V) N = O O o, E LU N E F- W Q Q N. N 3: tL = Lu � r- Q W � M J � a 00 w C7W (jr�i z � — d' Q0 W LL- oC Vi _ Ln N I- N Ln � N ro M J W Fa 0 0 co 0 z O n- U cn W z _O V) w W�W DATE 03125116 DRAWN BY C. SHIFFLETT DESIGNED BY C. SHIFFLETT CHECKED BY C. KOTARSKI SCALE 1 "=60' JOB NO. 37545 SHEET NO. C3.0 EROSION AND SEDIMENT CONTROL NARRATIVE: MINIMUM STANDARDS: GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL: PROJECT DESCRIPTION AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION THIS PROJECT IS A RESIDENTIAL DEVELOPMENT THAT INCLUDES THE ADDITION OF 7 SINGLE FAIMILY LOTS AS CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS: CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WELL AS ONE EXISTING SINGLE FAMILY LOT, ALONG WITH ASSOCIATED ROAD, CULVERTS AND STORMWATER MS-1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN WEEK PRIOR TO THE FINAL INSPECTION. MANAGEMENT FACILITIES. LIMITS OF CLEARING AND GRADING ARE 7.94 ACRES. SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT ADJACENT PROPERTY AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL THESE IMPROVEMENTS ARE BEING MADE WITHIN THE PROPERTY BOUNDARY. THE PROPERTY IS (BOUNDED BY STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN REGULATIONS. WOODLANDS ROAD ON THE EAST, AND A RESIDENTIAL PROPERTIES TO THE NORTH, SOUTH, AND WEST. ONE YEAR. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP MS-2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE IN CLEARING. EXISTING SITE CONDITIONS STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE THE SITE IS CURRENTLY A MOSTLY WOODED RESIDENTIAL PROPERTY WITH ONE HOUSE AND ASSOCIATED RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL AT ALL TIMES. SITE FEATURES. STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE THE PROJECT SITE. PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR OFF -SITE AREAS MS-3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND A NEW ENTRANCE ROAD WILL BE CONNECTED TO WOODLANDS ROAD. PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED APPROVAL BY THE PLAN APPROVING AUTHORITY. UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL CRITICAL EROSION AREAS WILL INHIBIT EROSION. MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN PROPOSED SLOPES STEEPER THAN 3:1 WILL BE STABILIZED WITH BLANKET MATTING. MS-4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES APPROVING AUTHORITY. INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES EROSION AND SEDIMENT CONTROL MEASURES LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL DISTURBANCE TAKES PLACE. IS ACHIEVED. PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND MS-5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. SPECIFICATIONS OF THE CURRENT ADDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH HANDBOOK. THE MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED MS-6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON RUNOFF -PRODUCING EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES HAVING JURISDICTION. THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. STORMWATER QUALITY CONSIDERATIONS OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT STORMWATER QUALITY REQUIREMENTS ARE BEING MET BY THE USE OF PROPOSED GRASS CHANNELS AND A ACRES. MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. LEVEL 1 EXTENDED DETENTION FACILITY. B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. ORDINANCE SECTION 5.1.28. STORMWATER RUNOFF CONSIDERATIONS THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE 13, ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH VESCH AND OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL ALBEMARLE. THE CONSTRUCTION SEQUENCE, INCLUDING THE INSPECTION OF ALL MEASURES AFTER ALL RAIN EVENTS, INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. STRUCTURAL PRACTICES: CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS 1. TEMPORARY CONSTRUCTION ENTRANCE - 3.02 A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE UTILIZED. LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO PROVIDED AT THE LOCATION INDICATED ON THE PLANS. IT IS IMPERATIVE THAT THIS MEASURE BE MS-7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL ADJACENT LAND AND STRUCTURES/IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF MAINTAINED THROUGHOUT CONSTRUCTION. ITS PURPOSE IS TO REDUCE THE AMOUNT OF MUD MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR SLIDES, SINKING, OR COLLAPSE. TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO 2. SILT FENCE BARRIER - 3.05 SILT FENCE SEDIMENT BARRIERS SHALL BE INSTALLED DOWNSILOPE OF MEASURES UNTIL THE PROBLEM IS CORRECTED. PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT -LADEN RUNOFF FROM SHEET FLOW AS INDICATED. MS-8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER ITS PURPOSE IS TO INTERCEPT SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS AND PREVENT WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN PORTION OF THE PROPERTY. SEDIMENT FROM LEAVING THE SITE. STRUCTURE. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 3. STORM DRAIN INLET PROTECTION - 3.07 STONE FILTERS SHALL BE PLACED AT THE INLET OF ALL MS-9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL DRAINAGE STRUCTURES AS INDICATED ON PLANS. ITS PURPOSE IS TO PREVENT SEDIMENT FROM SHALL BE PROVIDED. RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY ENTERING THE STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION. MS-10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/1100SF. 4. CULVERT INLET PROTECTION - 3.08 A SEDIMENT FILTER LOCATED AT THE INLET TO A CULVEIRT TO PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. PREVENT SEDIMENT FROM ENTERING THE SYSTEM PRIOR TO PERMANENT STABILIZATION. WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. 5. DIVERSION DIKE - 3.09 A TEMPORARY RIDGE OF COMPACTED SOIL TO DIVERT WATER FROM A CERTAIN MS-11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP AREA. OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 6. SEDIMENT TRAP - 3.13 A TEMPORARY BARRIER OR DAM WITH A CONTROLLED STORMWATER RELEASE TO CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% DETAIN SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS IN "WET' AND "DRY" STORAGE LONG ENOUGH CHANNEL. KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAIW FOR THE MAJORITY OF SEDIMENT TO SETTLE OUT. MS-12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY 6.1. MAINTENANCE OF SEDIMENT TRAP - INSPECT TRAP EMBANKMENT WEEKLY TO ENSURE IT IS MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO EROSION CONTROL INSPECTOR. STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED DURING CONSTRUCTION ACTIVITIES. THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE 19. MAINTENANCE: ALL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL EVENT. ANY ADDITIONALLY THE TRAP SHALL BE CHECKED AFTER EVERY RAINFALL EVENT. ONCE THE SEDIMENT HAS USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE (USED DAMAGE OR CLOGGING TO STRUCTURAL MEASURES SHALL BE REPAIRED IMMEDIATELY. SILT TRAPS REACHED THE DESIGNATED CLEANOUT LEVEL IT SHALL BE REMOVED AND PROPERLY DISPOSED OF, FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. SHALL BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED 7. DUST CONTROL - 3.39 DUST CONTROL IS TO BE USED THROUGH THE SITE IN AREAS SUBJECT TO MS-13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE AREAS SHALL BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS, SILT FENCE AND SURFACE AND AIR MOVEMENT. IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF DIVERSION DYKES WHICH COLLECT SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND NONERODIBLE MATERIAL SHALL BE PROVIDED. REPAIRED IMMEDIATELY. VEGETATIVE PRACTICES: MS-14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN 0 R 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS OF 8. TOPSOIL (TEMPORARY STOCKPILE) - 3.30 TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADED CROSSING LIVE WATERCOURSES SHALL BE MET, FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE AND STOCKPILED FOR LATER SPREADING. STOCKPILE LOCATIONS SHALL BE LOCATED ONSI7E AND MS-15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORIK IN COUNTY EROSION CONTROL INSPECTOR. SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND VEGETATION. THE WATERCOURSE IS COMPLETED. 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WTIHIN 1 YEAR OF THE DATE OF 9. TEMPORARY SEEDING - 3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MOIRE THAN 30 MS-16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G.) DAYS SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS GRADING OF THOSE AREAS. SELECTION OF THE SEED MIXTURE SHALL DEPEND ON THE TIME OF YEAR IT A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE IS APPLIED. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. SECTION 17-207B) 10. PERMANENT SEEDING - 3.32 FOLLOWING GRADING ACTIVITIES, ESTABLISH PERENNIAL VEGETATIVE C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN COVER BY PLANTING SEED TO REDUCE EROSION, STABILIZE DISTURBED AREAS, AND ENHANCE NATURAL APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAN BEAUTY. DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY, 11, SOIL STABILIZATION BLANKETS & MATTING - 3.36 A PROTECTIVE COVERING BLANKET OR SO?IL D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO STABILIZATION MAT SHALL BE INSTALLED ON PREPARED PLANTING AREAS OF CHANNELS TO PROTECT MINIMIZE EROSION AND PROMOTE STABILIZATION. AND PROMOTE VEGETATION ESTABLISHMENT AND REINFORCE ESTABLISHED TURF, E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. MANAGEMENT STRATEGIES MS-17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, 1. PROVIDE SEDIMENT TRAPPING MEASURES AS A FIRST STEP IN GRADING, SEED AND MULCH PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR IMMEDIATELY FOLLOWING INSTALLATION. TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR 2. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING. PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF 3. ISOLATE TRENCHING FOR UTILITIES AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDER TO EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND MINIMIZE PERIMETER CONTROLS. TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALL.OWED 4. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED UNTIL THEY ARE I \IO LONGER ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO REQUIRED TO COMPLY WITH THE CONTRACT DOCUMENTS OR STATE LAW. INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. MS-18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHINI 30 PERMANENT STABILIZATION DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER ALL NON -PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED IMMEDIATELY FOLLOWING FINISHED GRADING. SEEDING SHALL BE IN ACCORDANCE WITH STD. & SPEC. SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPOIRARY 3.32, PERMANENT SEEDING. SEED TYPE SHALL BE AS SPECIFIED FOR "MINIMUM CARE LAWNS" AND MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND "GENERAL SLOPES" IN THE HANDBOOK FOR SLOPES LESS THAN 3: 1. FOR SLOPES GREATER THAN 3: 1, SEED SEDIMENTATION. TYPE SHALL BE AS SPECIFIED FOR "LOW MAINTENANCE SLOPES" IN TABLE 3.32-D OF THE HANDBOOK. FOR MS-19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED MULCH (STRAW OR FIBER) SHALL BE USED ON ALL SEEDED SURFACES. IN ALL SEEDING OPERATIONS SEED, FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY FERTILIZER AND LIME SHALL BE APPLIED PRIOR TO MULCHING. AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE STANDARDS AND CRITERIA LISTED IN SECT -ION SEQUENCE OF INSTALLATION 19 OF THE VIRGINIA ADMINISTRATIVE CODE 9VAC25-840-40 MINIMUM STANDARDS. 1. A PRE -CONSTRUCTION MEETING IS REQUIRED WITH ALBEMARLE COUNTY E&S INSPECTOR, CONTRACTOR, OWNER, AND ENGINEER. THIS MEETING SHALL TAKE PLACE AT THE COUNTY OFFICE BUILDINIG. CLEARING LIMITS MUST BE FLAGGED PRIOR TO THE MEETING WITH ONE (1) WEEK OF NOTICE. 2. INSTALL CONSTRUCTION ENTRANCE. 3. INSTALL PERIMETER SILT FENCE AND TREE PROTECTION FENCING. 4. CLEAR AND GRADE AREA FOR SEDIMENT BASIN 1 AND INSTALL. 5. INSTALL DIVERSION DIKE, AND REMAINING SILT FENCE. 6. ONCE SEDIMENT BASIN 1 AND THE PERIMETER CONTROL MEASURES ARE IN PLACE, CONSTRUICTION ON WOODLAWN ROAD MAY BEGIN. 7. ROUGH GRADE PROJECT AREA. 8. INSTALL WOODLAWN ROAD, AND CULVERTS A AND B. INSTALL CULVERT INLET AND OUTLET PROTECTION. 9. ONCE UPSLOPE AREAS ARE PERMANENTLY STABILIZED, AND WITH THE COUNTY INSPECTOR AIPPROVAL, REMOVE CULVERT INLET PROTECTION, DEWATER SEDIMENT BASIN 1, REMOVE SATURATED SEDIMENT BASIN MATERIAL, AND CONVERT TO SWM-1, LEVEL 1 EXTENDED DETENTION FACILITY. REMOIVE REMAINING EROSION AND SEDIMENT CONTROL MEASURES. 10. FINALIZE GRASS CHANNEL GRADING AND GROUNDCOVER ONLY AFTER CONTRIBUTING DRAINAGE AREA IS STABILIZED. 11. SEED ALL DENUDED AREAS PER VESCH STANDARDS. Fu ry -' a 0 0 ti M co 0 GENERAL EROSION AND SEDIMENT CONTROL NOTES: ES-1: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND S-TRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT (CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. ES-2: THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY WILL MAKE A CONITINUING REVIEW AND EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE EROSION CONTROL PLAN. ES-3: PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST :STEP IN CLEARING, GRADING, OR LAND DISTURBANCE. ES-4: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE: SITE AT ALL TIMES. ES-5: PRIOR TO COMMENCING LAND -DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA)„ SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE ARCHITECT/ENGINEER AND THE CONNTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY FOR REVIEW AND ACCEPTANCE, ES-6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE RESPONSIBLE LAND DISTURBER. (MODIFIED NOTE) ES-7: ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES Air ALL TIMES DURING LAND -DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT. ES-8: DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE. ES-9: INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT. MAKE ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES IMMEDIATELY. E 0 U N U 0 0 rn E w N E = F- ui ¢ ¢ u` .. ai U_ LU c� V)-4 ¢ LU a± M a_jt00 Lu 0 Ql (D W U M z�-�r �OJC wiLL vi =U-v� in 01 Ql � N M d' J w I- U) O O 0 w w u z O M O 0 z O a U U) w 0 z O H U1 W Of WIW DATE 03125116 DRAWN BY C. SHIFFLETr DESIGNED BY C. SHIFFLETT CHECKED BY C. KOTARSKI SCALE 1"=30' H Lu 0 0;z H J - r^Luf 0 = VJ J H < %Wco ~ Q O C) LL z Z - o Lij U H W oC.J -6 � c c zi o 0 i 0 0 0 L W JOB NO. 37545 SHEET NO C4, 0 ri ID U co N 0 N m iz 0 0 2 0 a 0 o6 z 70' MIN. EXISTING S 1� Li (ar, TOP OF DAM = 536.00 A 3' PAVEMENT? Table 15: Sediment Basin design (spec 3.14) 10' SAFETY 8' BENCH 16' GRASS SPILLWAY -......,� FILTER 6 M MOUNTABLE BERM A 77( \ ) 5' R r ELEV. 534.20 CLOTH (OPTIONAL) ``�✓✓ ` EXISTING GROUND SIDE ELEVATION i.... '� IE C ��t If J. _� I �ll�.p sI Sediment Basin design .__.... drainage area acres g. (acres) basin Volumes: (using 2' Contour Intervals) .....__... 11.36 DESIGN MIN. t'YV25PtELLtAY 7 ntSPILL HIGH WATER (25-YR, STORM ELEV.) .y _. CREST OF EmrkoEv,cr Pt_twaY % CREST ELEV. 533.20 /._.. -- IMPERVIOUS CORE AND CUTOFF TRENCH - ........ t --- 70' MIN. WASHRACK0' MIN. B - � .........................(OPTIONAL) � )( 10 EXISTING Lic. �� 1�10 fl �• '�_'" i �� lt1 1, 1� ;8507 Ib �✓ �'�" � V4 �r� ' ... 12' MIN. MIN.� PAVEMENT 75 AT. elevation (ft) contour area (so volume(cy) �,-s. - - DRY STORAGE 1' I... z 52530 8930 436.3 ORY STORAGE },.{I,� ,,~° t 48" RCP RISER I ggBT nj - DEWATERING DEVICE W/ ANTI -VORTEX DEVICE i .------ 0 MIN. VDOT #1 COARSE AGGREGATE B I POSITIVE `..,' L 532 10660 - 725.E __ UEYATERING - otlncE INV IN 529.40 6" PVC 6" PERFORATED PVC ( ) t ` MUST EXTEND FULL WIDTH OF I DRAINAGE TO SEDIMENT 534 12550 859.6 ' WET' " STORAce -- ' -- INV OUT 529.30 (24" HDPE) Z INGRESS AND EGRESS OPERATION TRAPPING DEVICE E o 536 14230 991.9 , _,__ 3" ORIFICE I PLAN VIEW Mr .as, EGNt6ENT CLEANCUT P°iNT O� 4 C.vj AC`REjoucE WETSTORAGE EW-1 ;I I - 12' MIN. _ -----� 3" MIN. E N E = wet storage: PLUG 3" ORIFICE (FOR SWM-1) 90.00' - 1 24' HDPE @ 2.78% 3"MIN. Uj I- M a 3 v > Q Wet storagere Aired C 67*DA q- (y) ( ) 761.1 design high water g 9 535.0 ; ES-1 FILTER CLOTH SECTION A -A U. o �- dewatering orifice elevation (ft) 531.0 top of dam (ft) 536.0 SWM-1 BOTTOM 529.50 8' DIA. X 1.5' INV 526.80 6'a° LU W a M wet storage provided at this elevation (cy) 798.5 top width of dam (ft) 8.0 CONC. BASE I 1 �. �, w a J z available plume before cleanout (cy) 399.3 bottom of basin (ft) 529.5 - -_ ° � N i cleanout elevation (ft} 530-0 approx. bottom dimensions: 140'x80' 6' - 6" PVC @ 1.7% EMBED 6" IN CONCRETE c.. - z H distance from cleanout to orifice (ft) (> 1') 1.0 upstream face slope: 3-01 � O Lu x v cn downstream face slope: 3:1 NOTES: RIP -RAP OUTLET 1. IMPERVIOUS CORE AND CUTOFF TRENCH SHOWN FOR PROTECTION REINFORCED CONCRETE DRAIN SPACE CE 3.02 ¢ cn 1 _ W dry storage: SECTION B-B o a = cn N z dry storage required (cy) (67*DA) 761.1 baffles: no INFORMATIONAL PURPOSES ONLY. FINAL DESIGN TO BE PROVIDED v v ° O CONSTRUCTION ENTRANCE *principle s spillway crest fit 533-2 length of flow, L ft 140,BY GEOTECHNICAL ENGINEER. v () g �)���NE r, Ln "dry storage provided at this elevation (cy) 951-0 effective width, We (ft) 80 2. REFER TO SHEET C7.2 FOR FINAL DESIGN OF SWM-1 N > LLl diameter of dewatering orifice (in) 3.0 L / We (baffles required if > 2) 1 8 diameter of flexible tubing (in) (orifice+2") - 6.0 - 2 X 4" WOOD DROP INLET WITH SILT FENCE DROP INLET PROTECTION COMPACTED SOIL w i- ti ti collars: no FRAME GRATE W W runoff: depth of water at spillway crest (ft) 4.7 - _ 18" MIN. C (use 0,45 for bare earth) 0.45 slope of upstream face (ZA) 3 1 5, _ _FRAME -- FLOW O O tc (min) 12yr 2.8 Q 2yr 20 14.3 slope of barrel (Sb) length of barrel in saturated zone (Ls) 2.78 60 TABLE 3.31-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS "QUICK REFERENCE FOR ALL REGIONS" MAX. ` - J �_ � o U U 125yr 4.3 Q 25yr 22.0' number collars required 2 --- ��� (D principle spillway: head 1-8 dimension of collars 5x5 PLANTING DATES SPECIES RATE LBS./ACRE ( ) 3' �v MIN. -��, GATHER 4.5' MIN. DD CWD 3.09 o O OO available (ft) diameter riser in () 48 emergency spillway: re aired ca acit Q25-Q ) p y( p) (cfs yes NIA SEPT. 1 - FEB. 15 50/50 MIX OF ANNUAL RYEGRASS �- EXCESS �` �'-�' I I I I AT o w > 0 0 spillway capacity,Q v p�fs} 75.0 bottom width (ft) 16 v `l CORNERs TEMPORARY DIVERSION DIKE W w F- diameter trash rack (in) 72 slope of exist channel (ft/ft) head on Barrel through embankment (ft) 5.5 crest of spillway (ft) diameter of barrel (in) 24 " Riser crest elevation and dry storage determined by extended detnetioni facility SWM-1 design. 0.1 534.2 (LOLIUM MULTI-FLORUM) & 50-100 CEREAL (WINTER) RYE (SIECALE CEREALE) FEB. 16 - APR. 30 ANNUAL RYEGRASS 60-100 PERSPECTIVE VIEWS STAKE II FABRIC = ¢ z o > Q o o •-t 0 No Scale 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. DATE (LOLIIUM MULTI III III _ MIN. III- I 6' I% l =, , =o 03/25/16 DRAWN BY MAY 1 -AUG. 31 GERMAN MILLET 50 - '^-� /JIIII J. SHOWALTER (SETARIA ITALICA) �1 DETAI L A DESIGNED BY ELEVATION OF STAKE AND FABRIC ORIENTATION FLOW /�4„ p� I I SPECIFIC APPLICATION 3. STAPLE FILTER MATERIAL TO STAKES AND 4. BACKFILL AND COMPACT THE C. KOTARSKI THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET EXTEND IT INTO THE TRENCH. EXCAVATED SOIL. CHECKED BY DRAINS A RELATIVELY FLAT AREA (SLOPE NO GREATER THAN 5%) WHERE SB-1 3.14 TS 3.31 THE INLET SHEET OR OVERLAND FLOWS (NOT EXCEEDING 1 C.F.S.,) ARE TYPICAL. THE METHOD IP CONCENTRATED FLOWS, SHALL SUCH AOSTIN STREET REETLY O ORLETS HIGHWAY EIVINGMEDIANIS. 3.07-1 j _ j IU! IPA �j" FLOW ® ® C. KOTARSKI SCALE AS SEDIMENT BASIN #1 TEMPORARY SEEDING PLANT MATERIALS STORM DRAIN INLET PROTECTION / ® SHOWN No Scale No Scale No Scale -_ I • SHEET FLOW INSTALLATION _ --------- ---- - - - _ _ _-------------- - _ .__ _----- --------- - TABLE 3.32-D TYPICAL ORIENTATION OF TREATMENT - 1 SOIL (STABILIZATION BLANKET) (PERSPECTIVE VIEW) SPACING BETWEEN CHECK DAMS SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA 3' TOTAL LBS. PER ACRE MINIMUM CARE LAWN SHALLOW SLOPE f,--`` FLOW I MAX. A B A \\\ COMMERCIAL OR rjON SHALLOW SLOPES, STRIPS NETTING - �� A L B RESIDENTIAL 175-200 LBS. KENTUCKY 31 OR TU1RF-TYPE TALL FESCUE 90-100% '' 3i'"' PROTECTIVE COVERINGS MAY BE '' APPLIED ACROSS THE SLOPE. / - -'- PIPE OUTLET CONDITIONS IMPROVED PERENNIAL RYEGRASS 0-5% BERM �) \ A A KENTUCKY BLUEGRASS 0-5% WHERE THERE IS A BERM AT THE TOP OF THE SLOPE, BRING THE MATERIAL OVER THE BERM AND ANCHOR IT POINTS A SHOULD BE HIGHER THAN POINT B. Q , n v 1 GENERAL SLOPE (3:1 OR LESS) J L THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION -_ KENTUCKY 31 FESCUE 128 LBS. RED TOP GRASS 2 LBS. * STEEP SLOPE BEHIND THE BERM. SF DRAINAGEWAY INSTALLATION 3.05-2 (FRONT ELEVATION) 1J.. 3do SEASONAL NURSE CROP 20 LBS. : ON STEEP SLOPES, APPLY PROTECTIVE SILT FENCE (W/O WIRE SUPPORT) do 150 LBS. COVERING PARALLEL TO THE DIRECTION OF FLOW AND ANCHOR SECURELY. � Uj No Scale f PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL LOW -MAINTENANCE SLOPE (STEEPER THAN 3:1) KENTUCKY 31 FESCUE 108 LBS. RED TOP GRASS 2 LBS. BRING MATERIAL DOWN TO A LEVEL AREA BEFORE Q 06 2 ACRES OR LESS OF DRAINAGE AREA: 2-10 ACRES OF DRAINAGE AREA: PLAN VIEW ` SEASONAL NURSE DROP * 20 LBS. CROWNVETCH ** 20 LBS. TERMINATING THE 4---�. INSTALLATION. TURN THE END � r � v / „ 61* 6 3 S'* La 150 LBS. * USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES DITCH FLOW UNDER 4" AND STAPLE AT 12" 2 INTERVALS. Paved construction entrance for erosion control plans FILTER FILTERAS 0 % -- STATED BELOW: ;'- IN DITCHES, APPLY PROTECTIVE COVERING " ' hl W - z CLOTH cQl ,T�t� noi4 Q CLOTH OPTIONAL (OPTIONAL) DOWNSTREAM VIEW (OPTIONAL) DOWNSTREAM VIEW ( ) ; t `::.--. ff d FEBRUARY 16TH THROUGH APRIL.................................. ANNUAL RYE MAY 1ST THROUGH AUGUST 15TH ............................ FOXTAIL MILLET PARALLEL To THE DIRECTION OF FLOW. USE CHECK SLOTS AS REQUIRED. AVOID JOINING MATERIAL IN A, ._ , 3 v-�a A :>I IALr ��, cor'rV � rYl 'Iwr; j --� ( ) SECTION A -A FILTER KEY IN 6"-9"; RECOMMENDED FOR AUGUST 16TH THROUGH OCTOBER ............................... ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15TH........................ WINTER RYE THE CENTER OF THE DITCH IF AT ALL POSSIBLE. gM 3.36-1 ;;� ,� -� r L z - r s r'A1/FK1FNT ; ;� f� V`� -- - 1 1 _j � _ O VDOT #1 COARSE VDOT #1 COARSE CLOTH ENTIRE PERIMETER "* SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH EAST OF T, Tom,>,�r,��, � "f �'' "' 2'''' 'r "R`f'' i - N1' > LLI AGGREGATE------- AGGREGATE FARMVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL SOIL STABILIZATION BLANKET (EC - 2) PRQFILE m ~� Q OTHER PERIODS, USE UNHULLED SERICEA). IF FLATPEA IS USED IN LIEU OF CROWNVETCH, INCREASE LBS./ACRE. LL �"� No Scale FLOW 2 y 3�* FLOW 2 7 ;3'* RATE TO 30 ALL LEGUME SEED MUST BE PROPERLY INOCULATED. WEEPING LOVEGRASS MAY BE sro E:: {};,1:-,Rai {I`�^; O SILT FENCE CULVERT INLET PROTECTION ADDED TO ANY SLOPE OR LOW -MAINTENANCE MIX DURING WARMER SEEDING PERIODS; ADD 110-20 LBS./ACRE IN MIXES. ENDWALL -A::PrlALF PAVF__) c c:r_s " ` 'Wl HPA, >K z z -CLASS v - - 1, W CD * OR 3/4 OF DITCH HEIGHT I RIPRAIP 3.20 A ado MIN.) PS 3.32 TOE OF�Y FILL CULVERT L c" �, r a ,'� ..�_ .6 c d0,�r} ,.r, _ C c .� r F ��I r Nc � r�R �1�� 7'� 1 j �� 2% 2 • h: N O U do A ( ' PIPE OUTLET TO WELL PERMANENT SEEDING MIX FOR PIEDMONT AREAS �- , r`"rn73 tic' - - - f ? «M I SEX I Pl Fl. L ,^t i u Th l L/, 0 J I `J. F `J f Gr Itl ItF S A"•ID f t_RES' Ir,�-'NING +AC:F t��Ft_r<�,Tlo�i c 0 W L t 0 i ROCK CHECK DAM No Scale -__... _...._...__ . _....-.-----------_. _______.._._.......-.__. ___ ....-._.._-------________...........__... -... - ------ _...____.._._.__ No Scale DEFINED CHANNEL * TOE OF FILL PLAN I PLAN VIEW e t__J lU U l-I l O La � �� I I � � � J-1 SILT FENCE o � FLOW **OPTIONAL STONE (COMBINATION DISTANCE IS 612p.'�tlff54,%�' ___. ___"___._-1?' vl�t. i'C ;If 'I f)f1r11N�1: ( TO SFI"+ �1 -y ��;,>� ,�, '[ - x r , { i ._ Un 0 % -- T-r € d STANDARD ORANGE VINYL OR PLASTIC CONSTRUCTION FENCE ATTACHED TO POSTS (PRE -WEATHERED WOOD,TOWARD MINIMUM IF 1.0' 1.5'F�<<r FLOW IS rliTr, ,.I .,-11 LL.I SECTION A -A FILTER CLOTH -I KEY IN 6%9"; RECOMMENDED FOR ENTIRE PERIMETER GALVANIZED STEEL, IRON OR THICK PVC PLASTIC), AT LEAST 40" ABOVE FINISH GRADE WITH SPAN BETWEEN POSTS NO GREATER THAN U ON CENTER. EVERY NINTH POST SHALL EMBANKMENT C SECTION_ A A A uunur>um water tap of 1 inch 11 ust be jn,stallecl witlr a mitt un m i vieli Wilcock NOTES: CONTAIN A WARNING SIGN THAT CLEARLY IDENTIFIES THE �W-- 2.5' shutoff valve stipplyut; a ��•aA hose with a diameter of 1,S niclies foi- adequate 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET, OR FENCE AS A TREE PROTECTION FENCE. constant pressure. Nash water mint be c,-mied away fi�ow the entrance to all approved settliirg area to remove sedunent. All be from CONCRETE. 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES rse&uent ;:hall prevented eateriRRrry storm drains, ditches cot- watercourses. 3.18-3 AND 3.18-4. **VDOT #3, #357, #5, #56 OR #57 CLASS 1 3. INCHES TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 REPLACE RIPRAP PAVED WASH RACK OP O 3•18 O TP 3.38 NO SCALE O FENCECOARSE NAGGREGATEHTOE WHEN HSIL CIP VELOCITY OF FLOW IS EXPECTED CE) C Nlr 111`�'' r JOB No. 37545 OUTLET PROTECTION TREE PROTECTION CULVERT INLET PROTECTION No Scale No Scale No Scale SHEET NO. C4,1 a� a� 0 m to 0 2- CL a W 0 a 0 Q s to a Q 0 0 (") 14 U F— LU W U) O I— w H ry to ril T J}, -r 't Colai sIff.I3'O'EARSKI Lic. No. 040204850 71I 91 16 E 0 tri N CO O E w N E 2 N i H H > 3 a LL ( 3 LL = C � a � M LU H o (FLU UM Q w � cC vi tea'-'n�i x� I— N Ln N O� d' M J w z O I— d C1� U Ln Lu 0 z O W C1� W W 0 U U Qw 0 0 0 DATE 03125116 DRAWN BY C. SHIFFLETT DESIGNED BY C. SHIFFLETT' CHECKED BY C. KOTARSKI SCALE 1 °=40f JOB NO, 37545 SHEET NO. C4 . 2 5 CL D 70 �U) z ,0 .:E 2i MIQ WO LIJ qj x ur , sW J. iME RSKI L ic- No. M20/118307 191 �1�5 E 0 V N O O rn E u, N E ui = LL N Zi LL = O Q W M LU (DW Uchi w LL vi D Q ,j d- 4 X (n N Lq F— N Q1 � al [t M [t' J W I- FU 7 ry I a _N a O M M 0 Ir z O_ i- U W 0 z O W W W V U O O C� C� �0 �0 W Q 0 � h O O DATE 03125116 DRAWN BY C. SHIFFLETT DESIGNED BY C. SHIFFLETT CHECKED BY C. KOTARSKI SCALE 1 "=40' z Q ® z J ry ® z Q > 0 LLl U J Q ui W ~ a � ® 0 0 ui r V I O L 0 z z 0 V 1 � O 0 I.L � W 0 0 0 3: 30B NO. 37545 SHEET NO. C4, 3 3 d U 30 7 (Y 3 U U) -Z �0 T F T 3 5 Q7 in O O fn U C O N O C U Co � O N a O Q U O In O (6 U C i (6 C c O U Q O N U to N N N DRAINAGE AREA TO CULVERT B / DITCH A = 4.770 AC C= 0.44 TC= 20 MIN 1(2)= 2.8 IN/HR Q(2) = 0.44(4.77)(2.8) = 5.88 CFS 1(10) = 4.0 IN/HR Q(10) = 0.44(4.77)(4.0) = 8.40 CFS V(2) = 4.41 FT/S (ALLOWABLE VELOCITY = 5 FT/S) D(10) = 0.76' Q C11-A,i llAr.1. K,YEARSK1 Lie. I o. 0402041'0?507 E 0 vi N O 0 Ql E w N E = N 'ate N H > 3 Q LL v cn � Q LN M a j , W ,I O 01 C7 W M w 'q vi _ Lj N I— N Ln ON 01 � M [f' J W U] 0 0 1- 0 w w_ U a z 0 H 0 Z O_ U w Q z 0 L1J W W Q) 0 0 U U �0 ko w I- 0 k0 n 0 0 DATE 03125116 DRAWN BY C. SHIFFLETT DESIGNED BY C. SHIFFLETT CHECKED BY C. KOTARSKI SCALE 1 "=40' 0 ®Q u� W H Q > LLLI O '..�� m L.L W O ( ^ � vJ V O l J JOB NO. 37545 SHEET NO. C5.1 i ? ,'&, laa W Y w w W r �? CRKIG �7 J. as O TARS Kf > > d Lics No. 04020418507 > > _j J CDCD M. 119 fG ar Op O p C)C) pit. 580 " r� 0 560 0 4 N 56000 Lb o z z wcn_ o ci)tQ-O> cn�Z w r a0 Of wcnl-z wcn_ Z �� Z w w :cn _ E Z Z U p 575 -� 575 555 555 _.. _ -------.._.._______. .�.._......_-,..........___..............__.....__---..............._...............Q..__-_._._........_ ......�..._..._.-_.-`----...-._ N O Uj O z Z M O w N SHOULDER ELEVATION = 570.50 U v > SHOULDER ELEVATION = 548.38 p O o U. - w O 570--............_570 550 _.......- -- ...._.._550 ¢ w _..._..... __..... _ .. _._ _............ _. _._......... ,J LU M Z 00 J0 PROPOSED GRADE EXISTING GRADE (D W (j M PROPOSED GRADE z - U � j Ui W 565 dl 565 545 545 0 - .._.... _...__._..... _...-....... , _.......__.._........ - .............-._.... ... .._.. - -- ... - ... x cn z U 69 a o, 8� RTLu ro 560_.......... _....._560 540@......... 'O540 w ----------- ......._......--.........- -....... -- -._........ to v� EXISTING GRADE O UO ZD > O 555 555 535 ---------------- __.535 (D j O OO OU 0 0 w w w rn rn 550 550 530 530 o o 0 z O H Ln DATE 5 03125116 O 9+50 10+00 11+00 9+50 10+00 11+00 } DRAWN BY CULVERT A CULVERT B C. SHIFFLETT HORIZ SCALE: 1 "=40' HORIZ SCALE: 1 "=40' DESIGNED BY VERT SCALE: 1 "=4 VERT SCALE: 1 "=4 0 0 50 C. SHIFFLETT PROFILE SCALE CHECKED BY C. KOTARSKI SCALE HY-8 Analysis Results HY-8 Analysis Results ® AS SHOWN • Culvert Summary Table - 18" HDPE Culvert Summary Table - 18" HDPE • Culvert Crossing: Culvert A Culvert Crossing: Culvert B Discha Total Culvert Headw Inlet Outlet Flow Normal Critical Outlet Tailwat Outlet Tailwat rge Discha Discha ater Control Control Type Depth Depth Depth er Velocity er Names rge rge Elevati (ft) (ft) (ft) Depth (ft/s) Velocity (cfs) (cfs) on (ft) Depth(f Depth(f (ft) (ft/s) t;) 10 year 13.53 13.53 1566.01 1.01 10,W 11-S2n 0.36 0.72 10.44 10.34 18.13 13.37 25 year L.23 14.23 1566.13 1.13 0.0* 11-S2n 0.39 0.79 10.50 0.38 8.28 3.55 Discha Total Culvert Headw Inlet Outlet Flow Normal Critical Outlet Tailwat Outlet Tailwat rge Discha Discha ater Control Control Type Depth Depth Depth er Velocity er Names rge rge Elevati (ft) (ft) (ft) Depth (ft/s) Velocity (cfs) (cfs) on (ft) Depth(f Depth(f (ft) (ft/s) 10 year 18.40 8.40 1546.47 1.87 0.0* 5-S2n 10.58 11.12 10.74 10.54 9.64 .30 25 year 10.07 10.07 546.85 2.25 0.0* 5-S2n 0.64 1.22 0.83 0.59 10.09 14,52 U. 25-YR FREEBOARD: SHOULDER EiLEV. - Hw -> 570.50 - 566.13 = 4.37' 25-YR FREEBOARD: SHOULDER ELEV. - Hw -> 548.38 - 546.85 = 1.53' 0 Crossing - Culvert A, Design Discharge - 4.2 cfs Crossing m Culvert B, Design Discharge _ 10.1 cfs Culvert - 18" HDPE, Culvert Discharge - 4.2 cfs Culvert - 18" HDP.1:, Culvert Discharge - 1 efs _ O Critical Normal _._._Profile Tailwater Headwater Streambed Critical Normal Profile Tailwater Headwater Streambed __..._.__.___.__._ _...._.......... _. _.______......._....... ....... ......... ......... _ - .............. ........... _ __.____._..._ __ __.__ __.._...__. ................_ .. _............. ......_.. 570 t' 548 x> U t J i J Q = 569 d. , V J F--ll a U a 547 '` > LU 66 l m 568 J V . 1 / LIJ M - �{it- 567' 546 N s s 4 m z q 566 � ,t �rly > > 545 1 U i w 565 `. W h F 564 .544 ...� 563_.j..�.- U ` 116 543 562 ' a 561 -_. _ 542 f I : Y :.. � <{?::.:,,....lz;'{:7.cf�.., .:..,.i�;�"'�lilJ.,...u...:M:�i.i.ii.a$c....iiai.,M.L:...;..:3uF.�uL..lu.:x.....uU/.:F":::,::::7!"'7Yi7YS%u...'sa4ys�:✓%✓''',Gc.'y%c uw.9&rco'xwl"�.«...::i:;.� /,a .,.,,,,.� ..�.,,... ,�,,,..".' ".,.":... -20 -10 0 10 20 30 40 50 60 70 80 90 -10 0 10 20 30 40 50 60 � Station (f$) Station (ft) Q 3 I DRAINAGE AREA TO CULVERT A = 2.26 AC DRAINAGE AREA TO CULVERT B = 4.770 AC C= 0.39 C= 0.44 TC= 20 MIN TC= 20 MIN 0 1(10) = 4.0 IN/HR Q(10) = 0.39(2.26)(4.0) = 3.53 CFS 1(10 = 4.0 IN/HR Q(10) = 0.44(4.77)(4.0) = 8.40 CFS JOB NO. 1(25) = 4.8 IN/HR Q(25) = 0.39(2.26)(4.8) = 4.23 CFS 1(25) = 4.8 IN/HR Q(25) = 0.44(4.77)(4.8) = 10.07 CFS 37545 d h M _ CULVERT A CALCULATION CULVERT B CALCULATION SHEET NO. M O No Scale C6, 0 7 i0 S CL' x0 i <n z x0 x � CRAfG Iff, I. KOTAR KI Lic. No. 0412048507 r3 �� 71191 (C "I i4k "ONAL E u vi N � O � c, W N E LU ul Q .> Q w (v m tl J t c0 (9 uw U M >'0uj U_ U)N I— N Ln � O M d' J W SCALE 1 "=60' 0 60' 120' DATE 03125116 DRAWN BY C. SHIFFLETT DESIGNED BY C. SHIFFLETT CHECKED BY C. KOTARSKI SCALE 1 "=60' JOB NO. 37545 SHEET NO. C7.0 5 SCALE V=60' 0 60' 120' Nr - Q G�, q P, ('f Fbboa t C R.A T� V1. I. z s ' ! -RS "<I Lie. No. 0402048507 INN SAL �. E 0 u vi N � O 0 o, E u, N E F- Lu Q LL. N LL Lu=_ LuO >n Q -i v M a J w H rn U W U M w vi QQ;;dt U') x " =v�-.D F- N Ln M d' J w F- DATE 03125116 DRAWN BY C. SHIFFLETT DESIGNED BY C. SHIFFLETT CHECKED BY C. KOTARSKI SCALE 1 "=60' z Q a Q W rf" 0 (D 1—HUj G( i z J F--i Q 7- LU ® o z W z � oO U J W z W < Lr) IOB NO. 37545 SHEET NO. C7.1 iu rr TOP OF DAM = 536.00 T �1� 1 p' 10' SAFETY 8'-`� 16' GRASS SPILLWAY 1-YR ELEV = 532.31 Ex anded BENCH P" Steel Grate (T�p.) ... __ WELD (TYP.) ELEV. 534.20 2-YR ELEV = 533.30 12„ 1.12' FREEBOARD 10-YR ELEV = 533.89 ,,) o 20(0 100-YR ELEV. 534.88 100-YR ELEV = 534.88 CR_ifs Iff j. K (YFARSKI " 1/4" STEEL ANGLE Lwo IMPERVIOUS CORE L ic. o. 0- �is2i��f&��07 (TYP.) j .gym CREST ELEV. 533.20 AND CUTOFF TRENCH 71191 16 Expanded Steel Grate Opening Detail 21-3 LB PER FT2 1� yr3,�^�AAj ti EEL " / �y 3.7 Not To Scale EXPANDEGRATE DON PLUG 3 ORIFICE -a`,et' AL Low Flow OPENING Z.s 2.Ze 1.03" Zo3' FROM SB-1 v' 3.0 1 3.44 1.940" .264' / „ 48" RCP RISER S W/ ANTI -VORTEX DEVICE E INV IN 529.40 (6" PVC) i "- INV OUT 529.30 (24" HDPE) EW-1En �„ o /tb" HOLES r 2 E AS SHOWN LU N !_ WELD (TYP.) 3" ORIFICE W/ TRASHRACK 529.50 r`� 90.00 - 24" �� HDPE @ 2 78a/0 w a > 11 2°X11 2"X1 4" ES-1 / / / POND BOTTOM 529.50 i 3 ¢ H STEEL ANGLE (TYP.) ti o 6'- 6" PVC @ 1.7% 8' DIA. X 1.5' l" ,� INV 526.80 LU LU 0 :� - 1 1/2" X 1/4" STEEL „STOCK WELDED TO CONIC. BASE f ! 3 3 W aJ M ........... . ................................................................. BASE AS SHOWN...................... 4-1 w .� o � O GENERAL NOTES FOR TRASH RACKru EMBED 6" IN CONCRETE , � r 0 a . 1. STEEL TO CONFORM TO ASTM A-36. NOTES: � co (.9(. W U z U 2. ALL SURFACES OF TRASH RACK(S) MUST BE HOT DIPPED GALVANIZED AFTER FABRICATION. 1. TRASH RACK TO BE INSTALLED ON 3" ORIFICE AS SHOWN ON RIP -RAP OUTLET x 3:0 U.1 DETAIL ON THIS SHEET OR APPROVED EQUAL. PROTECTION >< Qa LLo 3. TRASH RACK(S) TO BE FASTENED TO WALL WITH 1/2" MASONRY ANCHORS. TRASH 2. IMPERVIOUS CORE AND CUTOFF TRENCH SHOWN FOR RACK(S) TO BE REMOVABLE. _ Cn t'v 0 z INFORMATIONAL PURPOSES ONLY. FINAL DESIGN TO BE PROVIDED = � O 4. TRASH RACK(S) TO BE CENTERED HORIZONTALLY OVER THE OIPENING. BY GEOTECHNICAL ENGINEER. L9 - 5. FABRICATOR MAY MODIFY COMPONENTS OF TRASH RACK FRANAE TO IMPROVE (V > CONSTRUCTABILITY OF TRASH RACK. MODIFICATIONS MUST BE APPROVED BY M � MCDPS PRIOR TO FABRICATION. It QUALITY CALCULATIONS: LU ORIFICE TRASH RACK DETAIL ~ w DETAIL TAKEN FROM MONTGOMEIRY COUNTY, MD Tv = 13,147 CU. FT. ILL! � LU WATER RESOURCES SPECIFICATIONS VOLUME PROVIDED AT RISER CREST (533.20) = 17,395 CU. FT. O OU 0 O 24-HR DRAW DOWN ORIFICE SIZING CALCULATION: _ z Qavg = 13,147 CU.FT. / (24hr)(3,600 s/hr) = 0.152 CFS 0 O U O U Qmax = 2(Qavg) = 0.304 CFS = REQUIRED ORIFICE AREA = 0.304 CFS / 0.6 (64.4)(h) = 0.033 SQ.FT. -> DIAMETER = 2.46" o ko � ORIFICE DIAMETER PROVIDED: 3" (MINIMUM RECOMMENDED) > LLJI- Lu rn o 0 z O SWM-1 - EXTENDED DETENTION FACILITY DETAIL LEVEL ONE DATE No Scale 03125116 n = 0.20 �2'1 7' Slope = 1.5% I n = 0.035 r2'j 24' Slope = 1.5% >_ DRAWN BY -.7 �`^ �� C. SHIFFLETT 1.33' 1.33' DESIGNED BY C. SHIFFLETT 0 GRASS CHANNEL GRASS CHANNEL CHECKED BY ® ® C. KOTARSKI QUALITY CALCULATIONS: EROSION / CAPACITY CALCULATIONS: QUALITY CALCULATIONS: EROSION / CAPACITY CALCULATIONS: ® SCALE (PER SPECIFICATION NO. 3, VERSION 1.9.) (PER SPECIFICATION NO. 3, VERSION 1.9.) DRAINAGE AREA TO GRASS CHANNEL A = 2.75 AC DRAINAGE AREA TO GRASS CHANNEL A = 5.179 AC ® 1 "=40' DRAINAGE AREA TO GRASS CHANNEL A = 2.750 AC DRAINAGE AREA TO GRASS CHANNEL A = 5.179 AC Q(2-YR) = 3.50 CFS Q(2-YR) = 1.64 CFS 24„ 1" RUNOFF CALCULATION PER VSMH 11.5.3 AS REFERENCED Q(10-YR) = 4.83 CFS IN SPECIFICATION 3, VERSION 2.0, PAGE 12.: 1" RUNOFF CALCULATION PER VSMH 11.5.3 AS REFERENCED Q(10-YR) = 9.57 CFS IN SPECIFICATION 3, VERSION 2.0, PAGE 12.: TW ELEV. 531.00 MAXIMUM MAXIMUM Q(2-YR) VELOCITY = 5 FT/S Q(2-YR) VELOCITY = 5 FT/S 1. CN CALCULATION: CN = 1000 Q(2-YR) VELOCITY PROVIDED = 0.45 FT/S 1. CN CALCULATION: CN = 1000 Q(2-YR) VELOCITY PROVIDED = 0.29 FT/S [10+ 5(1 In) + 100a - 10(Qa2+ 1.25Qa)05] [10+ 5(1 In) + 10Qa - 10(Qa2+ 1.25Qa)0.5] Q(10-YR) CAPACITY: Q(10-YR) CAPACITY: BASKET EDGE - Qa = Tv / Drainage Area -> [2582 Cf / (2.75 Ac X 43,560 Sq Ft)] X 12 In. = 0.2159 In MINIMUM FREEBOARD = 0.5' - Qa = Tv /Drainage Area -> [5984 Cf / (5.18 Ac X 43,560 Sq Ft)] X 12 In. = 0.318 In MINIMUM FREEBOARD = 0.5' D(10-YR): Z 12" D(10-YR): 0.76' 0.83' 24 LONG EPDXY COATED #4 REBAR CN - 1000 CHANNEL DEPTH: 1.33' CN - 1000 CHANNEL DEPTH: 1.33' Q O [10+ 5(1 In) + 10(0.259) - 10((0.259) + 1.25(0.259))0.5 ] FREEBOARD PROVIDED = 0.57' [10+ 5(1 In) + 10(0.31 8) - 10((0.318) + 1.25(0.318))0.5 ] FREEBOARD PROVIDED = 0.5' r--� f BW ELEV. 530.00 CN 88 CN=90 2. Tc: 24.2 MINUTES (REFER TO CALC BOOK) 2. Tc: 26.1 MINUTES (REFER TO CALC BOOK) :D EMBED 8" 3. 1" RAINFALL WATER QUALITY FLOW RATE, q Tv 3. 1" RAINFALL WATER QUALITY FLOW RATE, qPT, Q P U la= 0.273 (FROM TR-55 TABLE, BASED ON CN = 88) la= 0.222 (FROM TR-55 TABLE, BASED ON CN = 88) 06 STONE FILL qp,v = q0 X A X Qa (% from Exhibit 4-IA in TR-55; A in Square Miles) gpTv = % X A X Qa (q,, from Exhibt 4-IA in T'R-55; A in Square Miles) Al q = 72 X 0.0043 Mi X 0.259 = 0.08 CFS PT� gPTv = 95 X 0.008 Mi X 0.318 = 0.242 CFS z CHANNEL DESIGN: CHANNEL DESIGN: 0 MAXIMUM DEPTH FOR THE Tv PEAK FLOW (1" RAINFALL) = 3" MAXIMUM DEPTH FOR THE Tv PEAK FLOW (1" RAINFALL) = 3" + LLJ DEPTH PROVIDED = 0.84" DEPTH PROVIDED = 1.08" (�"� L v~� Q MINIMUM HYDRAULIC RESIDENCY TIME = 9 MINUTES MINIMUM HYDRAULIC RESIDENCY TIME = 9 MINUTES Q w z HYDRAULIC RESIDENCY TIME PROVIDED = L / V(1") / (60 S/MIN) HYDRAULIC RESIDENCY TIME PROVIDED = L / V(1") / (60 S/MIN) �� m 125' / (0.15 FT/S) / 60 = 13.89 MINUTES 1151 (0.11 FT/S) / 60 = 17.42 MINUTES Q 0 w 0.. O 41 ED GABION BASKET FOREBAY WALL ASS CHANNEL A CALCULATIONS LNcale GRASS CHANNEL B CALCULATIONS LLLI D Z No Scale No Scale f n U v J W WATER QUANTITY ANALYSIS WATER QUAILITY ANALYSIS WATER QUANTITY IS ADDRESSED BY THE USE OF A PROPOSED EXTENDED DETENTION SWM SITE DATA Q FACILITY. THE FACILITY IS DESIGNED TO DETAIN AND RELEASE STORMWATER AT AN POST DEVELOPED SITE AREA: 23.01 ACRES APPROPRIATE RATE FOR THE 1, 2, AND 10 YEAR DESIGN STORM EVENTS. THE EMERGENCY IMPERVIOUS = 1.77 ACRES 6' 3' SPILLWAY IS DESIGNED SUCH THAT A MINIMUM OF V FREEBOARD IS MAINTAINED. MANAGED 'TURF = 18.04 ACRE 0 Uj WOODS = 3.20 ACRE (--- 1-YEAR STORM EVENT CALCULATIONS: < TOTAL LOAD REDUCTION REQUIRED (LB/YR) = 2.86 LB/YR ENERGY BALANCE EQUATION: 0 MAX. Q(1YR POST-DEV) = 0.8[Q(1YR PRE-DEV)X(Rv(1YR PRE-DEV] / Rv(1YR POST-DEV) ON SITE TREATMENT PROPOSED GRASS CHANNEL - W / ' GRASS CHANNELS A & B AND EXTENDED DETENTION LEVEL ONE: HYDROGRAPHS WITHIN CALCULATIONS BOOK: TOTAL PHOSPHOROUS LOAD REDUCTION ACHIEVED (LB/YR) = 2.86 LB/YR;Q((1YR 6 >r OFROM PRE) = 6.23 CFS; RUNOFF VOLUME (Rv) = 0.974 AC -FT X 43,560 = 42,427 CFS Rw(1YR POST) = POST DEV. #1A + POST DEV. #1B + POST DEV. 12" J, C LO #1 + POST DEV. #1U = 4,274 CF + 9,428 CF + 11,491 CF + 19,639 CF = 44,832 CF (2) 6"X6" WOOD TIMBER^. �. r < = 0.8(6.23 CFS X 42,427 CU.FT.) / 44,832 CU.FT = 4.72 CFS 18" LONG #4 EPDXY POST DEVELOPED Q(1) = 2.80 CFS COATED REBAR VDOT STD. CLASS Al 2 AND 1(0-YEAR STORM EVENT SUMMARY: RIPRAP, JOB NO. Q(;2) PRE-DEV = 14.65 CFS Q(2) POST-DEV = 7.18 CFS 37545 Q(10) PRE-DEV = 47.46 CFS Q(10) POST-DEV = 46.24 CFS SHEET NO. LEVEL SPREADER DETAIL C7,2 No Scale U 0 0 0 2- ,z a 0 N N 7 a) 0 CU t 0 O _ �o �Of o O <n Lz �O 0 a� Co -_ _W C� a � O � Iu z N Oa Q x a) oZ_ 0 a� 2 0- a > N� =N U O Q) 0 N U L �