HomeMy WebLinkAboutZMA197900031 Approval - PC Zoning Map Amendment 1979-10-26Zvi OF ALBE/t'%
�RG114S
Department of Planning
ROBERT W. TUCKER. JR. 804/296-5823 RONALD S. KEELER
DIRECTOR OF PLANNING 414 EAST MARKET STREET ASSISTANT DIRECTOR OF PLANNING
CHARLOTTESVILLE. VIRGINIA 22901 DOUGLAS W. ECKEL
SENIOR PLANNER
September 26, 1979 NANCY MASON CAPERTON
PLANNER
Mr. Max Evans (DETTE CHARLIE KIMSEY
PLANNER
c/o Twin Group
2200 Old Ivy Road
Charlottesville, Virginia
Re: ZMA-79-31 Twin Group RPN
Planning Commission Action
Dear IYIr. Evans
This is to advise you that the Albemarle County Planning Commission at its meeting
September 25, 1979, by a vote of 7-2, recommended to the Board of Supervisors that
your request to rezone 16.0 acres from A-1 to RPN/RS-1 be approved subject to the
following conditions:
1. Approval is for a maximum of 10 lots. Location and acreages of land uses shall
comply with the approved plan. Open space shall be dedicated in accordance
with the number of lots approved in the final subdivision process;
2. No grading shall occur until the final subdivision process;
3. Compliance with the Runoff Control and Soil Erosion Ordinances;
4. Health Department approval of two septic field locations for each lot;
5._ County Attorney approval of Homeowners' Agreements prior to final subdivision
approval;
6. Fire Official approval of hydrant locations, prior to final subdivision approval;
7. All lots shall have access only on the interior road;
8. County Engineer approval of road plans prior to subdivision approval;
9. Virginia Department of Highways and Transportation approval of commercial
entrance and improvements to Route 654 prior to final subdivision approval;
10. No buildings shall be constructed on slopes of 250 or greater;
11. Only those areas where a structure, utilities, road or other improvement approved
in a final plan are to be located shall be disturbed; all other land shall remain
in its natural state;
12. All units shall be served by a public water supply system and approved by appropriate
agencies prior to final subdivision approval.
The Board of Supervisors will consider this request at its meeting October 17, 1979,
7:30 p.m., County Courthouse, Charlottesville, Virginia. YOU OR YOUR REPRESENTATIVE
MUST BE PRESENT FOR THAT MEETING.
Sincerely,
6,t,ane,'Gloeckner
ng Department
CC: Lettie Neher, Clerk to the Board -
Pi1t
September 25, 1979
STAFF REPORT
ZMA-79-31. Twin Group RPN
( Jessup Property )
Requested Zoning: RPN/RS-1
Existing Zoning: A-1 Agriculture
Acreage: 16.0 acres
Location: Property is described as Parcel 28 (portion of) on Tax Map 60, and is
located on the southwest side of Route 654, approximately 2 miles north-
west of the Barracks Road Shopping Center.
Character of the Area
The site is bordered to the north by the Montvue Subdivision, to the southeast by the
Colthurst Subdivision and the Old Salem Apartments are to the east of this parcel.
The topography of the site ranges from 5% to 50% slopes with the majority being in
rolling to moderate slopes ( 10% to 24.9% ).
Existing Zoning in the Area
Montvue and Colthurst Farm are zoned R-1 and other parcels surrounding the site are
zoned A-1, Agricultural. The Old Salem Apartment site is zoned R-3.
Comprehensive Plan Recommendation
The site is located in the urban area and is recommended for low density residential,
with a recommended density of one to four units per acre.
Condition of Roads Serving the Proposal
The 1978 traffic count on this section of Route 654 is 4,579 vehicle trips per day
and is currently listed as tolerable.
Comparative Impact Statistics
Existing A-1 RPN/RS-1
Dwellings approx. 7 10
Population 21.7 31
Vehicle Trips Per Day 49 70
School Impact 3.99 4.7
History
The Board of Supervisors denied ZMA-79-13 on July 18, 1979.
Land Use Data
Number of Lots
Total Area
Estimated Total Lot Area
Estimated Total Open Space
Range in Lot Size
Proposed Gross Density
Gross Density Permitted
Proposed Net Density
RPN Proposal
10
16.0 acres
9.43 acres
6.12 acres ( 38% )
0.918 acres to 1.00 acre
1.6 acres/unit
1 du/gross acre
0.943 acres/unit
The applicant proposes 10 single family lots with a gross density of 1.6 acres/unit
with 6.12 or 38% of the land in open space. The site is proposed to have access on
private roads. Public water is available and is proposed to be utilized for this
proposal.
Staff Comment
The Virginia Department of Highways and Transportation has recommended that the road
be widened along the development side of the road to accommodate a left turn lane
for vehicles headed northwest out of Charlottesville. Site distance can be obtained
for a commercial entrance.
The staff has some concern about the steep slopes as they relate to the building sites
shown on the plan. Mr. Yager, the Site Review Committee's representative from the
U. S. Soil Conservation Service commented that the steep slopes would create
"excessive erosion when disturbed" without proper soil erosion preventive measures.
Staff recommends approval subject to the following conditions:
Recommended Conditions of Approval
1. Approval is for a maximum of 10 lots. Location and acreages of land uses shall
comply with the approved plan. Open space shall be dedicated in accordance with
the number of lots approved in the final subdivision process;
2. No grading shall occur until the final subdivision process;
3. Compliance with the Runoff Control and Soil Erosion Ordinances;
4. Health Department approval of two septic field locations for each lot;
5. County Attorney approval of Homeowners' Agreements prior to final subdivision
approval;
6. Fire Official approval of hydrant locations, prior to final subdivision approval;
7. All lots shall have access only on the interior road;
8. County Engineer approval of road plans prior to subdivision approval;
9. Virginia Department of Highways and Transportation approval of commercial entrance
and improvements to Route 654 prior to final subdivision approval;
10. No buildings shall be constructed on slopes of 25% or greater;
11. Only those areas where a structure, utilities, road or other improvement approved
in a final plan are to be located shall be disturbed; all other land shall remain
in its natural state;
12. All units shall be served by a public water supply system and approved by appropriate
agencies prior to final subdivision approval.
Department of Planning
ROBERT W. TUCKER. JR. 804/266-5823 RONALD S. KEELER
DIRECTOR OF PLANNING 414 EAST MARKET STREET A6816TANT DIRECTOR OF PLANNING
CHARLOTTESVILLE. VIRGINIA 22001 DOUGLAS W. ECKEL
!SENIOR PLANNER
June 27, 1979 NANCY MASON CAPERTON
PLANNER
Twin Group IDETTE CHARLIE KIMSEY
ego Max Evans PLANNER
2200 Old Ivy Road
Charlottesville, Virginia, 22901
Re: PLANNING COMMISSION ACTION
Request for ZMA-79-13
Dear Mr. Evans:
This is to advise you that the Albemarle County Planning Commission at its meeting
June 26, 1979, recommended by unanimous vote to the Board of Supervisors that
your request for ZMA-79-13 be approved subject to the following conditions;
1. Approval is for a maximum of 12 lots. Location and acreages of land uses shall
comply with the approved plan. Open space shall be dedicated in accordance with
the number of lots approved in the final subdivision process;
2. Acreages approved for open space shall not include roads;
3. No grading shall occur until the final subdivision process;
4. - Compliance with the Runoff Control and Soil Erosion Ordinances;
5. Health Department approval fo two septic field locations on each lot;
6. County Attorney approval of Homeowners' Agreements prior to final subdivision
approval to include the use of open s aca for septic facilities, and for P P P
..private
road maintenance agreements;
7. Fire Official approval of hydrant locations, prior to final subdivision approval;
8. All lots shall have access only on the interior road;
9. County Engineer approval of road plans prior to subdivision approval;,
10. Virginia Department of Highways and Transportation approval of commercial
entrance and improvements to Route 654 in accordance with the Virginia
Department of Highways and Transportation letter dated June 6, 1979, prior to,
final subdivision approval;
11. No buildings shall be constructed on slopes of 25% or greater and appropriate
g;
changes made on the plan for building site locations;
12. Only those areas where a structure, utilities, road or other improvement approved
'
in a final plan are to be located shall ,be disturbed; all other land shall remain in
its natural state;'
13. All units shall be served by a public water supply system and approved by appropriate
agencies prior to final subdivision approval;
14. Soil study prior to final plat review by the Planning Commission.
The Albemarle County Board of Supervisors will consider this request at its meeting
Wednesday, July 18, 1979, 7:30 p.m., County Courthouse, Charlottesville, Virginia.
YOU OR YOUR REPRESENTATIVE MUST BE PRESENT FOR TIIIS MEETING.
Sincerely,
neGloeckner
j
anning Department
�
STAFF REPORT
June 26, 1979
ZMA-79-13 Twin Group RPN
{ Jessup Property )
Requested Zoning: RPN/RS-1
Existing Zoning: A-1 Agriculture
Acreage: 16.0 acres
Location: Property is described as Parcel 28 ( portion of ) on Tax Map 60 and is
located on the southwest side of Route 654, approximately 2 miles north-
west of the Barracks Road Shopping Center.
Character of the Area
The site is bordered to the north by the Montvue Subdivision, to the southeast by the
Colthurst Subdivision and the Old Salem Apartments are to the east of this parcel.
The topography of the site ranges from 5% to 50% slopes with the majority being in
rolling to moderate slopes ( 10%,to 24.9$ ).
Existing Zoning in the Area
Montvue and Colthurst Farm are zoned R-1 and other parcels surrounding the site are
zoned A-1, Agricultural. The Old Salem Apartment site is zoned R-3.
Comprehensive Plan Recommendation
The site is located in the urban area and is recommended for low density residential,
with a recommended density of one to four units per acre.
Condition of Roads Serving the Proposal
The 1978 traffic count on this section of Route 654 is 4,579 vehicle trips per day and
is currently listed as tolerable.
Comparative Impact Statistics
Existing A-1 RPN/RS-1
Dwellings approx. 7 )
Population 21.7
Vehicle Trips Per Day 49 ?C
School Impact 3.99 A4,
Land Use Data
Number of lots
Total Area 16.0 acres
Estimated total lot area . acres
Estimated total open space 6.12 acres pit)
Proposed gross density f' acres/unit
Gross density permitted du/gross acre
t.
RPN Proposal
The applicant proposes /0 single family lots with a gross density of s 11(,-4u
Wj &AZ ®r aj c=pen space. The site is proposed to have access on private roads.
oJv-ka Ia4u4.
Public water is available and is proposed to be utilized for this proposal.
Staff Comment
The Virginia Department of Highways and Transportation has recommended that the road
be widened along the development side of the road to accommodate a left turn lane
for vehicles headed northwest out of Charlottesville. Sight distance can be obtained
for a commercial entrance.
The staff has some concern about the steep slopes as they relate to the building
sites shown on the plan. Mr. Yager, the Site Reivew Committee's representative from
the U. S. Soil Conservation Service commented that the steep slopes would create
"excessive erosion when disturbed"
Recommended Condtions of Approval
1. Approval is for a maximum of 10 lots. Location and acreages of land uses shall
comply with the approved plan. Open space shall be dedicated in accordance with
the number of lots approved in the final subdivision process;
�,No grading shall occur until the final subdivision process;
. Compliance with the Runoff Control and Soil Erosion Ordinances;
q-Health Department approval of two septic field locations for each lot;
6-County Attorney approval of Homeowners' Agreements prior to final subdivision
approval to include the use of open space for septic facilities, and for private
road maintenance agreements;
&.Fire Official approval of hydrant locations, prior to final subdivision approval;
7.All lots shall have access only on the interior road;
b.County Engineer approval of road plans prior to subdivision approval;
Virginia Department of Highways and Transportation approval of commercial entrance
and improvements to Route 654 prior to final subdivision approval;
16.No buildings shall be constructed on slopes of 25% or greater-
and q9prepT4*te-
11,Jnly those areas where a structure, utilities, road or other improvement approved
in a final plan are to be located shall be disturbed; all other land shall remain
in its natural state;
17.All units shall be served by a public water supply system and approved by appropriate
agencies prior to final subdivision approval.
4
}
{
a
County of Albemarle
Page -4-
June 6, 1979
26) Cotten Final Plat, °pate 676 & Pnuto ()77: Property frontage is ade-
quate for private entrance. We recommend improvements to the frontage along both
roads placing the shoulder catch point at 15' from the center 14ine of the existing
road, and the ditch where necessary at 181. The pipe at the intersection of Route
676 and Route 677 will -need to be relocated. his will be Ucne at Department expense.
_W+ 2_7) Adventure Bound School The entrance while
exi.stin does not have adequate sight distan-
ce to.Jarc^e es TI. tie would recommend
frontage improvements placing the shoulder at 15' from the center of the existing
road and the ditch at 181.
---28) Gordonsville Electrical Substalion Site Plan. Poute 6L6: The entrance
location appears to have adequate sight distance. A. commercial entrance will be re-
quired, however, before the permit can be approved a determination of the number of
vehicles using the entrance needs to be given. We would reco =end that the frontage
of the property along Route 646 be improved placing the shoulder catch point at 15,
and the center of the ditch at 18' from the existing center line of the road.
--29) FHM Partnership/roctorIs Coilrt Office Bldg.. Ro_,te 7L : The entrance
is adequate for the proposed development. Precious improvements and dedication of
right of way arein accordance with the proposed plans for i-pro:-ement
of -Hydraulic
Road. The onsight drainage needs to be shown at the intersecting roads of tie r:arking .
lot. I believe those pipes currently flow wider the entrance to the south to a pro-
posed.pickup to be constructed by the Highway Department with=ydraulic Road improve-
ments. The new parking lot area shows a rip rap ditch with crainage leading to the
existing ditch line. This parking area should be graded to drain to the northern end
and an inlet placed to tie in with the existing 1211 corrugated metal pipe leading from
the upper parking area.
30) Layne Final Plat, Route 750: Sight distance is adequate for private
entrance. Sight distance could be improved to commercial standards, if necessary.
31) ZMA 79 13, Ttr n Group RPN (Jessup Property) Route 654, Barracks Rd._:
The entrance location sho,,nm appears to have adequate sight distance. t+e woud recom-
mend widening along the development side of the road to accommodate a left turn lane
for vehicles leaving Charlottesville headed northwest. A commercial entrance will be
required for this connection.
32) ZMA-79-18. Jarman Gap RPN, Route 641& 681: The entrance locations
have not been examined at this time to see if they have adequate=sight distance. We
would recommend that no access be allowed to Route 691 or Route 684 directly from the
adjacent lots. We recommend that the frontage of both roads be improved placing the
shoulder catch point at 15' from the center of the existing road and the ditch at 181.
The deceleration lane should be 12' wide, 200 feet long with a 200' taper on all en-
trances. Sufficient right of way for the turn lanes _should be dedicated.
Y
e