HomeMy WebLinkAboutWPO201900021 Bond Estimates 2019-10-22Project Name: UVA Research Park Loop Road VSMP Plan WP0201900021 WPO file number: WP0201900021 TM P(s): 03200-00-00-006 RO Date Estimate Completed: 10/22/19 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 stablization (PS, TS) 4.7 acres $5,000.00 $23,300.00 a silt fence (SF) 1316.0 ft $5.00 $6,580.00 3 tree protection (TIP) 458.0 ft $5.00 $2,290.00 3 safety fence (SAF) 200.0 ft $5.00 $1,000.00 4 diversion (DID, FD, RWD) 1260 ft $13.00 $16,380.00 5 temporary slope drain (TSD) pipe length 5 ft pipe diameter in $35.00 $2,075.00 13 Sediment Trap #1 14 earthwork for trap/basin 15 height of dam at toe so ft cut at high side ft i6 height of fill at faceft cut at face 4 ft 17 length of damft length of cut 35 ft 18 top width ft width of cut 20 ft 19 (area above transition 0 sf (area below transitii 112 sf ao (total width of dam) 6 ft (total width of cut) 42 ft ai (height below transitio 3 ft (depth below transit 3 ft as (area below transition 0 sf (area above transiti 54 sf 23 (total fill volume) 0.0 cy (total fill volume) 215.2 cy 24 length of spillway �ft (TOAL CY estimate 215 cy $13.00 $2,795.00 a5 width of spillway ft (spillway stone tons 17.6 tons $50.00 $880.00 26 Sediment Trap #2 27 earthwork for trap/basin 28 height of dam at toe 3 ft cut at high side ft 29 height of fill at face 2 ft cut at face 4 ft 30 length of dam 87 ft length of cutLM 40 ft 311 top width ft width of cut ft 32 (a,— Qoove transition 14 sf i-- —ow transitii 92 sf 33 (total width of dam) 6 ft (total width of cut) 35 ft 34 (height below transitio 1 ft (depth below transit 2 ft 35 (area below transition 2 sf (area above transiti 31 sf 36 (total fill volume) 51.6 cy (total fill volume) 182.2 cy 37 length of spillway Wft ft (TOAL CY estimate 199 cy $13.00 $2,587.00 38 width of spillway (spillway stone tons 12.1 tons $50.00 $605.00 39 structures for basin 40 riser height . 0 ft 10/23/2019 Project Name: UVA Research Park Loop Road VSMP Plan WP0201900021 WPO file number: WP0201900021 TM P(s): 03200-00-00-006 RO Date Estimate Completed: 10/22/19 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 41 riser diameter in (riser unit price) $0.00 $0.00 42 barrel lengthMin ft base plate or fdn - $200.00 $0 43 barrel diameter (barrel unit price) $0.00 $0.00 44 barrel collars $200.00 $0 45 baffle length =ft $50.00 $0 46 47 silt fence inlet protection (IP) 1 $100.00 $100.00 48 stone inlet protection (IP) 11 $200.00 $2,200.00 49 outlet protection (OP)-@ Str 200 length 9 ft width ft 1 $364.50 $364.50 50 outlet protection (OP)-@ Str. 300 length 9 ft width ft qJft 0 $243.00 $0.00 511 outlet protection (OP) length 0 ft width 0 $0.00 $0.00 52 channel (SCC, matted) length 0 ft width ft $0.00 53 check dam depth in channel 0 ft channel width ft 0 $0.00 $0.00 54 construction entrance (CE) 0 $2,500.00 $0.00 55 wash rack 1 $2,000.00 $2,000.00 56 paved construction entrance 1 $3,500.00 $3,500.00 57 rip -rap, placed depth 0 ft length -ft 58 width (tons) 0 tons $60.00 $0.00 59 6o survey and layout (price per 0.1 mi.) acres traps and basins $3,330.00 611 mobilization $2,500.00 62 Temporary Access road $500.00 cost sum $72,986.50 WP0201900021 UVA Research Park Loop Road _ESC_bond_est 102219Ja contingency $7,298.65 Total $80,290 10/23/2019