Loading...
HomeMy WebLinkAboutWPO201900021 Bond Estimates 2019-10-23Project Name: UVA Research Park Loop Road VSMP Plan WP0201900021 WPO file number: WP0201900021 TM P(s ): 03200-00-00-006 RO Date Estimate Completed: 10/23/19 Stormwater Management Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 permanent diversion or ditch 0 ft $13.00 $0.00 2 standard manhole frame top (not inlet) ea $500.00 $0.00 3 drop inlet or grate ea $3,500.00 $0.00 4 manhole structure (per ft. rise) ft $450.00 $0.00 5 pipe, rcp, cmp (15 to 48") in d ■ES-1,2 EC-1 0. ft $50.00 $1,000.00 6 aggregate base or drainage stone in d ft L ft W 0.0 ton $35.00 $0.00 7 8 earthwork for dry pond 9 height of dam at toe ft cut at high side ft 10 height of fill at face ft cut at face ft 11 length of dam ft length of cut ft 12 top width ft width of cut ft 13 (area above transition 0 sf (area below transitic 0 sf 14 (total width of dam) 0 ft (total width of cut) 0 ft 15 (height below transit 0 ft (depth below transit 0 ft 16 (area below transitim 0 sf (area above transitio 0 sf 17 (total fill volume) 0.0 cy (total fill volume) 0.0 cy 18 length of spillway -ft (TOAL CY estimate 406 cy Direct entry: Vol. from page $13.00 $5,281.90 19 width of spillway ft (spillway stone tons; 0 tons 62 Calc. booklet: 10,970cf $50.00 $0.00 20 structures for dry pond 21 riser height Lin ft22 riser diameterin (riser unit price) $0.00 $0.00 23 barrel lengthft base plate or fdn $200.00 $0 24 barrel diameter (barrel unit price) $50.00 $2,600.00 25 barrel collars 0 $200.00 $0 26 baffle length 0 ft $50.00 $0 27 28 trees ea $275.00 $0.00 29 shrubs ea $50.00 $0.00 30 seedlings ea $5.00 $0.00 31 underdrain (LF) ft $5.00 $0.00 32 biofilter soil mix (CY) cy $45.00 $0.00 33 trash rack/ anti vortex devices ea $1,500.00 $1,500.00 34 maintenance access road (LF) ft $50.00 $2,500.00 10/23/2019 Project Name: UVA Research Park Loop Road VSMP Plan WP0201900021 WPO file number: WP0201900021 TM P(s ): 03200-00-00-006 RO Date Estimate Completed: 10/23/19 Stormwater Management Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 35 rip -rap, placed depth ft length _ft 36 width (tons) 0 $60.00 $0.00 37 survey and layout (price per 0.1 mi.) acres basins $0.00 38 mobilization $2,500.00 39 as -built drawings (per facility) ea $2,000.00 $2,000.00 40 materials testing (per facility) ea Mea $2,000.00 $2,000.00 41 compaction testing (per dam) $3,000.00 $3,000.00 42 43 earthwork for Stormtech SC-740 chamber system -direct entry 44 (TOAL CY estimatcr 0 cy $13.00 $0.00 45 manufactured facilities (attach manufacturer's or contractor's price as a base) $23,000.00 46 Ref email, 10/22/2019 5:50 PM, James Clark (james.clark@ads-pipe.com) Mfr. quote: 47 'For the Stormtech, I would estimate $8000 Material and $400o Labor for the installation; for the Barracuda Unit - $8000 and $3000' - Total = $23,000 cost sum $45,381.90 contingency $4,538.19 WPO201900021 UVA Research Park Loop Road_SWM_bond_est 102319ja Total $49,930 10/23/2019