Loading...
HomeMy WebLinkAboutARB201800001 Plan - Approved 2018-04-16LOWER LEVEL OF ACM PANELS TO CONTINUE TO BACK OF BUILDING MAINTAIN UPPER LEVEL OF ACM PANEL TO THIS POINT — SEE ELEVATIONS EXTERIOR — ACM PANELS MEZZANINE PLAN SCALE; 114" = 1"-0" O 5 10 15 m a d LITTLE RHINO STUDIO ARCHITECTS ub as rwt xx. aearr, rn aroz rape. aw.Nro.aw uw.m. REVISI IONS DATE DESCRIPTION 1D/TE WVC FACADE j}{LS sREjjL-:)( I I J/7/B A B REVL FACADE 316 ROB BARBER ANDUMN "1 . Na 3885 ISSUE: PROGRESS DRAWN BY: RBA CHECKED BY: 6 F Q � o WW J > Z w FW§y z N a� N &�W W V S m PRp1EGT NUMBER: 1612 —ET NUMBER_ M.9 APRIL 16, 2018 n in I O co PROVIDE BRACING FOR ACM PANELS WHERE ROOF LEVEL DROPS REPLACE EXISTING GUTTER & DOWN SPOUTS WEST ELEVATION SCALE; 1/4" : 1"-0" O 5 10 15 NEW 3' X 3' WINDOWS ADJUST LOCATION OF THESE TWO WINDOWS PENDING LOCATION OF DIAGONAL BRACING IN WALL —7 NEW ROOF NEW GUTTER NEW EXTERIOR WALL PANELS MFR STANDARD ----i HVAC UNITS TO BE LOCATED SO THAT �— EXISTING ROOF (INSTALL NEW MEMBRANE) THERE WILL BE NO VISIBILITY FROM EXISTING GUTTER RT 29 EXISTING CMU WALL EXISTING DOOR NEW ADDITION BEYOND NEW ACM PANEL SYSTEM ALL SIDES & FRONT a n d V LITRE RHINO STUDIO ARCHITECTS T .pw MwRpvY1Y�.YA IIYGL Tr{fb. tl1. 9V6.21a IlYliers REVISIONS DATE DESCRIPTION ID/24/16 EVE® FACADE REV&b'FACADE Cam/ vv�W- 3/2/S AIS - FAC ->rtFIS SHEET H 7 16BARr � eNDe D M N . saes c c� ssue PROGRESS DRAWN BY: RBA CHECKED BY: Z� °�o W J gW- W� J w� a �Eqo U Z2 a PROJECT NUMBER: 1612 SHEETNUMBER: 0 ¢9TE. APRIL 16, 2018