HomeMy WebLinkAboutARB201900051 Application 2019-04-22 Community De"elopmentDepartment
t t °' Albemarle Coup 401ty 'eRoadCharlottesville.VA22902-4596
` .41 ^ Voice:(434)296-5832 Fax:(434)972-4126
Planning Application
16 rR.*�•
PARCEL/ OWNER INFORMATION
TMP 07800-00-00-005A0 Owner(s): PANTOPS CORNER LC
Application# ARB201900051
PROPERTY INFORMATION
Legal Description ACREAGE
Magisterial Dist Rivanna Land Use Primar. Residential -- Single-family (incl. modular homes',
Current .FD Not in A/F District -, Current Zoning Primar; Highway Commercial v I
APPLICATION INFORMATION
Street Address [
Entered By
Jennifer Smithy.
Application Type Architectural Review Board {4;23/2019
Project WAWA AT PANTOPS CORNER - FINAL
Received Date 04/22/19 F.e:ei ed Date Final Submittal Date 04/22/19 Total Fees 1075
Closing File Date Submittal Date Final, Total Paid I 1075
Revision Number
Comments
Legal Ad _.—
SUB APPLICATION(s) —^
Type Sub Applicatio Comment
Final Site Development Plan 04/23/19
APPLICANT /CONTACT INFORMATION
ContactType Name Address CityState Zip Phone PhoneCell
CPO/ ri4ppb:ert PANTOPS CORNER LC 12704 CRIMSON COURT SUITE HENRICOVA 23233- 4348068549 •
pr:mery Certa= RV AN PERKINS- IaM LEY-HORN 1700 WILLOW LAWN DR., RICHMOND,VA 23230 .,=-_ --'03
Signature of Contractor or Authorized Agent Date
Architectural Review Board Application~4
Part A: Applicant,Contact and Parcel Information
Project Name: V N/i NO at- Panttv5 COV
Tax map and parcel(s): 7 P; - pc(lv- V't-) Physical Street Address: -SD
Contact Person: g.y0 h QC y Y
Business Name: l inn(
Address lion 1/V ►nov\ City y-y C State V 11-S% Zip 23230
S�►F� Zoo
Daytime Phone( O-r (c5-'12- -f 10-5 Fax#( ) E-mail y/e/ .p VISP 14-11eY1VI-VW -Cum
Owner of Record: Pan 4b S Co(A t r L C
Address I I Q d &rr1: Sflee 71 City CAA//p#ej Val Statc UII Zip ZZ 103
Daytime Phone( 7J71 $'OG $SY9 Fax#( ) E-mail NIGgowan Ij5c' gtv►a.. I.Co"
Part 13: Review Type and Fee
Select review type
Review by the Architectural Review Board
Conceptual Plan/Advisory Review(for a Special Use Permit or a No Fee
Rezoning)
Preliminary/Initial Review of a Site Development Plan No Fee
Final Review of a Site Development Plan $1075.00
Amendment to an approved Certificate of Appropriateness $242.00
Building Permit Review $634.00
County-wide Certificate of Appropriateness
Structures 750'or more from the EC,no taller than 5 stories No Fee
Structures located behind a structure that fronts the EC No Fee
Personal wireless service facilities No Fee
Fencing or Equipment or Lighting No Fee
Additions to ARB-approved buildings No Fee
Minor amendments to site or architectural plans No Fee
Building permits where the change is 50%or less of the altered elevation No Fee
NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS.
FOR OFFICE USE ONLYBP# ARB#
Fee Amount$ I/v3 Date Paid 9 By who?Ofitta e # l 1±53 heck# 11 V By OS
1),G/600QC/0-fund,Liz
County of Albemarle Dept of Community Development,401 McIntire Rd,Char ottesville,VA 22902 Voice:(434)296-5832 Fax:(434)972-4126
10/2015 Page 1 of 2
OVER-
Part C: Description of Proposal
Describe your proposal.Attach a separate sheet if necessary.
1(7)14)."_ fY -tom ?vo\COt N G w0►-hve_ ►roc 1ci o nl
w i-hn 6 OYYNVi a
Part D: Applicant Agreement
Applicant must read and sign
• Each application package must contain(8)folded copies of all plans and documents being submitted.
Only(1)set of building material samples is required. All submittal items,including building material
samples,become the property of Albemarle County. Applicants are encouraged to maintain duplicate
copies of all submittal items in their own files.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without the appropriate checklist, completed, signed, and included with the required submittal
materials indicated on the checklist.
I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this
application. *See submittal requirements below. I also certify that the information provided on this application
and accompanying information is accurate,true, and correct to the best of my knowledge, and that the attached
plans contain all informa ' uired by the appropriate checklist.
S 1
Signature of owner,owner's representative Da1lz0t9
or contract purchaser
Printed name,Title V Daytime phone number of Signatory
*Ownership Information:
• If ownership of the property is in the name of any type of legal entity or organization including, but not
limited to,the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious
name, a document acceptable to the County must be submitted certifying that the person signing above has
the authority to do so.
• If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing
the owner's written consent to the application.
• If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is
evidence of the existence and scope of the agency.Attach the owner's written consent.
11/2010 Page 2 of 2
OVER—.
Paul Sprouse
From: Michael McGowan <mcgowan1950@gmail.com>
Sent: Wednesday,April 17, 2019 8:21 AM
To: Paul Sprouse
Cc: Justin Shimp; Perkins, Ryan; Dan Hargett
Subject: Re:WaWa Outparcel at Pantops Corner
Attachments: image001.png
Paul,
Thank you for the email. Rebkee(and affiliates)is the contract purchaser of this parcel and can seek approvals
necessary for obtaining permits. Please sign as necessary and proceed.
Best,
Michael McGowan
Manager, Pantops Corner,LC
Please send us a PDF of submittal.
On Tue, Apr 16,2019, 3:59 PM Paul Sprouse<psprouse@rebkee.com>wrote:
Good Afternoon Michael.
I just wanted to reach out and give you a quick update. We are working to submit our application to ARB for
final approval. Submittal deadline is 4/22 (next Monday)to go in front of ARB on Monday,June 3rd. I have
attached a copy of the application that we will submit and the last section either has to be signed by the owner
or contract purchaser. Are you ok if we sign as contract purchaser? If so, can you please send us a quick email
stating that you are ok with Daniel Hargett signing this application as contract purchaser. We just wanted to
have documentation as stated on the second page to make sure the County is ok.
Thanks for your help!
PAUL SPROUSE
psprouse@rebkee.com
2800 Patterson Ave.Suite 200,Richmond,VA 23221 RECEIVED
Direct:804-419-0747 1 Mobile:804-387-4449 APR 1 1 2019
rebkee.com COMMUNITY
1 DE JELOP,..,.:N T
OF
:4 I'rli Architectural Review Board
s
Final Review of a Site Development Plan
Submittal Requirements Checklist
Part A: Applicant, Contact and Parcel Information
Project Name: Wawa at Pantops Corner
Tax map and parcel(s): 07800-00-00-005A0 Physical street address: not yet assigned
Contact Person: Paul Sprouse
Business Name: The Rebkee Company
Address Suite 200, 2800 Patterson Road City Richmond State VA Zip 23221
Daytime Phone(8et 419-0747 Fax#( ) E-mail psprouse@a rebkee.ce
Part B: Submittal Requirements
Important:Submittal packages must contain 8 collated copies of all information unless otherwise indicated.
A. Written description of the proposal
® Provide a description of the proposal. Identify changes from the preliminary submittal. Indicate
specifically how each ARB comment from the preliminary review has been addressed. If there are no
changes proposed, then explain why.
® Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Site plan showing the following (drawn to the scale of 1"=20; clearly legible and folded):
® Location(s) of proposed building(s)on the site.
® Location of proposed parking, travelways, walkways and other improvements.
® Mechanical equipment, trash containers, loading and service areas, other similar features and
improvements, and associated screening.
® Existing and proposed topography drawn with contour intervals of 5-feet or less, and with sufficient
off-site topography to describe prominent and pertinent off-site features and physical characteristics,
but in no case less than 50-feet outside of the site.
® Location and size of existing and proposed utilities and easements. Identify type of utility and extent
of easement.
® Stormwater management plan.
® Location of retaining walls indicating top and bottom elevations, maximum wall height, and proposed
materials, with material and color samples.
® Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and
contact information for the firm preparing the drawings in the title block on all drawings. For revised
drawings, clearly identify revisions made.
1
OVER—>
C. Landscape plan showing the following (drawn to the scale of 1"=20'or larger,clearly legible and folded):
® Proposed landscaping that meets or exceeds the requirements outlined in the ARB guidelines.
® Existing landscaping to be removed. Include the location, size, and species.
® Landscape key including all landscape symbols and a description of what they represent.
® Location of existing and proposed tree lines and tree save areas.
® Location of existing natural features.
® Location of individual trees of 6-inch caliper or greater and all significant groups of trees indicated by
botanical name and caliper.
® Location and height of above-ground utilities and associated easements, and location of below-
ground utilities and associated easements.
® Stormwater facilities.
® Provide a signed, tree conservation checklist with all checklist items drawn on the landscape plans.
® Include tree protection fencing and limits of work on the landscape, grading and E&S plans.
D. Lighting plan showing the following (drawn to the scale of 1"=20'or larger,clearly legible and folded):
® Location of all proposed building and site lighting.
® Lighting schedule identifying all proposed light fixtures, poles and brackets.
® Manufacturer's cut sheets illustrating proposed lighting fixtures and information on illumination type,
intensity, style, shielding, color, finish, and installation height.
® Photometric plan addressing all fixtures and indicating that lighting does meet the requirements of
Section 4.17 of the Zoning Ordinance.
• Coordination of lighting with landscaping and other site elements.
E. Appearance of the building(s) (architectural elevations, color perspective sketches,site sections):
® Dimensioned architectural elevations of the proposed building(s). Elevations must be drawn to the
scale of 1/8"=1'-0". Include a building materials schedule and key on the elevation drawings.
Submittal of elevations that are not visible from the Entrance Corridor may be required to clarify the
overall building design.
® Site sections that clarify proposed changes in topography and illustrate the visibility of the proposed
development from the Entrance Corridor. Site sections shall indicate the finish floor elevation(s) and
roof height(s) relative to the natural elevations along the Entrance Corridor.
® One set of all building materials/colors.
® A floor plan adequate to show exterior walls, windows and doors.
F. Additional material
® Provide labeled, color, 8-Y2' x 11" photographs of the site as seen from both directions on the
Entrance Corridor.
® Color perspective images (for example: sketches, renderings, photosimulations, etc.) that show the
proposed development as seen from the Entrance Corridor are often useful for gaining a clear
understanding of the proposal. The ARB may require such images in certain cases when other
submitted documents do not answer all questions of building form, building details, materials, context,
topography, and/or visibility.
❑ Any additional material that is necessary to address comments made by the ARB at the preliminary
review with a memo itemizing how each of the preliminary comments have been addressed.
❑ The applicant is welcome to submit any additional material that will make the final site development
review more productive. Drawings or other submittal items that clarify topography, visibility, utilities,
landscaping, or other unique or unusual conditions are welcome.
2
OVER->
Part C: Applicant Agreement
Applicant must read and sign
• Each application package must contain (8) folded copies of all plans and documents being submitted.
Only (1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain
duplicate copies of all submittal items in their own files.
• All information in this checklist is required, unless specifically waived by the ARB, prior to processing
a final site development plan review by the ARB. Additional submittal materials may be required,
depending on the proposal.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without this checklist, completed, signed, and included with the required submittal materials
indicated on the checklist.
In representing the above referenced firm submitting this application for review, I hereby state that the
information provided in this application, and all accompanying information, is accurate, true and correct to
the best of my knowledge, and that the attached plans contain all information required by this checklist.
4/19/19
Signa ure person completing checklist Date
Ryan Perkins, Project manager 804 672-4703
Printed Name/Title Daytime phone number of Signatory
County of Albemarle Department of Planning and Community Development
401 McIntire Road, Charlottesville, VA 22902-4596
(434)296-5832 Tel www.albemarle.orq revised.10/24/2014
3
OVER—.