HomeMy WebLinkAboutARB201900109 Staff Report 2019-10-25TABLE A
This report is based on the following submittal items:
Sheet #
Drawing Name
Revision Date
C0.0
Cover
7/6/2019
C0.1
Notes
7/6/2419
C0.2
Existing Conditions
7/6/2419
C 1.0
Site Layout
7/6/2019
C LA
Site Details
7/6/2019
C1.B
Site Details
7/6/2019
C 1.1
Grading and Drainage Plan
7/6/2419
C 1.2
Utility Plan
7/6/2019
C1.3
Erosion & Sediment Control Notes & Details
7/6/2019
C 1.4
Erosion & Sediment Control Plan — Phase 1
7/6/2019
C 1.5
Erosion & Sediment Control Plan — Phase 2
7/6/2019
C 1.6
Stormwater Management Plan
7/6/2019
C 1.7
Stormwater Summary Plan
7/6/2019
C 1.8
Pipe & Inlet Calculations
7/6/2019
C 1.9
Stormwater Quality Calculations
7/6/2419
C2.0
Utility Profiles
7/6/2419
C2.1
Storm Profiles
7/6/2019
C2.2
Sight Distance Profiles
7/6/2019
D1.0
Demolition Plan
7/6/2019
L1.0
Landscape Plan
7/6/2019
L2.0
Landscape Notes & Details
7/6/2019
PH 1.0
Photometric Plan
7/6/2019
CE-1
Color Elevation
9/18/2019
A-1
Floor Plan/Door Schedule/Wall Details
9/12/2019
A-6
Roof Plan/Details
9/12/2019
15