Loading...
HomeMy WebLinkAboutARB201900060 Checklist 2019-05-21 791z -/- zafi- (0 .4.°11ALN, d?6toc (wp.,,,,,(4,7- ,___0)642(f-,L) 8 Architectural Review Board '"> ; . r Preliminary Site Development Plan Checklist for Completeness gyp collated copies A. Written description of the proposal Provide a general description of all proposed work. xplain how the proposal is compatible with the surrounding area and the Entrance Corridor. B. Site plan showing the following (drawn to the scale of 1"=20; clearly legible and folded): 1. ocation(s) of proposed building(s) on the site. LShematic layout of parking, travelways, and other improvements. Location of existing and proposed tree lines. Individually identify trees of a 6-inch caliper or greater. xisting and proposed topography drawn with contour intervals of 2-feet, and with sufficient off-site topography to describe prominent and pertinent off-site features and physical characteristics, but in no case less than 50-feet outside of the site. Location and size of existing and proposed utilities and easements. Identify type of utility and extent of easement. v© Conceptual stormwater management plan. Conceptual landscaping that meets or exceeds the requirements outlined in the ARB guidelines. LAD/Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. C. Appearance of the proposed building(s) ow a representation of the appearance of the osed building(s). This must include architectural elevations drawn to the scale of at least '=1'-0". This may also include perspective sketches, or photos of the proposed building(s). These documents should provide a basic understanding of: tsize, form, and scale of the building. Udd The rchitectural style of the building. ' The proposed building materials and color(s). D. Additional material friThrovide labeled, color, 8-%" x 11" photographs of the site as seen from both directions on the Er�tr-ance Corridor. The applicant is welcome to submit any additional material that will make the preliminary review more productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping, o ther unique or unusual conditions are welcome. Site sections may be useful. l/Signatures ;