HomeMy WebLinkAboutWPO201800007 Plan - E&S Minor Amendment 2019-05-09RIVANNA VILLAGE: EROSION AND SEDIMENT RIVANNAVILLAGE AMENDMENT AND P11ASE 11 CONTROL PLAN AMENDMENT 1 AND PHASE II ALBEMARLE COUNTY, VIRGINIA WPO 201800007 EROSION AND SEDIMENT CONTROL PLANS ALBEMARLE COUN I Y, VIRGINIA BCE PROJECT NARRATIVE SHEET INDEX Blossom Consulting and Engineering Inc. 1101 Professional Drive, Suite G Williamsburg VA 23185 p: 757-870-4825 1.) COVER THE PROPOSED EROSION AND SEDIMENT CONTROL PLAN FOR PHASE 2 OF RIVANNA VILLAGE 2.) EXISTING CONDITIONS AND DEMOLITION CONSISTS OF THOSE MEASURES NECESSARY TO PREVENT SEDIMENT LADEN RUNOFF FROM \Rp 3.) SHEET INDEX ENTERING DOWNSTREAM WATERWAYS. SPECIFICALLY, THIS PLAN ADDRESSES: Ail,�� 4a.) MASTERPLAN (STAGE 1) - ACCESS TO THE SITE �_' 4b.) MASTERPLAN (STAGE 2) / - STAGING AND STOCKPILE AREAS 5.) E&S STAGE 1: BLOCK G - CONSTRUCTION SEQUENCING - ON -SITE EROSION AND SEDIMENT CONTROL FACILITIES INCLUDING PERIMETER •i•� 6.) E & S STAGE 2: BLOCK G CONTROLS, SEDIMENT TRAPS, AND SEDIMENT BASINS f '•�. 7.) BLOCK G: CROSS SECTIONS - STABILIZATION PRACTICES TO BE IMPLEMENTED DURING CONSTRUCTION IN A I • A 8.) E & S STAGE 1: BLOCK I & J(EAST) �� PHASED MANNER TO TREAT DISTURBED AREAS �» � 9.) E & S STAGE 2: BLOCK I & J (EAST) THE PLAN IS DESIGNED TO SPECIFY MEASURES THAT WILL PROVIDE EROSION AND SEDIMENT ��.5 � ADO J � '•� lo. ) BLOCK I: CROSS SECTIONS "' a �'c�lJ CONTROL FOR DISTURBED AREAS ASSOCIATED WITH CLEARING, SITE GRADING, UTILITIES, `/ �•11.) E & S STAGE 1: BLOCK J (EAST) `� �•. ROADS AND STORM DRAIN INFRASTRUCTURE. PROPOSED EROSION AND SEDIMENT CONTROL �.,` 1`a 12.) E & S STAGE 2: BLOCK J (EAST) MEASURES INCLUDE: �•, 13.) BLOCK J (EAST): CROSS SECTIONS �� "„ '•� '�•• 14.) E & S STAGE 1: BLOCK J (WEST) 1) MINIMIZATION OF SITE DISTURBANCE TO PRESERVE STREAM BUFFERS AND RIPARIAN 7' aJb 393.00 30 388.6 386,e JJ A� ti88.8-` y 2) PHASED CONSTRUCTION PRACTICES WITH STABILIZED CONSTRUCTION ENTRANCES 3.,0 3887�'� 15.) E & S STAGE 2: BLOCK J (WEST) oFs _, 393.1 AND CONSTRUCTION ROAD STABILIZATION (WHERE NECESSARY). ;,, 385.c °tio 16.) BLOCK J (WEST): CROSS SECTIONS 38°� o 374-s � ��� KEY PLAN 3) PERIMETER CONTROLS INCLUDING TREE PROTECTION, DIVERSIONS, SWALES, � �� � 17.) E & S DETAILS (1) AND SILT FENCE �o.e 3 32 380.3 370 '57 '•� 18.) E & S DETAILS (2) • •'�' sT�9 f 4) COMBINATION OF SEDIMENT TRAPS AND BASINS USED IN COORDINATION WITH 3, �. DIVERSIONS AND SWALES �' ' ' 4' _ '0��9 376.4 : `°•°• 371.0 0 ''� 19.) E & S DETAILS (3) � ` -= �} 5) TEMPORARY AND PERMANENT STABILIZATION OF SLOPES AND GRADED �ti� 384 � 20.) E & S DETAILS (4) AREAS - •a� osw /% 21.) E & S NOTES ' EXISTING PHASE i st Yn SEDIMENT BASIN 361.2 G 3ss.s PHASE 2 AREAS CONSIST GENERALLY OF THOSE LOCATED ON THE EASTERN AND Q¢�• TO REMAIN SOUTHWESTERN PORTION OF THE SITE ACCESSED BY GLENMORE WAY (AND EVENTUALLY .• 358.4 �� ROUTE 250). TRAFFIC MANAGEMENT PRACTICES ARE PROPOSED UNDER SEPARATE COVER AND SHALL BE IMPLEMENTED IN COORDINATION WITH THE ACCESS MEASURES PROPOSED \� _, HEREIN. V�OLUNPE RNA \ -, - - - SITE DATA , FIRE COMPANY �• /� PROJECT (SITE) LIMITS = 9o.6 ACRES THIS PHASE 2 EROSION AND SEDIMENT CONTROL PLAN IS PROPOSED IN ADDITION TO AND AS ./ - f" ; / '�., .• A COMPLEMENT OF THE PHASE 1 EROSION AND SEDIMENT CONTROL PLANS THAT WERE /' ,. �\ �•,PHASE 2 LIMITS OF DISTURBANCE = 58.33 ACRES /.,/ % 1 PREVIOUSLY APPROVED BYALBEMARLE COUNTY. AS DETAILED ON THE MASTERPLAN (SHEET j •�,. ES-4), SELECT MEASURES OF PHASEI EROSION AND SEDIMENT CONTROL WILL REMAIN IN �, J I •�• PLACE DURING PHASE 2 CONSTRUCTION ACTIVITIES. THE FOLLOWING SUMMARY DETAILS.. 35a5 \ \, .�. v� 35s.e. i \ ISSUE THE OVERALL PHASING AREAS FOR THE RIVANNA VILLAGE DEVELOPMENT IN TERMS OF '"• , �••/. SURVEY AND BASE INFORMATION EROSION AND SEDIMENT CONTROL, STORMWATER, AND THE STORMWATER POLLUTION PROPOSEDPHASE2 7� 36 , sEDIMENT BASINs 1 �.•� 344.6, i 345 REV # DATE DESCRIPTION PREVENTION PLAN (INCORPORATED BY REFERENCE HEREIN): U ��� / o _ ROUDABUSH, GALE & ASSOCIATES, INC. „•.a 6.. #1 3/2/18 PER COUNTY COMMENTS #2 4/16/18 PER COUNTY COMMENTS �/• 3 z PHASE 1 PROJECT AREA (LIMITS OF DISTURBANCE) = 32.27 ACRES \ g14 MONTICELLO ROAD PHASE 2 PROJECT AREA = 68.55 ACRES 5�� �9 I / l3`d3 CHARLOTTESVILLE, VIRGINIA PREVIOUSLY APPROVED PHASE i INCLUDES PORTION OF PHASE 1 (PREVIOUSLY PERMITTED) THAT IS WITHIN PHASE 2 SITE BOUNDARY AND PHASE 1 '52.8 , 22go2 LIMITS OF DISTURBANCE ACRES LIMITS of DISTURBANCE O "`' 35�.� �I / 336.8 = 10.22 355.E � PHONE: (434) 976-0205 PHASE 2 PROJECT AREA (ACTUAL NEW LIMITS OF DISTURBANCE) = 68.55 - 10.22 = 58.33 ACRES '• 35�, OVERALL PROJECT LIMITS = 9o.6 ACRES .7 BOUNDARY SURVEY: ROUDABUSH, GALE & ASSOCIATES (434) 977-0205 '•� THIS PLAN PRESENTS STAGE 1 AND STAGE 2 CONSTRUCTION ACTIVITIES AND ASSOCIATED �� ! r\, i.: �y % TOPOGRAPHIC SURVEY: LOUISA AERIAL SURVEYS, 20o8 (540) 967-1499 EROSION AND SEDIMENT CONTROL. STAGE 2 INCLUDES GRADING OF PERMANENT BMPS THAT '••` •,•; FIELD VERIFIED BY ROUDABUSH, GALE & ASSOCIATES IN 2014 N .,. .,., N �•,�•' ARE FINALIZED IN STAGE 3 AS SHOWN ON THE STORMWATER MANAGEMENT PLANS. IZS �8.& ` '.� _ ,• / PRINCIPAL AND EMERGENCY SPILLWAYS, AND OUTFALL PROTECTION ASSOCIATED WITH I � � 388.8 STORM DRAIN INFRASTRUCTURE IS INSTALLED DURING STAGE 2. UPLAND BMPS WITHA 380.5 ' 4.5 ENGINEERED SOIL MEDIA AND FINAL BMP LANDSCAPING WILL BE INSTALLED DURING STAGE �0.3 � ••�• , ��' CZ . \ AS SHOWN ON THE STORMWATER MANAGEMENT PLANS. 72"7 '� 3 ���� •�••2YR0�� \ OWNER DEVELOPER `•• \ \ RIVANNA INVESTMENT HOLDINGS LLC VICINITY MAP: 1" = lOOO' SCALE: 1 INCH 5 - 2 o FEET - C/O ROBINSON DEVELOPMENT GROUP INC. - • O '. •^ � '`� _ ,'' 150 W. MAIN STREET SUITE iloo • • � � � � 7 ; x. O 250 500 1,000 •,�`• APPROVED b the Albemarle Count , • ,•� .�(� • NORFOLK, VIRGINIA 23510 •� • _..�I�4 Community Development Department D18 ate :7 `, �`, P0200 e1800007 • • a •� PROJECT LIMITS . �, , T H 0 ' ' • �� ~?` • ��- (� - ��'�'� °r� RESPONSIBLE LAND DISTURBER t r • ` 4 .; o t �� • • •1' • �• ,-• � • `, '�; � • � � ' •.. ' ice`' U SCOTT C. BLOSSOM a SCOTT C. BLOSSOM P.E. SHALL BE THE RLD UNTIL WHICH TIME Job No: 1005 Drawn By: BCE "' , `�� `� '• '� • . = O` �� " '" `' .• ; Llc. No. 40287 THE CONTRACTOR IS IDENTIFIED. RLD TO BE IDENTIFIED Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. • �• � �: `' ,<� o�� 1�w BEFORE CONSTRUCTION AND SHALL BE NOTED IN THE SWPPP. COVER DATE: 12/04/2017 o -v 49 " `' REVISED: /02/2018 ;•,!\✓; REVISED: 4/16/2018 ` cj, i ES�l t S ! f � I 5 gn 41E.:) 'I21.8 �l PSI r 62B-( I. 418 / 46B/(C) 418.5 41 \\ . / I r08.7 l \ V\ � • � ti � 394.3 .� • 404.8 x3c'75 &2B (C) PREVIOULSY APPROVED PHASE 1 )4.5 ' •. RIVANNA VILLAGE PROJECT LIMITS ' 3f 400 e - ♦•• 392.8 ♦ ,� � 402.E �%9� 403.3 ;.1 uc. 402 7�7 R 399..E 398.4 ; ••` 386.4 380----- � 379.4 `•.` C7. 14DZO.6 3 9.5 = �• •`�' 384.3 5i �' �D) ���•�ITs o /3;�.R 51 B (C/`I �.,� �� / � 370/4, 6 2 B (C) 390.*0414'., + ' 388.6 '� t `'• ., -- )� 400.E 386.6 393.0 �•, 382.1 1,C" 3F38.8 389.2 ••` ' 381. ^o �, 388.1 •• 377.4 51B (C/D) ` J 393.1 yy y �•,� i �c �••� 3 381.2 •• ''� / ♦ I �35 .1 374 � ♦ 380.7 •• i ..371 y 3>0 •.� 0 380 88 A 7 R 380.3 , ri 3g22 y " ♦ �' y _ , y y y y ♦ y yy�• y�y i yy�� 357. o � �390.9 \ \ y O ♦ 376.4 `yw yy� 371 ••* � : A� Yy� •• i8F.2 075,53 C/ ♦ ♦ 388.7 • 1.7 396.5 % 3\11 360.2 ` '87.5 I 358.9 ♦ yyy ` ♦ 350 356.5 + ♦,�,y,�,, y 349.6 y / 354.9 354.2 400.5 BB o 398.7 ♦ �� 45.5 35 0 50 ` w a♦ ` __ 350 1 ' \ ,40 356.9 5fC C/ ••�• + 396.4 51 B C D . � 31 •� o ; �w •�,• : ywyyyy 368 J� ,� �o �•, 0 4 Q 51 C (C /D) EXISTING \ ••`•• 3 STREAM . ' 51 B (C/D BUFFER 52.9 50.8 W 1 I 3 C5.`. ' ��•�••��•.' / / 35 8 _ \ • B 24 '•� �� 3 O 358. �6 ¢ 1. 350.5 � � f� \ � • • ,� I ' • ` 356.6 �a I �L• 374. tia • � � 3 � _ • ` 355.1 ` � 350 � � W. - 344.2 ® PREVIOUSLY • y --Zr - 34 2 x APPROVED , 35 .1 350.8 - h� _46 B ( ) 348.7 4 PHASE i ♦ , 345.1 373.0 / PROJECT , � `S Ss `�SR 351.1 � � � y � 344. � / x 378. v `LIMI� TS' y , �� • / o� ` 340 79 -o • 348.8 y 339.8 EXISTING POND ` ♦ 343.2 ' EXISTING POND '(50 / I W./FP6 3�.1 TA ^ P ! 1'. 1 E.+- ■ I : / ♦ .556 357.0 340.9 G, 358.3\� 52.6 �x ` • ♦ / , ` �/ 3 5s_, rn I 1 ♦ 3 352 I I • 35 7 4. . \ `T, ^A P E ♦ 354 355.6 46B (C �-- '0 332.9 y • • - - ♦ % -3rJ- 51 C% • - y y y y • ♦� ♦ y y o y r ••� ••0..0'• woo \ •.�'' i 373.7 • 0•000 326. �� 349.'_' 63.? 51 B (C/D) ■�.t �\ � 1 C (C/ 380 \ 375.6 385.5 / 376 � \ / 371.1 \ 376.E 01 SCALE: 1 INCH = 15o FEET 0' 150' 300' CONTOUR INTERVAL = 2 FT 450' i ` 364.4 362 / 363.1 362.0 - 375.3 376.6 378.9 C NOTES THE PROPOSED RIVANNA VILLAGE DEVELOPMENT ENCOMPASSES AN AREA OF FOREST AND OPEN MEADOW LOCATED APPROXIMATELY 12.5 MILES SOUTHEAST OF CHARLOTTESVILLE VIRGINIA. THE SITE IS CHARACTERIZED BY MODERATE SLOPES AND WOODED CORRIDORS THAT WILL BE PRESERVED AS A COMPONENT OF THIS PLAN. TWO (2) EXISTING PONDS ARE LOCATED NEAR THE CONFLUENCE OF THE EXISTING INTERMITTENT STREAM CHANNELS. EXISTING WATER FEATURES INCLUDE 1.o8 ACRES OF WETLANDS AND 2,645 LINEAR FEET OF STREAM CHANNELS THAT DRAIN TO THE RIVANNA RIVER LOCATED APPROXIMATELY 4 MILES DOWNSTREAM. THE PREVIOUSLY APPROVED PHASE 1 RIVANNA VILLAGE PROJECT LIMITS COVERED 32.27 ACRES. PROPOSED PHASE 2 SITE AREA = 68.55 ACRES, WHICH INCLUDES 10.2 ACRES OF SITE AREA THAT WAS PREVIOUSLY APPROVED WITHIN THE PHASE 1 LIMITS OF DISTURBANCE. THUS, THE NEW PROPOSED LIMITS OF DISTURBANCE IS 58.3 ACRES. GLENMORE WAY AND PIPER WAY SERVE AS THE ENTRANCE ACCESS TO THE ADJACENT NEIGHBORHOODS. THE ADJACENT NEIGHBORHOODS ARE NOT ADVERSELY AFFECTED BY TEH CONSTRUCTION ACTIVITIES. STEAMER DRIVE IS AN EXISTING ACCESS ROUTE APPROVED AS A COMPONENT OF THE PHASE 1 EROSION AND SEDIMENT CONTROL PLANS. THIS ENTRANCE WILL REMAIN IN PLACE AND ADDITIONAL ENTRANCES ARE PROPOSED WITH PHASE 2 CONSTRUCTION ACTIVITIES, INCLUDING AN ENTRANCE OFF OF ROUTE 250. PHASE i CONSTRUCTION ACTIVITIES WERE INITIATED IN 2017. AS A COMPONENT OF PHASE 2 CONSTRUCTION, EXISTING STRUCTURES WITHIN THE LIMITS OF DISTURBANCE NEAR ROUTE 25o AND NEAR THE EXISTING POND WILL BE DEMOLISHED. IN ADDITION, A PORTION OF CUMBRIA LANE WILL BE RETROFITTED AND REPAIRED. ALL DEMOLITION ACTIVITIES WILL BE CONDUCTED IN ACCORDNACE WITH STATE AND LOCAL STANDARDS. LEGEND PHASE 1 PROJECT AREA (PREVIOUSLY APPROVED) • PHASE 2 PROJECT AREA (LIMITS OF DISTURBANCE) EXISTING WETLANDS y yy yy yy ' (PER KIRK HUGHES & ASSOC. yy yy y'SURVEY) EXISTING STREAM CHANNEL LIMITS (PER KIRK HUGHES & ASSOC. SURVEY) EXISTING POND (PER KIRK HUGHES & ASSOC. SURVEY) APPROXIMATE EXISTING TREE LINE (PER KIRK HUGHES & ASSOC. SURVEY) \ EXISTING ROAD (PER KIRK HUGHES & ASSOC. SURVEY) + EXISTING FENCE (PER KIRK HUGHES & ASSOC. + SURVEY) EXISTING BUILDING (PER KIRK HUGHES & ASSOC. SURVEY) EXISTING POWER POLE o (PER KIRK HUGHES & ASSOC. SURVEY) EXISTING SIGN os (PER KIRK HUGHES & ASSOC. SURVEY) EXISTING MANHOLE o .H. (PER KIRK HUGHES & ASSOC. SURVEY) \�e EXISTING CONTOURS (PER KIRK HUGHES & ASSOC. 3' SURVEY) c EXISTING STREAM BUFFER (PER ALBEMARLE COUNTY) APPROXIMATE SOIL 51 C BOUNDARIES EXISTING HYDRIC SOIL (MANTEO CHANNERY SILT LOAM) STEEP SLOPES (GREATER THAN 25%) RIVANNA VILLAGE: EROSION AND SEDIMENT CONTROL PLAN AMENDMENT 1 AND PHASE II ALBEMARLE COUNTY, VIRGINIA SCE Blossom Consulting and Engineering Inc. 1101 Professional Drive, Suite G Williamsburg VA 23185 p: 757-870-4825 KEY PLAN ISSUE REV # DATE DESCRIPTION #1 3/2/18 PER COUNTY COMMENTS #2 4/16/18 1 PER COUNTY COMMENTS �� 'LTH of O G� SCOTT C. Lic. No. BLOSSOM 40287 ��SSI ONAL E��1 Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. EXISTING CONDITIONS AND DEMOLITION ES-2 FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEW\Design and Analysis\CAD\005-RivannaPH2_ESC_REV2.dwglHilijApr 12, 2018 at 11:541Layout: 2 Ex Conditions 412. 6 LEGEND RIVANNA VILLAGE: 411. G 417.0 4'. 8 S EROSION AND SEDIMENT S 418.5 417.3 42Cj. 7 F, 4 N PROPOSED LIMITS OF DISTURBANCE CONTROL PLAN 419.3 41 Z 420 4i9AS• 4 S 417 (3 BLOCK LIMITS • 404.8 4 0 0. AMENDMENT 1 AND PHASE 11 ALBEMARLE COUNTY, VIRGINIA 6OP 3C7 5 g qj .17 404.5 10W, @ 77 INNig✓ �A-q2.9 EXISTING WETLANDS (PER KIRK HUGHES & ASSOC. 39 39 10=370.86 91 [BLOCK I (SEE SHEETS 8 - 12) SURVEY) '2 1 389.1 ♦ 9 .8 -',-,97b. '5.4 h384.9b '5&'$4.6,f Z APPROXIMATE EXISTING STREAM CHANNEL LIMITS 42 �� ��/� BLOCx BLOCK D, F AND G (SEE SHEETS S5-7) 40".6 35 5.62 (PER KIRK HUGHES & ASSOC. SURVEY) �21v' 41 402.3 384 09 STREAM q + 333.4 BUFFEREXISTING 398.4 J0 386.4 4:2 Z. 5 sip• 421 p /to 0 399.5 VZ11 1 1♦ Q -�83.82 '%3,22 384.3 APPROXIMATE EXISTING TREE LINE 40(l *aft♦ 82.97 C, (PER KIRK HUGHES & ASSOC. SURVEY) LLI 70/4.9 381.97 BCE 442'1.4(PER �.3 CO 8 'IV EXISTING ROAD KIRK HUGHES & ASSOC. 779.66 Blossom Consulting and Engineering Inc. 388.t� SURVEY) S s.♦ 379.85 390.' + 4207 -18,1 EXISTING FENCE 1101 Professional Drive, Suite G Williamsburg VA 23185 -66./ 381 4 (PER KIRK HUGHES & ASSOC. SURVEY) p: 757-870-4825 4178 406.9 II 377.4 ♦96 41 Z -7j.26.: '0 -�# 380 - A, - I II t477�.. 5 EXISTING BUILDING (PER KIRK HUGHES & ASSOC. .4 405.1, .0po 381.2/ SURVEY) I BLOCK '55" 380.i380.3 399.'- B X) 3.20 395.,E 411.5 405.5 V 4 ♦ 390.9 - 376.4 41, 371.0 7 *41 3811--52 zz AR 383.0 399,3 406.2 BLOCK 4D9.8 389.7 �FF? 7 384.4 r g n 407.," 3 one 388. 396.5 15A + 365.p �4 3 5 -0 JBT� A73 9's S + w BLOCKO. 394.- 349,6 354.2 + 81 + 360 Wr &7. -75 1>0 3 -�6 0 4t V 3 6 3 ; KEY PLAN BLOcx 362.8 356.1 "41 4 Q� ��i CD t 345 --368 • .0 ♦ 35 BLOCK J (WEST 356.6 x • 353.1 �342.2 000 ♦ 350.8 348.7 347.o� 344 ;5.1 34�A. [BLOCK J (FAST) 4.8 ---340 ISSUE � 48.8 ♦ I ' 3go / � I \ I WE+ - 3L 7�. 0 340.9 339.8 .3,13.2 1 11 1 1 4 362, -8.3 369.�- . ....... REV # DATE DESCRIPTION #1 3/2/18 PER COUNTY COMMENTS # 2 4/16/18 PER COUNTY COMMENTS 352.6 359.5 354.7 x 3 4.8 1368,5 357.7 355.6 355.4 8 0.7 -5696`�`tr ** BLOCK J (EAST)] 5 .4 3 \\/\/\\37 + * *'+ + * + + 'k 'k 'k 'w w 358.6 356.7 7 5 + * 332.9 'k 'k .7 1 3 .7 378.9 ♦ 41:11111 1,11 'k + 'k 38 3 BLOCK J (V 362.6 -- '358.8 ;" �_"a" 381.5 360.8 0 51 366.E 360.5 368.L; �� (ELT 373�.2 7 - 364 5• \ 3828 H op p 3 5 2.8 372.7 -4- SCOTT C. BLOSSOM 371., Lie. No. 40287 ��777 L 0 I AND J(EAST) (SEE SHEETS 11 15) [ , ABLOCK ONAI, 364.4 38. 380 )] .9 BLOCK H AND J(WEST) (SEE SHEETS 14 16 Job No: 1005 Drawn By: BCE 389.0 388.2 36 362 Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. 372.3 SHEET INDEX SCALE: 1 INCH = 15o FEET of 150' 3001 CONTOUR INTERVAL = 2 FT 6001 ES 3 FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEWDesign and Analysis\CAD\005 RivannaPH2-ESC-REV2.dwg I Hill lApr 12, 2018 at 11:5411-ayout: 3 Index Sheet L- I I EROSION AND SEDIMENT CONTROL MASTERPLAN -- ��� - -- - � � _ LEGEND SUMMARY _ \ --- NOTE ALL PERIMETER SILT FENCE ADJACENT �\ RIVANNA VILLAGE: THIS PHASE 2 EROSION AND SEDIMENT CONTROL PLAN FOR RIVANNA - TO PRESERVED STREAM CHANNELS SHALL BE - SUPER SILT FENCE AS SHOWN ON DETAIL 4, �` PROPOSED PHASE 2 LIMITS OF DISTURBANCE (SITE) LOD EROSION AND SEDIMENT _ - _,- F_ VILLAGE IS DESIGNED TO PREVENT SEDIMENT LADEN RUNOFF FROM ;- _ SHEET 18. SUPER SILT FENCE SHALL SERVE AS \ CONTROL MASTERPLAN BEING TRANSPORTED TO DOWNSTREAM RECEIVING WATERWAYS AND IS PREPARED IN CONSIDERATION OF THOSE MEASURES SPECIFIED AND ----- - - �' TREE PROTECTION. SAFETY FENCE SHALL BE SITE BENCHMARK APPROVED ON THE PHASE 1 EROSION AND SEDIMENT CONTROL PLANS. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO 408.7 41 417.0 _ - - INSTALLED IN ACCESSIBLE AREAS NEAR THE EXISTING FIREHOUSE IF REQUESTED BY (PER ROUDABUSH, GALE AND ASSOC. SURVEY) AMENDMENT 1 AND PHASE II \\ CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS � s 4.8 �o _ ALBEMARLE COUNTY INSPECTOR. ALBEMARLE COUNTY, VIRGINIA OTHERWISE NOTED. � 418.� A • 7 7 _- y . _ � y� y� yy ' EXISTING WETLANDS (PER KIRK HUGHES & ASSOC. ALL EROSION AND SILTATION CONTROL MEASURES SHALL BE 42Q7 419.3 � 4, SURVEY) PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL 42.0 a� 9. s `i • ^. 4 \ PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 7 - PROPOSED STOCKPILES LOCATED ON UPLAND AREAS OUTSIDE OF EXISTING STREAM CHANNEL LIMITS ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE •,, - ne.2 40o.o ' ��� ' <{ ��a8 - CONVEYANCE AREAS MAY BE MODIFIED UPON APPROVAL OF ALBEMARLE COUNTY FIELD INSPECTOR. CONTRACTOR SHALL BE �\� (PER KIRK HUGHES & ASSOC. SURVEY) CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM s� _,.�n,1�, � � RESPONSIBLE FOR LOCATING DEWATERING AREAS FOR SEDIMENT ACCUMULATED IN EXISTING POND AND PROVIDING PERIMETER STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR A ��Sc� OFFSITE DRAINAGE AREA SHALL BE CONVEYED THROUGH THE SITE TO MAINTAIN 'CLEAN CONTROLS AS NEEDED DURING DRYING AND DEWATERING ACTIVITIES EXISTING POND (PER KIRK HUGHES & ASSOC. 625-02-oo EROSION AND SEDIMENT CONTROL REGULATIONS. ti ` 2iQ WATER BYPASS IN EXISTING CHANNEL DURING CONSTRUCTION. DIVERT DISTURBED AREAS SURVEY) IN CONSIDERATION THAT PHASE 1 CONSTRUCTION ACTIVITIES WERE INITIATED IN 2017, THIS PHASE 2 PLAN UTILIZES SELECT EROSION AND 42 - �Q� FROM EXISTING CHANNELS WITH RIGHT OF\\ WAY DIVERSIONS AND DIVERSION DIKES AS APPROXIMATE EXISTING TREE LINE SEDIMENT CONTROLS THAT HAVE PREVIOUSLY BEEN CONSTRUCTED. < SHOWN HEREIN \ (PER KIRK HUGHES & ASSOC. --- SURVEY) SPECIFICALLY, SEDIMENT BASINS LOCATED IN BLOCKS D, F AND H TREAT PORTIONS OF PREVIOUSLY APPROVED BLOCK C AS WELL AS Z S Yy�y� OFFSITE DRAINAGE AREA SHALL BE CONVEYED THROUGH THE SITE TO MAINTAIN 'CLEAN EXISTING ROAD BICE PHASE 2 DEVELOPMENT IN BLOCKS D, F AND H. IN ADDITION, SEDIMENT TRAPS PREVIOUSLY CONSTRUCTED IN PHASE 1 BLOCK H BLOCK y y WATER' BYPASS IN EXISTING CHANNEL DURING (PER KIRK HUGHES & ASSOC.CONSTRUCTION. WILL REMAIN IN PLACE TO TREAT PROPOSED PHASE 2 DEVELOPMENT `•y ��� .�♦ DIVERT DISTURBED AREAS FROM EXISTING CHANNELS WITH RIGHT OF SURVEY) WITHIN BLOCK H. EXISTING PHASE 1 STOCKPILE AREAS AND CONSTRUCTION ENTRANCES (CE 1 & CE2) MAY ALSO BE USED IN h & SSF •�• WAY DIVERSIONS AND DIVERSION DIKES AS SHOWN HEREIN \ \ EXISTING FENCE Blossom Consulting and Engineering Inc. 1101 Professional Drive, Suite G CONJUNCTION WITH PHASE 2 CONSTRUCTION. �� ) (PER KIRK HUGHES & ASSOC. Williamsburg VA 23185 SURVEY) p:757-870-4825 THIS PHASE 2 EROSION AND SEDIMENT CONTROL PLAN CONSISTS OF TWO (2) STAGES. STAGE 1 GENERALLY CONSISTS OF THE INSTALLATION OF THE FOLLOWING MEASURES: I \._ �' EXISTING BUILDING LOD �Y / `•'` SSF 01_� (PER KIRK HUGHES & ASSOC. 1.) PERIMETER CONTROLS (I.E. SILT FENCE, SUPER SILT FENCE AND SAFETY FENCE) % �''+� A k CWD �.. -� SURVEY) 2.) CONSTRUCTION ENTRANCE (CE1 AND CE2 (EXISTING), CE3 AND CE 4 \ \ xy, 41\4 / x �•. CE 0 \ EXISTING POWER POLE (PER KIRK HUGHES & ASSOC. (PROPOSED PHASE 2)) AND TEMPORARY STREAM CROSSINGS (TSC #3-7). 3.) SEDIMENT TRAPS AND BASINS SIZED TO TREAT CONTRIBUTING SUB SEE PHASE 1 EROSION AND �' �� � '` CE3 SURVEY) WATERSHED WITH PROPOSED DISTURBANCE. 4.) DIVERSION DIKES AND RIGHT OF WAY DIVERSIONS DESIGNED TO CONVEY RUNOFF FROM DISTURBED AREAS TO PROPOSED STRUCTURAL SEDIMENT CONTROL PLANS FOR ADDITIONAL INFORMATION REGARDING PHASE 1 DIVERSION BLOCK 1 \ DV '�� •.` " i �•��. LOD I x ( '•� 1 �•� -s EXISTING SIGN (PER KIRK HUGHES & ASSOC. EROSION AND SEDIMENT CONTROL MEASURES (I.E. TRAPS AND DIKES AND SEDIMENT BASINS IN BLOCK i �, BLOCK �x i DV SURVEY) BASINS) WHILE ALLOWING'CLEAN WATER' FROM OFF SITE BLOCK D AND F (DISTURBED AREA \ DV - DV ��� A \ EXISTING MANHOLE UNDISTURBED AREA TO BYPASS THROUGH THE SITE. PREVIOUSLY CONVEYED TO FACILITY). CS1 a AND CS1 (SB1) TO �, x t %��,, '� DV l ry ` �. LOD 3s�,..; o M (PER KIRK HUGHES & ASSOC. STAGE 2 GENERALLY CONSISTS OF THE FOLLOWING EROSION AND SEDIMENT CONTROL MEASURES: REMAIN IN PLACE THROUGHOUT PHASE 2 E & S STAGES. _' _ �Gj ��� `� DV S'I' � I �� •. � ) GS3 '` h � x + �'• BLOCK � �� SURVEY) EXISTING CONTOURS 5.) CONVERSION OF SEDIMENT TRAPS AND BASINS TO ROUGH GRADED AS SITE ARE COMPLETED AND - _ �\ / U2 SSF x ST ♦�• �'� (PER KIRK HUGHES & ASSOC. PERMANENT BMPS EARTHWORKS ROADS, INFRASTRUCTURE AND RETAINING WALLS ARE INSTALLED. BLOCK K 3s8. �\\\ G� Y \"` 1 X SURVEY) NOTE THAT FINAL COMPLETION OF PERMANENT BMPS CONVERSION SEQUENCING IS PROVIDED IN THE STORMWATER MANAGEMENT ST TSC I 1 PLANS (STAGE 3). 6.) REMOVAL OF TSC 5-7 AND CONSTRUCTION OF PERMANENT BRIDGE STRUCTURES. CONVERSION OF TSC 3-4 TO PERMANENT CULVERTS. PHASE 1 SEDIMENT BASIN SB1 UPSTREAM WATERSHED IS SHALL REMAIN IN PLACE UNTIL Q` BLOCK F - 2Q `� \ GS1 '` \ TSC / P� TSC #5 C } x #6 / �- % \� --/ -\ EXISTING STREAM BUFFER (PER ALBEMARLE COUNTY) KEY PLAN 6.) REMOVAL OF SELECT DIVERSION DIKES AS STORM DRAINAGE INFRASTRUCTURE IS INSTALLED. RELOCATION OF TEMPORARY PERIMETER CONTROLS TO LOCATIONS STABILIZED. ONCE STABILIZED, CEl #3 U,� SP BLOCK y RUNOFF FROM SB1 DRAINAGE x �+ x + ( / \. SP / APPROXIMATE SOIL BOUNDARIES 7.) AREA SHALL BE DIRECTED TO ' x \ / DV f� \ \ THAT WILL REMAIN IN PLACE WHEN PHASE 2 DEVELOPMENT PLANS ARE IMPLEMENTED. 8.) STABILIZATION OF THE SITE. 400.:" FOREBAY OF LEVEL 2 WET POND (SEE PHASE 2 / STORMWATER PLANS) �. I \ e / - / / \ / + ` // EXISTING HYDRIC SOIL DV ( y, // (MANTEO CHANNERY SILT LOAM) GENERAL CONSTRUCTION NOTES FOR CONVERSION OF/ � �� �� . BLOCKA \\� I \ �, � I x \ \• •. •I•• `•• �••�..`•• EROSION AND SEDIMENT CONTROL MEASURES TO STORMWATER MANAGEMENT FACILITIES - c '� TSC \ / / I \4 \ ;� IB / LOD SSF ��•'� `••�•• % PROPOSED DIVERSION DIKE DV 1. ALL DAMS AND CONSTRUCTED FILL TO BE WITHIN % OF MAXIMUM 95 +. t � DV •'�• 3 > � DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL TO BE APPROVED BY A GEOTECHNICAL ENGINEER. A GEOTECHNICAL ENGINEER IS TO BE PRESENT DURING CONSTRUCTION PHASE 1 SEDIMENT TRAPS (HS1 �� AND HS2a) IN BLOCK H TO BLOCK / SB / SB1 I1 \ •/ •�••� �\ �� -� 370.E / A CLEAN WATER DIVERSION CWD ISSUE OF DAMS. REMAIN IN PLACE FOR PHASE 2 / CONSTRUCTION ACTIVITIES. `, • TSC , ST } #7 DV CRS � �j Ole \ �j /�•• \ 2. PIPE AND RISER JOINTS ARE TO BE WATERTIGHT WITHIN STORMWATER MANAGEMENT FACILITIES. CONVERSION TO PERMANENT \1 BMPS SHOWN ON PHASE 2 + \ } 1 / - _ - - -- D�7 lxi•• SEDIMENT BASIN SHALL BE CONSTRUCTED IN I x PROPOSED SUPER SILT FENCE SSF REV # DATE DESCRIPTION #1 3/2/18 PER COUNTY COMMENTS STORMWATER MANAGEMENT / % 1 k (12) 3' FOR TEMPORARY SEDIMENT TRAPS OR BASINS WHICH ARE TO BE CONVERTED TO PERMANENT STORMWATER MANAGEMENT FACILITIES; CONVERSION IS NOT TO TAKE PLACE UNTIL THE SITE IS STABILIZED, TSC / 4. PLANS + +a 344.c SSF /� ` #1 _� -� x� " . '// x -' x� \_ + x + x / �* ) LOCATION PROPOSED BMP (12/13) AND CONVERTED UPON STABILIZATION OF CONTRIBUTING DRAINAGE AREA PROPOSED STOCKPILE WITH PERIMETER CONTROLS (SILT #2 4/16/18 PER COUNTY COMMENTS AND PERMISSION HAS BEEN OBTAINED FROM THE COUNTY EROSION CONTROL INSPECTOR. j ', � _ � �♦ 1 / x / 1; < CRS � � � 3.43.2 + \ I SSF I ST \ / x J \` / EXISTING POND SHALL BE DRAINED AND DE -WATERED PRIOR TO ROUGH GRADING TO ATTAIN SEDIMENT BASIN DESIGN FENCE) SP 4. SELECT E&S MEASURES MAY BE IMPLEMENTED DURING PHASE 2 STAGE 1 CONSTRUCTION AND THEN MODIFIED DURING STAGE 2 (AND ` ST / `f� } w.E.+- I 357.oi , y 34o.9 \SSF / 35 . \ • VOLUME. REMOVE SEDIMENT AND DEBRIS TO APPROVED DISPOSAL FACILITY AND/OR DE -WATER ON SITE. MAINTAIN OFF -SITE DRAINAGE AREA BYPASS IN EXISTING STREAM (41 PROPOSED CONSTRUCTION ENTRANCE CE 3). PROPOSED TEMPORARY STREAM CROSSINGS ARE DESIGNED AND SHALL BE IMPLEMENTED TO AVOID IMPACTS IN AREAS SHOWN AS 390 - - / �_% " f I i%'r\ �!� \�� SSF I CWD DURING STAGE 1 CONSTRUCTION. DIVERT STREAM CHANNEL DURING CONSTRUCTION OF EMBANKMENT (AS SHOWN IN PRESERVED ON THE PERMIT APPLICATION. � 380 I x3ss. • d �I o / \ -J� DV � \ \ y ` BLOCKJ(WEST) ��- y ' STAGE 2 EROSION AND SEDIMENT CONTROL PLAN). IMPLEMENT STAGE 3 STORMWATER MANAGEMENT PLANS 1 PROPOSED TEMPORARY TSC 5. EXISTING ENTRANCES ALONG AND PARALLEL TO STEAMER DRIVE SHALL BE MAINTAINED AND UTILIZED IN PHASE 2 AS NEEDED TO ACCESS EXISTING STAGING AND STOCKPILE LOCATIONS. 382. `�3s3. i<< ( +y'` / ``` \ 'S ,` k/ __ I • AFTER CONTRIBUTING WATERSHED IS STABILIZED. STREAM CROSSING ENTRANCES HALL BE E EQUIPPED WITH TRUCK 6. CONSTRUCTION S QU W UC WASH DOWN AREAS ADJACENT TO EXISTING ROADWAYS (I.E. STEAMER DRIVE AND ROUTE 250)• x r'2't I _ PHASE 1 SEDIMENT BASIN - / TO REMAIN IN PLACE TO , SSF ` x �� � � w � ,, y y ,� � ST �'� T�#2 ST \ 'yy `` ` �� _ /� �� _� C' \ BLOCK (EAST) ST T� PROPOSED SEDIMENT TRAP ST T H 0 L F ���'A p O Gl 7.) STREAM BUFFER LIMITS SHALL BE CLEARLY IDENTIFIED AND MARKED IN THE FIELD WITH SUPER SILT FENCE. TREAT BLOCK F & D (SIZED ADEQUATELY IN PHASE 1) _ - / DV \ y y y + DV It % + ���W \ yy�y yy / PROPOSED SEDIMENT BASIN S$ SCOTT C. BLOSSOM a Lic. No. 40287 375.9 I \� DV ` \ LOD W 8.) PHASE 2 STAGE 2 EROSION AND SEDIMENT CONTROL PLANS DEPICT ELEMENTS TO BE IN PLACE PRIOR TO CONVERSION TO PERMANENT \ �66.8 360.5 373.2 J I x \i'� k `�, ` \+ •• \\ \ / 355:7 / PROPOSED CONSTRUCTION CRS OI BMP FACILITIES AS SHOWN ON THE STORMWATER PLAN. ��0 x 364.5 -, 3 3 \ \� \70.3 •� /. OUTFALL ` CWD / •i \ \ � s . ROAD STABILIZATION 0 E NAL 37�.� /� \ 9.) ALL EROSION AND SEDIMENT PERIMETER CONTROLS SHALL REMAIN IN PLACE THROUGHOUT CONSTRUCTION ACTIVITIES AND /i, _ "° h / �• \�\ \`• MAINTAIN BASE FLOW / \ �� 1 PROPOSED CONSTRUCTION ACCESS ROUTE (USE DUST CONTROL REMOVED ONLY WHEN FINAL SITE STABILIZATION IS ACHIEVED. CHANNEL / \\ AND PROVIDE \ 2t, PER VESCH 3.39) Job No: 1005 Drawn By: BCE N FLANKING BASINS/TRAPS • �pHP � \ \ NOTE: ALL CLEAR WATER DIVERSIONS SHALL \ \ TERMINATE INTO OUTFALL PROTECTION (CL 1 RIP RAP MIN LENGTH 20 FT). ( / \ PROPOSED BLOCK LIMITS Date: 12.04.2017 Checked By: Scott C. Biossom. P.E. MASTERPLAN 376.7 \ 371.1 \ NOTE: ALL SILT FENCE AND SUPER SILT FENCE 386.4 \ SHALL BE A MINIMUM OF 5 FT FROM STREAM NOTE: \ BANKS. SEE SHEET ES- 20 FOR PUMP AROUND DETAIL SCALE: 1 INCH = 15o FEET 388.2 386.9 J` 3�0 372.4 37i.4 \\ 372.3 \ \ SEE SHEET ES-17 FOR CONSTRUCTION ENTRANCE DETAIL 01 150' 300' 450' 364.9 322.3 \ SEE SHEET ES-2o FOR TEMPORARY/PERMANENT SEEDING DETAILS AND SPECIFICATIONSES 4a s CONTOUR INTERVAL- 2FT I l'c u EROSION AND SEDIMENT CONTROL MASTERPLAN � -- -' — - � - __ LEGEND SUMMARY '" - �'�,- I NOTE: ALL PERIMETER SILT FENCE ADJACENT TO PRESERVED STREAM FENCE ,� SUPER SILT F CHANNELS SHALL BE S E \ PROPOSED PHASE 2 LIMITS LOD R I VAN NA VILLAGE: EROSION A N D SEDIMENT THIS PHASE 2 EROSION AND SEDIMENT CONTROL PLAN FOR RIVANNA � �� _ - _ -� � �- �— � - AS SHOWN ON DETAIL SHEET 18. 4, OF DISTURBANCE (SITE) VILLAGE IS DESIGNED TO PREVENT SEDIMENT LADEN RUNOFF FROM BEING TRANSPORTED TO DOWNSTREAM RECEIVING WATERWAYS AND - ,% - ,- _ -- � � �' `_ - SUPER SILT FENCE SHALL SERVE AS CONTROL MASTERPLAN IS PREPARED IN CONSIDERATION OF THOSE MEASURES SPECIFIED AND i �� TREE PROTECTION. SAFETY FENCE SITE BENCHMARK APPROVED ON THE PHASE 1 EROSION AND SEDIMENT CONTROL PLANS. ALL MATERIALSAND L CONFORM CAT RAND OSTANDARDS N METHODS SHALL I I - e SHALL BE INSTALLED INACCESSIBLE - STAGE 1 CLEAN WATER DIVERSION AREAS NEAR THE EXISTING FIREHOUSE �� (PER ROUDABUSH GALE AND ASSOC. SURVEY) AMENDMENT 1 AND PHASE II CURRENT SPECIFICATIONS VDOT S3 OTHERWISE NOTED. c no ` SHALL BE CONVERTED S PERMANENT DRAINAGE SWALE AS IF REQUESTED BY ALBEMARLE COUNTY yyy EXISTING WETLANDS ALBEMARLE COUNTY, VIRGINIA ALL EROSION AND SILTATION CONTROL MEASURES SHALL BE \ _' \ SHOWN ON GRADING HEREIN AND ON STORMWATER MANAGEMENT INSPECTOR. _ yyyyy�y' (PER KIRK HUGHES & ASSOC. SURVEY) PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING s PLANS. REMOVE CWD ONLY AFTER ALL SUPER SILT FENCE SHALL BE OR OTHER CONSTRUCTION. 'goo CONTRIBUTING SITE AREA IS STABILIZED AND MAINTAINED AT A MINIMUM OF 5 FT EXISTING REAM ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE FROM STREAM BANKS. RECEIVING PERMAMENET SWALE IS STABILIZED P R KIRK HUGHEL ES S & ASSOC. SURVEY) CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR �'�S� A VA \ \ �\ EXISTING POND (PER KIRK HUGHES & ASSOC. 62 -02 oo EROSION AND SEDIMENT CONTROL REGULATIONS. 5 PHASE 2 STAGE 2 SUPER SILT ,\ �� \\\ SURVEY) 0 2A FENCE SHALL REMAIN IN PLACE ��\ \\ \\\ DURING INTERMEDIATE GRADING � � ' IN CONSIDERATION THAT PHASE 1 CONSTRUCTION ACTIVITIES WERE INITIATED IN 2017, THIS PHASE 2 PLAN UTILIZES SELECT EROSION AND O `C % `.,,\ �_ �, \ V \ OF BMPS AND DURING FINAL �\ \\ \\\\� //� J CONSTRUCTION OF BMPS (AS - \\\� - APPROXIMATE EXISTING TREE LINE SEDIMENT CONTROLS THAT HAVE PREVIOUSLY BEEN CONSTRUCTED. (PER KIRK HUGHES & ASSOC. l DEPICTED ON THE STORMWATER \ SURVEY) SPECIFICALLY, SEDIMENT BASINS LOCATED IN BLOCKS D, F AND H TREAT PORTIONS OF PREVIOUSLY APPROVED BLOCK C AS WELL AS PHASE 2 DEVELOPMENT IN BLOCKS D, F AND H. IN ADDITION, SEDIMENT TRAPS PREVIOUSLY CONSTRUCTED IN PHASE 1 BLOCK H I / \ y �� BLOCK B yy yy y y y �� S MANAGEMENT PLANS). SUPER SILT FENCE SHALL BE REMOVED ONLY \ \\� \ \� WHEN THE UPSTREAM \ \ CONTRIBUTING WATERSHED AND \\ \ \ EXISTING ROAD PER KIRK HUGHES & ASSOC. BCE WILL REMAIN IN PLACE TO TREAT PROPOSED PHASE 2 DEVELOPMENT WITHIN BLOCK H. EXISTING PHASE 1 STOCKPILE AREAS AND�� � " y BMPS ARE STABILIZED. \ SURVEY) Blossom Consulting and Engineering Inc. CONSTRUCTION ENTRANCES (CE 1 & CE2) MAY ALSO BE USED IN CONJUNCTION WITH PHASE 2 CONSTRUCTION. — - -- _ w r J EXISTING FENCE (PER KIRK HUGHES & ASSOC. SURVEY) 1101 Professional Drive, Suite G Williamsburg VA 23185 p: 757-870-4825 THIS PHASE 2 EROSION AND SEDIMENT CONTROL PLAN CONSISTS OF TWO (2) STAGES. STAGE 1 GENERALLY CONSISTS OF THE INSTALLATION OF THE FOLLOWING MEASURES: \\ yy - _: ;i - �.. J � _. � � EXISTING BUILDING (PER KIRK HUGHES & ASSOC. 1.) PERIMETER CONTROLS (I.E. SILT FENCE, SUPER SILT FENCE AND � � � I1 '+► \ y (\\ `,` �., ` 1 SURVEY) SURVEY ) ° �. j SAFETY FENCE) 2.) CONSTRUCTION ENTRANCE (CE1 AND CE2 (EXISTING), CE3 AND CE 4 (PROPOSED PHASE 2)) AND TEMPORARY STREAM CROSSINGS (TSC #3-7). o P ' 'l \ - - . " . ��, �� ���: oP Ts \ •. •• \ \ -a � EXISTING POWER POLE (PER KIRK HUGHES & ASSOC. SEDIMENT TRAPS AND BASINS SIZED TO TREAT CONTRIBUTING SUB ' `,\ SURVEY) 3.) WATERSHED WITH PROPOSED DISTURBANCE. 4.) DIVERSION DIKES AND RIGHT OF WAY DIVERSIONS DESIGNED TO BLOCKS \ �yy P �•.� , � �" '� � ••4%T I ' + •• \ ���, •• -� , / C-S) EXISTING SIGN (PER KIRK HUGHES & ASSOC. CONVEY RUNOFF FROM DISTURBED AREAS TO PROPOSED STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES (I.E. TRAPS AND BLOCK y y � � o f �., sLocxc - •` •• �4r -- ��� P ��� ��eo. { � / , P ••� SURVEY) BASINS) WHILE ALLOWING 'CLEAN WATER' FROM OFF SITE UNDISTURBED AREA TO BYPASS THROUGH THE SITE. /\ `� / \ " ; Ts " ( y '; P _ •• I P „ P ;+b, P /�\+ • EXISTING E MANHOLE i P �^ o R KIRK K HUGHES & ASSOC. STAGE 2 GENERALLY CONSISTS OF THE FOLLOWING EROSION AND SEDIMENT CONTROL MEASURES: *W yy yy "` y ��w� yy �y y Ts P �\ - "� �J I y y y y s ;- '� ss 0� �oP �/I Ts - I . \; Ts J P SURVEY) 5.) CONVERSION OF SEDIMENT TRAPS AND BASINS TO ROUGH GRADED -_ _ \� �\ y yy yy� \/ y y Ps it I BLOCK �\/, ' IP\.\ BM EXISTING CONTOURS (PER KIRK HUGHES & ASSOC. PERMANENT BMPS AS SITE EARTHWORKS ARE COMPLETED AND ROADS, INFRASTRUCTURE AND RETAINING WALLS ARE INSTALLED. \ �. BLocxx ., \ �• \ y y i�.� � �f Q oP ° �� SURVEY) NOTE THAT FINAL COMPLETION OF PERMANENT BMPS CONVERSION SEQUENCING IS PROVIDED IN THE STORMWATER MANAGEMENT O ? / Q` BLOCK F s y oP / IP i oP �/ P ,, P fj � / 1/ EXISTING STREAM BUFFER PLANS (STAGE 3). 6.) REMOVAL OF TSC AND CONSTRUCTION OF PERMANENT BRIDGE , 2Q , � � , _ - - _ _ , ��\ - + j i (PER ALBEMARLE COUNTY) 5-7 STRUCTURES. CONVERSION OF TSC 3-4 TO PERMANENT CULVERTS. .,-� P \ .� Ts + ;, T , _\ KEY PLAN 6.) REMOVAL OF SELECT DIVERSION DIKES AS STORM DRAINAGE INFRASTRUCTURE IS INSTALLED. J \ �' BLOCK 5 ° + P f \� \ APPROXIMATE SOIL BOUNDARIES 7.) RELOCATION OF TEMPORARY PERIMETER CONTROLS TO LOCATIONS THAT WILL REMAIN IN PLACE WHEN PHASE 2 DEVELOPMENT PLANS=` ARE IMPLEMENTED. 3° \ IP \ P y P y BM oP P i_63 s.-; ,�.'` ♦ ® J Ts 'z 8.) STABILIZATION OF THE SITE. _moo \ P -i o + Ts P � P _ ��: / . •'.' _ � � � P \ ' ' �� `• } � // EXISTING HYDRIC SOIL (MANTEO CHANNERY SILT LOAM) GENERAL CONSTRUCTION NOTES FOR CONVERSION OF � OCKA �' IP '' \ P �" . RR OP ""SIP ••� •�•. •• IP PROPOSED STORM DRAIN (SEE SITE PLANS BY ALAN EROSION AND SEDIMENT CONTROL MEASURES TO STORMWATER MANAGEMENT FACILITIES 1. ALL DAMS AND CONSTRUCTED FILL TO BE WITHIN 95% OF MAXIMUM , �� �� �� / ` A.� BLOCK Pv'I 'I (�\\� �'� .••�.. +��'•� �•• �' � tl FRANKLIN P.E.)0**#* DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL TO BE APPROVED BY A GEOTECHNICAL ENGINEER. A GEOTECHNICAL ENGINEER IS TO BE PRESENT DURING CONSTRUCTION � , - / P ��\ / P / m �� / / << \ `,\ \\ l _ ;, ®•r ��o •,�I CWD PROPOSED CLEAN WATER DIVERSION ISSUE OF DAMS. 2. PIPE AND RISER JOINTS ARE TO BE WATERTIGHT WITHIN STORMWATER MANAGEMENT FACILITIES. RR RR oP 50 oP \ \ / / o `�> I PROPOSED SUPER SILT FENCE SSF REV # DATE DESCRIPTION 3. FOR TEMPORARY SEDIMENT TRAPS OR BASINS WHICH ARE TO BE / oIP ° 0 P RR y �/ -► oP BM °P y ' , �! O \\ \ k Ts ; IP RR \\ // / P x #1 3/2/18 PER COUNTY COMMENTS #2 4/16/18 PER COUNTY COMMENTS CONVERTED TO PERMANENT STORMWATER MANAGEMENT FACILITIES CONVERSION IS NOT TO TAKE PLACE UNTIL THE SITE IS STABILIZED, / y �%= J / ��� /// � �� �� IP 40 3\yoP P - PROPOSED OUTFACE PROTECTION OP AND PERMISSION HAS BEEN OBTAINED FROM THE COUNTY EROSION CONTROL INSPECTOR. �/ �� t SELECT E&S MEASURES MAY BE IMPLEMENTED DURING PHASE 2 PHASE 2 STAGE 2 SUPER SILT ` IP '/` / IP / _ CDs • �' s CID IP PROPOSED INLET 4' STAGE 1 CONSTRUCTION AND THEN MODIFIED DURING STAGE 2 (AND 3)• PROPOSED TEMPORARY STREAM CROSSINGS ARE DESIGNED AND FENCE SHALL REMAIN IN PLACE DURING INTERMEDIATE GRADING OF BMPS AND DURING FINAL • < =` / �� o I co r �� IP - PROTECTION SHALL BE IMPLEMENTED TO AVOID IMPACTS IN AREAS SHOWN AS PRESERVED ON THE PERMIT APPLICATION. CONSTRUCTION OF BM ( PS AS DEPICTED ON THE STORMWATER MANAGEMENT PLANS). SUPER SILT ` TS ` BM I ' IP , \� �� =� : Ts ,; a a \ P BLOCK J(WEST) °y OP i _ "IP �� -� % \ \\� J PROPOSED INTERMEDIATE BMP GRADING (STAGE 2 E&S) 5. EXISTING ENTRANCES ALONG AND PARALLEL TO STEAMER DRIVE SHALL BE MAINTAINED AND UTILIZED IN PHASE 2 AS NEEDED TO FENCE SHALL BE REMOVED ONLY P \ 1-1 O� r ��� � �\ ACCESS EXISTING STAGING AND STOCKPILE LOCATIONS. 6. CONSTRUCTION ENTRANCES SHALL BE EQUIPPED WITH TRUCK WHEN THE UPSTREAM CONTRIBUTING WATERSHED AND BMPS ARE STABILIZED. � � r• ,�./ �,_ ��� '" �� y oP RR ,Y y� __ // � y s 1 cD \ ," ; / 3 �o y yy yy cD \ -0 ,% ?' PS PERMANENT STABILIZATION { ALT H OF WASH DOWN AREAS ADJACENT TO EXISTING ROADWAYS (I.E. STEAMER DRIVE AND ROUTE 250). •� , \ ', ;�� ` S 3g8 y yy yy y\ d" y \ PS 1 OP \„ ` y y y y BM BLOCK J (EAST) O y y y y y t yy y*yy P O 7.) STREAM BUFFER LIMITS SHALL BE CLEARLY IDENTIFIED AND MARKED IN THE FIELD WITH SUPER SILT FENCE. TS F' �(- BM OP yy yy yy OP yyy, \ .y \ i \ - 1 TEMPORARY STABILIZATION SCOTT C. BLOSSOM — a Lic. No. 40287 • OP / e 8.) PHASE 2 STAGE 2 EROSION AND SEDIMENT CONTROL PLANS DEPICT ELEMENTS TO BE IN PLACE PRIOR TO CONVERSION TO PERMANENT / \ : P `` ' \ / .•��• \ OUTFALL CLEAN WATER DIVERSION (CWD) �o INSTALLED DURING STAGE 1 SHALL REMAIN IN PLACE UNTIL THE �_ -_ PROPOSED SEEDING � w ��' �w ZONAL BMP FACILITIES AS SHOWN ON THE STORMWATER PLAN. : �.•� \ . DOWNSTREAM BMPS ARE $Nj AND EROSION CONTROL MATTING\ 9.) ALL EROSION AND SEDIMENT PERIMETER CONTROLS SHALL REMAIN IN PLACE THROUGHOUT CONSTRUCTION ACTIVITIES AND \ G� \ COMPLETED AND STABILIZED AS DEPICTED ON STORMWATER REMOVED ONLY WHEN FINAL SITE STA I IZATION IS ACHIEVED. STAGE 1 CLEAN WATER DIVERSION SHALL BE CONVERTED TO •� �O 21 P \ \ MANAGEMENT PLANS 3so ��. PROPOSED BLOCK LIMITS N PERMANENT DRAINAGE SWALE AS ` \ Job No: 1005 Drawn By: BCE SHOWN ON GRADING HEREIN AND ON STORMWATER MANAGEMENT PLANS. REMOVE CWD ONLY AFTER \ \ \ Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. 11 MASTERPLAN UPSTREAM CONTRIBUTING SITE \ \ AREA IS STABILIZED AND, RECEIVING PERMAMENET SWALE IS STABILIZED V� \ SCALE: 1 INCH = 15o FEET \ \ \ ` r of 150 300 450 \` ES CONTOUR INTERVAL = 2FT � u u DIVERSION CHANNEL GS3 CALCULATIONS: RATIONAL METHOD, Q = aA C = 0.50 (ROUGH BARE SOIL) NOTE: SILT FENCE SHALL NOT BE %� \ NOTE: ALL CLEAR WATER DIVERSIONS SHALL LEGEND USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, INSTALLED ACROSS SPILLWAYS. l TERMINATE INTO OUTFALL PROTECTION (CL 1 RIP R I VAN NA VILLAGE: Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.06 - 0.012 HOURS Tt SHALLOW WITH LENGTH OF 356 FT AND SLOPE OF 0.068 = 0.024 HOURS To - 0.036 HOURS - 2.15 MINUTES - RAP MIN LENGTH 20 FT). EROSION AND SEDIMENT USING NOAA'S PRECIPITATION FREQUENCY DATA SERVER (http://hdsc.nws.noaa.gov/hdsc/pfdsn, 10 MINUTE 2-YR i - 3.981NCHES/HOUR / ` / ` NOTE: ALL SILT FENCE AND SUPER SILT FENCE PROPOSED LIMITS ♦♦ OF DISTURBANCE CONTROL PLAN 10 MINUTE 10-YR i - 5.25 INCHES/HOUR A =1 .21 ACRES , ? SHALL BE A MINIMUM OF 5 FT FROM STREAM 2-YR PEAK FLOW - 0.50 x 3.98 x 1.21 - 2.4 CFS 10-YR PEAK FLOW = 0.50 x 5.25 x 1.21 = 3.2 CFS SLOPE OF PROPOSED CHANNEL - RISE / RUN - 16 FT/ 578.5 FT - 0.028 / BANKS. / ` / SITE BENCHMARK (PER ROUDABUSH, GALE AND AMENDMENT 1 AND PHASE 11 USING PLATE 5-2 OF MINIMUM FLOW AREA(AE) - QGINIA EROSION 2.75 ANDSEDIMENT SOFT NT CONTROL HANDBOOK, V = 2.75 FT/S / NOTE: ALL PERIMETER SILT FENCE ADJACENT ASSOC. SURVEY) ALBEMARLE COUNTY, VIRGINIA DESIGN DEPTH (d) = 2 FT DESIGN BOTTOM WIDTH (b) = 4 FT T PRESERVED STREAM CHANNELS HALL BE EXISTING WETLANDS GIVEN 2:1 SIDE SLOPE, e = z FT x a = z FT x z = 4FT Z = e / d = 4 FT / 2 FT = 2 -F SUPER SILT FENCE AS SHOWN ON DETAIL 4, \ ` y yy (PER KIRK HUGHES & ASSOC. TRAPEZOIDAL CHANNEL CROSS -SECTIONAL AREA (A) _ (b x d) + [Z x (d ^ 2)] _ (4 FT x 2 FT) + [2 x ((2 FT) ^ 2)] = 16 SOFT TRAPEZOIDAL CHANNEL TOP WIDTH - b d Z) - 4 FT 2 FT 2) - 12 FT \ SHEET 18. \ BYPASS OFF -SITE \ ' \ DRAINAGE AREA TO ` yy , SURVEY) + (2 x x + (2 x x TRAPEZOIDAL CHANNEL HYDRAULIC RADIUS (R) _ {(b x d) + [Z x (d ^ 2)]} / {b + {(2 x d x [((Z^ 2) + 1)^ (1/2)])l NOTE: ALL CLEAR WATER DIVERSIONS SHALL EXISTING STREAM / X EXISTING {(4 x 2) + [2 x (2 ^ 2)]} / {4 + {(2 x 2 x [((2 ^ 2) + 1) ^ (1 /2)])l FT �-.` / CHANNEL (CLEAR WATER 00.6 ` TERMINATE INTO OUTFALL PROTECTION (CL 1 / STREAM CHANNEL LIMITS .23 CHANNEL LINING = VEGETATED WITH EC-2 TYPE AIMATTING, PERMISSIBLE VELOCITY OF 0.0-4.0 FT/S 3 7 SHEET 17) \ DIVERSION (SEE DETAIL #9 \' ` RIP RAP MIN LENGTH 20 FT). \ -y (PER KIRK HUGHES & ASSOC. SURVEY) (VDOT APPROVED MATERIALS, AUGUST 2014, SECTION 57) (http://www.virginiadot.org/business/resources/Materials/Approved_Lists.pdf) USING TABLE 5-13 OF THE VESCH, RETARDANCE CLASSIFICATION = C ` EXISTING POND I (PER KIRK HUGHES & ASSOC. USING PLATE 5-29 OF THE VESCH, ROUGHNESS COEFFICIENT (n) = 0.046 MAX CAPACITY FLOW = (1.49 / n) x [R ^ (2/3)] x [S ^ (1 /2)] x A = (1.49 / 0.046) x [1.23 ^ (2/3)] x [0.028 ^ (1 /2)] x 16 / \ SURVEY) = 99.6 CFS / 1 • ` DA Goff) - MAX CAPACITY VELOCITY = (1.496z/n) x [R ^ (2/3)] x [S ^ (1 /2)] = (1.49 / 0.046) x [1.23 ^ (2/3)] x [0.04 ^ (1 /2)] � • • / 2.16 AC �� APPROXIMATE DIMENSIONS: MINIMUM BOTTOM WIDTH = 4 FT ` \ �; • • / � EXISTING TREE LINE (PER KIRK HUGHES & ASSOC. MINIMUM DEPTH = 2 FT MINIMUM SIDE SLOPE = 2.1 \ `• SURVEY) AVERAGE CHANNEL SLOPE - 0.028 LINING = VEGETATED WITH EC-2 (TREATMENT TYPE 1 MATTING) • _ - � • ��% � ��Il-� OP �` / EXISTING ROAD (PER KIRK HUGHES & ASSOC. C DIVERSION CHANNEL GS1 CALCULATIONS: •� UTILIZE TEMPORARY BRIDGE STREAM CROSSING TO SPAN �/ • ` STREAM AND AVOID IMPACTS TO JURISDICTIONAL WATERS OF SURVEY) Blossom Consulting and Engineering Inc. RATIONAL METHOD, Q = CIA C = 0.50 (ROUGH BARE SOIL) USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.15 = 0.008 HOURS �� • THE U.S. PERMANENT BRIDGE STRUCTURE DESIGN PROVIDED ( `• ' ,' `♦ UNDER SEPARATE COVER) TO BE INSTALLED IN STAGE 2 AND/OR IN STAGE 3 AS DEPICTED ON STORMWATER MANAGEMENT PLANS. + EXISTING FENCE (PER KIRK HUGHES & ASSOC. 1101 Professional Drive, Suite G Williamsburg VA 23185 g p: 757-870-4825 Tt SHALLOW WITH LENTH OF 522 FT AND SLOPE OF 0.031 = 0.051 HOURS • `♦ Tc = 0.060 HOURS = 3.58 MINUTES USING NOAA'S PRECIPITATION FREQUENCY DATA SERVER (http://hdsc.nws.noaa.gov/hdsc/pfdsn, / \. �/ \ 4* • ' SURVEY) 10 MINUTE 2-YR i i 3.98 INCHES/HOUR 10 MINUTE 10-YR i = 5.25 INCHES/HOUR A ACRES ACRES 2.46 ACRES ♦,mil \ `� "L I' ' `, y[ • • EXISTING BUILDING (PER KIRK HUGHES & ASSOC. =2.17 + 0.29 = 2-YR PEAK FLOW = 0.50 x 3.98 x 2.46 = 4.9 CFS ♦ DA GS3 ♦ �� • SURVEY) �L \ ' 10-YR PEAK FLOW = 0.50 x 5.25 x 2.46 = 6.5 CFS SLOPE OF PROPOSED CHANNEL - RISE / RUN - 19 FT / 658 FT - 0.029 USING PLATE 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, V = 2.75 FT/S k • 0.29 AC ' A \ �♦ �'\ �� ♦ • ` ♦ •, ■ `• I �� / \ \ MINIMUM FLOW AREA (A) - Q / V - 7.2 / 2.75 - 2.62 SOFT DESIGN DEPTH (d) = 2 FT ` `� • 1 . / EXISTING CONTOURS (PER KIRK HUGHES & ASSOC. DESIGN BOTTOM WIDTH (b) = 4 FT GIVEN 2:1 SIDE SLOPE, e = 2 FT x d = 2 FT x 2 = 4 FT % \ ♦ `� / ` `• ` • ` c SURVEY) Z=e/d=4FT/2FT=2 ^ / `� ` \ ` ■ • I TRAPEZOIDAL CHANNEL CROSS -SECTIONAL AREA (A) _ F (b x d) + [Z x (d 2)] - (4 FT x 2 FT) + [2 x ((2 n ^ 2)] = 16 SOFT TRAPEZOIDAL CHANNEL TOP WIDTH - b + (2 x d x Z) - 4 FT + (2 x 2 FT x 2) - 12 FT • ■� k \ + % �\ k \-\ `♦ ` EXISTING STREAM BUFFER TRAPEZOIDAL CHANNEL HYDRAULIC RADIUS (R) _ {(b x d) + [Z x (d ^ 2)]} / {b + {(2 x d x [((Z 2) + 1) (1/2)]}} - {(4 x 2) + [2 x (2 2)]} / {4 + {(2 x 2 x [((2 2) + 1) (1 /2)]}} \ S%11 � �+ • • � (PER ALBEMARLE COUNTY) V - 1.23 FT/ CHANNEL LINING =VEGETATED WITH EC-2 TYPE AMATTING, PERMISSIBLE VELOCITY OF 0.0-4.0 FT/S V �i�� `! �\ r `• ` \ `• QJ - (VDOT APPROVED MATERIALS, AUGUST 2014, SECTION 57) (http://www.virginiadot.org/business/resources/Materials/Approved_Lists.pdf)• USING TABLE 5-13 OF THE VESCH, RETARDANCE CLASSIFICATION = C USING PLATE 5-29 OF THE VESCH, ROUGHNESS COEFFICIENT = 0.046 ` ` • / ♦ ; ` \ W • ` PROPOSED DIVERSION DIKE DV '> (n) MAX CAPACITY FLOW - (1.49 / n) x [R ^ (2/3)] x [S ^ (1 /2)] x A - (1.49 / 0.046) x [1.23 ^ (2/3)] x [0.029 ^ (1 /2)] x 16 - 101.3CFS MAX CAPACITY VELOCITY - (1.49 / n) x [R ^ (2/3)] x [S ^ (1 /z)] _ (1.49 / 0.046) x [1.23 ^ (2/3)] x [0.029 ^ (1 /2)] ♦ \ BLOCK E '• \ ♦� �x �� `�- \ J -=�-' - - = DIMENSIONS: 6.33 FT/S • • 1/ �� r �- �; ♦ � PROPOSED CLEAR WATER CWD KEY PLAN - 4FT MINIMUM BOTTOM WIDTH - MINIMUM DEPTH - 2 FT MINIMUM SIDE SLOPE = 21 - � � _ ♦ f • � � .l MAINTAIN DIVERSION DIKES FROM PHASE 1 `'' `�\ ` t• DIVERSION AVERAGE CHANNEL SLOPE = 0.029 = VEGETATED WITH EC-2 (TREATMENT TYPE 1 MATTING) �� �� \ EROSION AND SEDIMENT CONTROL PLANS IN PLACE ♦ f ` ` 4.LINING DURING GRADING AND CONSTRUCTION ACTIVITIES ` � DA GS4 , ` J C� ` �J ;s ® ASSOCIATED WITH BLOCK D AND F. DIVERSION ♦ �\ BLOCK G ' PROPOSED SUPER SILT FENCE SSF x RIGHT-OF-WAY DIVERSION GS4 CALCULATIONS: DA GS3 0.61 AC • ? LEADS TO SEDIMENT BASIN CS 2 TO REMAIN IN ♦ + PLACE DURING PHASE 2 CONSTRUCTION ACTIVITIES. 0.92 AC RATIONAL METHOD, Q = CiA C = 0.26 (MIXED LANDUSE)• USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, ■ SEDIMENT BASIN CS2 SHALL BE CONVERTED TO ♦♦ ♦� f FOREBAY OF BMP 11 AS SPECIFIED IN STAGE 2 ` ` ` � . � EROSION AND SEDIMENT CONTROL PLANS AND PROPOSED STOCKPILE WITH SP Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.066 = 0.208 HOURS Tt SHALLOW WITH LENGTH OF 111 FT AND SLOPE OF 0.072 = 0.007 HOURS ASSOCIATED STORMWATER MANAGEMENT PLANS PERIMETER CONTROLS Tt CHANNEL WITH LENGTH OF 565.6 FT AND SLOPE OF 0.053 = 0.016 HOURS (STAGE 3) ` I' Tc - 0.232 HOURS - 13.91 MINUTES USING NOAA'S PRECIPITATION FREQUENCY DATA SERVER (http://hdsc.nws.noaa.gov/hdsc/pfdsn,, 10 MINUTE 2-YR i - 3.98 INCHES/HOUR.. T / ■ y( _ x ` \ ` PROPOSED CONSTRUCTION CE 10 MINUTE 10-YR i -5.25 INCHES/HOUR A -2.77 ACRES 2-YR PEAK FLOW = 0.26 x 3.98 x 2.77 = 2.87 CFS \ \ II MAINTAIN CONSTRUCTION ACCESS AND EXTEND CONSTRUCTION ENTRANCES FROM PHASE 1 f `f ` \ 3 7 x ENTRANCE 10-YR PEAK FLOW = 0.26 x 5.25 x 2.77 = 3.78 CFS SLOPE OF PROPOSED CHANNEL RISE / RUN - 28 FT / 653 FT - 0.043 USING PLATE 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, V = 3.3 FT/S \ ■ EROSION AND SEDIMENT CONTROL PLANS DURING 1 ■ �_ �� �l �l DV ` GRADING AND CONSTRUCTION ACTIVITIES DV ` O ` ` I' 3 � �,, O ` PROPOSED TSC MINIMUM FLOW AREA (A) = Q / V = 3.8 / 3.3 = 1.15 SF DESIGN DEPTH (d) = 2 FT ASSOCIATED WITH PHASE 2. CE2 SHALL BE UTILIZED f //j \ SF ` ` x' UNTIL CE 3 AND CE 4 ARE IN PLACE AND SITE ` F ,c 1 TEMPORARY STREAM CROSSING ISSUE DESIGN BOTTOM WIDTH (b) = 4 FT GIVEN 2:1 SIDE SLOPE, e = 2 FT x d = 2 FT x 2 = 4 FT CONTRACTOR DE -MOBILIZES FROM PHASE 1 SITE S \ �( �/ �/ ` I / + OP ✓/ AREAS. f 1 Z-e/d-4FT/2FT-2 TRAPEZOIDAL CHANNEL CROSS -SECTIONAL AREA (A) _ (b x d) + [Z x (d ^ 2)] 7 / + SSF {� 6,� ( \ �T x■ / \ " g 7 ` \� ` O ! V .^;, �/ �/ �� / i PROPOSED SEDIMENT TRAP _ (4 FT x 2 FT) + [2 x ((2 FT)-2)] = 16 SOFT TRAPEZOIDAL CHANNEL TOP WIDTH = b + (2 x d x Z) = 4 FT + (2 x 2 FT x 2) = 12 FT TRAPEZOIDAL CHANNEL HYDRAULIC RADIUS ^ 2)]} ^ 2) 1) ^ \1 + / // \ DA GS1 ` / � �� � � / � �� REV # DATE DESCRIPTION (R) _ {(b x d) + [Z x (d / {b + {(2 x d x [((Z + (1 /2)]}} _ {(4 x 2) + [2 x (2 ^ 2)]} / {4 + {(2 x 2 x [((2 ^ 2) + 1) ^ (1 /2)]}} �' 2.17 AC + x s Q #1 3/2/18 PER COUNTY COMMENTS = 1.23 FT CHANNEL LINING = VEGETATED WITH EC-2 TYPE A MATTING, k I / \ \ I , ` / SP l 1 / /O PROPOSED SEDIMENT BASIN ,SB #2 4/16/18 PER COUNTY COMMENTS PERMISSIBLE VELOCITY OF 0.0 4.0 FT/S`,- (VDOT APPROVED MATERIALS, AUGUST 2014, SECTION 57) - ;. ` / I, ` I (http://www.virginiadot.org/business/resources/Materials/Approved_Lists.pdf) USING TABLE 5-13 OF THE VESCH, RETARDANCE CLASSIFICATION = C 11! sQ / / / \ J u \ �/ �/ SSF-- I USING PLATE 5-29 OF THE VESCH, ROUGHNESS COEFFICIENT (n) = 0.046 MAX CAPACITY FLOW = (1.49 / n) x [R ^ (2/3)] x [S ^ (1 /2)] x A = (1.49 / 0.046) x [1.23 ^ (2/3)] x [0.043 ^ (1 /2)] x 16 123.4 CFS , ` /�/ 1� 1� 1� ` f \ \ / 1 ` OP x s \ / I \ T / O i PROPOSED CONSTRUCTION /� w ( CRS = MAX CAPACITY VELOCITY = (1.49 / n) x [R ^ (2/3)] x [S ^ (1 /2)] _ (1.49 / 0.046) x [1.23 ^ (2/3)] x [0.043 ^ (1 /2)] = 7.7 FT/S DIMENSIONS: � ; .�- x DV x \ t / ', ,� f _ _ SEDIMENT TRAP GS3 / `r• \ i it ` ROAD STABILIZATION MINIMUM BOTTOM WIDTH = 4 FT/ \ / / \ , x / PROPOSED CONSTRUCTION MINIMUM DEPTH = 2 FT MINIMUM SIDE SLOPE = 2:1 - ;, + SSF 7 CE2 ,` y lO x ( ) ACCESS ROUTE (USE DUST AR AVERAGE CHANNEL SLOPE = 0,043 LINING =VEGETATED WITH EC-2 (TREATMENT TYPE 1 MATTING) \ / 1L/ DV >/ ",, \ i � / ' \ ` x \ CONTROL PER VESCH 3.39) SEDIMENT TRAP GS1 CALCULATIONS: \ l / a BLOCK F f ` / X \ ` / `\` PROPOSED BLOCK LIMITS / DA 2.17 ACRES + 0.29 ACRES = 2.46 ACRES REQUIRED STORAGE = 134 CY PER ACRE = 329.6 CY = 8,900.3 CF s °' \ \ ' \ \ / ' �. + IF VOLUME 1 = 0.85 x NORMAL POOL SURFACE AREA x WET DEPTH, F`U TSC #5 THE REQUIRED NORMAL POOL SURFACE AREA = 4,450 CF / (0.85 x 4 Fl) = 1,308.9 SF IF VOLUME 2 = [(NORMAL POOL SURFACE AREA + CREST SURFACE AREA) / 2] x DRY DEPTH � \ / , � S� � >%/ y, /�� ,S^ ��,' / • � a � '` / / / �\\Y 2,,,: ;, / ST LTH OF A D THE REQUIRED CREST SURFACE AREA = [2 x (4,450 SF / 2 FT)] - 1,155.8 SF = 3,294 SF MINIMUM FLOW PATH LENGTH = 70 FT\ EFFECTIVE WIDTH = NORMAL POOL SURFACE AREA / LENGTH = 1,155.8 / 70 = 16.5 FT MINIMUM LENGTH TO WIDTH RATIO = LENGTH / EFFECTIVE WIDTH = 70 / 16.5 = 4:1 /j< \ / "" / \ ` S1 354.5 �j 112-1 �' / �\ PHASE 1 DIVERSIONS TO REMAIN IN \� \ ` ` + SCOTT C. BLOSSOM DIMENSIONS: / \ ' PLACE FOR PHASE 2 STAGE 1 E&S . \ \ \ / SC ` �j a % \ / a Lic. No. 40287 NORMAL POOL SURFACE AREA = 1,156 SF, ELEVATION = 350 MINIMUM FLOW PATH LENGTH = 70 FT \ 41 As } Yd w� MINIMUM EXCAVATION DEPTH = 4 FT, BOTTOM ELEVATION = 346 WET BANK HEIGHT = 4 FT, WEIR ELEVATION = 350 / \ \ 3s /'�` " N I S �04� OVAL MINIMUM BERM TOP WIDTH = 3 FT BERM HEIGHT = 2 FT, ELEVATION = 352 �/ \ _ \� \ MINIMUM WEIR LENGTH = 6 x DA 6 x 2.17 = 13.o FT MINIMUM EXCAVATION SIDE SLOPE = 2:1 BLOCK D MINIMUM EMBANKMENT SIDE SLOPE = 3:1 CE1 n s x \ • '\ SSF Op �+ /� / ' \-\ \ � x r. + Job No: 1005 Drawn By: BCE SEDIMENT TRAP GS3 CALCULATIONS: / �`` s \\ x ,� \ \ % X Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. DA = 1.21 ACRES REQUIRED STORAGE = 134 CY PER ACRE = 162.1 CY = 4,382.2 CF \ f + �FN;a= ' \ % a E&S STAGE 1: BLOCK G IF VOLUME 1 = 0.85 x NORMAL POOL SURFACE AREA x WET DEPTH, THE REQUIRED NORMAL POOL SURFACE AREA 2,191.1 CF 4 FT644.4 SF ,, UTILIZE STREAM CROSSING TO CROSS STREAM (IMPACTS TO SEDIMENT TRAP GS111/ / \ ` / j JURISDICTIONAL WATERS OF THE U.S. PREVIOUSLY \ I O) ♦ = / (0.85 x = IF VOLUME 2 = [(NORMAL POOL SURFACE AREA + CREST SURFACE AREA) / 2] x DRY DEPTH THE REQUIRED CREST SURFACE AREA = [2 x (2,191.1 CF / 2 FT)] - 644 SF = 1,547 SF MINIMUM FLOW PATH LENGTH = 40 FT \ s ♦ / PERMITTED AND MITIGATED FOR UNDER SEPARATE COVER \ \ 1 x , ) (SEE DETAIL 7SHEET 18 FOR TSC CULVERT SIZING). (off \ I SCALE: ♦♦ \ > 1 INCH = 5o FEET - EFFECTIVE WIDTH = NORMAL POOL SURFACE AREA / LENGTH = 644 / 40 - 16.1 FT \ MINIMUM LENGTH TO WIDTH RATIO = LENGTH / EFFECTIVE WIDTH = 2.51 DIMENSIONS: SEE ' / TYPICAL DETAIL FOR SEDIMENT TRAP AS STAGE 1 SSF v ♦ \ / / NORMAL POOL SURFACE AREA = 644 SF, ELEVATION = 356 MINIMUM FLOW PATH LENGTH = 40 FT ♦ GRADING IS NOT DEPICTED ON ES-7 CROSS SECTION I `k. 0� 501 100200, MINIMUM EXCAVATION DEPTH = 4 FT, BOTTOM ELEVATION = 352 WET BANK HEIGHT - 4 FT, ELEVATION - 356 ♦♦ ` /5.5 . / CONTOUR INTERVAL = 2 FT MINIMUM BERM TOP WIDTH = 3 FT `\ I BERM HEIGHT = 2 FT, ELEVATION = 358 MINIMUM WEIR LENGTH = 6 x DA = 6 x 1.21 = 7.3 FT MINIMUM EXCAVATION SIDE SLOPE = 2:1 MINIMUM EMBANKMENT SIDE SLOPE 3:1 = PHASE 2: STAGE 1 EROSION AND SEDIMENT CONTROL PLAN (BLOCK F AND G) FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEVNADesign and Analysis\CAD\005_RivannaPH2_ESC_REV2.dwgl HilllApr 13, 2018 at 16:19ILayout: 5 ES Blk G (1) PHASE 2: STAGE 2, BLOCK F AND G SUMMARY / / RIVANNA VILLAGE: EROSION AND SEDIMENT LEGEND THIS PHASE 2 STAGE 2 EROSION AND SEDIMENT CONTROL PLAN FOR RIVANNA VILLAGE BLOCK G INCLUDES STABILIZATION OF UPLAND GRADED AREAS UPON REACHING SITE GRADES. STAGE 2 \ / 4 0 3 <;' / / / ; -� �•• PROPOSED LIMITS OF DISTURBANCE LOD CONTROL PLAN PRACTICES SHALL BE IN PLACE UPON COMPLETION OF ROAD / / / /0 _- CONSTRUCTION AND INSTALLATION OF STORM DRAINAGE INFRASTRUCTURE. THE STAGE 2 EROSION AND SEDIMENT CONTROL PLAN FOR BLOCK G INCLUDES THE FOLLOWING MEASURES: 0 2.3 / // / /� / �� SITE BENCHMARK (PER ROUDABUSH, GALE AND ASSOC. SURVEY) AMENDMENT 1 AND PHASE 11 ALBEMARLE COUNTY VIRGINIA 1.) INSTALLATION OF INLET PROTECTION AT ALL INSTALLED STORM DRAIN INLETS 398.4 , y yy y yy yy Wy , EXISTING WETLANDS (PER KIRK HUGHES & ASSOC. SURVEY) 2.) INSTALLATION OF OUTFALL PROTECTION AT ALL STORM \ _ DRAINAGE OUTFALLS. 3.) ROUGH GRADING OF PROPOSED PERMANENT BMPS TO\ 3� / �� \ \ 0. \� 3 9 EXISTING STREAM CHANNEL LIMITS (PER KIRK HUGHES & ASSOC. APPROXIMATE DESIGN ELEVATIONS, AND PERMANENT . xSEE SURVEY) STABILIZATION OF PERIMETER GRADES. 4.) INSTALLATION OF BMP RISER STRUCTURES (PRINCIPAL OUTFALLS) AS SPECIFIED ON THE STORMWATER MANAGEMENT \ STORMWATER MANAGEMENT PLANS FOR ADDITIONAL BMP G1, G2 �� AND G3 DESIGN AND SPECIFICATIONS. STAGE 2 INCLUDES ONLY ROUGH \ GRADING TO APPROXIMATE FINISHED BMP DESIGN ELEVATIONS TO 1 EXISTING POND PER KIRK HUGHES & ASSOC. SURVEY) PLANS (STAGE 3). DO NOT INSTALL ENGINEERED SOIL MEDIA, UNDER DRAINS, OR FINAL BIORETENTION PLANTING MATERIALS. \\ \�__ FACILITATE OUTFACE FROM STORM DRAINAGE INFRASTRUCTURE AND \\� • \. \\ PLACEMENT OF STABILIZED OUTFALL. RISERS SHALL BE INSTALLED AS I \\\ ``. A COMPONENT OF STAGE 2. DO NOT INSTALL UNDERDRAINS NOR / ENGINEERED SOIL MEDIA UNTIL UPLAND CONTRIBUTING DRAINAGE APPROXIMATE EXISTING TREE LINE 5.) SITE LANDSCAPING OUTSIDE OF PROPOSED PERMANENT BMPS MAY BE INSTALLED PER THE LANDSCAPE PLANS (PROVIDED UNDER • \ / \\ • AREA IS COMPLETELY STABILIZED, AS SHOWN ON STAGE 3 / •. STORMWATER MANAGEMENT PLANS. (PER KIRK HUGHES & ASSOC. SURVEY) BCE SEPARATE COVER) ONLY AS APPROVED BY THE LANDSCAPE ARCHITECT. \ • • � �j _ \ \ ` -- � � � � ` • • \\ EXISTING ROAD (PER KIRK HUGHES & ASSOC. • \Jl \Jt`,, ` • • _ SURVEY) 6.) CONVERSION OF THE TEMPORARY RIGHT OF WAY DIVERSION TO A PERMANENT SWALE AS SHOWN ON THE SITE GRADING PLANS AND STABILIZATION. • • \,_- • • I I • - A ' "' �. _ S • �� ;+ \+ EXISTING FENCE (PER KIRK HUGHES & ASSOC. Blossom Consulting and Engineering Inc. 1101 Professional Drive, Suite G Williamsburg VA 23185 p: 757-870-4825 7.) INSTALLATION OF EMERGENCY SPILLWAYS AT EACH BMP LOCATION (G1, G2, AND G3). • • \ y • - • � - ` •. - _ oa Y'""`sr4k, • SURVEY) 8.) PHASE 2 STAGE 2 EROSION AND SEDIMENT CONTROL PLANS .• ' / • • ` •• I EXISTING BUILDING (PER KIRK HUGHES & ASSOC. / DEPICT ELEMENTS TO BE IN PLACE PRIOR TO CONVERSION TO PERMANENT BMP FACILITIES AS SHOWN ON THE STORMWATER ;, . �_ i • XSURVEY) �� �' PLAN. •.', / / / • • �•- ■ X EXISTING POWER POLE 9.) ALL EROSION AND SEDIMENT PERIMETER CONTROLS SHALL REMAIN IN PLACE THROUGHOUT CONSTRUCTION ACTIVITIES AND - �� A j •. . ) .� � / / � �Y � • ` I P I • / � � \� (PER KIRK HUGHES & ASSOC. V \ \ REMOVED ONLY WHEN FINAL SITE STABILIZATION IS ACHIEVED. 389. - �� l A �\ • �� \ �_ _ . • / �� �� \ C EXISTING SIGN (PER KIRK HUGHES & ASSOC. / \ � �•'� ��� � / � • I SURVEY) I '� \ A � •� �� \ �� / / _ ` ��� % SSF �� \ �� -�� • • f� • Y \�� / / / �.• � � `'� EXISTING CONTOURS (PER KIRK HUGHES & ASSOC. SURVEY) \ BLOCK E �• �• x I P / �• . - -_ EXISTING STREAM BUFFER (PER ALBEMARLE COUNTY) ;. " \ \ .,, o�. •• �• KEY PLAN • \ - - - \ / / % ! �\� , I (� `v� A / �2 •` + co BLOCK G i �• V "r V� ` ��-�► '`� W D .' .� �) ��(� ,. J 5 x; C) n PROPOSED LOTS (STABILIZED UPON COMPLETION OF PHASE PROPOSED LANDSCAPE PLANTINGS 2) TS � •. ip N. I,l (SEE LANDSCAPE PLANS) -, \ x ' i ♦ PROPOSED STORM DRAIN (SEE SITE PLANS BY ALAN FRANKLIN P.E.) A• V e SEE CIVIL SITE PLANS PROVIDED BYALAN �� 9 `A"\+TS I Pv��`,�> / I/� \ FRANKLIN, P.E. FOR ROAD DESIGN AND �► v v w STORMWATER INFRASTRUCTURE DESIGN. i v + SSF � \� / �� OP x SSF - � X�) % PROPOSED CLEAR WATER DIVERSION CWD ISSUE q- 3 7 ,D / 6 z__ x \ S \� \\ � �\ � / / \\, I f 37\ \,� : / x PROPOSED SUPER SILT FENCE PROPOSED OUTFACE SSF REV # DATE DESCRIPTION #1 3/2/18 PER COUNTY COMMENTS > V PS _ / \_ BM x BMP G3 /—�� PROTECTION OP #2 4/16/18 PER COUNTY COMMENTS OP �l �l '` s I P x PROPOSED INLET PROTECTION CE2 O \� �. BM BMP G2 / �+ �� � PROPOSED INTERMEDIATE BMP GRADING E&S) (STAGE 2 j j BLOCK F + SSF. -- OP IP .: ♦� OP \ V I ♦ PS \/'\') PERMANENT STABILIZATION 3 �� ♦ _ I P TS TEMPORARY STABILIZATION l� O �' SCOTT C. BLOSSOM I P �� 5 ♦ �i BMP G 1 \��/ �// eo �� 1 ' // % �v �, BM PROPOSE/ SEEDING NTROL AND EROSION CONTROL Lie. No. 40287 �r� CE1 q� ♦/ ♦. I P x \,�� BLOCK D MATTING � S Cs IOVAI NOTE: ALL PERIMETER SILT FENCE ADJACENT TO PRESERVED STREAM CHANNELS SHALL BE SUPER \ ,� � SILT FENCE AS SHOWN ON DETAIL 4, SHEET 18. IP \ OP x / �, A f `� 0 v%� I P N Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. ��� ♦/ I P BM SSF SSF E&S STAGE 2: BLOCK G V ; , 41 TS ip v 4 5. + , . SCALE: 1 INCH = 5o FEET oSo' ioo' 200' ES_ 6 PHASE 2: STAGE 2 EROSION AND SEDIMENT CONTROL PLAN (BLOCK F AND G) CONTOUR INTERVAL — 2 FT FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEW\Design and Analysis\CAD\005_RivannaPH2_ESC_REV2.dwgI Hill lApr 12, 2018 at 11:541Layout: 6 ES Blk G (2) 366 344 343 342 341 GRADE 364 DIVERSION SWALES GS2, GS3, 362 I rSIDEWALK PROPosED ■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■ among 12.61 ' N■ME Noun am O 0 5 10 15 20 DISTANCE (FT.) TYPICAL DIVERSION SWALE CROSS-SECTION VERTICAL SCALE: 1" = 2' HORIZONTAL SCALE: 1" = 5' DIMENSIONS TOP WIDTH - 12.o FT, MAX. DEPTH - 2.0 FT. DTE: =E LINING CALCULATIONS PROVIDED ON STAGE 1 E&S PLAN FOR PROPOSED CHANNEL LININ, _L DIVERSIONS ARE ADEQUATE AND 'OVER -SIZED' IN CONSIDERATION OF TYPICAL UCKET' DIMENSIONS.. 360 358 356 EXISTINX 354 GRADE 352 \ 350 348 346 344 342 340 PROPOSED STABILIZATION SEEDING AND EC-2 MATTING 36" RCP RISER (INSIDE DIA.) WITH METAL TRASHRACK AND ANTI -VORTEX PLATE RIM ELEVATION=353•o FT 3.5" ORIFICE @ ELEV.=352.5 FT ACE ELEV.=352.0 FT CONCRETE FILLED RISER BASE (2' MIN.) 2-FT TOP OF BERM[ ELEV.=356.o FT SPILLWAY WEIR CREST ELEV.=354•o FT, BO'I'TCM WIDTH = 10 FT PROPOSED STRUCTIAU,L FILL SEE NOTES SHEET SWM-2o 48' -18 RCP 4.2%\ -�- @ \ US INV.=348.o FT DS INV.=346.o FT INSTALL CONCRETE CRADLE ALONG CONDUIT (SEE DETAIL 3, THIS SHEET) / STABILIZED OUTFALLJ (CLASS I RIPRAP, MIN. 2-FT DEPTH) -VDOT ES1 (18") 338 1 ---------------- ----------------------------------------------------------------------------- 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 CROSS SECTION A -A' (GSi) VERTICAL SCALE: 1"=4' HORIZONTAL SCALE 1"=20 372 370 368 366 364 362 360 358 356 354 352 350 348 346 344 GRADE OSED GRADE PROPOSED STABILIZATION SEEDING AND EC-2 MATTING PROPOSED STRUCTURAL FILL SEE NOTES SHEET SWM-2o 36" RCP RISER (INSIDE DIA.) WITH METAL TRASHRACK AND ANTI -VORTEX PLATE RIM ELEVATION=359•o FT 3.5" ORIFICE @ ELEV.=358.5 FT ACE ELEV.=358.o FT 1 SEDIMENT TRAP TOP OF BERM ELEV.=362.o FT SPILLWAY WEIR CREST ELEV.=36o.o FT, BOTTOM WIDTH = 10 FT Z E CRADLE ALONG CONDUIT (SEE DETAIL 3, THIS SHEET) STABILIZED OUTFALL (CLASS I RIPRAP, MIN 2-FT DEPTH; ESi (18") }ci 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 CROSS SECTION B-B' (GS3) VERTICAL SCALE: 1"=4' HORIZONTAL SCALE I"=20 RIVANNA VILLAGE: EROSION AND SEDIMENT CONTROL PLAN AMENDMENT 1 AND PHASE II ALBEMARLE COUNTY, VIRGINIA BICE Blossom Consulting and Engineering Inc. 1101 Professional Drive, Suite G Williamsburg VA 23185 p: 757-870-4825 KEY PLAN ISSUE REV # DATE DESCRIPTION #1 3/2/18 PER COUNTY COMMENTS #2 4/16/18 PER COUNTY COMMENTS ��,tiTH of I't cl SCOTT C. BLOSSOM a Lie. No. 40287 �SSIONAL Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. BLOCK G CROSS SECTIONS FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEW\Design and Analysis\CAD\005_RivannaPH2_ESC_REV2.dwgI Hill lApr 12, 2018 at 11:551Layout: 7 Blk G (XS) ES-7 DIVERSION CHANNELS CALCULATIONS: RATIONAL METHOD, Q = CIA USING NOAA'S PRECIPITATION FREQUENCY DATA SERVER (http://bdsc.nws.noaa.gov/hdsc/pfdsn, 10 MINUTE 2-YR i = 3.98 INCHES/HOUR 10 MINUTE 10-YR i = 5.25 INCHES/HOUR USING VDOT DRAINAGE MANUAL FOR ALBEMARLE COUNTY, INTENSITY (i)=B/((tc+D) ^ E) b-46.95 D=9.5 E= 0.73 IS1 a A=2.55 ACRES C = 0.50 (ROUGH BARE SOIL) USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.048 = 0.013 HOURS Tt SHALLOW WITH LENGTH OF 145 FT AND SLOPE OF 0.055 = 0.011 HOURS Tt CHANNEL FLOW WITH LENGTH OF 441.5 FT AND SLOPE OF 0.041 = 0.015 HOURS Tc - 0.039 HOURS = 2.31 MINUTES i (10-YR) = 7.74 IN/HR 2-YR PEAK FLOW = 0.50 x 3.98 x 2.55 = 5.1 CFS = 5 CFS 10-YR PEAK FLOW = 0.50 x 5.25 x 2.55 = 6.7 CFS = 7 CFS 10-YR PEAK FLOW = 0.50 X 7.74 X 2.55 = 9.9 CFS = 10 CFS SLOPE OF PROPOSED CHANNEL = RISE / RUN = 25.3 FT / 635 FT = 0.040 MAX. PERMISSIBLE VELOCITY OF EC-2 MATTING = 4 FPS (USE 2.7 FPS FOR COMPUTATIONS) MINIMUM FLOW AREA (A) = Q / V = 10 / 2.7 = 3.7 SF IS1 b A=1.48 ACRES C = 0.50 (ROUGH BARE SOIL) USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.069= 0.012 HOURS Tt SHALLOW WITH LENGTH OF 107 FT AND SLOPE OF 0.122 = 0.005 HOURS Tt CHANNEL WITH LENGTH OF 263.6 FT AND SLOPE OF .049 = .008 HOURS Tc = 0.025 HOURS = 1.48 MINUTES 1 (10-YR) = 8.17 IN/HR 2-YR PEAK FLOW = 0.50 x 3.98 x 1.48 = 2.9 CFS 10-YR PEAK FLOW = 0.50 x 5.25 x 1 .48= 3.9 CFS 10-YR PEAK FLOW = 0.50 x 8.17 x 1.48 = 6.0 CFS SLOPE OF PROPOSED CHANNEL = RISE / RUN = 22 FT / 475 FT = 0.046 MAX. PERMISSIBLE VELOCITY OF EC-2 MATTING = 4 FPS (USE 2.7 FPS FOR COMPUTATIONS) MINIMUM FLOW AREA (A) = Q / V = 6 / 2.7 = 2.2 SF IS1 C A=2.91 + 2.95 = 5.86 ACRES C = 0.50 (ROUGH BARE SOIL) USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.03= 0.016 HOURS Tt SHALLOW WITH LENGTH OF 388 FT AND SLOPE OF 0.057 = 0.028 HOURS Tt CHANNEL WITH LENGTH OF 356.3 FT AND SLOPE OF .008 = .026 HOURS Tc = 0.070 HOURS = 4.2 MINUTES 1 (10-YR) = 6.95 IN/HR 2-YR PEAK FLOW = 0.50 x 3.98 x 5.86 = 11.7 CFS 10-YR PEAK FLOW = 0.50 x 5.25 x 5.86= 15.4 CFS 10-YR PEAK FLOW = 0.50 x 6.95 x 5.86 = 20.4 CFS SLOPE OF PROPOSED CHANNEL = RISE / RUN = 11 FT / 731 FT = 0.015 MAX. PERMISSIBLE VELOCITY OF EC-2 MATTING = 4 FPS (USE 2.7 FPS FOR COMPUTATIONS) MINIMUM FLOW AREA (A) = Q / V = 20.4 / 2.7 = 7.5 SF IS1 d A=2.55 + 2.78 = 5.33 ACRES C = 0.50 (ROUGH BARE SOIL) USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.05= 0.013 HOURS Tt SHALLOW WITH LENGTH OF 289 FT AND SLOPE OF 0.055 = 0.021 HOURS Tt CHANNEL WITH LENGTH OF 398.3 FT AND SLOPE OF .022 = .018 HOURS Tc = 0.052 HOURS = 3.11 MINUTES i (10-YR) = 7.38 IN/HR 2-YR PEAK FLOW = 0.50 x 3.98 x 5.33 = 10.6 CFS 10-YR PEAK FLOW = 0.50 x 5.25 x 5.33= 14 CFS 10-YR PEAK FLOW = 0.50 x 7.38 x 5.33 = 19.7 CFS SLOPE OF PROPOSED CHANNEL = RISE / RUN =15 FT / 566 FT = 0.026 MAX. PERMISSIBLE VELOCITY OF EC-2 MATTING = 4 FPS (USE 2.7 FPS FOR COMPUTATIONS) MINIMUM FLOW AREA (A) = Q / V = 19.7 / 2.7 = 7.3 SF IS1 f A=2.95 C = 0.50 (ROUGH BARE SOIL) USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.08= 0.011 HOURS Tt SHALLOW WITH LENGTH OF 66.7 FT AND SLOPE OF 0.075 = 0.004 HOURS Tt CHANNEL WITH LENGTH OF 468.6 FT AND SLOPE OF .029 = 0.018 HOURS To = 0.033 HOURS = 1.98 MINUTES i (10-YR) = 7.9 IN/HR 2-YR PEAK FLOW = 0.50 x 3.98 x 2.95 = 5.9 CFS 10-YR PEAK FLOW = 0.50 x 5.25 x 2.95= 7.7 CFS 10-YR PEAK FLOW = 0.50 x 7.9 x 2.95 = 11.7 CFS SLOPE OF PROPOSED CHANNEL = RISE / RUN =19 FT / 624 FT = 0.030 MAX. PERMISSIBLE VELOCITY OF EC-2 MATTING = 4 FPS (USE 2.7 FPS FOR COMPUTATIONS) MINIMUM FLOW AREA (A) = Q / V = 11.7 / 2.7 = 4.3 SF IS1 g A = 0.81 ACRES C = 0.50 (ROUGH BARE SOIL) USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.09= 0.010 HOURS Tt SHALLOW WITH LENGTH OF 52.4 FT AND SLOPE OF 0.076 = 0.003 HOURS Tt CHANNEL WITH LENGTH OF 251.7 FT AND SLOPE OF 0.08 = 0.006 HOURS Tc - 0.020 HOURS = 1.17 MINUTES i (10-YR) 8.34 IN/HR 2-YR PEAK FLOW = 0.50 x 3.98 x 0.81 = 1.6 CFS 10-YR PEAK FLOW = 0.50 x 5.25 x 0.81 = 2.1 CFS 10-YR PEAK FLOW = 0.50 x 8.34 x 0.81 = 3.4 CFS SLOPE OF PROPOSED CHANNEL = RISE / RUN =18 FT / 306.5 FT = 0.059 MAX. PERMISSIBLE VELOCITY OF EC-2 MATTING = 4 FPS (USE 2.7 FPS FOR COMPUTATIONS) MINIMUM FLOW AREA (A) = Q / V = 3.4 / 2.7 = 1.26 SF IS2b A = 5.99 ACRES C = 0.50 (ROUGH BARE SOIL) USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.09= 0.010 HOURS Tt SHALLOW WITH LENGTH OF 52.4 FT AND SLOPE OF 0.076 = 0.003 HOURS Tt CHANNEL WITH LENGTH OF 251.7 FT AND SLOPE OF 0.08 = 0.006 HOURS Tc = 0.020 HOURS = 1.17 MINUTES 1 (10-YR) 8.34 IN/HR 2-YR PEAK FLOW = 0.50 x 3.98 x 5.99 = 11.9 CFS 10-YR PEAK FLOW = 0.50 x 5.25 x 5.99= 15.7 CFS 10-YR PEAK FLOW = 0.50 x 8.34 x 5.99 = 24.9 CFS SLOPE OF PROPOSED CHANNEL = RISE / RUN =19 FT / 330 FT = 0.058 MAX. PERMISSIBLE VELOCITY OF EC-2 MATTING = 4 FPS (USE 2.7 FPS FOR COMPUTATIONS) MINIMUM FLOW AREA (A) = Q / V = 3.3 / 2.7 = 1.2 SF DIVERSION DESIGN DIMENSIONS TRAPEZOIDAL CHANNEL CROSS -SECTIONAL AREA (A) = (b x d) + [Z x (d ^ 2)] = (4 FT x 2 FT) + [2 x ((2 FT) ^ 2)] = 16 SF TRAPEZOIDAL CHANNEL TOP WIDTH = b + (2 x d x Z) = 4 FT + (2 x 2 FT x 2) = 12 FT TRAPEZOIDAL CHANNEL HYDRAULIC RADIUS (R) = {(b x d) + [Z x (d ^ 2)11 / {b + {(2 x d x [((Z^ 2) + 1) ^ (1 /2)]}} ={(4 x 2) + [2 x (2 ^ 2)]1/ {4 + {(2 x 2 x [((2 ^ 2) + 1) (1 /2)]}} =1 .23 FT CHANNEL LINING = VEGETATED WITH EC-2 MATTING, PERMISSIBLE VELOCITY OF 2.5 - 4.0 FT/S (VDOT APPROVED MATERIALS, AUGUST 2014, SECTION 57) (http://www.virginiadot.org/business/resources/Materials/Approved_Lists. pdD USING TABLE 5-13 OF THE VESCH, RETARDANCE CLASSIFICATION = C DESIGN PARAMETER ISia ISib IS1c ISid ISif ISIg IS2b LENGTH (FT) 635 475 731 566 624 3o6 684 SLOPE (FT/FT) 0.040 0.046 0.015 0.026 0.030 0.059 0.041 io-YR DEPTH (FT) o.69 0.46 0.70 0.71 0.78 0.28 1.31 DESIGN DEPTH (FT) 2 2 2 2 2 2 2 BOTTOM WIDTH (FT) 4 4 4 4 4 4 4 SIDE SLOPES (H:V) 2:1 2:1 2:1 2:1 2:1 2:1 2:1 io-YEAR FLOW AREA (SF) 3.70 2.26 3.79 3.84 4.37 1.26 8.71 DESIGN AREA (SF) 16 16 16 16 16 16 16 \ NOTE: ALL CLEAR WATER DIVERSIONS SHALL TERMINATE INTO OUTFALL PROTECTION (CL 1 RIP RAP MIN LENGTH 20 FT). NOTE: ALL SILT FENCE AND SUPER SILT FENCE SHALL BE A MINIMUM OF 5 FT FROM STREAM BANKS. 384.1 -- , -- - - --- NOTES AND CONSTRUCTION SEQUENCE FINAL LOCATION OF ALL CONSTRUCTION ACCESS & PROPOSED STAGING & -- __ STOCKPILE LOCATIONS TO BE APPROVED AND CONFIRMED WITH ALBEMARLE COUNTY AND PROPERTY OWNER PRIOR TO CONSTRUCTION AND IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE. 1. CONTRACTOR TO PERFORM ROUGH GRADING WHERE SHOWN ON THIS SHEET. 2 ALL DENUDED OR DISTURBED AREAS TO BE PERMANENTLY STABILIZED I MAINTAIN BASE FLOW IN ADJACENT CHANNEL DURING ICONSTRUCTION ACTIVITIES ASSOCIATED WITH BLOCK I. GRADE PROPOSED SEDIMENT BASIN TO PROPOSED DIMENSIONS SHOWN HEREIN. INSTALL PERMANENT x RCP RISER PER STAGE 3 STORMWATER MANAGEMENT / + PLANS AND MODIFY FOR EROSION AND SEDIMENT 1 I ` CONTROL AS SHOWN ON DETAIL 1, SHEET 19. / 582..1 81.4 3 2.95AC CE4 x DA IS1a ` � �♦ 2.55 AC / x N" ` 381.2 I I DAIS1g a.c / n i x I AC UF I / DV x DV SF oP SSF i 37 .0 x '� Qlel '� BLOCK I I DV B 6 I ,� �/ � � 383.0 �, � 388.2 , �� OP E !' i b 4 e / DA Is1 a x X x , z.7a Ac / ' STIS1 W10 X / x n 7 88. / S6 + \_ #5� + / 36.0.2 + DV 1/ \ DA IS1 c / • \ 358.g / + f /SSF + x \` I \+/} / SSF , + - �ti OSSF _+ 'X X \ i MAINTAIN BASE FLOW IN ADJACENT CHANNEL DURING CONSTRUCTION ACTIVITIES ASSOCIATED \ IMMEDIATELY AFTER FINAL GRADE. WITH BLOCK I. GRADE PROPOSED SEDIMENT BASIN A TO PROPOSED DIMENSIONS SHOWN HEREIN AFTER - DEWATERING. INSTALL TEMPORARY CMP RISER / 386.4 PER VESCH STANDARD AND SPECIFICATIONS (TO BE REMOVED AND REPLACED UPON CONVERSION TO PERMANENT BMP (STAGE 2 AND STAGE 3) --- /� 384��3 - + g DV / `♦ r ,�0 x / 5.99 AC I i I 345. Dv B12 O � I i \ 4 SC / , '0­7/ DA IS1 e x o.7i Ac RWD -, / 385. 4 \ i.100001 CRS DA JSi a z.57 Ac SB11 O E, 4 PROPOSED BAFFLE TO PREVENT SHORT CIRCUITING (SEE DETAIL 5 SHEET i9) W \ x + 1000, \ I OP / -1.3i 2 } TJs1 F.I I / NOTE: SILT FENCE SHALL NOT BE / INSTALLED ACROSS SPILLWAYS. t, nop + i /[ / PHASE 2: STAGE 1 EROSION AND SEDIMENT CONTROL PLAN (BLOCK I AND J) x 7 SEDIMENT BASIN 11 CALCULATIONS: DA = 11.9 ACRES REQUIRED STORAGE = 134 CY PER ACRE = 1595 CY IF VOLUME 1 = 0.4 x NORMAL POOL SURFACE AREA x WET DEPTH, THE REQUIRED NORMAL POOL SURFACE AREA = 797.3 CY / (0.4 x 5 FT)=10,764 SF IF VOLUME 2 = [(NORMAL POOL SURFACE AREA + CREST SURFACE AREA) / 2] x DRY DEPTH THE REQUIRED CREST SURFACE AREA = [2 x (797.3 CY / 2 FT)] - 10,764 SF = 10,763 SF MINIMUM FLOW PATH LENGTH = 140 FT EFFECTIVE WIDTH = NORMAL POOL SURFACE AREA / LENGTH = 10,764 SF / 140 = 77 FT MINIMUM LENGTH TO WIDTH RATIO = LENGTH / EFFECTIVE WIDTH = 140 / 77 = 1.8:1 RATIONAL METHOD, Q = CIA C = 0.50 (ROUGH BARE SOIL) FROM DIVERSION CHANNEL 11 c CALCULATIONS, Tc = 4.2 MINUTES USING NOAA'S PRECIPITATION FREQUENCY DATA SERVER (http://hdsc.nws.noaa.gov/hdsc/pfdsn, 10 MINUTE 2-YR i = 3.98 INCHESMOUR 10 MINUTE 25-YR i = 5.89 INCHESMOUR 2-YR PEAK FLOW = 0.50 x 3.98 x 11.9 = 23.7 CFS = 24 CFS 25-YR PEAK FLOW = 0.50 x 5.89 x 11.9 = 35.0 CFS = 35 CFS USING PLATE 3.14-8 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, IF RISER HEAD (h) = 1 FT, RISER DIAMETER = 36 INCHES USING TABLE 3.14-B OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, IF BARREL HEAD (H) = 8 FT, RCP BARREL DIAMETER = 24 INCHES USING APPENDIX 3.14-a OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, DEWATERING ORIFICE FLOW = 797.3 CY / 21,600 SECONDS = 1.0 CFS DEWATERING ORIFICE AREA = Q / {[(64.32 x HYDRAULIC HEAD) ^ (1/2)] x 0.61 = 1.0 / {[64.32 x 2 FT) ^ (1 /2)] x 0.61 = 0.15 SF DEWATERING ORIFICE DIAMETER = 2 x [(A / 3.14) ^ (1 /2)] = 2 x [(0.15 / 3.14) ^ (1 /2)] = 0.44 FT = 6 INCHES DIMENSIONS: NORMAL POOL SURFACE AREA = 10,764 SF MINIMUM FLOW PATH LENGTH = 140 FT MINIMUM EXCAVATION DEPTH = 5 FT, BOTTOM ELEVATION = 336 FT OUTLET RISER HEIGHT = 6 FT, ELEVATION = 342 FT OUTLET RISER DIAMETER - 36 INCHES OUTLET BARREL LENGTH = 50 FT OUTLET BARREL DIAMETER = 24 INCHES DEWATERING ORIFICE DIAMETER = 6 INCHES, ELEVATION = 340 EMBANKMENT HEIGHT = 5 FT, ELEVATION = 344 MINIMUM EMBANKMENT TOP WIDTH = 6 FT MINIMUM EXCAVATION SIDE SLOPE = 2:1 MINIMUM EMBANKMENT SIDE SLOPE = 2.5:1 SEDIMENT TRAP IS1 CALCULATIONS: (INCLUDING IS1 b AND IS19) DA = 2.29 ACRES REQUIRED STORAGE = 134 CY PER ACRE = 306.9 CY = 8,285.2 CF IF VOLUME 1 - 0.85 x NORMAL POOL SURFACE AREA x WET DEPTH, THE REQUIRED NORMAL POOL SURFACE AREA = 4,142.6 CIF / (0.85 x 4 FT) = 1,213.4 SF IF VOLUME 2 = [(NORMAL POOL SURFACE AREA + CREST SURFACE AREA) / 2] x DRY DEPTH THE REQUIRED CREST SURFACE AREA = [2 x (4,142.6 CIF / 2 FT)] - 1,218.4 SF = 2,924 SF MINIMUM FLOW PATH LENGTH = 70 FT EFFECTIVE WIDTH = NORMAL POOL SURFACE AREA / LENGTH = 1,218.4 / 70 = 17.4 FT MINIMUM LENGTH TO WIDTH RATIO = LENGTH / EFFECTIVE WIDTH = 70 / 17.4 = 4:1 LEGEND PROPOSED LIMITS OF DISTURBANCE SITE BENCHMARK (PER ROUDABUSH, GALE AND ASSOC. SURVEY) EXISTING WETLANDS (PER KIRK HUGHES & ASSOC. SURVEY) EXISTING STREAM CHANNEL LIMITS (PER KIRK HUGHES & ASSOC. SURVEY) EXISTING POND (PER KIRK HUGHES & ASSOC. SURVEY) PROPOSED DIVERSION DIKE I)`T PROPOSED CLEAR WATER CWD DIVERSION PROPOSED SUPER SILT FENCE x SSF PROPOSED STOCKPILE WITH PERIMETER CONTROLS (SILT SP FENCE) PROPOSED CONSTRUCTION ENTRANCE CE PROPOSED TEMPORARY TSC STREAM CROSSING PROPOSED SEDIMENT TRAP ST PROPOSED SEDIMENT BASIN S$ ( PROPOSED CONSTRUCTION CRS ROAD STABILIZATION PROPOSED CONSTRUCTION ACCESS ROUTE (USE DUST CONTROL PER VESCH 3.39) NOTE: ALL PERIMETER SILT FENCE ADJACENT TO PRESERVED STREAM CHANNELS SHALL BE SUPER SILT FENCE AS SHOWN ON DETAIL 4, SHEET 18. N SCALE: 1 INCH = 8o FEET o' 8o' 16o' CONTOUR INTERVAL = 2 FT SEDIMENT BASIN 12 RIVANNA VILLAGE: EROSION AND SEDIMENT CONTROL PLAN AMENDMENT 1 AND PHASE II ALBEMARLE COUNTY, VIRGINIA SCE Blossom Consulting and Engineering Inc. 1101 Professional Drive, Suite G Williamsburg VA 23185 p: 757-870-4825 KEY PLAN ISSUE REV # DATE 320' #1 3/2/18 #2 4/16/1E CALCULATIONS: DA = 6.0 ACRES REQUIRED STORAGE = 134 CY PER ACRE = 804 CY IF VOLUME 1 = 0.4 x NORMAL POOL SURFACE AREA x WET DEPTH, THE REQUIRED NORMAL POOL SURFACE AREA = 402 CY / (0.4 x 4 FT) =6,784 SF IF VOLUME 2 = [(NORMAL POOL SURFACE AREA + CREST SURFACE AREA) / 2] x DRY DEPTH THE REQUIRED CREST SURFACE AREA = [2 x (402 CY / 2 FT)] - 6,784 SF = 4,070 SF MINIMUM FLOW PATH LENGTH = 100 FT EFFECTIVE WIDTH = NORMAL POOL SURFACE AREA / LENGTH = 6,784 SF / 100 = 68 FT MINIMUM LENGTH TO WIDTH RATIO = LENGTH / EFFECTIVE WIDTH = 100 / 68 = 1.5:1 RATIONAL METHOD, Q = CIA C = 0.50 (ROUGH BARE SOIL) FROM DIVERSION CHANNEL 12b CALCULATIONS, Tc = 1.17 MINUTES USING NOAA'S PRECIPITATION FREQUENCY DATA SERVER (http://hdsc.nws.noaa.gov/hdsc/pfds�, 10 MINUTE 2-YR i = 3.98 INCHESMOUR 10 MINUTE 25-YR i = 5.89 INCHESMOUR 2-YR PEAK FLOW = 0.50 x 3.98 x 6.0 = 11.9 CFS = 12 CFS 25-YR PEAK FLOW = 0.50 x 5.89 x 6.0 = 17.7 CFS = 18 CFS USING PLATE 3.14-8 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, IF RISER HEAD (h) = 1 FT, RISER DIAMETER - 30 INCHES USING TABLE 3.14-B OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, IF BARREL HEAD (H) = 6 FT, RCP BARREL DIAMETER = 18 INCHES USING APPENDIX 3.14-a OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, DEWATERING ORIFICE FLOW = 402 CY 21,600 SECONDS = 0.50 CFS DEWATERING ORIFICE AREA = Q / {[(64.32 x HYDRAULIC HEAD) ^ (1 /2)] x 0.61 = 0.50 / {[64.32 x 2 FT) ^ (1 /2)] x 0.61 = 0.07 SF DEWATERING ORIFICE DIAMETER = 2 x [(A / 3.14) ^ (1 /2)] = 2 x [(0.07 / 3.14) ^ (1 /2)] = 0.31 FT = 4 INCHES DIMENSIONS: NORMAL POOL SURFACE AREA = 6,784 SF MINIMUM FLOW PATH LENGTH = 100 FT MINIMUM EXCAVATION DEPTH = 4 FT, BOTTOM ELEVATION = 346.5 OUTLET RISER HEIGHT = 6.3 FT, ELEVATION = 352.8 OUTLET RISER DIAMETER = 35 INCHES OUTLET BARREL LENGTH = 100 FT OUTLET BARREL DIAMETER = 18 INCHES US INV. = 348.5 FT, DS INV. = 347.5 FT DEWATERING ORIFICE DIAMETER = 4 INCHES, ELEVATION = 352.3 EMBANKMENT HEIGHT = 2.2 FT, ELEVATION = 354 MINIMUM EMBANKMENT TOP WIDTH = 6 FT MINIMUM EXCAVATION SIDE SLOPE = 2.5:1 MINIMUM EMBANKMENT SIDE SLOPE = 2.5:1 DIMENSIONS: NORMAL POOL SURFACE AREA = 1,208 SF, ELEVATION = 354 MINIMUM FLOW PATH LENGTH = 60 FT MINIMUM EXCAVATION DEPTH = 4 FT, BOTTOM ELEVATION = 350 WET BANK HEIGHT = 4 FT, WEIR ELEVATION = 350 MINIMUM BERM TOP WIDTH = 3 FT BERM HEIGHT = 2 FT, ELEVATION = 358 MINIMUM WEIR LENGTH = 6 x DA = 6 x 2.27 = 13.6 FT MINIMUM EXCAVATION SIDE SLOPE = 2:1 MINIMUM EMBANKMENT SIDE SLOPE = 3:1 DESCRIPTION PER COUNTY COMMENTS PER COUNTY COMMENTS ��'LTH of 7'r SCOTT C. Lic. No. BLOSSOM a 40287 O �ISISIONAI, 'A� Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. E & S STAGE 1: BLOCK I & BLOCK J ES-8 PHASE 2: STAGE 2, BLOCK I AND J (EAST) SUMMARY QD - — - NOTES AND CONSTRUCTION SEQUENCE LEGEND — FINAL LOCATION OF ALL CONSTRUCTION ACCESS & PROPOSED STAGING & — RIVANNA VILLAGE. THIS PHASE 2 STAGE 2 EROSION AND SEDIMENT CONTROL PLAN FOR RIVANNA VILLAGE BLOCK I AND J INCLUDES STABILIZATION \ STOCKPILE LOCATIONS TO BE APPROVED AND CONFIRMED WITH` \ ALBEMARLE COUNTY AND PROPERTY OWNER PRIOR TO CONSTRUCTION �� 1 OF DISTURBANCE PROPOSED LIMITS LOD STORMWATER OF UPLAND GRADED AREAS UPON REACHING SITE GRADES. STAGE 2 PRACTICES SHALL BE IN PLACE UPON COMPLETION OF ROAD -- AND IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE. �" \ MAST E R P LA N CONSTRUCTION AND INSTALLATION OF STORM DRAINAGE INFRASTRUCTURE. THE STAGE 2 EROSION AND SEDIMENT 1. CONTRACTOR TO PERFORM ROUGH GRADING WHERE SHOWN ON THIS \` I SITE BENCHMARK (PER ROUDABUSH, GALE AND CONTROL PLAN FOR BLOCK I AND J INCLUDES THE FOLLOWING SHEET. / ASSOC. SURVEY) AMENDMENT 1 AND PHASE II MEASURES: 2. ALL DENUDED OR DISTURBED AREAS TO BE PERMANENTLY STABILIZED ALBEMARLE COUNTY, VIRGINIA 1.) INSTALLATION OF INLET PROTECTION AT ALL INSTALLED STORM IMMEDIATELY AFTER FINAL GRADE. y y yy yy yy ' EXISTING WETLANDS (PER KIRK HUGHES & ASSOC. DRAIN INLETS NOTE: ALL PERIMETER SILT FENCE ADJACENT TO yy yy y SURVEY) 2.) INSTALLATION OF OUTFALL PROTECTION AT ALL STORM PRESERVED STREAM CHANNELS SHALL BE SUPER EXISTING DRAINAGE OUTFALLS. SILT FENCE AS SHOWN ON DETAIL 4, SHEET 18. STREAM CHANNEL LIMITS 3.) ROUGH GRADING OF PROPOSED PERMANENT BMPS TO SEE STORMWATER MANAGEMENT PLANS FOR ADDITIONAL BMP 11, 12 AND 13 DESIGN AND SPECIFICATIONS. STAGE 2 INCLUDES ONLY ROUGH / (PER KIRK HUGHES & ASSOC. SURVEY) APPROXIMATE DESIGN ELEVATIONS, AND PERMANENT STABILIZATION OF PERIMETER GRADES. GRADING TO APPROXIMATE FINISHED BMP DESIGN ELEVATIONS TO FACILITATE OUTFALL FROM STORM DRAINAGE INFRASTRUCTURE AND EXISTING POND PLACEMENT OF STABILIZED OUTFALL. RISERS SHALL BE INSTALLED AS ��- 4.) INSTALLATION OF RETAINING WALLS, BMP RISER STRUCTURES V u A COMPONENT OF STAGE 2. DO NOT INSTALL UNDER DRAINS NOR \ !1> ENGINEERED SOIL MEDIA FOR BMP 12/13 NOR FINAL AQUATIC (PER KIRK HUGHES & ASSOC. SURVEY) (PRINCIPAL OUTFALLS) AS SPECIFIED ON THE STORMWATER MANAGEMENT PLANS (STAGE 3). DO NOT INSTALL ENGINEERED SOIL MEDIA, UNDER DRAINS, OR FINAL BIORETENTION PLANTING MATERIALS. BENCH/WETLAND PLANTINGS IN BMP 11 UNTIL UPLAND CONTRIBUTING DRAINAGE AREA IS COMPLETELY STABILIZED (I.E. STAGE 3). \ / APPROXIMATE EXISTING TREE LINE (PER KIRK HUGHES & ASSOC. 5.) SITE LANDSCAPING OUTSIDE OF PROPOSED PERMANENT BMPS / �- J SURVEY) EXISTING ROAD CE MAY BE INSTALLED PER THE LANDSCAPE PLANS (PROVIDED UNDER SEPARATE COVER) ONLY AS APPROVED BY THE LANDSCAPE��. (PER KIRK HUGHES & ASSOC. ARCHITECT. SURVEY) 6.) CONSTRUCTION OF THE OUTFALL PROTECTION/FOREBAYS ASSOCIATED WITH BMP I1. NOTE THAT THE TEMPORARY SEDIMENT OP x l / ' �, TS `� ~ �n O � +�+ EXISTING FENCE (PER KIRK HUGHES & ASSOC. Blossom Consulting and Engineering Inc. 1101 Professional Drive, Suite G WilliamsburgVA 23185 p: 757-870-4825 BASIN (SBI1), WILL BE INCREMENTALLY REDUCED IN SIZE AND � I P � \ I I / / SURVEY ) REPLACED WITH THE MAIN SEDIMENT FOREBAY FOR Ii AS THE SITE REACHES FINISHED GRADE ELEVATIONS.. 7.) TEMPORARY PUMP AROUND AND/OR DIVERSION DURING `� ss � ' �/ � � � EXISTING BUILDING (PER KIRK HUGHES & ASSOC. SURVEY) DEMOLITION OF THE EXISTING EMBANKMENT AND�- CONSTRUCTION OF THE PROPOSED EMBANKMENT AND CLAY CORE." STAGE 2 INCLUDES ALL ROUGH GRADING ASSOCIATED WITH BMPI1, WITH EXCEPTION OF INSTALLATION OF THE CLAY LINER. FINE GRADING, PLANTING AND COMPLETION OF BMP I1 SHALL NOT �' . � .� /' / , /n7 \ V� T ' �� % '4 _ IF, �, -o. EXISTING POWER POLE (PER KIRK HUGHES & ASSOC. SURVEY ) / COMMENCE UNTIL STAGE 3 AS SHOWN ON THE STORMWATER PLANS. �����,p� ✓ f cis ❑ Z I P(PER O �. ,/ O-S EXISTING SIGN KIRK HUGHES & ASSOC. 8. INSTALLATION OF PRINCIPAL AND EMERGENCY SPILLWAYS AT EACH BMP LOCATION (I1, I2, AND . NOTE FOR I1, THE TEMPORARY W. CORRUGATED METAL RISER WILL BE REMOVED AND REPLACED WITH THE PERMANENT CONCRETE OUTFACE STRUCTURE ( AS SHOWN ON THE STORMWATER MANAGEMENT PLANS) DURING TS b '� IP �� - '� IP n _ \__ L IP IP ,\ IP ♦ OP '� -- _ O -' ,� \ /EXISTING �. o TS �20 SURVEY) CONTOURS (PER KIRK HUGHES & ASSOC. i A , STAGE 2, AS THE BMP I1 ROUGH GRADES ARE ESTABLISHED AND THE EMBANKMENT CONSTRUCTED. I b N jp_TEMPORARY SEDIMENT 8 \ SSF }—_ TS i TRAP REMOVED DURING STAGE 2. OP �� IP SURVEY) \ ; 9.) PHASE 2 STAGE 2 EROSION AND SEDIMENT CONTROL PLANS DEPICT ELEMENTS TO BE IN PLACE PRIOR TO CONVERSION TO PERMANENT BMP FACILITIES AS SHOWN ON THE STORMWATER- PLAN. �,� _ _ ,, ✓ l k a IP 6 BLOCK I I P —� ... fi o OP BM � h \ BMP G3 D� �' V IP �♦ / EXISTING STREAM BUFFER PER ALBEMARLE COUNTY ( ) PROPOSED LOTS (STABILIZED --� KEY PLAN 1o.) ALL EROSION AND SEDIMENT PERIMETER CONTROLS SHALL REMAIN IN PLACE THROUGHOUT CONSTRUCTION ACTIVITIES AND IP ✓ °` \ IP \� - j \ = I IF O UPON COMPLETION OF PHASE 2) REMOVED ONLY WHEN FINAL SITE STABILIZATION IS ACHIEVED. NOTE: TO CONSTRUCT EMBANKMENT, DIVERT STREAM CHANNEL: (PUMP AROUND AND/OR DIVERSION CHANNEL) AROUND LIMITS OF DISTURBANCE. DIVERSION CHANNEL SHALL BE LINED WITH IP �� �`• IP � IP x°\, A / �, `� OP IP \ � IP B�,v O PROPOSED LANDSCAPE PLANTINGS (SEE LANDSCAPE PLANS) EROSION CONTROL MATTING (EC-3). CONSTRUCT OUTFALL PROTECTION AND CHECK DAM AT OUTFALL. CHANNEL SHALL BE A--- _ I P 7� , /i` � + I P 0 / I P TS + �' -,_ �, „ ��, Z_-� PROPOSED STORM DRAIN (SEE SITE PLANS BY ALAN MINIMUM FT BOTTOM WIDTH 2 FT FLOW DEPTH :1 SIDE SLOPES TO CONVEY THE BANKFULL EVENT NON-EROSIVELY. LARGER EVENTS SHALL BE ALLOWED TO BYPASS THROUGH PRINCIPAL / /� + 7 '} f �� BMP G1 ` / �' i / \ , FRANKLIN P.E.) EMERGENCY SPILLWAY. OP �` �/ ♦ IP r� �/G� PROPOSED RIGHT OF WAY RWD DIVERSION J �a �/ / "\ %�i } IP f �. OP0 �SF �� TS / �� ,' —� ` PROPOSED SUPER SILT FENCE SSF ISSUE SSF � IP 7 �_ A• �� = �Q�/— IP STAGE 2 INTERMEDIATE BMPS 12 AND 13 F t EMBANKMENTS TO BE COMPACTED AND , �� PROPOSED OUTFALL REV # DATE DESCRIPTION TS IP / STABILIZED PER SPECIFICATIONS ON STAGE 3 `` IP �, %� ) PROTECTION OP #1 3/2/18 PER COUNTY COMMENTS #2 4/16/18 PER COUNTY COMMENTS I r STORMWATER PLANS AND STABILIZED WITH CLASS IP 1 RIP RAP (MIN DEPTH 2.2 FEET )TO 10 YEAR WATER / SURFACE ELEVATION (353 FT). ALL DISTURBED \ < OP AREAS TO RECEIVE RIP RAP SHALL BE UNDERLAIN �- PROPOSED INLET IP GEOTEXTILE FILTER FABRIC PER VESCH 'WITH`� STANDARDS AND SPECIFICATIONS. �i IP PROTECTION + OP BMP 12 �' i� IP -:;. IP �. PROPOSED INTERMEDIATE BMP GRADING (STAGE 2 E&S) OP -__ _ A , .� 00 l, TS OP PV nip:� \� / .' PERMANENT STABILIZATION IP , / SSF H OF \\ \ \ �3\5 \ �\ D i / �r �• i, ,I,S TEMPORARY STABILIZATION Q)� /t SCOTT C. BLOSSOM a _- OP w PROPOSED SEEDING AND EROSION CONTROL Lic. No. 40287 �p� V BMP 11 V A �\ n - / / / r�� ^ �i I � �� \ � . MATTING �,)v SjONAL PROPOSED CHECK DAM RR TS IP IP BM� SEE BUFFER MITIGATION PLANS FOR REQUIRED MITIGATION N I �� } (V / MEASURES TO BE IMPLEMENTED UPON IMPACTING THE STREAM ` _ _ / IP Q I / BUFFER FOR EROSION AND SEDIMENT CONTROL, STORMWATER co / MANAGEMENT AND DEVELOPMENT RELATED ACTIVITIES. —� PV PROPOSED PUMP AROUND AND/OR Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. q / DIVERSION CHANNEL E & S STAGE 2: BLOCK , _ X BM _- �+ / `, _ (U f If OPIP cD •�, OP / U / 41 y RR PROPOSED CLASS 1 RIP RAP SCALE: INCH FEET \\ \z TEMPORARY DIVERSION CHANNEL (AND/OR PUMP AROUND) TO '� CID f ;? IP / BE INSTALLED DURING CONSTRUCTION OF EMBANKMENT (SEE TS / NOTES THIS SHEET). REMOVE AND STABILIZE UPON COMPLETION OF -- 1 = ioo SSF F CD BMP J1 / FOREBAY AND EMBANKMENT, PRIOR TO BRINGING POND ON LINE. TS ' , ( PROPOSED BLOCK LIMITS 0� 100� 200� 400' \CD CONTOUR INTERVAL = 2 FT ES 9 PHASE 2: STAGE 2 EROSION AND SEDIMENT CONTROL PLAN (BLOCK I AND J) RIVANNA VILLAGE: 36o 360 ALL DISTURBED AREAS SEDIMENT BASIN I1 (sTAGE 1) EROSION AND SEDIMENT TO RECEIVE 6 INCHES SEE STORMWATER PLANS FOR PERMANENT BMP Ii REINFORCED TOP SOIL AND CONCRETE PRINCIPAL SPILLWAY STRUCTURE TO BE INSTALLED AS SEE CIVIL SITE PLANS I DIMENSIONS: CONTROL PLAN 358 BY ALAN FRANKLIN P.E.) 358 NORMAL POOL SURFACE AREA 10,764 SF STABILIZATION SEED MIX A COMPONENT OF TRANSITION FROM STAGE 2->3. ( I = PRIOR TO APPLICATION PERMANENT CONCRETE RISER SHALL REPLACE TEMPORARY CMP (INSTALLED FOR PROPOSED STORM DRAIN I MINIMUM FLOW PATH LENGTH = 140 FT OF EROSION CONTROL DURING STAGE >) WHEN ROUGH GRADING FOR BMP h IS COMPLETED INFRASTRUCTURE DESIGN I MINIMUM EXCAVATION DEPTH = 5 FT, BOTTOM ELEVATION = 336 FT 356 MATTING AS SPECIFIED (AFTER STABILIZATION OF CONTRIBUTING WATERSHED). I I 356 OUTLET RISER HEIGHT = 6 FT, ELEVATION = 342 FT OUTLET RISER DIAMETER = 36 INCHES HEREIN OUTLET BARREL LENGTH = 50 FT AMENDMENT 1 AND PHASE 11 OUTLET BARREL DIAMETER = 24 INCHES 354 PROPOSED COMPACTED STRUCTURAL TEMPORARY CORRUGATED METAL (CMP) RISER SEDIMENT BASIN DEWATERING / 354 DEWATERING ORIFICE DIAMETER = 6 INCHES, ELEVATION - 340 EMBANKMENT HEIGHT FT, ELEVATION ALBEMARLE COUNTY , V I RG I N IA PROPOSED COMPACTED STRUCTURAL TEMPORARY FILL TO ELEVATION 344 FT TO SYSTEM WITH TEMPORARY CURRUGATED METAL CULVERT THROUGH EXISTING = 5 = 344 MINIMUM EMBANKMENT TOP WIDTH = 6 FT EMBANKMENT FILL. (SEE STORMWATER ATTAIN SEDIMENT BASIN DESIGN VOLUME EMBANKMENT MINIMUM EXCAVATION SIDE SLOPE = 2:1 / PLANS FOR DETAILED SPECIFICATION FO FILL RISER DIAMETER = 36 INCHES MINIMUM EMBANKMENT SIDE SLOPE = 2.5:1 352 MATERIAL, CLAY CORE AND KEY TRENCH. EXISTING STREAM CHANNEL TO ACT OUTFALL BARREL DIAMETER = 24 INCHES 352 ADDITIONAL GEOTECHNICAL REPORT TO BE AS BYPASS DURING STAGE ], AND OUTFALL BARREL LENGTH = 5o FEET (US INV. = 338 FT, DS INV. = 337.5 FT) NOTE: SEE STORMWATER PLANS FOR ADDITIONAL DESIGN DIMENSIONS AND ELEVATIONS PROVIDED UNDER SEPARATE COVER SHALL BE DIVERTED (AND/OR ORIFICE SIZE = 6 INCHES FOR STAGE 2 INTERMEDIATE ROUGH GRADING OF BMP 11 350 PUMPED AROUND DURING ORIFICE ELEVATION = 34o FT 350 CONSTRUCTION OF EMBANKMENT (SEE DETAIL SHEET 18) DURING STAGE 2 AND STAGE 3. / 348 APPLY 6 IN TOPSOIL AND STABILIZE EMBANKMENT WITH STAGE BMP I> ROUGH / 348 2 (INTERMEDIATE STABILIZATION SEED MIX SEE STORMWATER PLANS GRADING (ONLY) SEE STORMWATER PLANS FOR PRINCIPAL OUTFACE / AND EC-3 MATTING FOR FINAL DESIGN ELEVATIONS TO BE 346 STRUCTURE DESIGN CONSTRUCTED IN STAGE AFTER UPSTREAM 346 IIWATERSHED IS COMPLETELY STABILIZED. II 344 IIIII — I � - - - --_'' 344 —III I —III ICI I I —III —I / �� BICE342 - - - - - _ _- — � �___I 1�1=III=III 342 '�• _III-1 I I I-1 I I- I� � 1= —I 340 - II=III=III=III • 340 Blossom Consulting and Engineering Inc. _ 11I 7� I \—PROPOSED 1101 Professional Drive, Suite G 1=1 I I —I I I — --- I I—_ 1 I I_ ` —III—III—I — — — — III—III=1 I / ' GRADE Williamsburg VA 23185 338 —III—III—III —III—III I it U VD..' CV %% 338 p:757-870-4825 I — 04' 336 I I=1 I=1 I I �� EXISTING POND ELEVATIONS ARE APPROXIMATE BASED ON 336 — — — — I �` �i FIELD SURVEY. SEDIMENT AND DEBRIS ACCUMULATION VARIES IN DEMOLISH EXISTING EMBANKMENT — I I �� i' SELECT LOCATIONS OF EXISTING POND. CONTRACTOR SHALL AND REMOVE UNSUITABLE MATERIALS PROPOSED STAGE i SEDIMENT ,�' STAGE 1 SEDIMENT BASIN ENTIDE REVIEW GEOTECHNICAL RECOMMENDATIONS AND BE RESPONSIBLE 334 _ TO PRE APPROVEDOFFSITELOCATION BASINhSEDST GE1SEDI ------------------------- - ---------------#0(SB11) FOR DEWATERING EXISTING FACILITY T FACILITATE ROUGH GRADING 334 OR ON -SITE DEWATERING AND SLOPES TO REACH DESIGN TO DESIGN ELEVATIONS FOR STAGE i SEDIMENT BASIN AND STAGE 2 STAGING AREA ELEVATIONS INTERMEDIATE BMP h GRADING 332 332 0+00 0+10 0+20 0+30 0+40 0+50 o+6o 0+70 o+8o o+go 1+00 1+10 1+20 1+30 1+40 1+50 i+6o 1+70 1+8o i+go 2+00 2+10 2+20 2+30 2+40 2+50 2+60 2+70 2+80 2+90 3+00 3+10 3+20 3+30 3+40 3+50 CROSS SECTION C-C' (SBI1/BMP I1) VERTICAL SCALE: 1"=4' HORIZONTAL SCALE 1"=20 362 362 PROPOSED GRADE TAGE 3: LEVEL 2 36o BIORETENTION SPILLWAY PROPOSED RETAINING WALL 360 (SEE STORMWATER PLANS (SEE STORMWATER PLANS) FOR DESIGN DETAILS) 358 STAGE 3: LEVEL 2 358 BIORETENTION SPILLWAY (SEE STORMWATER PLANS FOR DESIGN DETAILS) " 356 EXISTING 356 GRADE KEY PLAN 354 PROPOSED -- - 354 STABILIZATION SEEDING 352 352 ► I 1 I i\-STAGE 3: LEVEL 2 350 BIORETENTION I3 350 ► (SEE STORMWATER PLANS) 1 1 1 1 O 1► 348 11 348 L----------------------------- ry — ---- ---- ----J DIVERSION SWALES IS1 a-IS1 g 346 346 STAGE 2. INTERMEDIATE BIORETENTION STAGE 3: LEVEL 2 344 344 ROUGH GRADE BIORETENTION I2 PROPOSED OUT344 DIMENSIONS ISSUE (SEE STORMWATER PLANS) CULVERT (i8 INCH RCP) CULVERT R TOP WIDTH - 12.0 FT. US INV. = 348.3 FT, MAX. DEPTH - 2.0 FT. REV # DATE DESCRIPTION PROPOSED STRUCTURAL 343 342 STAGE 1: DS INV. = 346.5 FT FILL SEE NOTES SHEET 18 342 12.0' ESIGN SEDIMENT SEE STORMWATER PLANS CHANN L W1DTH BASIN FOR DETAIL #1 3/2/18 PER COUNTY COMMENTS 340 340 342 #2 1 4/16/18 PER COUNTY COMMENTS 0+00 0+10 0+20 0+30 0+40 0+50 o+6o 0+70 o+8o o+go 1+00 1+10 1+20 1+30 1+40 1+50 1+6o 1+70 1+8o 1+90 2+00 2+10 2+20 341 CROSS SECTION D-D' (SB2/BMP I2/I3) p ?� ti 4,0' CHANN L VERTICAL SCALE: 1"=4' HORIZONTAL SCALE 1"=20 CAPACI 3400 5 10 15 20 DISTANCE (FT.) DIVERSION SWALE CROSS-SECTION 364 -------- 364 I VERTICAL SCALE: 1 " = 2' HORIZONTAL SCALE: 1 " = 5' 362 I I PROPOSED EC-2 MATTIN 362 (SEE DETAILS 1-3, SHEET 14) 36o STAGE ]: SEDIMENT 360 GRADE p,LT H op yf �XISTING TRAP SPILLWAY (SEE I DETAIL 6, SHEET i8) 4' O� 358 358 _ j f o �, SCOTT C. BLOSSOM � — M Lic. No. 40287 356 _ N o __ 356 I \ . � __ I `� r � O �W� •��SSIO NAL 354 I / 354 I I I I Y 352 352 j PROPOSED COMPACTE I STAGE 1: SEDIMENT TRAP-, STRUCTURAL FILL SEE 350 NOTES SHEET ES-4 APPROXIMATE 350 Job No: Drawn By: BCE (SEE DESIGN AND SIZING AND SWM PLANS STREAM CHANNEL Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. SUMMARY ON SHEET LOCATION i ES-8) BLOCK I: CROSS SECTIONS (1) 348 -- -- -- -- -- -- -- -- -- -- -- -- -- — 348 0+00 0+10 0+20 0+30 0+40 0+50 o+6o 0+70 o+8o o+go 1+oo 1+10 1+20 1+30 1+40 CROSS SECTION E-E' (SEDIMENT TRAP) VERTICAL SCALE: 1"=4' HORIZONTAL SCALE 1"=20 ES 10 FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEW\Design and Analysis\CAD\005_RivannaPH2_ESC_REV2.dwgI Hill lApr 12, 2018 at 11:551Layout: 10 Blk 11 (XS) DIVERSION CHANNEL JS1 CALCULATIONS: RATIONAL METHOD, Q = CiA D\ / / V r + �/ / DA IS21b k / \ LEGEND C 0.50 BARE SOIL) \ / / 5.99 AC k I = (ROUGH USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.07= 0.204 HOURS Tt SHALLOW WITH LENGTH OF 331 FT AND SLOPE OF 0.10 - 0.018 HOURS X / + / / / R I VAN NA VILLAGE: Tt CHANNEL WITH LENGTH OF 236.6 FT AND SLOPE OF 0.025 = 0.010 HOURS Tc = 0.231 HOURS = 13.87 MINUTES � k / • PROPOSED LIMITS EROSION AND SEDIMENT USING NOAA'S PRECIPITATION FREQUENCY DATA SERVER (http://hdsc.nws.noaa.gov/hdsc/pfdsn, 10 MINUTE 2-YR i - 3.98 INCHES/HOUR I \ '� X / X-� OF DISTURBANCE CONTROL PLAN 10 MINUTE 10-YR i = 5.25 INCHES/HOUR A =2.51 ACRES x + 2-YR PEAK FLOW = 0.50 x 3.98 x 2.51 = 5 CFS 10-YR PEAK FLOW = 0.50 x 5.25 x 2.51 = 6.6 CFS = 7 CFS SLOPE OF PROPOSED CHANNEL = RISE / RUN = 8 FT / 340 FT = 0.024 \ \ / \ / / + • • SITE BENCHMARK (PER ROUDABUSH, GALE AND AMENDMENT 1 AND PHASE USING PLATE 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, V = 2.5 FT/S MINIMUM FLOW AREA (A) - Q / V - 7 / 2.2 - 2.8 SOFT DESIGN DEPTH (d) = 2 FT\, , \ / / x + // - •11 • • , / • ` • OD / ASSOC. SURVEY) ALBEMARLE COUNTY, VIRGINIA DESIGN BOTTOM WIDTH (b) - 4 FT GIVEN 2:1 SIDE SLOPE, e = 2 FT x d = 2 FT x 2 = 4 FT Z=e/d=4FT/2FT=2 \ I \/ xD"/1/`•SURVEY) } B 12 • • • • , 1 Ell' EXISTING WETLANDS (PER KIRK HUGHES & ASSOC. TRAPEZOIDAL CHANNEL CROSS -SECTIONAL AREA (A) = (b x d) + [Z x (d ^ 2)] ^ / ' \ / • `• / = (4 FT x 2 FT) + [2 x ((2 FT) 2)] = 16 SQFT TRAPEZOIDAL CHANNEL TOP WIDTH = b + (2 x d x Z) = 4 FT + (2 x 2 FT x 2) = 12 FT TRAPEZOIDAL CHANNEL HYDRAULIC RADIUS (R) _ {(b x d) + [Z x (d^2)]} / {b + {(2 x d x [((Z- 2) + 1)^(1/2)]}} ^2) ^ \ , / 1f % • I• • / • / • �� EXISTING STREAM CHANNEL LIMITS _ {(4 x 2) + [2 x (2^2)]} / {4 + {(2 x 2 x [((2 + 1) (1/2)]}} - 1.23 FT j k SEE STORMWATER PLANS (STAGE 3) FOR PRINCIPAL • SPILLWAY DESIGN SPECIFICATIONS, ELEVATIONS • • (PER KIRK HUGHES & ASSOC. CHANNEL LINING =VEGETATED WITH EC-2 MATTING, PERMISSIBLE VELOCITY OF 0.0-4.0 FT/S41 \ / t• � / AND DIMENSIONS. PERMANENT RCP SHALL BE \ SURVEY) (VDOT APPROVED MATERIALS, AUGUST 2014, SECTION 57) (http://www. vi rg i n i adot.org/business/resources/Materials/Approved_Lists. pdf) USING TABLE 5-13 OF THE VESCH, RETARDANCE CLASSIFICATION = C USING PLATE 5-29 OF THE VESCH, ROUGHNESS COEFFICIENT (n) = 0.046 ' ' 1 ' , i I V TSC INSTALLED WITH DURING STAGE 1 ACTIVITIES AND 4000, • MODIFIED PER STANDARDS DEPICTED ON SHEET 17 • AND 18. PERMANENT RISER TO TO FINALIZED / • • ` DURING STAGE 2 AS SPECIFIED ON SHEET 12. I 00 EXISTING POND (PER KIRK HUGHES & ASSOC. SURVEY) MAX CAPACITY FLOW - (1.49 / n) x [R ^ (2/3)] x [S ^ (1 /2)] x A - (1.49 / 0.046) x [1.23 ^ (2/3)] x [0.024 ^ (1 /2)] x 16 I 1 / / = 92.2 CFS +� • �r MAX CAPACITY VELOCITY - (1.49 / n) x [R ^ (2/3)] x [S -(1/2)] _ (1.49 / 0.056) x [1 .23 ^ (2/3)] x [0.024-(1/2)] DIMENSIONS: F DA IS1e � now,, V_ am" ' � � � • 0000' � � Q5 • 4 385.4 ) APPROXIMATE EXISTING TREE LINE (PER KIRK HUGHES & ASSOC. MINIMUM BOTTOM WIDTH = 4TT/S MINIMUM DEPTH = 2 FT MINIMUM SIDE SLOPE = 2:1 0.71 AC RWD j \ • . \�- SURVEY) BICE AVERAGE CHANNEL SLOPE = 0.024 LINING = VEGETATED WITH EC-2 MATTING , \ } 000 • / EXISTING ROAD \ \ + • ( ) (PER KIRK HUGHES & ASSOC. SURVEY) DIVERSION CHANNEL JS2b CALCULATIONS: \ / \ ,�-� • n : _ ,� Blossom Consulting and Engineering Inc. RATIONAL METHOD, Q = CiA C - 0.50 (ROUGH BARE SOIL) / \ / '� / CRS / / ' y> / u\ EXISTING FENCE 1101 Professional Drive, Suite G Williamsburg VA 23185 USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, / / / • • } (PER KIRK HUGHES & ASSOC. p: 757-870-4825 Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.12= 0.009 HOURS Tt SHALLOW WITH LENGTH OF 274 FT AND SLOPE OF 0.044 = 0.023 HOURS Tt CHANNEL WITH LENGTH OF 154.7 FT AND SLOPE OF 0.052 = 0.005 HOURS Tc = 0.036 HOURS = 2.18 MINUTES } ` \ / DA JS1 a . • � �/ �� • �\ / ��� SURVEY) EXISTING BUILDING USING NOAA'S PRECIPITATION FREQUENCY DATA SERVER (http://hdsc.nws.noaa.gov/hdsc/pfds�, 10 MINUTE 2-YR i - 3.98 INCHES/HOUR 10 MINUTE 10-YR i = 5.25 INCHES/HOUR ` SB11 / \ / ,r DV I 2.51 AC • • X / (PER KIRK HUGHES &ASSOC. SURVEY) A - 2.86 ACRES 2-YR PEAK FLOW 2.86= CFS ` / \ // /' • • •• • / \ = 0.50 x 3.98 x 5.7 10-YR PEAK FLOW = 0.50 x 5.25 x 2.86= 7.5 CFS SLOPE OF PROPOSED CHANNEL = RISE / RUN - 10 FT / 247 FT = 0.079 USING PLATE 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, V = 4.6 FT/S } ` ` - . / ` / / 1 /'� • / / , • / EXISTING CONTOURS I ,\ \ \ MINIMUM FLOW AREA (A) = Q / V = 7.5 / 4.6 = 1.6 SQFT % - .. / �` / • / • / , �� (PER KIRK HUGHES & ASSOC. \ \ DESIGN DEPTH (d) = 2 FT DESIGN BOTTOM WIDTH - 4 FT L ` 1 / SURVEY) (b) GIVEN 2:1 SIDE SLOPE, e = 2 FT x d = 2 FT x 2 = 4 FT Z-e/d=4FT/2FT-2 TRAPEZOIDAL CHANNEL CROSS SECTIONAL AREA (A) _ (b x d) + [Z x (d ^ 2)] �� • • / / EXISTING STREAM BUFFER / _ (4 FT x 2 FT) + [2 x ((2 FT) ^ 2)] - 16 SQFT TRAPEZOIDAL CHANNEL TOP WIDTH = b + (2 x d x Z) = 4FT + (2 x 2 FT x 2) = 12 FT TRAPEZOIDAL CHANNEL HYDRAULIC RADIUS (R) _ {(b x d) + [Z x (d^2)]} / {b + {(2 x d x [((Z^2) + 1)^(1/2)]}} ` } � W / � (PER ALBEMARLE COUNTY) _ {(4 x 2) + [2 x (2 ^ 2)]} / {4 + {(2 x 2 x [((2 ^ 2) + 1) ^ (1 /2)]}} 1.23 FT CHANNEL LINING - VEGETATED WITH EC-3 MATTING, PERMISSIBLE VELOCITY OF 4.0 - 7.0 FT/S (VDOT APPROVED MATERIALS, AUGUST 2014, SECTION 57) �� } S S � • / • / PROPOSED DIVERSION DIKE �� �� �� (http://www.virginiadot.org/business/resources/Materials/Approved_Lists.pdf) / USING TABLE 5-13 OF THE VESCH, RETARDANCE CLASSIFICATION = C USING PLATE 5-29 OF THE VESCH, ROUGHNESS COEFFICIENT (n) = 0.036 k / X \ / • . \ \\ \\ / \\ J/ MAX CAPACITY CAPACITY FLOW = (1.49 / n) x [R ^ (2/3)] x [S ^ (1 /2)] x A = (1.49 / 0.036) x [1.23 ^ (2/3)] x [0.079 ^ (1 /2)] x 16 =CFS MAX CAPACITY VELOCITYY = = ( (1 .49 / n) x [R ^ (2/3)] x [S ^ (1 /2)] _ (1.49 / 0.036) x [1.23 ^ (2/3)] x [0.079 ^ (1 /2)] PROPOSED CLEAR WATER CWD =1 3.4 FT/S I / / • 1 / 7 J i DIVERSION KEY PLAN DIMENSIONS: MINIMUM BOTTOM WIDTH = 4 FT MINIMUM DEPTH = 2 FT MINIMUM SIDE SLOPE = 2:1 OP • • A PROPOSED SUPER SILT FENCE AVERAGE CHANNEL SLOPE = 0.079 LINING = VEGETATED WITH EC-3 MATTING \ F / x, X TJS1 --� INSTALL TEMPORARY SEDIMENT TRAPS IN LOCATION OF FUTURE J1 AND J2 BMPS PER DESIGN x SS`Fi CLEAR WATER DIVERSION JS2a �I SPECIFICATIONS AND DIMENSIONS DEPICTED HEREIN. INSTALL OUTFALL PROTECTION AT CALCULATIONS: RATIONAL METHOD, Q = CiA CI r / DIVERSION OUTFALLS AND AT OUTFALL OF PROPOSED SEDIMENT TRAP PER DETAILS ON SHEET 1 PROPOSED STOCKPILE WITH PERIMETER CONTROLS (SILT SP C = 0.20 (MIXED LANDUSE) USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK,°L � 17 AND 18. 1-)6 FENCE) Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.08- 0,193 HOURS �o v �� I \ 000, �� Tt SHALLOW WITH LENGTH OF 580 FT AND SLOPE OF 0.064 = 0.040 HOURS Tt CHANNEL WITH LENGTH OF 574.2 FT AND SLOPE OF 0.026 - 0.024 HOURS Tc = 0.256 HOURS = 15.37 MINUTES �� a 0000' • • PROPOSED CONSTRUCTION ENTRANCE CE USING NOAA'S PRECIPITATION FREQUENCY DATA SERVER (http://hdsc.nws.noaa.gov/hdsc/pfds�, 10 MINUTE 2-YR i = 3.98 INCHES/HOUR x O + • 10 MINUTE 10-YR i = 5.25 INCHES/HOUR *040 � � � • A = 5.26 ACRES 2-YR PEAK FLOW = 0.20 x 3.98 x 5.26= 4.2 CFS 10-YR PEAK FLOW = 0.20 x 5.25 x 5.26- 5.5 CFS � / 3 4. U ` I **WON / • PROPOSED TEMPORARY TSC SLOPE OF PROPOSED CHANNEL = RISE / RUN = 36 FT / 808.5 FT = 0.045 USING PLATE 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, V - 3.4 FT/S MINIMUM FLOW AREA V 1.6 SQFT + I S 3166.8 1 STREAM CROSSING ISSUE (A) = Q / = 5.5 / 3.4 = DESIGN DEPTH (d) = 2 FT I DA • DESIGN BOTTOM WIDTH (b) = 4FT v _ CONTRACTOR TO INSTALL TEMPORARY CLEAR k WATER DIVERSIONS UP SLOPE OF PROPOSED LOT GIVEN 2:1 SIDE SLOPE, e = 2 FT x d = 2 FT x 2 = 4 FT PROPOSED SEDIMENT TRAP_ (01) Z=e/d=4FT/2FT=2 / ---___-- GRADING TO DIVERT RUNOFF FROM OFF SITE REV # DATE DESCRIPTION � _� TRAPEZOIDAL CHANNEL CROSS -SECTIONAL AREA (A) = (b x d) + [Z x (d ^ 2)] • _ - --- CONTRIBUTING DRAINAGE AREAS AROUND THE ' - (4 FT x 2 FT) + [2 x ((2 FT) ^2)] - 16 SQFT k / / __- _ -- DISTURBED AREAS DURING CONSTRUCTION. CLEAR ` WATER DIVERSIONS TO REMAIN IN PLACE UNTIL TRAPEZOIDAL CHANNEL TOP WIDTH = b + (2 x d x Z) = 4 FT + (2 x 2 FT x 2) = 12 FT TRAPEZOIDAL CHANNEL HYDRAULIC RADIUS (R) _ {(b x d) + [Z x (d^2)]} / {b + {(2 x d x [((Z 2) + 1)^(1/2)]}} _ {(4 x 2) + [2 x (2 ^ 2)]} / {4 + {(2 x 2 x [((2 ^ 2) + 1) ^ (1/2)]}} I / Yl / :' / _ _--= _ --_ - DISTURBED AREA IS STABILIZED AND STORMWATER ` INFRASTRUCTURE IS INSTALLED. i PROPOSED SEDIMENT BASIN #1 3/2/18 PER COUNTY COMMENTS #2 4/16/18 PER COUNTY COMMENTS - 1.23 FT • CHANNEL LINING =VEGETATED WITH EC-2 MATTING, PERMISSIBLE VELOCITY OF 0-4.0 FT/S j X (VDOT APPROVED MATERIALS, AUGUST 2014, SECTION 57) (http://www.vi rg i n iadot. org/business/resources/Materials/App roved_Lists. pdf) USING TABLE 5-13 OF THE VESCH, RETARDANCE CLASSIFICATION = C I, / • ` PROPOSED CONSTRUCTION CRS USING PLATE 5-29 OF THE VESCH, ROUGHNESS COEFFICIENT (n) - 0.041 MAX CAPACITY FLOW = (1.49 / n) x [R ^ (2/3)] x [S-(1/2)] x A = (1.49 / 0.041) x [1 .23 ^ (2/3)] x [0.045 ^ (1 /2)] x 16 O I"') / r • ROAD STABILIZATION =CFS • .6 MAX CAPACITY VELOCITY = (1.49 / n) x [R-(2/3)] x [S -(1/2)] _ (1.49 / 0.041) x [1 .23 ^ (2/3)] x [0.045 ^ (1 /2)] =8.85 FT/S \ \ PROPOSED CONSTRUCTION DIMENSIONS: 'MINIMUM / ACCESS ROUTE (USE DUST CONTROL BOTTOM WIDTH = 4FT MINIMUM DEPTH = 2 FT k A � PER VESCH 3.39) MINIMUM SIDE SLOPE = 2:1 AVERAGE CHANNEL SLOPE = 0.045 LINED =VEGETATED WITH EC-2 MATTING �\ � � � � �� � � V • DA JS2a • � � -� ,o �\ DA JS2b 2.86 AC 5.26 AC PROPOSED OUTFACE PROTECTION OP SEDIMENT TRAP JS1 i \� CALCULATIONS: DA - 2.51 ACRES REQUIRED STORAGE = 134 CY PER ACRE = 336.3 CY \ OP TJS 2 i \ � �l , '� � � ALT H �� IF VOLUME 1 = 0.85 x NORMAL POOL SURFACE AREA x WET DEPTH, I, I / I / + \ 11l\ 11l ;' 11l NOTE: ALL PERIMETER SILT FENCE ADJACENT TO Q THE REQUIRED NORMAL POOL SURFACE AREA = 168 CY / (0.85 x 2 FT) = 2,671 SF IF VOLUME 2 = [(NORMAL POOL SURFACE AREA + CREST SURFACE AREA) / 21 x DRY DEPTH C \ BLOCK J (EAST) PRESERVED STREAM CHANNELS SHALL BE SUPER SILT FENCE AS SHOWN ON DETAIL SHEET 18. (1 THE REQUIRED CREST SURFACE AREA = [2 x (168 CY / 2 FT)] - 2,671 SF = 1,870 SF (i ` \ / S 4, SCOTT C. BLOSSOM a MINIMUM FLOW PATH LENGTH = 80 FT EFFECTIVE WIDTH - NORMAL POOL SURFACE AREA / LENGTH = 2,671 / 80 - 33.4 FT MINIMUM LENGTH TO WIDTH RATIO = LENGTH / EFFECTIVE WIDTH = 80 / 33.4 = 2.4:1 DIMENSIONS: NORMAL POOL SURFACE AREA = 2,671 SF, ELEVATION = 336 I /\ D` V, \ Lic. No. 40287 MINIMUM FLOW PATH LENGTH = 80 FT MINIMUM EXCAVATION DEPTH = 4 FT, BOTTOM ELEVATION = 332 BANK HEIGHT = 6 FT, ELEVATION = 338 11l 11l 11l �1l Yl \ / 0 �/ �/ �/ N `�I ONAL MINIMUM BERM TOP WIDTH - 3 FT OUTLET HEIGHT = 2 FT, ELEVATION = 336 MINIMUM WEIR LENGTH - 6 x DA - 6 x 2.51 - 15.1 FT \` �l �l P f xNOTE_ : ALL CLEAR WATER DIVERSIONS SHALL �j 0 � TERMINATE INTO OUTFACE PROTECTION RIP MINIMUM EXCAVATION SIDE SLOPE = 2:1 MINIMUM EMBANKMENT SIDE SLOPE = 3:1 \ - - � _ �� _� 6 (CL 1 \ 0 MEOW_\� \�,_ RAP MIN LENGTH 20 FT). SEDIMENT TRAP JS2 \ - Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. CALCULATIONS: d NOTE: ALL SILT FENCE AND SUPER SILT FENCE DA 2.86 ACRES = REQUIRED STORAGE = 134 CY PER ACRE = 383.2 CY R �" \ \ SHALL BE A MINIMUM OF FT FROM STREAM Jc E & S STAGE 1: BLOCK J (EAST) IF VOLUME 1 = 0.85 x NORMAL POOL SURFACE AREA x WET DEPTH, �,��, • • BANKS. SCALE: INCH = 5o FEET THE REQUIRED NORMAL POOL SURFACE AREA - 191.6 CY / (0.85 x 4 FT) - 1,521.7 SF • • \ IF VOLUME 2 = [(NORMAL POOL SURFACE AREA + CREST SURFACE AREA) / 2] x DRY DEPTH \ • •' THE REQUIRED CREST SURFACE AREA - [2 x (191.6 CY / 2 FT)] - 1521.7 SF - 3,651.5 SF NOTE: SILT FENCE SHALL NOT BE MINIMUM FLOW PATH LENGTH = 60 FT EFFECTIVE WIDTH - NORMAL POOL SURFACE AREA / LENGTH = 1521.7 / 60 - 25.4 FT \ INSTALLED ACROSS SPILLWAYS. 0 50 100 150 MINIMUM LENGTH TO WIDTH RATIO = LENGTH / EFFECTIVE WIDTH = 60 / 25.4 = 2.411 DIMENSIONS: OUTFALL ` NORMAL POOL SURFACE AREA = 1522 SF, ELEVATION = 332 CONTOUR INTERVAL = 2FT MINIMUM FLOW PATH LENGTH = 60 FT MINIMUM EXCAVATION DEPTH - 4 FT, BOTTOM ELEVATION - 328 BANK HEIGHT = 2 FT, ELEVATION = 334 MINIMUM BERM TOP WIDTH - 3 FT OUTLET HEIGHT = 2 FT, ELEVATION = 332 MINIMUM WEIR LENGTH = 6 x DA = 6 x 2.86 = 17.2 FT MINIMUM EXCAVATION SIDE SLOPE = 2:1 NOTE: ALL CLEAR WATER DIVERSIONS SHALL TERMINATE INTO OUTFACE PROTECTION (CL 1 RIP MINIMUM EMBANKMENT SIDE SLOPE = 3:1 PHASE 2 • STAGE 1 EROSION AND SEDIMENT CONTROL • PLAN (BLOCK J (EAST)) _ RAP MIN LENGTH 20 FT). N TS PHASE 2: STAGE 2, BLOCK I AND J EAST SUMMARY v I P D I ' �^ �4b.5 + / 1 IP LEGEND �; ) THIS PHASE 2 STAGE 2 EROSION AND SEDIMENT CONTROL PLAN ,/ _\ RIVANNA VILLAGE: FOR RIVANNA VILLAGE BLOCK J (EAST) INCLUDES STABILIZATION f O P / OF UPLAND GRADED AREAS UPON REACHING SITE GRADES. STAGE \ / \ \ I P PROPOSED LIMITS OF DISTURBANCE LOD EROSION AND SEDIMENT 2 PRACTICES SHALL BE IN PLACE UPON COMPLETION OF ROAD '�/ \ \ \ / / I P CONTROL PLAN \ �_' % • • CONSTRUCTION AND INSTALLATION OF STORM DRAINAGE / /✓/� INFRASTRUCTURE. THE STAGE 2 EROSION AND SEDIMENT \ \ \ I • • • / ' / P SITE BENCHMARK CONTROL PLAN FOR BLOCK G INCLUDES THE FOLLOWING �. �. ` \ / • • + (PER ROUDABUSH, GALE AND AMENDMENT 1 AND PHASE 11 MEASURES: �'� v + X BMP 12 ••� / ASSOC. SURVEY) R SU ALBEMARLE COUNTY, VIRGINIA 1.) INSTALLATION OF INLET PROTECTION AT ALL INSTALLED STORM ' ' �� ,_�,\ �� x \ + eG ,� • \ - � • DRAIN INLETS � �� ' � - �_ ; ;_ -, � � 1 P _ � � — � 1 P OP \ .../ I EXISTING WETLANDS W W y PER KIRK HUGHES & ASSOC. �' �' �' ��` SURVEY) 2.) INSTALLATION OF OUTFALL PROTECTION AT ALL STORM �I "3 6 % P + DRAINAGE OUTFALLS. \ kk'� C D '�� ` + \ `� ; ,a; v \ \ \ IS / O P I 6, Q3.) EXISTING STREAM CHANNEL LIMITS ROUGH GRADING OF PROPOSED PERMANENT BMPS (WET \ \ • �,'... �'34 y� \\ a � IP r • SWALES J1 AND J2) TO APPROXIMATE DESIGN ELEVATIONS, AND�i� (PER KIRK HUGHES & ASSOC. SURVEY) / PV -� PERMANENT STABILIZATION OF PERIMETER GRADES. �� � � A � �� i`� \ // \\ \, / EXISTING POND (PER KIRK HUGHES & ASSOC. 4.) INSTALLATION AND STABILIZATION OF PRINCIPAL OUTFALL \\ .. �f WEIRS AS SPECIFIED ON THE STORMWATER MANAGEMENT PLANS \ � \\'\ \( \ BMP 13 ice_ I SURVEY) , (STAGE 3). DO NOT INSTALL FINAL WET SWALE PLANTINGS OR FINE ` / 1 \ \ �\ \\�\ \ \ \\ \ \ I P /, /'' • APPROXIMATE GRADE UNTIL ALL CONSTRUCTION IN THE CONTRIBUTING f\ TS \` EXISTING TREE LINE WATERSHED IS COMPLETE AND/OR PERIMETER EROSION AND \ \� \ \\ \ + I` ` '-�- , . \ SEDIMENT CONTROLS ARE IN PLACE IN ASSOCIATION WITH \ \ \\ \ \ �\ \\ t3'�5 INDIVIDUAL LOT GRADING. V\ \ \ \\ \ \\�+ \ ! • (PER KIRK HUGHES & ASSOC. SURVEY) BICE \ \�. �v A . SITE LANDSCAPING OUTSIDE OF PROPOSED PERMANENT BMPS \\ / �� EXISTING ROAD 5.) ,• \\ \ \\ \ \ / STABILIZE SWALE WITH EC-2 MATTING AND RE -PLANT MAY BE INSTALLED PER THE LANDSCAPE PLANS UNDER \� i l i TRIBUTARY STREAM BUFFER AS SPECIFIED ON (PER KIRK HUGHES & ASSOC. Blossom Consulting Engineering Inc. (PROVIDED \ \ s• ., \ \\ BUFFER MITIGATION PLANS (SHEET SR-3). SURVEY —' ) SEPARATE COVER) ONLY AS APPROVED BY THE LANDSCAPE 1 i 341 `• '! ARCHITECT. _ EXISTING FENCE and 1101 Professional Drive, Suite G 6.) REMOVAL OF TEMPORARY RIGHT OF WAY DIVERSIONS AS \ I \ ` / ,: ; • • (PER KIRK HUGHES & ASSOC. / SURVEY) Williamsburg VA 23185 p 757-870-4825 SHOWN ON THE SITE GRADING PLANS AND STABILIZATION WITH \ BMB M = t r %:` STABILIZATION SEED MIX AND MATTING. ALL DISTURBED AREAS / / \ '• \ �, ••' TO BE SEEDED SHALL RECEIVE 6 INCHES TOPSOIL PRIOR TO + 343.5 \ \ \ \ \\ \ ` ` \/ % / • SEEDING AND MATTING. \ `(�/ \ \\ SEE LANDSCAPE PLANS PROVIDED UNDER E EXISTING BUILDING ) (PER KIRK HUGHES & ASSOC. -, V V'. . ( SEPERATE COVER FOR LANDSCAPE PLANTING \ 341.5 _ � �7.) INSTALLATION OF CHECK DAMS IN STAGE 2 LOW FLOW (STAGE 3 ��,, `l - � _ INSTALLATION AND GUIDELINES REGARDING FINAL \ 342.2 / �-�� SURVEY) \L, \ ;� \\ \ / � �. � �� , STABILIZATION OF LOT AREAS. PER THIS STAGE 2 HIGH FLOW) CHANNELS OF EACH WET SWALE, AND STABILIZATION I:, ! ! \\ \PLAN SET, ALL LOTS SHALL RECEIVE TEMPORARY I EXISTING POWER POLE �L OF LOW FLOW CHANNEL WITH SUBSTRATE ENHANCEMENT (1 FT x i j \ \ TS SEEDING AND/OR TEMPORARY STABILIZATION CLASS 1 RIP RAP OVERLAIN WITH 3-6 INCH ROUNDED RIVER ; I \\ \ \ ` \ / I / ( J MEASURES (I.E. MULCH) UPON COMPLETION OF \ \ / I P 1 P STAGE 2 GRADING ACTIVITIES, J (PER KIRK HUGHES & ASSOC. ` \ - SURVEY) \ \ COBBLE IN LOW FLOW CHANNEL ONLY, BETWEEN CHECK DAMS) .BM EXISTING SIGN 8.) COMPACTED EARTHEN BERM FORMING WET SWALE LOW HEAD �� R R \` \ \ \ �; // / f • EMBANKMENT SHALL BE COMPACTED AND STABILIZED WITH �� PER KIRK HUGHES & ASSOC. SURVEY) / 1 STABILIZATION SEED MIX AND EROSION CONTROL MATTING (EC-2) '•' !VAvv �� i 1, i AS SHOWN ON DETAIL SHEETS 17 AND 18. �� � I �����, 9.) ALL GRADED LOTS SHALL BE TEMPORARILY STABILIZED PER I(/� • VESCH STANDARDS UNTIL INDIVIDUAL LOT CONSTRUCTION IS `f + ' ), • EXISTING CONTOURS (PER KI ��� SURVEY)K HUGHES & ASSOC. \ \� } I�' COMPLETED. BM -- / / W I + ip O P 1o.) PHASE 2 STAGE 2 EROSION AND SEDIMENT CONTROL PLANS _ % DEPICT ELEMENTS TO BE IN PLACE PRIOR TO CONVERSION TO y+ - \ • PERMANENT BMP FACILITIES AS SHOWN ON THE STORMWATER j / EXISTING STREAM BUFFER ( (PER ALBEMARLE COUNTY) PLAN (STAGE 3 TO BE COMPLETED UPON COMPLETION OF LOT 's. OP 1 / •, • �� KEY PLAN CONSTRUCTION AND FINAL STABILIZATION OF UPLAND DRAINAGE PLACE RIPRAP ON SPILLWAY AS SPECIFIED x / �� AREAS) IN STAGE 3 SWM PLAN SET. CD 1 P • PROPOSED LOTS (STABILIZED 1 �� • / TS /. UPON COMPLETION OF PHASE 2) 1 - 11.) ALL EROSION AND SEDIMENT PERIMETER CONTROLS SHALL -- SSF x \ F I CD REMAIN IN PLACE THROUGHOUT CONSTRUCTION ACTIVITIES AND REMOVED ONLY WHEN FINAL SITE STABILIZATION IS ACHIEVED.:. / ;', TS + PROPOSED LANDSCAPE PLANTINGS (SEE LANDSCAPE PLANS) STAGE 2 INTERMEDIATE BMP 11 EMBANKMENT TO _ • BE COMPACTED AND STABILIZED PER C �/ /` I - ~^i :,''/ _ SPECIFICATIONS ON STAGE 3 STORMWATER PLANS X CD/ o i / /� AND STABILIZED WITH STABILIZATION SEED MIX �,., �� \---•_.� AND EC-3 MATTING. ALL DISTURBED AREAS TO PROPOSED STORM DRAIN (SEE , SITE PLANS BYALAN X ' RECEIVE SEED MIX SHALL BE FINE GRADED WITH 6 3 / j �/ I INCHES TOPSPOIL PRIOR TO SEED APPLICATION PER I P • \, FRANKLIN P.E.) �� VESCH STANDARDS AND SPECIFICATIONS. t / a / 1 F • / / �T I P BM °� J / �/ I PROPOSED RIGHT OF WAY DIVERSION RWD I P i i I PROPOSED SUPER SILT FENCE SSF x ISSUE REV # DATE DESCRIPTION o J I P= PROPOSED OUTFALL PROTECTION OP #1 3/2/18 PER COUNTY COMMENTS #2 4/16/18 PER COUNTY COMMENTS + 3 0.7 �� -OP� BMP J2 • \ PROPOSED INLET PROTECTION SSF C \ ' I �� PROPOSED INTERMEDIATE BMP i I • 2 • (� GRADING (STAGE E&S) \' 9z - STAGE 2 INTERMEDIATE BMPS J1 AND J2 :^ \ 2 - EMBANKMENTS TO BE COMPACTED AND j STABILIZED PER SPECIFICATIONS ON STAGE 3 1, + �\ i i ' • I /' STORMWATER PLANS AND STABILIZED WITH / �,I/ CD PB i I STABILIZATION SEED MIX AND EC-2 MATTING. ALL \ �� PERMANENT I STABILIZATION DISTURBED AREAS TO RECEIVE SEED MIX SHALL BE I' ;+ \ 1 \ I u • • / -� FINE GRADED WITH 6 INCHES TOPSOIL PRIOR TO \ y� \I/ JJ SEED APPLICATION PER VESCH STANDARDS AND BM M + 1'� \ ,I SPECIFICATIONS. I BLOCK J (EAST)-�� + ', ', TEMPORARY TS �LTH op °r ) :y \ \ �.% � STABILIZATION SCOTT C. BLOSSOM \ \ a \ PROPOSED SEEDING gM AND EROSION CONTROL Lic. No. 40287 \ X MATTING IONAL 3 6 0 o .- OP � PROPOSED BLOCK LIMITS \ , N \ \ NOTE: ALL PERIMETER SILT FENCE ADJACENT TO Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. PRESERVED STREAM CHANNELS SHALL BE SUPER • �----\ SILT FENCE AS SHOWN ON DETAIL 4, SHEET 18. • � I' • \ \ E & S STAGE 2: BLOCK J (EAST) • I . • • \ \ NOTE: SEE STORMWATER MANAGEMENT PLANS •' \ OUTFALL \ STAGE FOR STABILIZATION AREAS AND PROPOSED �' 3 • i' • \ \ MEASURES TO BE IMPLEMENTED IN STAGE 2 SCALE: 1 INCH = 5o FEET / , • • \ \ DURING INTERMEDIATE BMP GRADING STAGE. 3 �. • 0' 50' 100' 150' '' \ \ CONTOUR INTERVAL = 2 FT ES 12 PHASE 2: STAGE 2 EROSION AND SEDIMENT CONTROL PLAN (BLOCK J (EAST)) 344 343 342 341 DIVERSION SWALE JS2b among ■ • J CHANNEL �MENE WIDTH 001111 .............. 3400 5 10 15 20 DISTANCE (FT.) DIVERSION SWALE CROSS-SECTION VERTICAL SCALE: 1 " = 2' HORIZONTAL SCALE: 1 " = 5' DIMENSIONS TOP WIDTH - 12.0 FT. MAX. DEPTH - 2.0 FT. 34 344 342 340 338 336 334 332 330 328 34 344 342 340 338 336 334 332 330 328 0+00 0+10 0+20 0+30 0+40 0+50 o+6o 0+70 o+8o o+go 1+oo 1+10 1+20 1+30 1+40 1+50 CROSS SECTION F-F(SEDIMENT TRAP JS1) VERTICAL SCALE: 1"=4' HORIZONTAL SCALE 1"=20 340 340 338 338 STAGE 1: SEDIMENT EXISTING TRAP SPILLWAY (SEE 336 \ GRADE DETAIL 6, SHEET > 8) 336 \ 334 \ 334 PROPOSED STRUCTURAL 332 FILL SEE NOTES SHEET 18 332 y � 330 330 \--PROPOSED GRADE 328 328 STAGE i1 SEDIMENT TRAP \ jl 326 — - -STAGE 3: LEVEL 2 WET SWALE (J2) 1326 II (SEE STORMWATER PLANS) 324 �� -- -- -- -- -- -- -- --� 324 0+00 0+10 0+20 0+30 0+40 0+50 o+6o 0+70 o+8o o+go 1+oo 1+10 1+20 1+30 1+40 CROSS SECTION G-G' (SEDIMENT TRAP JS2) VERTICAL SCALE: 1"=4' HORIZONTAL SCALE 1"=20 RIVANNA VILLAGE: EROSION AND SEDIMENT CONTROL PLAN AMENDMENT 1 AND PHASE II ALBEMARLE COUNTY, VIRGINIA SCE Blossom Consulting and Engineering Inc. 1101 Professional Drive, Suite G Williamsburg VA 23185 p: 757-870-4825 KEY PLAN ISSUE REV # DATE DESCRIPTION #1 3/2/18 PER COUNTY COMMENTS #2 4/16/18 PER COUNTY COMMENTS AtiT H op I'r� o � U SCOTT C. BLOSSOM a Lic. No. 40287 o 147 �s`SIONAL E��1 Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. BLOCK J (EAST): CROSS SECTIONS FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEW\Design and Analysis\CAD\005_RivannaPH2_ESC_REV2.dwgIHill jApr 12, 2018 at 11:561Layout: 13 Blk Jeast (XS) ES - 13 SEDIMENT TRAP JS3 CALCULATIONS: / } / SC ' DA = 2.15 ACRES REQUIRED STORAGE = 134 CY PER ACRE 288.1 CY EXISTING SEDIMENT TRAP FROM PHASE ^ LEGEND F IF VOLUME 1 = 0.85 x NORMAL POOL SURFACE AREA x WET DEPTH, THE REQUIRED NORMAL POOL SURFACE AREA = 144.1 CY / (0.85 x 4 FT) = 1,144 SF IF VOLUME 2 = [(NORMAL POOL SURFACE AREA + CREST SURFACE AREA) / 2] x DRY DEPTH / 1 TO REMAIN DURING PHASE 2 - CONSTRUCTION. TRAP SHALL, BE __ __- --- - CONVERTED STORMWATER \ } S B \ #4 I RIVAN NA VILLAGE. EROSION AND SEDIMENT THE REQUIRED CREST SURFACE AREA = [2 x (144.1 CY / 2 FT)] - 1,144 SF = 2,745 SF --- -- - - TO BMP PER PHASE PLANS UPON STABILIZATION �, �;' ' MINIMUM FLOW PATH LENGTH = 60 FT EFFECTIVE WIDTH = NORMAL POOL SURFACE AREA / LENGTH = 1144 / 60 = 19.1 FT 1 � BLOCK H OF CONTRIBUTING WATERSHED / } �� % PROPOSED LIMITS OF DISTURBANCE CONTROL PLAN MINIMUM LENGTH TO WIDTH RATIO = LENGTH / EFFECTIVE WIDTH = 60 / 19.1 = 3:1 DIMENSIONS: / NORMAL POOL SURFACE AREA = 1144 SF, ELEVATION = 348V MINIMUM FLOW PATH LENGTH = 60 FT / y/ / /\ R S' F I -! SITE BENCHMARK AMENDMENT 1 AND PHASE II MINIMUM EXCAVATION DEPTH = 4 FT, BOTTOM ELEVATION = 342 BANK HEIGHT 2 FT, ELEVATION 350 / / 35 �� / / / I ( (PER ROUDABUSH, GALE AND = = MINIMUM BERM TOP WIDTH = 3 FT / / 5 / " / x 1 \ ASSOC. SURVEY) ALBEMARLE COUNTY, VIRGINIA OUTLET HEIGHT = 2 FT, ELEVATION = 348 MINIMUM WEIR LENGTH = 6 x DA = 6 x 2.15 = 12.9 FT MINIMUM EXCAVATION SIDE SLOPE = 2:1 / / 5 / \ k X / X X L \ , y �y EXISTING WETLANDS MINIMUM EMBANKMENT SIDE SLOPE = 3:1 SEDIMENT TRAP JS4 / / 5 / SC / - X EXISTING SEDIMENT BASIN FROM \ PHASE 1 TO REMAIN UNTIL FINAL x I ` yy'. y� . (PER KIRK HUGHES &ASSOC. SURVEY) CALCULATIONS: DA = 1.31 ACRES REQUIRED STORAGE = 134 CY PER ACRE = 175.5 CY / # 1 5 / / `•; // / 3 CONVERSION TO BMP I1 / I \ ` EXISTING STREAM CHANNEL LIMITS IF VOLUME 1 = 0.85 x NORMAL POOL SURFACE AREA x WET DEPTH, THE REQUIRED NORMAL POOL SURFACE AREA = 87.8 CY / (0.85 x 4 FT) = 697 SF / % J / I \ S t (PER KIRK HUGHES & ASSOC. SURVEY) IF VOLUME 2 = [(NORMAL POOL SURFACE AREA + CREST SURFACE AREA) / 2] x DRY DEPTH THE REQUIRED CREST SURFACE AREA = [2 x (87.8 CY / 2FT)] - 697 SF = 1,674 SF MINIMUM FLOW PATH LENGTH = 145 FT k � � i / ST ^ // \+ EXISTING SEDIMENT TRAP FROM \� I % � PHASE 1 (HSl) TO REMAIN /•J \ � I ` EXISTING POND EFFECTIVE WIDTH = NORMAL POOL SURFACE AREA / LENGTH = 697 / 145 = 4.8 FT MINIMUM LENGTH TO WIDTH RATIO =LENGTH /EFFECTIVE WIDTH = 145 / 4.8 = 30:1 s df L DURING PHASE 2 CONSTRUCTION I f 1 (PER KIRK HUGHES & ASSOC. DIMENSIONS: NORMAL POOL SURFACE AREA = 697 SF, ELEVATION = 336 MINIMUM FLOW PATH LENGTH = 145 FT MINIMUM EXCAVATION DEPTH = 4 FT, BOTTOM ELEVATION = 332 BANK HEIGHT = 2 FT, ELEVATION = 338 MINIMUM BERM TOP WIDTH = 3 FT OUTLET HEIGHT = 2 FT ELEVATION = 336 s / ` + ` , \ 5 7 + \_ 35 f \ x \ X + /. � . ll \ �t .� _ _ _ - _ _ VV ll `- v / _' �_ / / J / i \ % \ ` i�� ) SURVEY APPROXIMATE EXISTING TREE LINE (PER KIRK HUGHES & ASSOC. 113CE MINIMUM WEIR LENGTH = 6 x DA = 6 x 1.31 = 8 FT � � � BM 3 4 7.0 X / -� --��� �- SURVEY) MINIMUM EXCAVATION SIDE SLOPE = 2:1 MINIMUM EMBANKMENT SIDE SLOPE = 3:1 SEDIMENT TRAP JS5b \ \ ` / \ 344.6 \ �. + L \ X / X + r- x �' \ti x / x I \ 3 �% ` `� X / x / �l SSF x j X - X - x \+�� \ EXISTING ROAD (PER KIRK HUGHES &ASSOC. Blossom Consulting Engineering Inc. CALCULATIONS: = 1.53 ACRES I--- I�- I � + � \ X \ vc, L O \ / / \ RWD - `- -- X + �� � � �, + x � i -� SURVEY) and 1101 Professional Drive, Suite G Williamsburg VA 23185 g RE REQUIRED STORAGE = 134 CY PER ACRE = 205.0 CY IF VOLUME 1 = 0.85 x NORMAL POOL SURFACE AREA x WET DEPTH, THE REQUIRED NORMAL POOL SURFACE AREA = 102.5 CY / (0.85 x 4FT) = 814.1 SF \ \ \ \ + J O � j= \ x P ` ` I\ \" - ` �� r + EXISTING FENCE (PER KIRK HUGHES & ASSOC. p: 757-870-4825 ITHE REQUIRED CREST SURFACE AREA = [2 x (102.5 CY / 2 FT)] - 814.1 SF VOLUME 2 = [(NORMAL POOL SURFACE AREA + CREST SURFACE AREA) / 2] x DRY DEPTH j SURVEY) F = 1953.4 SF \ \ k / �� MINIMUM FLOW PATH LENGTH = 45 FT \ X �4 O P �� KEY PLAN EFFECTIVE WIDTH = NORMAL POOL SURFACE AREA / LENGTH = 814.1 / 45 = 18.1 FT MINIMUM LENGTH TO WIDTH RATIO = LENGTH / EFFECTIVE WIDTH = 45 / 18.1 = 2.5:1 DIMENSIONS: \ ' \ \ � / �\ / (i f 3 3 `j �\ /�c� C EXISTING BUILDING PER KIRK HUGHES & ASSOC. -, f �L NORMAL POOL SURFACE AREA = 814.1 SF, ELEVATION = 348 MINIMUM FLOW PATH LENGTH = 45 FT o + \ 0000 ~I ^ � 3 \^ 3L 4- SURVEY) \ MINIMUM EXCAVATION DEPTH - 4 FT, BOTTOM ELEVATION - 344 BANK HEIGHT = 2 FT, ELEVATION = 350 IL MINIMUM BERM TOP WIDTH = 3 FT ST / k �� Y \ \ EXISTING CONTOURS \ OUTLET HEIGHT = 2 FT, ELEVATION = 348 MINIMUM WEIR LENGTH = 6 x DA = 6 x 1.53 = 9.2 FT � JS3 / �2 (PER KIRK HUGHES & ASSOC. SURVEY) MINIMUM EXCAVATION SIDE SLOPE = 2:1 MINIMUM EMBANKMENT SIDE SLOPE = 3:1 ' \ / } _-- CLEAN WATER DIVERSION JS5a CALCULATIONS: RATIONAL METHOD, Q = CiA ► \ o CRS + ♦ ; - / W. + ` = \ / EXISTING STREAM BUFFER (PER ALBEMARLE COUNTY) A= 2.09 ACRES C = 0.21 (MIXED LANDUSE) USING PLATES 5-1 AND 5-2 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, ` \ , ♦♦ S a Q 3 5 7. 10. �J ` I _ Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.042= 0.250 HOURS \ 51 \ 1 Tt SHALLOW WITH LENGTH OF 221 FT AND SLOPE OF 0.049 = 0.017 HOURS Tt CHANNEL WITH LENGTH OF 86.8 FT AND SLOPE OF 0.104 = 0.002 HOURS Tc = 0.269 HOURS = 16.13 MINUTES ` \ . ♦ \ o '� • \ �- DA JS3 INSTALL TEMPORARY SEDIMENT TRAPS IN/I ` LOCATION OF FUTURE J3 AND J5 BMPS PER DESIGN SPECIFICATIONS AND DIMENSIONS PROPOSED DIVERSION DIKE DV `\ ` 2.15 AC \ \\ X ` DEPICTED HEREIN. INSTALL OUTFALL �\ J USING NOAA'S PRECIPITATION FREQUENCY DATA SERVER (http://hdsc.nws.noaa.gov/hdsc/pfdsn, 10 MINUTE 2-YR i = 3.98 INCHES/HOUR /j o 3 \ ♦ `t \� ♦ ` / PROTECTION AT DIVERSION OUTFALLS AND 10 MINUTE 10-YR i = 5.25 INCHES/HOUR 2-YR PEAK FLOW = 0.21 x 3.98 x 2.09= 1.74 CFS 1 0-YR PEAK FLOW = 0.21 x 5.25 x 2.09= 2.3 CFS \ \ \ ` \ ♦ o / AT OUTFALL OF PROPOSED SEDIMENT TRAPS f SF ` / �, I PER DETAILS ON SHEET 17 AND 18. PROPOSED CLEAR WATER CWD SLOPE OF PROPOSED CHANNEL = RISE / RUN = 25 FT / 404 FT = 0.062 MAX. PERMISSIBLE VELOCITY OF EC-2 MATTING, V = 4.0 FT/S (USE 2.7 FT/S) MINIMUM FLOW AREA (A) = Q / V = 1.9 / 2.7 = 0.7 SQFT \5- \0000\ ` *00,00 - ♦ \ \ ♦ vvv� DIVERSION DESIGN DEPTH (d) = 2 FT DESIGN BOTTOM WIDTH (b) = 4 FT GIVEN 2:1 SIDE SLOPE, e=2FTxd=2FTx2=4FT \ ` \ r! \ \0 ► \ / f \ / 1 c:1,_ PROPOSED SUPER SILT FENCE SSF Z=e/d=4FT/2FT=2 TRAPEZOIDAL CHANNEL CROSS -SECTIONAL AREA (A) = (b x d) + [Z x (d ^ 2)] ` ♦ \ / \ BLOCK J (WEST) I, Y� / = (4 FT x 2 FT) + [2 x ((2 FT) ^ 2)] = 16 SQFT MOORS\ � \ / \ TRAPEZOIDAL CHANNEL TOP WIDTH = b + (2 x d x Z) = 4 FT + (2 x 2 FT x 2) = 12 FT TRAPEZOIDAL CHANNEL HYDRAULIC RADIUS (R) _ {(b x d) + [Z x (d ^ 2)]} / f b + f (2 x d x [((Z ^ 2) + 1) ^ (1 /2)]}} �� , - ♦ \\ \\ i �- _ j \ j \ / / PROPOSED STOCKPILE WITH PERIMETER CONTROLS (SILT SP ={(4 x 2) + [2 x (2 ^ 2)]} / {4 + {(2 x 2 x [((2 ^ 2) + 1) ^ (1 /2)]}} \ \\ \ i f / i / 3 0.7 FENCE) =1 .23 FT ♦ CHANNEL LINING = VEGETATED WITH EC-2 MATTING, PERMISSIBLE VELOCITY OF 0-4.0 FT/S (VDOT APPROVED MATERIALS, AUGUST 2014, SECTION 57) (http://www.virginiadot.org/business/resources/Materials/Approved_Lists.pdf) ` \ ♦ �J 1 ,-' / = �✓ J \ xx / PROPOSED CONSTRUCTION ENTRANCE CE USING TABLE 5-13 OF THE VESCH, RETARDANCE CLASSIFICATION = C ` USING PLATE 5-29 OF THE VESCH, ROUGHNESS COEFFICIENT (n) = 0.044 MAX CAPACITY FLOW = (1.49 / n) x [R ^ (2/3)] x [S ^ (1 /2)] x A = (1.49 / 0.044) x [1.23 ^ (2/3)] x [0.062 ^ (1 /2)] x 16 =154.9 CFS XX ♦ xX 1 X ♦ / - /_ / ` j \I/ I OP �/ \ ` PROPOSED TSC MAX CAPACITY VELOCITY = (1 .49 /S) x [R ^ (2/3)] x [S ^ (1 /2)] _ (1.49 / 0.041) x [1.23 ^ (2/3)] x [0.062 ^ (1 /2)] DIMENSIONS: ♦ ' `Il \l/ `I'` Imo' X X / ♦ r \�y\�\ l�Il_ \ \` SSF t I, I/ I, I/ 11l � `" �- --=-- \I/ \I/ i / \I j Y/ TEMPORARY STREAM CROSSING ISSUE MINIMUM BOTTOM WIDTH = 4 FT MINIMUM DEPTH = 2 FT ♦ � Y� Y� Y� \Y� - _ _- / ♦ ' .� \ ` BM Sf / X �� / �� -- $ ~ �� \� PROPOSED SEDIMENT TRAP ST MINIMUM SIDE SLOPE = 2:1 AVERAGE CHANNEL SLOPE = 0.062 LINED = VEGETATED WITH EC-2 MATTING I , - -- t 356.7 ; \ x �X \ ` S� ,� ♦ � ® i X� � i � \ REV # DATE DESCRIPTION PER COUNTY COMMENTS NOTE: SEE SHEET 15 FOR ADDITIONAL DIVERSION DIKE SIZING INFORMATION X - x ��\ ' �I - \ SSF OP � ��� DU � \ \ ` / s k � � X � � � � � �� #1 3/2/18 #2 4/16/18 PER COUNTY COMMENTS + _ - JS5b AJ( �( � �( \jj \VI,r I � PROPOSED SEDIMENT BASIN S'$ NOTES AND CONSTRUCTION /♦♦ DV + i 3 PROPOSED CONSTRUCTION cRs s \ ROAD STABILIZATION SEQUENCE ♦ DA JS4 PROPOSED CONSTRUCTION FINAL LOCATION OF ALL CONSTRUCTION ACCESS & PROPOSED I `♦ Q ` �, ST r ' 1.31 AC 15� JS4 r ACCESS ROUTE (USE DUST CONTROL ♦` `\ ,_. \ PER VESCH 3.39) STAGING &STOCKPILE LOCATIONS TO BE APPROVED AND x \ -- s - k I s ��\ CONFIRMED WITH ALBEMARLE COUNTY AND PROPERTY OWNER ♦ x ♦ ` / c �i PRIOR TO CONSTRUCTION AND IS THE RESPONSIBILITY OF THE ' x� PROPOSED RIGHT-OF-WAY RWD CONTRACTOR TO COORDINATE. 368.8 ♦♦ x I� f i DIVERSION IF tiT H OF 1. CONTRACTOR TO PERFORM ROUGH GRADING WHERE SHOWN ON THIS SHEET. x `♦ CWD ` ♦ JS5a DA JS5b \k , 1 AC ' \4- \� , SSF �� � ✓ 2. ALL DENUDED OR DISTURBED AREAS TO BE PERMANENTLY ` .53 1 x ` x 3g4 SCOTT C. BLOSSOM y STABILIZED IMMEDIATELY AFTER FINAL GRADE. �. • 3 ♦` '` Lic. No. 40287 ' _ x j 'f NOTE: ALL PERIMETER SILT FENCE ADJACENT PRESERVED STREAM CHANNELS SHALL TO BE SUPER � ♦ ♦� // NOTE: ALL CLEAR WATER DIVERSIONS SHALL DA JS5a / j; SILT FENCE AS SHOWN ON DETAIL 4, SHEET 18. SIONAL TERMINATE INTO OUTFACE PROTECTION (CL 1 RIP RAP MIN LENGTH 20 FT). ' 2.09 AC ♦• 11�0 �♦ }/ / x NOTE: ALL CLEAR WATER DIVERSIONS SHALL _ �' TERMINATE INTO OUTFALL PROTECTION (CL 1 RIP NOTE: ALL SILT FENCE AND SUPER SILT FENCE `.♦ i 0 • RAP MIN LENGTH 20 FT). Job No: 1005 Drawn By: BCE SHALL BE A MINIMUM OF 5 FT FROM STREAM ' x j' / Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. BANKS. ' ` ` ,-------__ / x , • x '` / E & S STAGE 1: BLOCK J (WEST) NOTE: TO INSTALL CLEAN WATER DIVERSION JS5a ♦ ' ♦` 379.0 x /I' CONTRACTOR TO INSTALL TEMPORARY CLEAN � � x ; I' WATER DIVERSION UP SLOPE OF PROPOSED LOT / THE CONTRACTOR SHALL CONSTRUCT A SMALL (1 ♦ / x GRADING TO DIVERT RUNOFF FROM OFF SITE FT HEIGHT) BERM ACROSS THE SHALLOW, POORLY ` 1 , x CONTRIBUTING DRAINAGE AREAS AROUND THE DISTURBED AREAS DURING CONSTRUCTION. i DEFINED SWALE AND CUT THE HIGH POINT ♦♦ RIGHT OF WAY DIVERSIONS TO REMAIN IN PLACE BETWEEN THE SWALE AND THE OUTFACE TO 1 V UNTIL DISTURBED AREA Is STABILIZED AND �, �- ' Q SCALE: 1 INCH = 5o FEET CREATE POSITIVE DRAINAGE TOWARDS THE ' % STORMWATER INFRASTRUCTURE IS INSTALLED. EXISTING WETLAND SYSTEM. ES 14 PHASE 2: STAGE 1 EROSION AND SEDIMENT CONTROL PLAN (BLOCK J (WEST)) 0' 501 1001 1501 NOTE: SILT FENCE SHALL NOT BE INSTALLED ACROSS SPILLWAYS. CONTOUR INTERVAL = 2 FT FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEW\Design and Analysis\CAD\005_RivannaPH2_ESC_REV2.dwgIHill Apr 12, 2018 at 11:561Layout: 14 ES Blk Jwest (1) PHASE 2: STAGE 2, BLOCK J (WEST) - - _ y � 3 \ I `, _ - i _ D, 5 % �,, \ `' a; �� \\ LEGEND SUMMARY THIS PHASE 2 STAGE 2 EROSION AND SEDIMENT CONTROL PLAN FOR RIVANNA VILLAGE BLOCK J _ A ,• BLOCK H 6BMP H1 // / /�.� / \\ + / ti % q \\ // / \\ = - `` 'y `-_ PROPOSED LIMITS OF DISTURBANCE LOD RIVANNA VILLAGE: EROSION AND SEDIMENT (WEST) INCLUDES STABILIZATION OF UPLAND GRADED AREAS UPON REACHING SITE GRADES. STAGE 2 PRACTICES SHALL BE IN PLACE UPON ` q p °+ � l( pb + / n / / I \ ` \`\\ \ \ \\ + + 'q 1 ` 1 \ \ \ \ % ' \ SITE BENCHMARK (PER ROUDABUSH, GALE AND CONTROL PLAN COMPLETION OF ROAD CONSTRUCTION AND \ \` Assoc. SURVEY) AMENDMENT 1 AND PHASE II INSTALLATION OF STORM DRAINAGE INFRASTRUCTURE. THE STAGE 2 EROSION AND SEDIMENT CONTROL PLAN FOR BLOCK G INCLUDES A \` I l - 5 I P ; \"33�5 '' STAGE 2INTERMEDIATE BMP Hi \\ \ \ \\ \ \ \\ \ \ \ \ \ oc EMBANKMENT TO BE COMPACTED AND \ \ I \ \\ �\ I �y y �� yy ��' EXISTING WETLANDS (PER KIRK HUGHES & ASSOC. ALBEMARLE COUNTY, VIRGINIA THE FOLLOWING MEASURES: STABILIZED PER SPECIFICATIONS ON STAGE 3 �` \ \\ \ \ �y�•. SURVEY) 1.) INSTALLATION OF INLET PROTECTION AT ALL INSTALLED STORM DRAIN INLETS +'------- A /; qS __ STORMWATER PLANS AND STABILIZED WITH \ V STABILIZATION SEED MIX AND EC-3 MATTING. 1 \ i ALL DISTURBED AREAS TO RECEIVE SEED MIX at as \ \\ 34� ;� ` i EXISTING STREAM CHANNEL LIMITS 2.) INSTALLATION OF OUTFALL PROTECTION AT ALL RR -� j s ' + i SHALL BE FINE GRADED WITH 6 INCHES TOPSPOIL PRIOR TO SEED APPLICATION PER B (PER KIRK HUGHES & ASSOC. SURVEY) STORM DRAINAGE OUTFALLS. 3.) ROUGH GRADING OF PROPOSED PERMANENT qq VESCH STANDARDS AND SPECIFICATIONS. / \ BMP 11 • + r` i\ \ A N \ ���� EXISTING POND (PER KIRK HUGHES & ASSOC. BMPS (BIORETENTION FACILITIES J3 AND J5) TO R R RR SURVEY) APPROXIMATE DESIGN ELEVATIONS, AND PERMANENT STABILIZATION OF PERIMETER GRADES. O P ' '�'�� \ \�\� A OP \. 342.2 VA APPROXIMATE �. I EXISTING TREE LINE (PER KIRK HUGHES & ASSOC. 4.) INSTALLATION AND STABILIZATION OF PRINCIPAL OUTFALL STRUCTURES AND EMERGENCY SPILLWAYS AS SPECIFIED ON THE STORMWATER MANAGEMENT ' • - R R _ , f, \ I P V � �� VA V A� / / / 4 7 0 / \\ `�� \ ` / // �� SURVEY) EXISTING ROAD 13CE PLANS (STAGE 3). DO NOT INSTALL FINAL BIORETENTION PLANTINGS OR FINE GRADE UNTIL I P N BM X / ,� 4 5� X "� RR \`\\ �� // \� (PER KIRK HUGHES & ASSOC. ALL CONSTRUCTION IN THE CONTRIBUTING WATERSHED IS COMPLETE AND/OR PERIMETER �� P OP��, _ - - _ - _ VA x O / A ; �� SURVEY) EXISTING FENCE Blossom Consulting and Engineering Inc. EROSION AND SEDIMENT CONTROLS ARE IN PLACE IN ) 1101 Professional Drive, Suite G ASSOCIATION WITH INDIVIDUAL LOT GRADING. p` ' C \ _ / _ _ /�,� DO (PE R KIRK K HUGHES & ASSOC. SURVEY) Williamsburg VA 23185 p: 757-870-4825 5.) SITE LANDSCAPING OUTSIDE OF PROPOSED PERMANENT BMPS MAY BE INSTALLED PER THE LANDSCAPE PLANS (PROVIDED UNDER SEPARATE - // ; ' / �. + BM -- 8.8 + / EXISTING BUILDING KEY PLAN _ _ _ ` "r\ '♦ (PER KIRK HUGHES & ASSOC. � COVER) ONLY AS APPROVED BY THE LANDSCAPE ARCHITECT. 6.) REMOVAL OF TEMPORARY RIGHT OF WAY ::. \ \ :.• �_� = X �� + \ - �/ X X �- / \ qa y,� — —X_X�� +� + �� 2 ��. 3 O P + SURVEY) EXISTING POWER POLE - \L � DIVERSIONS AS SHOWN ON THE SITE GRADING PLANS `_ � , , � � G _ -+_ _ J _ — � / + - � / � � (PER KIRK HUGHES & ASSOC. SURVEY) I AND STABILIZATION WITH STABILIZATION SEED MIX AND MATTING. ALL DISTURBED AREAS TO BE SEEDED SHALL RECEIVE 6 INCHES TOPSOIL PRIOR TO ,� : =:: - I P :� __ _ _ _-� \< . r CD / -A p I P - `� ��— '� ,� �A � � � \� � S S P x � I \ C EXISTING SIGN \ \ SEEDING AND MATTING. 7.) INSTALLATION OF CHECK DAMS IN LOW FLOW \ :• v. / / / / / X �� r� W. E . � ! I ��� ` r (PER KIRK HUGHES & ASSOC. SURVEY ) / � CHANNELS OF EACH WET SWALE, AND STABILIZATION OF LOW FLOW CHANNEL WITH i �'� l `r i----�-, :'✓ / I = ' \ CD �� EXISTING CONTOURS � 4 SUBSTRATE ENHANCEMENT (1 FT CLASS 1 RIP RAP OVERLAIN WITH 3-6 INCH ROUNDED RIVER COBBLE IN LOW FLOW CHANNEL ONLY, BETWEEN CHECK , A .v •� -� � % � 3 5 g . 5 k -;_— % i �8 �� A , % ��� � X �� �� A 3 (PER KIRK HUGHES & ASSOC. SURVEY) \ \ DAMS) . 8. INSTALL RETAINING WALL ADJACENT TO BMP I v '/ �� :. TS SEE LANDSCAPE PLANS PROVIDED UNDER \ \ ° /' \\ \ B M f / f EXISTING STREAM BUFFER (PER ALBEMARLE COUNTY) \ 5 CONCURRENT WITH ROAD GRADING AND � / � � \ SEPERATE COVER FOR LANDSCAPE PLANTING :G / ; ; \% I � � � � INSTALLATION AND GUIDELINES REGARDING / INSTALLATION OF STORM DRAIN INFRASTRUCTURE. ROUGH GRADE BIORETENTION SIDE SLOPES AT BASE OF RETAINING WALL AND STABILIZE WITH EC-2 j \ •�� - TS \ ,` i' A FINAL STABILIZATION OF LOT AREAS. PER�- f THIS STAGE 2 PLAN SET, ALL LOTS SHALL \ \/ \ " i PROPOSED LOTS (STABILIZED MATTING. - ;: _% \ + \ RECEIVE TEMPORARY SEEDING AND/OR ��� UPON COMPLETION OF PHASE 2 ) 9.) INSTALL RIP RAP ON DOWN SLOPE SIDE OF J3 r / • \� \ \� TEMPORARY STABILIZATION MEASURES (LE.�- MULCH UPON COMPLETION OF STAGE 2 / / II� / COMPACTED EARTHEN BERM CONCURRENT WITH STABILIZATION OF RIGHT STREAM BANK AS SHOWN ` \ I P \ GRADING ACTIVITIES. ' _ - \�(.' �/ OP � PROPOSED LANDSCAPE PLANTINGS SEE LANDSCAPE PLANS ( ) ON BUFFER MITIGATION PLANS. CLASS 1 RIP RAP--- . ` i 3 0.7 BANK PROTECTION SHALL BE INSTALLED TO 10 YEAR WATER SURFACE ELEVATION. INSTALL CLASS 1 RIP RAP (MIN DEPTH 2.2 FT UNDERLAIN WITH GEOTEXTILE FILTER FABRIC) AT UPSTREAM AND DOWNSTREAM WING WALLS OF PERMANENT BRIDGE I P \� \ y i Q �� _ / /+ PROPOSED STORM DRAIN (SEE SITE PLANS BYALAN FRANKLIN P.E.) CROSSING WHEN INSTALLED. SEE BRIDGE PLAN PROVIDED UNDER SEPARATE COVER. • � _-QV- - _ \ / SSF PROPOSED RIGHT OF WAY RWD � DIVERSION 1o.) ALL GRADED LOTS SHALL BE TEMPORARILYTIWA STABILIZED PER VESCH STANDARDS UNTIL INDIVIDUAL LOT CONSTRUCTION IS COMPLETED. 11. PHASE 2 STAGE 2 EROSION AND SEDIMENT ` +�� • ' ' n '• ��( RR f \I( \I( �. OP _ j , -Q I s PROPOSED SUPER SILT FENCE F ISSUE REV # DATE DESCRIPTION CONTROL PLANS DEPICT ELEMENTS TO BE IN PLACE PRIOR TO CONVERSION TO PERMANENT BMP FACILITIES AS SHOWN ON THE STORMWATER PLAN - O P - � 1 ' ' 3 � � \ �` � I � \ S S F -Ay�\ BM � �I � � � � M ) PROPOSED OUTFACE PER COUNTY COMMENTS (STAGE 3 TO BE COMPLETED UPON COMPLETION OF i / \' ' i j / / �; �/ )sIl p` _ ' / ' • � �l �l �l - �l �l �Il �l � PROTECTION OP #1 3/2/18 #2 4/16/18 PER COUNTY COMMENTS LOT CONSTRUCTION AND FINAL STABILIZATION OF UPLAND DRAINAGE AREAS). �// _� z 6 � �� CJ V \\ � � � � _ -� - � �� :� I �� , ,\` �/ �.., 'ems 0 �� 12.) ALL EROSION AND SEDIMENT PERIMETER / � : / �`b- - / ' �� �OP IP PROPOSED INLET PROTECTION CONTROLS SHALL REMAIN IN PLACE THROUGHOUT / • / /., \I( \I( \ \I( �/ I P RN/1 , CONSTRUCTION ACTIVITIES AND REMOVED ONLY WHEN FINAL SITE STABILIZATION IS ACHIEVED. _ \ I P , �•• : .� - "� � \� \� \� \� \� - / PROPOSED INTERMEDIATE BMP GRADING (STAGE 2 E&S) 20 9 ti • , —' - RR 1 PROPOSED CLASS 1 RIP RA (MIN DEPTH F ) 22 P M T 368.8 TS I P S T .. �T H Op _\� �� . <-• •' � ^ � � I TEMPORARY STABILIZATION `� 1 G' I• / O U — SCOTT C. BLOSSOM a Lic. No. 40287 STAGE 2 INTERMEDIATE BMPS J3 AND J5 / 1 � �\ i . /� � \ EMBANKMENTS TO BE COMPACTED AND / • / `� •' A BM PROPOSED SEEDING AND EROSION CONTROL MATTING "� w� �'� ti STABILIZED PER SPECIFICATIONS ON STAGE 3 • STORMWATER PLANS AND STABILIZED WITH �•� �. % 3 . • • �• / � A / I S IONAL CLASS I RIPRAP (MIN. DEPTH 2.2 Fr). ALL DISTURBED AREAS TO RECEIVE SEED MIX A ' j. • � �� ! • • \ A NOTE: ALL PERIMETER PRESERVED SILT FENCE ADJACENT TO STREAM CHANNELS SHALL BE SUPER SHALL BE FINE GRADED WITH 6 INCHES S�. SILT FENCE AS SHOWN ON DETAIL 4, SHEET 18. TOPSOIL PRIOR TO SEED APPLICATION PER �• 3 A ' e\j \, \ VESCH STANDARDS AND SPECIFICATIONS. ` ' • L STAGE 1 SEDIMENT TRAP SHALL BE '\ \ N / • • CONVERTED TO A SWALE AS SHOWN ON THE • / • • STORMWATER PLANS. STABILIZE WITH EC-2 /�� j \ \ Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. • • / MATTING AS SPECIFIED ON STORMWATER , • _ PLANS. - - • • - �,i% \ E&S STAGE 2: BLOCK J (WEST) •* SCALE: i INCH = 5o FEET e '. •� / 7 9180 0 too 150 50 ES 1 5 PHASE 2: STAGE 2 EROSION AND SEDIMENT CONTROL PLAN (BLOCK J (WEST)) CONTOUR INTERVAL = 2 FT FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEW\Design and Analysis\CAD\005_RivannaPH2_ESC_REV2.dwgI Hill jApr 12, 2018 at 11:561Layout: 15 ES Blk Jwest (2) 344 343 342 341 DIVERSION SWALES JS5b, JS4 ■■■MEN ■■ ■■■■■■■■ 12.01 d" SIGN _Nnj�� ■iilm■■■■■■ .i■■■■■ '• ■■BEE■■ A■■■■ ■��■� son ENRON 3400 5 10 15 20 DISTANCE (FT.) DIVERSION SWALE CROSS-SECTION VERTICAL SCALE: 1 " = 2' HORIZONTAL SCALE: 1 " = 5' DIVERSION CHANNEL JS4 DIMENSIONS TOP WIDTH - 12.0 FT. MAX. DEPTH - 2.0 FT. CALCULATIONS: RATIONAL METHOD, Q = CIA A =1.31 ACRES C = 0.50 (ROUGH BARE SOIL) USING PLATES 5-1 AND 5-2 OF THE VESCH, Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.080= 0.011 HOURS Tt SHALLOW WITH LENGTH OF 142 FT AND SLOPE OF 0.169 = 0.006 HOURS Tt CHANNEL WITH LENGTH OF 117.9 FT AND SLOPE OF 0.042 = 0.004 HOURS Tc = 0.021 HOURS = 1.24 MINUTES USING NOAA'S PRECIPITATION FREQUENCY DATA SERVER (http://hdsc.nws.noaa.gov/bdsc/pfdsn, 10 MINUTE 2-YR i = 3.98 INCHES/HOUR 10 MINUTE 10-YR i = 5.25 INCHES/HOUR 2-YR PEAK FLOW = 0.50 x 3.98 x 1.31 = 2.6 CFS 10-YR PEAK FLOW = 0.50 x 5.25 x 1.31= 3.4 CFS SLOPE OF PROPOSED CHANNEL = RISE / RUN = 10 FT / 251 FT = 0.04 MAX. PERMISSIBLE VELOCITY OF EC-2 MATTING, V = 4.0 FT/S (USE 2.7 FT/S) MINIMUM FLOW AREA (A) = Q / V = 3.4 / 2.7 = 1.26 SF DESIGN DEPTH (d) = 2 FT DESIGN BOTTOM WIDTH (b) = 4 FT GIVEN 2:1 SIDE SLOPE, e = 2 FT x d = 2 FT x 2 = 4 FT Z = e / d = 4 FT / 2 FT = 2 TRAPEZOIDAL CHANNEL CROSS -SECTIONAL AREA (A) = (b x d) + [Z x (d ^ 2)] =(4 FT x 2 FT) + [2 x ((2 FT) ^ 2)] = 16 SQFT TRAPEZOIDAL CHANNEL TOP WIDTH = b + (2 x d x Z) = 4 FT + (2 x 2 FT x 2) = 12 FT TRAPEZOIDAL CHANNEL HYDRAULIC RADIUS (R) = {(b x d) + [Z x (d ^ 2)]} / {b + {(2 x d x [((Z ^ 2) + 1) ^ (1 /2)]}} ={(4 x 2) + [2 x (2 ^ 2)]] / {4 + {(2 x 2 x [((2 ^ 2) + 1) ^ (1 /2)]}} =1.23 FT CHANNEL LINING = VEGETATED WITH EC-2 MATTING, PERMISSIBLE VELOCITY OF 0 - 4.0 FT/S (VDOT APPROVED MATERIALS, AUGUST 2014, SECTION 57) (http://www.vi rgi ni adot. org/business/resources/Materials/Approved_Lists. pdf) USING TABLE 5-13 OF THE VESCH, RETARDANCE CLASSIFICATION = C USING PLATE 5-29 OF THE VESCH, ROUGHNESS COEFFICIENT (n) = 0.044 MAX CAPACITY FLOW = (1.49 / n) x [R ^ (2/3)] x [S ^ (1 /2)] x A = (1.49 / 0.044) x [1.23 ^ (2/3)] x [0.04 ^ (1 /2)] x 16 =124.4 CFS MAX CAPACITY VELOCITY = (1.49 / n) x [R ^ (2/3)] x [S ^ (1 /2)] _ (1.49 / 0.04) x [1.23 ^ (2/3)] x [0.04 ^ (1 /2)] =7.8 FT/S DIMENSIONS: MINIMUM BOTTOM WIDTH = 4 FT MINIMUM DEPTH = 2 Fr MINIMUM SIDE SLOPE = 2:1 AVERAGE CHANNEL SLOPE = 0.04 LINING = VEGETATED WITH EC-2 MATTING DIVERSION CHANNEL JS5b CALCULATIONS: RATIONAL METHOD, Q = CIA A = 1.53 ACRES C = 0.50 (ROUGH BARE SOIL) USING PLATES 5-1 AND 5-2 OF THE VESCH, Tt OVERLAND WITH LENGTH OF 100 FT AND SLOPE OF 0.08= 0.011 HOURS Tt SHALLOW WITH LENGTH OF 105 FT AND SLOPE OF 0.124 = 0.005 HOURS Tt CHANNEL WITH LENGTH OF 130.2 FT AND SLOPE OF 0.061 = 0.003 HOURS Tc = 0.019 HOURS = 1.17 MINUTES USING NOAA'S PRECIPITATION FREQUENCY DATA SERVER (http://hdsc.nws.noaa.gov/hdsc/pfdsn, 10 MINUTE 2-YR i = 3.98 INCHES/HOUR 10 MINUTE 10-YR i = 5.25 INCHES/HOUR 2-YR PEAK FLOW = 0.50 x 3.98 x 1 .53= 3.0 CFS 10-YR PEAK FLOW = 0.50 x 5.25 x 1.53= 4.0 CFS SLOPE OF PROPOSED CHANNEL = RISE / RUN = 16 FT / 175 FT = 0.091 MAX. PERMISSIBLE VELOCITY OF EC-2 MATTING, V = 4.0 Fr/S (USE 2.7 FT/S) MINIMUM FLOW AREA (A) = Q / V = 4 / 2.7 = 1.5 SOFT DESIGN DEPTH (d) = 2 FT DESIGN BOTTOM WIDTH (b) = 4 Fr GIVEN 2:1 SIDE SLOPE, e = 2 FT x d = 2 FT x 2 = 4 FT Z = e / d = 4 FT / 2 FT = 2 TRAPEZOIDAL CHANNEL CROSS -SECTIONAL AREA (A) = (b x d) + [Z x (d^ 2)] =(4 FT x 2 FT) + [2 x ((2 FT) ^ 2)] = 16 SF TRAPEZOIDAL CHANNEL TOP WIDTH = b + (2 x d x Z) = 4 FT + (2 x 2 FT x 2) = 12 FT TRAPEZOIDAL CHANNEL HYDRAULIC RADIUS (R) = {(b x d) + [Z x (d ^ 2)]} / {b + {(2 x d x [((Z ^ 2) + 1) ^ (1 /2)]]} ={(4 x 2) + [2 x (2 ^ 2)]] / {4 + {(2 x 2 x [((2 ^ 2) + 1) (1 /2)]}} =1.23 FT CHANNEL LINING = VEGETATED WITH EC-3 MATTING, PERMISSIBLE VELOCITY OF 4.0 - 7.0 FT/S (VDOT APPROVED MATERIALS, AUGUST 2014, SECTION 57) (http://www.virginiadot. org/business/resources/Materials/Approved_Lists.pdf) USING TABLE 5-13 OF THE VESCH, RETARDANCE CLASSIFICATION = C USING PLATE 5-29 OF THE VESCH, ROUGHNESS COEFFICIENT (n) = 0.044 MAX CAPACITY FLOW = (1.49 / n) x [R ^ (2/3)] x [S ^ (1 /2)] x A = (1.49 / 0.044) x [1.23 ^ (2/3)] x [0.091 ^ (1 /2)] x 16 =187.6 CFS MAX CAPACITY VELOCITY = (1.49 / n) x [R ^ (2/3)] x [S ^ (1 /2)] _ (1.49 / 0.044) x [1.23 ^ (2/3)] x [0.091 ^ (1 /2)] =11.7 FT/S DIMENSIONS: MINIMUM BOTTOM WIDTH = 4 FT MINIMUM DEPTH = 2 FT MINIMUM SIDE SLOPE = 2:1 AVERAGE CHANNEL SLOPE = 0.091 LINING = VEGETATED WITH EC-2 MATTING 344 344 RIVANNA VILLAGE: 342 I 342 EROSION AND SEDIMENT I STAGE 1: SEDIMENT-\ -- CONTROL PLAN 340 - ` EXISTING GRADE TRAP PILLWAY (SEE 340 I - - DETAIL 6, SHEET 18) PROPOSED 3' 338 - I- STABILIZATION 338 SEEDING _ - -1 CJI � +1'�1 336 -,I - ► -- -- 336 I c PROPOSED GRADE `o 334 =fin +-��H_oYosED 334 I - RBI. ],IRJSE:E 332 - STAGE 1. - I -I I I if 11+- 1 ]QOTES SHEET 332 _- II II j I I-IIII I I- SEDIMENTTRAP IIIII I I I i II !!, II II II I -I I I -I I I-IIII I I I i - 18 � I 330 -I-I-I -- -- -- -- -- -- -I 330 0+00 0+10 0+20 0+30 0+40 0+50 o+6o 0+70 o+8o o+go 1+00 1+10 1+20 1+30 1+40 1+50 1+6o 1+70 1+8o 1+90 2+00 2+00 CROSS SECTION N-N' (JS4) VERTICAL SCALE: 1"=4' HORIZONTAL SCALE 1"=20 358 356 354 352 350 348 346 344 2 358 356 354 352 350 348 346 344 34 342 0+00 0+10 0+20 0+30 0+40 0+50 o+6o 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 CROSS SECTION M-M' (JS5b) VERTICAL SCALE: 1"=4' HORIZONTAL SCALE 1"=20 354 352 350 348 346 344 342 340 8 STAGE 3: LEVEL 1 BIORETENTION (J5) (SEE STORMWATER PLANS) STABILIZATION SEEDING n STAGE 3: LEVEL 1 BIORETENTION SPILLWAY (SEE STORMWATER PLANS FOR DESIGN DETAILS) STAGE is SEDIMENT TRAP SPILLWAY (SEE DETAIL 6, SHEET 18) e 1 I ib EXISTIN EO PROPOSED EC-2 MATTING l GRADE I o N (SEE DETAILS 1-3, SHEET 14) 1 1 f, ! - s-------- ---� -- I � � _ STAGE 2. _ INTERMEDLATE I L PROPOSED STRUCTURAL =BIORETENTION= _� I_ FILL SEE NOTES SHE ROUGH GRADE - I I i / --APPROXIMATE - -- STREAM CHANNEL - STAGE it-- _ 7"Y'I TION SEDIMENTTRAP I I 354 352 350 348 346 344 342 340 33 338 0+00 0+10 0+20 0+30 0+40 0+50 o+6o 0+70 o+8o o+go 1+oo 1+10 1+20 1+30 1+40 1+50 CROSS SECTION L-L' (JS3) VERTICAL SCALE: 1"=4' HORIZONTAL SCALE 1"=20 STAGE 1: SEDIMENT TRAP SPILLWAY (SEE DETAIL 6, SHEET 18) EXISTING GRADE " � � N II I I- PROPOSED EC-2 MATTING-i !/ I- 0 1 (SEE DETAILS 1-3, SHEET 14)PROPOSED STABILIZATION J/ 00 L-PROPOSED STRUCTURAL I J/ SEEDING _ FILL SEE NOTES SHEET 18 _LI -- :z'APPROX_ IF I - STREAM CHANNEL LOCATION STAGE 1: _ IIII SEDIMENT TRAP i I!_ 362 362 36o PROPOSED TAGE 3:LEVEL 1 360 BIORETENTION SPILLWAY STABILIZATION / \ (SEE STORMWATER PLANS SEEDING TAGE 3: LEVEL 2 / FOR DESIGN DETAILS) 8 BIORETENTION (H1) 35 358 (SE STORMWATER PLANS) - 356 PROPOSED STRUCTURAL 356 1 I FILL SEE NOTES SHEET 18 1 EXISTING 354GRADE I �.'. 354 �� 1 1 I TAGE 1: SEDIMENT A II- TRAP SPILLWAY (SEE / 352 - i \ \ i DETAIL 6, SHEET 18) 352 - ..--------- - - - - - ------- _ \, STAGE 2:- 350- - INTERMEDIATE - - �� 350 BIORETENTION _ 348 I ROUGH GRADE_I I _ 348 346 I \!` 346 I _ STAGE 1:_j `t - SEDIMENT TRAP 344 344 -- - - 342 42 3�- - -- - - -- -- --- - -- - 0+00 0+10 0+20 0+30 0+40 0+50 o+6o 0+70 o+8o o+go 1+oo 1+10 1+20 1+30 1+40 1+50 CROSS SECTION O-O' (H1) VERTICAL SCALE: 1"=4' HORIZONTAL SCALE 1"=20 E&S FACILITY (ST AND SB) STAGE - STORAGE SUMMARY ST-GS3 Elevation WD Area (SF) Area AC Ai+A24(Al*A2)1/2 Volume C Cumulative Volume C Cumulative Volume AC-ft 352 312.70 0.007 0.00 0.00 0.00 0.000 354 633.50 0.015 1,391.28 927.52 927.52 0.021 356 1 1,055.10 1 0.024 2,506.16 1,670.77 2,598.29 0.060 358 1 2,197.70 1 0.050 4,775.56 3,183.71 5,782.00 0.133 ST-GSI Elevation Area (SF) Area Al+A2+(A1*A2)1/2 Volume Cumulative Cumulative 346 480.90 0.011 0.00 0.00 0.00 0.000 348 950.00 0.022 2,106.81 1,404.54 1,404.54 0.032 350 2,190.60 0.050 4,583.19 3,055.46 4,460.00 0.102 352 4,028.30 0.092 1 9,189.49 6,126.33 10,586.33 1 0.243 ST ISI Elevation Area (SF) Area AC Al+A2+(Al*A2)1/2 Volume C Cumulative Volume C Cumulative Volume AC-ft 352 583.90 0.013 0.00 0.00 0.00 0.000 354 1,260.20 0.029 2,701.91 1,801.27 1,801.27 0.041 356 2,016.20 0.046 4,870.39 3,246.93 5,048.20 0.116 358 3,397.00 0.078 1 8,030.27 5,353.51 10,401.71 1 0.239 ST-Ma Elevation Area (SF) Area AC Al+A24{Al*A2)1/2 Volume C Cunwiative Volume C Cumulative Volume AC-ft 332 1,356.70 0.031 0.00 0.00 0.00 0.000 334 2,105.60 0.048 5,152.47 3,434.98 3,434.98 0.079 336 2,955.10 0.068 7,555.15 5,036.76 8,471.74 0.194 338 3,907.60 0.090 10,260.84 6,840.56 15,312.30 0.352 ST-JSZb Elevation (FT) Area (SF) Area (AC) Al+A2+(Al*A2)1/2 Volume (CF) Cumulative Volume (CF) Cumulative Volume (AC-ft) 328 2,382.20 0.055 0.00 0.00 0.00 0.000 330 3,233.30 0.074 8,390.81 5,593.88 5,593.88 0.128 332 4,191.50 0.096 11,106.16 7,404.10 12,997.98 0.298 334 5,252.00 r0,121 r 14,135.38 9,423.59 22,421.57 1 0.515 ST-JS3 Elevation (FT) Area (SF) Area (AC) Al+A2+(Al*A2)1/2 Volume (CF) Cumulative Volume (CF) Cumulative Volume (AC-ft) 342 299.60 0.007 0.00 0.00 0.00 0.000 344 756.70 0.017 1,532.44 1,021.63 1,021.63 0.023 346 1,323.70 0.030 3,081.22 2,054.15 3,075.77 0.071 348 1,994.20 0.046 4,942.62 3,295.08 6,370.85 1 0.146 350 4,879.20 0.112 9,992.71 6,661.81 13,032.66 1 0.299 ST-JS4 Elevation (FT) Area (SF) Area (AC) A1+A24{A1*A2)1/2 Volume (CF) Cumulative Volume (CF) Cumulative Volume (AC-ft) 332 164.70 0.004 0.00 0.00 0.00 0.000 334 897.00 0.021 1,446.06 964.04 964.04 0.022 336 1,880.20 0.043 4,075.87 2,717.25 3,681.29 0.085 338 3,103.70 0.071 7,399.59 4,933.06 1 8,614.35 0.198 ST-JS5b Elevation (FT) Area (SF) Area (AC) Al+A2+(Al*A2)1/2 Volume (CF) Cumulative Volume (CF) Cumulative Volume (AC-ft) 344 394.40 0.009 0.00 0.00 0.00 0.000 346 830.60 0.019 1,797.35 1,198.24 1,198.24 0.028 348 1,386.60 0.032 3,290.38 2,193.59 3,391.82 0.078 350 2,072.60 0.048 5,154.45 3,436.30 6,828.12 1 0.157 ST-HI Elevation (FT) Area (SF) Area (AC) Al+A2+(Al*A2)1/2 Volume (CF) Cumulative Volume (CF) Cumulative Volume (AC-ft) 344 776.50 0.018 0.00 0.00 0.00 0.000 346 1,288.80 0.030 3,065.68 2,043.78 2,043.78 0.047 348 1,901.80 0.044 4,756.18 32170.79 5,214.57 0.120 350 3,010.30 0.069 7,304.79 4,869.86 10,084.43 0.232 352 4,344.50 0.100 10,971.19 7,314.12 17.398.56 0.399 SBI1 Elevation (FT) Area (SF) Area (AC) Al+A2+(Al*A2)1/2 Volume (CF) Cumulative Volume (CF) Cumulative Volume (AC-ft) 336 10,167.30 0.233 0.00 0.00 0.00 0.000 338 12,190.40 0.280 33,490.69 22,327.13 22,327.13 0.513 340 14,314.00 0.329 39,713.99 26,476.00 48,803.12 1.120 342 16,537.00 1 0.380 1 46,236.40 30,824.27 79,627.39 1.828 344 118,859.30 1 0.433 1 53,056.32 1 35,370.88 114,998.27 2.640 SBI(front Phase 1 Elevation WD Area (SF) Area (AC) +� �*�) 1/2 Volume (CF) Cumulative Volume (CF) Cumulative Volume (AC-ft) 342 6,116.40 0.140 0.00 0.00 0.00 0.000 344 7,557.80 0.174 20,473.21 13,648.81 13,648.81 0.313 346 9,099.80 0.209 24,950.64 16,633.76 30,282.56 0.695 348 10,742.30 0.247 1 29,729.10 19,819.40 50,101.96 1.150 350 12,485.40 0.287 1 34,808.80 23,205.87 73,307.83 1.683 352 14,329.10 0.399 1 40,190.02 26,793.35 100,101.18 2.298 SBI2 Elevation WO Area (SF) Area (AC) Al+A24(Al*A2)1/2 Volume (CF) Cumulative Volume (CF) Cumulative Volume (AC-ft) 346.5 3,534.10 0.081 0.00 0.00 0.00 0.000 348 4,560.90 0.105 12,109.81 6,054.90 6,054.90 0.139 350 5,831.60 0.134 15,549.76 10,366.51 16,421.41 0.377 351 6,505.20 0.149 18,496.00 6,165.33 22,586.74 0.519 352 7,204.20 0.165 20,555.18 6,851.73 29,438.47 0.676 353 7,928.70 0.182 22,690.67 7,563.56 37,002.03 0.849 354 8,678.60 0.199 24,902.48 8,300.83 45,302.86 1.040 355 9,454.00 1 0.217 27,190.61 9,063.54 54,366.39 1.248 AMENDMENT 1 AND PHASE II ALBEMARLE COUNTY, VIRGINIA SCE Blossom Consulting and Engineering Inc. 1101 Professional Drive, Suite G Williamsburg VA 23185 p: 757-870-4825 KEY PLAN ISSUE REV # DATE DESCRIPTION #1 3/2/18 PER COUNTY COMMENTS #2 4/16/18 PER COUNTY COMMENTS l� 'LT H OF 1't SCOTT C. Lic. No. BLOSSOM a 40287 �IIIIII0 �SSIONAL ��� ���� Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. BLOCK J (WEST): CROSS SECTIONS FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEW\Design and Analysis\CAD\005_RivannaPH2_ESC_REV2.dwglHilllApr 12, 2018 at 11:561Layout: 16 Blk Jwest (XS) ES - 16 ------------ ON SHALLOW SLOPES, STRIPS OF NETTING PROTECTIVE COVERINGS MAY BE APPLIED ACROSS THE SLOPE. BERM WHERE THERE IS A BERM AT THE TOP OF THE SLOPE, BRING THE MATERIAL OVER THE BERM AND ANCHOR IT BEHIND THE BERM. ON STEEP SLOPES, APPLY PROTECTIVE COVERING PARALLEL TO THE DIRECTION OF FLOW AND ANCHOR SECURELY. BRING MATERIAL DOWN TO A LEVEL AREA BEFORE TERMINATING THE INSTALLATION. TURN THE END UNDER 4" AND STAPLE AT 12" INTERVALS. T `\ 12" IN DITCHES, APPLY PROTECTIVE COVERING PARALLEL TO THE DIRECTION OF FLOW. USE CHECK SLOTS AS REQUIRED. AVOID JOINING MATERIAL IN THE CENTER OF THE DITCH IF AT ALL POSSIBLE. DETAIL: E & S CONTROL BLANKET INSTALLATION NTS A q 'IPE OUTLET TO FLAT ,REA WITH NO DEFINED ;HANNEL L a O% d T SECTION A -A FILTER CLOTH KEY IN 6"-9' ; RECOMMENDED FOR ENTIRE PERIMETER 3d o (MIN.) 'IPE OUTLET TO WELL )EFINED CHANNEL d SECTION A -A FILTER CLOTH KEY IN 6"-9'; RECOMMENDED FOR ENTIRE PERIMETER NOTES: L APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET, OR CONCRETE. 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3.18-4. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. UPSTREAM BASIN ROCK SIZE MIN LENGTH G 1,2,3 CLASS I RIPRAP 20 FT I 1, 2, 3 CLASS I RIPRAP 20 FT J 1, 2,3 CLASS I RIPRAP 20 FT DETAIL: PIPE OUTLET CONDITIONS NTS 1. DUST CONTROL SHALL BE IMPLEMENTED IN ACCORDANCE WITH VESCH STANDARD AND SPECIFICATION 3.39• 2. CONTRACTOR SHALL LIMT DISTURBNACE TO THE DEGREE FEASIBLE TO LIMIT DUST EMISSIONS. 3. UTILIZE TEMPORARY STABILIZATION MEASURES AS SPECIFIED IN MINIMUM STANDARD # 1. 4. TO CONTROL DUST, IRRIGATE/SPRAY WITH WATER TO MOISTEN AND REPEAT AS NEEDED AND/OR AS DIRECTED BY ALBEMARLE COUNTY E&S INSPECTOR. 5. ADHESIVES MAY BE REQUIRED BASED ON SITE CONDITIONS AND SHALL BE ADDED AS SPECIFIED IN VESCH 3.39• 10 DETAIL: DUST CONTROL NOTES 2" Oj�Gij ��OipGip Gj. G p , • • 1-11 f1!l.115. 1 II II 11=11=11 I1111I _ 11=1 • I=11 II=1 II If=11-11 11 =II 11= II I IL=11 II II=11=11=1 -IAMP CHECK SLOT FIRMLY 6' 101-2.. JUNCTION SLOT F TAMP FIRMLY 12' ANCHORSLOT BM NOTES APPROXIMATELY 200 STAPLES REQUIRED PER too SQ. YDS. OF MATERIAL ROLL. ANCHOR SLOTS, JUNCTION SLOTS & CHECK SLOTS TO BE BURIED 6" TO 12". 12" MAX. 4:1 OR FLATTER 6" MAX. STEEPER THAN 4:1 _ 1 EDGE AND END JOINTS I I I I I I I I TO BE SNUGLY ABUTTED I (JUTE MESH WILL HAVE I 1 STAPLED LAP JOINT IN LIEU OF EDGE JOINT) I I I I I I I 1 I I 5 MAX. 4:1 OR FLATTER 3' MAX. STEEPER THAN 4a I I T I I 1 I I I I I I I I I ji I I I I I 1 I I I I I I I CHECKSLOT I I I I 1" TO " I I I 1 11 1 1 1 1 —�—i —5 ii i " VAR. D. i VAR. 6" TO 8" MIN. PLAN VIEW STAPLING DIAGRAM STAPLE FORMED FROM NO.11 STEEL WIRE. CHECK SLOTS AT MIN. �o' C-C INTERVALS; 8"STAPLE MIN. LENGTH FOR SANDY SOIL. T()T RF(1 'T) 1ATTTII AT I 6" TO 12" TERMINALFOLD DETAIL: E & S CONTROL STAPLING DETAIL NTS 3-1/4" 1o" MIN. STAKE ` 2' DIA. WASHER 18 = 3/16" DIA. STEEL PIN PIN 6" 11 GAUGE STEEL 6"xT"x6" STAPLE STAPLE 1) IM TRIANGULAR SURVEY STAKE - MINIMUM 1o" IN LENGTH. PLACEMENT OF THE STAKE ACROSS THE FLOW OF THE WATER IS THOUGHT TO PROVIDE A "PINBALL EFFECT" TO HELP SLOW THE VELOCITY. 2) 11 GAUGE STEEL - MINIMUM 1" WIDE BY 6" IN LENGTH STEEL STAPLE - 2"x8" STAPLE MAY BE REQUIRED IN CERTAIN SOIL CONDITIONS. 3) STEEL PINS - 3/16 DIAMETER STEEL PIN BY 18" IN LENGTH WITH A 2" DIAMETER WASHER ON TOP. (SEE ILLUSTRATION) DETAIL: SOIL MATTING ANCHORS d � 5" M NI Z'A Al. GA L -- PROFILE F_ I i I Y: o t V21 _7 I L EXI PLAN A I InU1I111111 Nvatel tali of I inch must be instafted v4th a inni iiinum 1 urc:ll b.-IRCOCL "111Itoff valve sajppl�ing a wash hose vilth a cl anletei• of 1. ulche f61 adequate c►rl taliit ].lI ilre. Wash-Arate1- III114 be 'eanied mv-,w hoill t11e ent1ance to an all I I� ecl et�lui area t+ � irc a ecl YYeirt. _ secIi Went shall be pievented f -oni Ientenim, stoiln ch,aaui.,, chtch es,- of w atel c'ckuj- e,,-_�, 1. CONSTRUCTION ACCESS ROADS ARE SHOWN ON THE E&S MASTERPLAN SHEET ES-4a, AND ARE GENERALLY LOCATED IN THE FUTURE ROAD ALIGNMENT CORRIDOR. 2. AFTER PERIMETER CONTROLS ARE PLACED, ACCESS ROADS SHALL BE INSTALLED CONCURRENT WITH CLEARING AND GRUBBING ACTIVITIES, GENERALLY FOLLOWING EXISTING GRADE. 3. IN STEEP AREAS (I.E. SLOPE EXCEEDING 1o%), CRS SHALL BE INSTALLED PER VESCH STANDARD AND SPECIFICATION 3.03. 4. ROADBEDS SHALL GENERALLY BE 14 FEET WIDE FOR ONE WAY TRAFFIC AND 20 FEET WIDE FOR 2 WAY TRAFFIC, WITH LESS THAN 4% CROSS SLOPE. CUTS AND FILLS SHALL BE LESS THAN 2:1 SLOPE. 11 DETAIL: CONSTRUCTION ACCESS ROAD NOTES NTS 1o%SETTLEMENT 12" x 12" TIMBER 12" MA TIMBER MAT CROSSING CONNECTION TO BE DESIGNED BY TOFOFgANK CONTRACTOR FLOW B �a ASE �LOIv � � — STREAM BE � TYPICAL PROFILE CONNECTION TO ai� BE DESIGNED BY TIMBER CONTRACTOR ACCESS ROUTE ACCESS ROUTE MATTING ACCESS CONNECTIONS TO APPROACH TO BE DESIGNED BY 12 FEET DESIGNED BY CONTRACTOR 12 INCHES — CONTRACTOR BASE FLOW VARIES FLOW EXISTING 12' GROUND EXTEND ACROSS ENTIRE CONSTRUCTION ROUTE TIMBER OR CONCRETEFOOTER PLAN TO BE DESIGNED BY CONTRACTOR DETAIL: VEHICULAR STREAM CROSSING TIMBER MATTING NOT TO EXCEED WIDTH OF EXISTING ROADBED (12 FT) i MAXIMUM FILL DEPTH =18IN. EXISTING �� EXISTING GRADE VDOT #21A STONE (MAX. DEPTH = 6 IN.) EXISTING — OPTIONAL SOIL FILTER VDOT #57 STONE FABRIC (MAX. DEPTH = 6 IN.) VDOT #3 STONE (MAX. DEPTH = 6 IN.) DETAIL: CONSTRUCTION ROAD STABILIZATION TYPICAL PARABOLIC DIVERSION 1o% SETTLEMENT y 0.3' FREE BOARD DESIGN FLOW DEPTH TYPICAL TRAPEZOIDAL DIVERSION 1o% SETTLEMENT TYPICAL VEE-SHAPED DIVERSION DETAIL: DIVERSIONS �I NTS \ STREAM BED NTS Tsc 1. TIMBER MATTING SHALL BE USED WHERE CONSTRUCTION EQUIPMENT CROSSES THE BASE/LOW FLOW CHANNEL WITHIN THE STREAM CHANNEL OR ANY NON -TIDAL WETLANDS. 2. CONTRACTOR SHALL DESIGN THE TIMBER MATTING TO PROTECT THE STREAM CHANNEL BOTTOM OR WETLAND AREAS FROM VEHICLES. THE MATTING SHALL BE DESIGNED TO BE STABLE WHEN TRAVERSED BY CONSTRUCTION VEHICLES. 3. THE CROSSING SHOULD BE CONSTRUCTED IN SUCH A WAY TO PREVENT THE WHEELS FROM PASSING THROUGH THE STREAM FLOW, AND MINIMIZE DEBRIS FROM VEHICLES FALLING INTO THE STREAM CHANNEL. 4.) BRIDGE TEMPORARY STREAM CROSSING SHALL BE USED FOR TSC 5,6 AND 7 (AREAS WHERE PERMANENT IMPACTS WERE AVOIDED THROUGH THE USE OF A BRIDGE SPAN) NOTE: GRAVEL ACCESS ROAD STABILIZATION PROPOSED ONLY WITHIN EXISTING ROAD BEDS. FILL WILL GENERALLY BE USED TO RETURN EXISTING ROADS TO ADJACENT GRADE BUT WILL NOT EXCEED A MAXIMUM FILL DEPTH OF 18 INCHES OVERALL. NTS RWD VDOT #1 COARSE AGGREGATE 18" MIN — 6MINIMUM TYPICAL GRAVEL STRUCTURE COMPACTED SOIL i 18" MIN I 6' MINIMUM — I TYPICAL EARTHEN STRUCTURE 9 DETAIL: RIGHT-OF-WAY DIVERSION 17 NTS RIVANNA VILLAGE: EROSION AND SEDIMENT CONTROL PLAN AMENDMENT 1 AND PHASE II ALBEMARLE COUNTY, VIRGINIA SCE Blossom Consulting and Engineering Inc. 1101 Professional Drive, Suite G Williamsburg VA 23185 p: 757-870-4825 KEY PLAN ISSUE REV # DATE DESCRIPTION #1 3/2/18 PER COUNTY COMMENTS #2 4/16/18 PER COUNTY COMMENTS �,LTH OF o � 0 SCOTT C. Lie. No. BLOSSOM a 40287 �SSIONAL E��1 Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. E & S DETAILS (1) ES - 17 NTS NTS RIVANNA VILLAGE: EROSION AND SEDIMENT CONTROL PLAN SB TEMPORARY CULVERT CROSSING CROSS SECTION SF CONSTRUCTION OF A SILT FENCE AMENDMENT 1 AND PHASE II (WITHOUT WIRE SUPPORT) .LUTE, OR EXCELSIOR OR EQUIVALENT CREST OF EMERGENCY DESIGN HIGH WATER SPILLWAY (25-YR. STORM ELEV.)� C"Wolcm or Aft CULVEM - FLOW VW7 fi 00ARSC A09RWATe or oeEP ALBEMARLE COUNTY, VIRGINIA STAPLED IN PLACE VARIABLE (MIN. 7') MIN. 1.0' I. SET THE STAKES. 2. EXCAVATE A 4 x 4 TRENCH UPSLOPE ALONG THE LINE OF STAKES. 1/2 ouu6TER Of PIPE OR If, EARTH E µOVA WHICHEVER IS try L BURIED 6" MIN. 6" MIN. 6' MAX. BURIED 6" N. I I —III —III—I I �I I MIN. i.0' IP =1 I I=1 I I=1 I I I=1 RISER CREST C I I-T-�T-1 I I� I(-1 I i-1 I I-1 I �I I-T�1 f�T- 6'7 c.Y./ AC. DEWATERING DRY "STORAGE — / sLEVELPREADEROF — 2:1 OR — — — FLATTER DEVICE �r / FLYER Qor \\\FLYER FLOW 1"V.. 6' 67 C.Y./ AC. "WET "STORAGE 4 4 LEVEL SPREADER WITH VEGETATED LIP 3. STAPLE FILTER MATERIAL 4. BACKFILL AND COMPACT ELEVATION TO STAKES AND EXTEND THE EXCAVATED SOIL. IT INTO THE TRENCH. LAST 20' OF DIVERSION NOT TO EXCEED i% GRADE SEDIMENT CLEANOUT POINT "STORAGE REDUCED TO 34 C.Y./ ACRE) I rl '^• r, \ 10ai 1 00MRSE LAM �Nlxlwe �ocxt TE Roar aim raRTH FILL CE DIVERSION Blossom Consulting and Engineering Inc. — FLOW l FLOW 1101 Professional Drive, Suite G j Williamsburg VA 23185 —LEVEL SHEET FLOW INSTALLATION p: 757-870-4825 SPREADER DESIGN ELEVATIONS WITH (PERSPECTIVE VIEW) I ' STABILIZED EMERGENCY SPILLWAY FLOW 3' MAX. sa IM1dAUlA , , 50' MNI4g111 TOP OF BANK tSt 1 OP of CHANNEL GRADE o% UNDISTURBED OUTLET N DESIGN HIGH WATER 9MIl� SION moo/ OR S�wrI.E �""/ PLAN VIEW OR (25-YR. STORM ELEV.) MIN. 2.0' MIN. 3.0' POINTS A SHOULD BE HIGHER THAN POINT B. - 6' MIN. MIN. 0.5' MIN. 1.0' DRAINAGEWAY INSTALLATION (FRONT ELEVATION) TSC#3 = TWO (2) 48 INCH DIAMETER CULVERTS OR EQUIVALENT* TSC#4 = FOUR (4) 48 INCH DIAMETER CULVERTS OR EQUIVALENT* 6X6 SALT TREATED TIMBER (IF APPLICABLE) 67 C.Y./ AC. " DRY " STORAGE 3 DETAIL: SILT FENCE DETAIL: TEMPORARY STREAM CROSSING PERSPECTIVE VIEW RISER CREST 18 NTS 18 NTS NOTE: ALL TEMPORARY BERMS, SWALES AND LEVEL SPREADER DITCH MUST RECEIVE TEMPORARY 67 C.Y./ AC. �\ DEWATERING " WET ° STORAGE DEVICE SIZES BASED ON ASSUMED CONSTRUCTION DURATION. MAY BE MODIFIED UPON APPROVAL OF ENGINEER. — SEEDING IMMEDIATELY AFTER INSTALLATION SEDIMENT CLEANOUT POINT ST DESIGN ELEVATIONS WITHOUT 1 2 - KEY PLAN 1 DETAIL: LEVEL SPREADER EMERGENCY SPILLWAY ORIGINAL 3�I REQUIREMENTS FOR 18 NTS GROUND TOE 1 (RISER PASSES 25-YR. EVENT) ELEV. BANK STA BILIZA 'ION 1.0' 6'7CU. YD./ACRE FILTER CLOTH UNDERLINER (PREFERRED) 2 DETAIL: SEDIMENT BASIN SCHEMATIC S S F i8 ELEVATIONS NTS 67 CU. YD./ACRE KEY 1N T FLIER CLOTH 4 CHAIN LINKED FENCE 2 1/2" DIA GALV. COVERED BY FILTER ALUMINUM FENCE FABRIC POST (EXCAVATED) FILTER CLOTH ORIGINAL GROUND T PROVIDE ADEQUATE STRAPPING ELEV. S B GROUND z N � POLYETHYLENE CAP * \ COARSE AGGREGATE CLASS I RIPRAP ( 1 ISSUE z REV # DATE DESCRIPTION FILTER CLOTH M CROSS SECTION OF OUTLET #1 3/2/18 PER COUNTY COMMENTS #2 1 4/16/18 PER COUNTY COMMENTS GRANULAR FILTER PERSPECTIVE VIEW — — — DEPTH VARIES AS DIA. GALV. TACK WELD PERFORATED POLYETHYLENE * _ DRAINAGE TUBING, DIAMETER REQUIRED FOR DRY" CLASS I RIPRAP LENGTH (IN FEET) _ STORAGE 2 I/2" / ALUMINUM FENCE POST _ VARIES (SEE CALCULATIONS IN / 6 X DRAINAGE AREA T CHAIN LINKED FENCE \ APPENDIX 3.14-A) } 12" MIN. FIRST LAYER o FILTER FABRIC I \ _ / DIVERSIONDIKE FILTER CLOTH W/ z w 12" OVERLAP AT i i \_ �— BOTTOM I�i —F —GROUND EMBED FILTER FABRIC FERNCO-STYLE " COUPLING WET STORAGE1000 9' MI INTO � � � � � •� �� FILTER� � � �CLOTH BOTTOM OF 24" MIN WIDE TRENCH DEWATERING ORIFICE, *r SECTION VIEW SCHEDULE 40 STEEL STUB 1-FOOT MINIMUM, ���— �— —� — COARSE ACCREQ41E Wn. iHiCKNE55 = 6" LDIAMETER FENCING: VARIES (SEE CALCULATIONS ON CORRUGATED METAL RISER PLAN SHEETS) /// �Aj,T H O f t FENCING SHALL BE 42 HIGH CHAIN LINK FENCE CONSTRUCTED IN x � Source: Adapted from VDOT DTairiage Man1w Plate 3.19-1 f ACCORDANCE WITH THE LATEST VIRGINIA DEPARTMENT OF I / TRANSPORTATION CHAIN LINK FENCE DETAIL 02.0 .THE 5 4 COARSE AGGREGATE / �' / SCOTT C. BLOSSOM Lic. No. 40287 SPECIFICATION FOR A 6'-o" FENCE SHALL BE USED, SUBSTITUTING 42 FABRIC AND 6 -o LENGTH POSTS. 11 EXCAVATED / 1. CHAIN LINK FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. NOTE: WITH CONCRETE RISER, USE PVC SCHEDULE 40 STUB FOR DEWATERING ORIFICE FILTER CLOTH AREA ---- NOTES: CLASS 1 RIP RAP SLOPE STABILZATION TO BE APPLIED ON BIOFILTER SLOPES DOWNSTREAM OF BRIDGE/CULVERT CROSSINGS AS SHOWN 0 �S`�IONAL 2. FILTER CLOTH TO BE FASTENED SECURELY TO CHAIN LINK FENCE IN PLAN VIEW. WITH TIES EVERY 24" AT TOP AND MID SECTION. MINIMUM DEPTH = 2.2 FT 3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY DRAINAGE TUBING SHALL COMPLY WITH ASTM F667 MINIMUM HEIGHT = 3 FT UNLESS OTHERWISE SPECIFIED HEREIN SHALL BE OVERLAPPED BY 6' AND FOLDED. AND AASHTO M294 UNDERLAIN BY FILTER FABRIC PER VESCH STANDARDS AND SPECIFICATIONS. Job No: 1005 Drawn By: BCE 4. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND SILT Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. BUILDUPS REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE. E & S DETAILS (2) 5 DETAIL: SEDIMENT BASIN DEWATERING SYSTEM 6 DETAIL: SEDIMENT TRAP 8 DETAIL: RIP RAP SLOPE STABILIZATION 4 DETAIL: SUPER SILT FENCE i8 NTS 18 1$ NTS 18 NTS NOTES: 1) CONCRETE SHALL BE CLASS A3 2) CONTRACTOR MAY SUBMIT 1 ALTERNATE BID WITH FLOWABLE swM DR FILL INSTEAD OF CONCRETE, t (thickness) 3.0" R I VAN NA VILLAGE: ANTI VORTEX DEVICE DESIGN PENDING APPROVAL BY DESIGN ENGINEER EROSION AND SEDIMENT STANDARD PIPE HANGER OR x 2" METAL CLAMPS WITH HOLES 7ea" DIAMETER 8 LT5 & NUTS F R l SIDE WALLS MAY CONFORM CONTROL PLAN 3" MIN. DIAMETER TEMP. ORIFICE STUBOUT,SCHEDULE 40 STEEL STUB, PRESISURE RELIEF I TO THE SHAPE OF EXCAVATED i FOOT. MIN. LENGTH. TOP OF HOLES ��r �• TRENCH SHALL NOT BE LESS THAN 6" 8„ AMENDMENT 1 AND PHASE II I ; POLYETHELEiNE CAP DRY A�\ O A TEIIIPORA:r O O TOP STIFFENER (If REOUIRED) D i a m e t e r ALBEMARLE COUNTY, VIRGINIA 3 I; STORAGE PIS PERFORATED ELEVATION DEWATERINc: DEVICE IS -X-X -ANGLE WELDED TO TOP AND ORIENTED PER - I ; - - S" DIAMETER I I POLYETHYLENE DRAINAGE O �r Tuaw O PENDICULAR TO CORRUGATIONS. 1 /2 (D + 2t) = 15 2 ' WET •� WATERTIGHT FLEXIBLE STORAGE ` FOR ELEVATION I 7TEMPORARY WATER p ;� O O O TOP IS -GAGE CORRUGATED METAL OR 1 /8' STEEL PLATE. • COUPLING g" DIA. .`,. O -_ POLYETHELENE TUBING �` •' COUAO EIRYPLOATIEICE , PRESSURE RELIEF HOLES MAY - - - B" DIA. SOLID POLYETHYLENE I /OUTLET PERMANENT WATERS BE OMMITTED, ENS OF TARE LEFT PIF't DRArJAGE TtPSW QUALITY ORIFICE � CORRUGATIONS FULLY OPENING ; 1 " - \.-WATERTIGHT FLEXIBLE COUPLING FOR PLAN VIEW OPEN WHEN THE TOP IS 2 D - 2 " ATTACHED. 3MIN. DIA. STEEL PIPE TO I I %4 DOR611 I I 8" DIA. POLYETHELENE TUBING I - - - - - -- D � I T Eo CYLINDER IS GAGE CORRUGATED DRAINAGE TUBING SHALL COMPLY WITH ALL AROUND METAL PIPE OR FABRICATED FROM 12" 12" SIDE VIEW ASTM F667 OR AASHITO M294. FRONT VIEW-STORMWATER (TYPICAL DETAILS)) (TYPICAL DETAILS) MANAGEMENT DRAINAGE STRUCTURE (STD_ SWM-I TYPICAL) H /8 STEEL PLATE. 113CE 811 NOTES: NOTES: 1_ THESE DETAILS ARE TO BE USED TO MODIFY THE PERMANENT STORMWATER MANAGEMENT �� �N' 1. THE CYLINDER MUST BE Blossom Consulting and Engineering Inc. DRAINAGE STRUCTURE WHERE THE STORMWATER MANAGEMENT BASIN IS TO BE USED FOR A TEMPORARY SEDIMENT BASIN DURING PROJECT CONSTRUCTION. FIRMLY FASTENED TO THE 12 INCH 1101 Professional Drive, Suite G 2. GRADE STORMWATER MANAGEMENT BASIN As SHOWN IN PLANS, TOP OF THE RISER. Diameter DRAINAGE Williamsburg VA 23185 p: 757-870-4825 3. ALL OPENINGS (IF ANY) IN SIDE OF STRUCTURE (OTHER THAN PERMANENT WATER QUALITY ORIFICE) ARE TO BE COVERED WITH SOLID METAL PLATES WHILE THE BASIN IS BEING USED N6 x •2- SUPPORT BAR SIZE F* 2. SUPPORT BARS ARE WELDED BLANKET / (VDOT#78) FOR SEDIMENT CONTROL, SPACER tea? (#6 REBAR MIN TO THE TOP OF THE RISER 4. DEWATERING DEVICE AND COMPONENTS AND TEMPORARY METAL PLATES (IF ANY), AS SHOWN OR ATTACHED BY STRAPS IN THE DETAIL. ARE TO BE REMOVED AND PERMANENT STEEL PLATE WITH WATER OUALITY� ORIFICE IS TO BE INSTALLED WHEN BASIN IS NO LONGER NEEDED FOR SEDIMENT CONTROL_ BOLTED TO TOP OF RISER. 4INCH DIAMETER 5. SMIILAR DEVICE MAY ALSO BE USED ON OTHER STORMWATER MANAGEMENT DRAINAGE STRUCTURES. RISER �:��a c t i� -~ I SLOTTED PVC PIPES 12" ! (MIN. 5 FEET LONG) G. COST OF TEMPORARY DEWATERING DEVICE .AND TEMPORARY METAL PLATES (IF ANY) SHALL I I - � DAYLIGHTED BE INCLUDED IN THE BID PRICE FOR STORMWATER MANAGEMENT DRAINAGE STRUCTURE. THROUGH 7. THE TEMPORARY 8" DIA. POLYETHELENE DRAINAGE TUBING IS TO BE SOLID FOR THE LENGTH SECTION A - A ISOMETRIC WEEPHOLE IN BELOW WET STORAGE ELEVATION AND IS TO BE PERFORATED ABOVE THE WET STORAGE HEADWALL ELEVATION. THE COUPLING IS TO BE WATERTIGHT. T SPECIFICATION NOTES: 3 DETAIL: OUTFALL CULVERT CONCRETE CRADLE STORMWATER MANAGEMENT (S W M) DETAILS REFERENCE 1) PROPOSED TEMPORARY SEDIMENT BASIN RISER STRUCTURE SHALL CONSIST OF 36-INCH INSIDE DIAMETER CORRUGATED METAL PIPE. PER TABLE 3.14-D 19 AND GRAVEL DRAINAGE BLANKET NTS ROAD AND BRIDGE STANDARDS OF THE VESCH HANDBOOK, THE CONCENTRIC TRASH RACK SHALL CONSIST OF A 54-INCH DIAMETER CYLINDER, 14 GAGE,17-INCHES IN HEIGHT. MINIMUM .:.III ; r T OF 5 REVISION DATE 302 SUPPORT BAR SIZE IS #8 REBAR. 11.1.:: 6 V�7GINIA, DEPAR PAENT OF TRANSPORTATION 2) CORRUGATION FOR 12"-36" PIPE MEASURES 2 3 " x 2" 1 DETAIL: MODIFICATIONS TO PERMANENT SWM RISER TO SERVE AS TEMPORARY SEDIMENT BASIN PRINCIPAL SPILLWAY 2 DETAIL: SEDIMENT BASIN ANTI -VORTEX DEVICE FOR CMP RISER (TEMPORARY STAGE 1 SB 11) 19 19 (FROM VESCH 3.14 - SEDIMENT BASIN) FLOTATION CALCULATIONS FOR RISER BASE (01) EXAMPLE PLAN VIEWS ►r S Ol' WEIGHT OF WATER = 64.2o LBS/CU-FT KEY PLAN PRINCIPAL SPILLWAY WEIGHT OF CONCRETE=150.00 LBS/CU-FT BAFFLE LOCATIONS IN 54" TOP INVERT OF RISER = 346.o FT, NAVD88 THE RISER OF THE PRINCIPAL SPILLWAY SHALL BE SECURELY ATTACHED TO THE BARREL BY WATERTIGHT INVERT OF UNDERDRAIN = 342.o FT, NAVD88 SEDIMENT BASINS CONNECTION. THE BARREL AND RISER SHALL BE PLACED ON A FIRMLY COMPACTED SOIL FOUNDATION. INVERT OF CULVERT = 336.o FT, NAVD88 THE BASE OF THE RISER SHALL BE FIRMLY ANCHORED AS SHOWN TO PREVENT FLOATING. SPECIAL CARE BOTTOM INVERT OF RISER = 336.o FT, NAVD88 D _ SHALL BE TAKEN IN COMPACTING AROUND THE PIPE IN 4-INCH LAYERS AND COMPACTED UNTIL 95% HEIGHT OF RISER = 1o.o FT o 2 NO SOME COMPACTION IS ACHIEVED. A MINIMUM OF TWO FEET OF FILL SHALL BE HAND -COMPACTED OVER THE RISER INSIDE DIAMETER = 3.o FT BARREL BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. WALL THICKNESS = 4 INCHES RISER INSIDE AREA = 7.07 SF H�0" i `� `� ��- RISER `��- FILTER OR DRAINAGE DIAPHRAGM RISER OUTER AREA = 10. 56 SF ��� RISER FOOTPRINT = xx SF ��2 1) THE DIAPHRAGM SHOULD CONSIST OF SAND, MEETING FINE CONCRETE AGGREGATE REQUIREMENTS RISER BASE: MOW L TOTµ ��� FLCW NORMAL PDOL PDWrNOT of (AT LEAST 15% PASSING THE NO.40 SIEVE BUT NO MORE THAN 1o% PASSING THE NO. too SIEVE). IF RISER BASE AREA = 25.22 SF AR OIL( THE RISfRTHE BAFFIC rc UNUSUAL SOIL CONDITIONS EXIST, A SPECIAL ANALYSIS SHOULD BE COMPLETED. BASE DEPTH = 5.o FT 2) THE DIAPHRAGM SHOULD BE A MINIMUM OF 3 FEET THICKNESS AND SHOULD EXTEND VERTICALLY RISER OPENINGS: HMMAL POOL UPWARD AND HORIZONTALLY AT LEAST 3 TIMES THE PIPE DIAMETER AND VERTICALLY DOWNWARD UNDERDRAIN ORIFICE (6" DIAMETER) = 0.20 SF �^ ORRUGATED METAL AT LEAST 24 INCHES BENEATH THE BARREL INVERT, OR TO ROCK, WHICHEVER IS ENCOUNTERED OUTFALL CULVERT (24" INSIDE DIAMETER) = 3.14 SF 0/2 L RISER FIRST (SCS TECH. NOTE 709). TOTAL AREA = 3.34 SF D CYLINDER WITH 3) THE DIAPHRAGM SHOULD BE PLACED IMMEDIATELY DOWNSTREAM OF THE CUTOFF TRENCH, TOTAL VOLUME (AREA X 4") = 1.11 CU-FT �� I S S U E ANTI -VORTEX BARS PER APPROXIMATELY PARALLEL TO THE CENTERLINE OF THE DAM. WEIGHT OF DISPLACED WATER: DETAIL 2,THIS SHEET) 4) IN ORDER TO ACHIEVE MAXIMUM DENSITY OF CLEAN SANDS, FILTER LAYERS SHOULD BE FLOODED VOLUME OF RISER = 105.6 CU-FT WITH CLEAN WATER AND VIBRATED JUST AFTER THE WATER DROPS BELOW THE SAND SURFACE. THE VOLUME OF BASE = 78.02 CU-FT REV # DATE DESCRIPTION FILTER MATERIAL SHOULD BE PLACED IN LIFTS NO MORE THAN 12 INCHES. TOTAL DISPLACED VOLUME = 183.62 CU-FT NONMPL anal Rlsot NFLOW 5) UP TO FOUR FEET OF EMBANKMENT MATERIAL MAY BE PLACED OVER A FILTER MATERIAL LAYER WEIGHT OF DISPLACED WATER = 11,458 LBS � #1 3/2/18 PER COUNTY COMMENTS BEFORE EXCAVATING BACK DOWN TO EXPOSE THE PREVIOUS LAYER. AFTER REMOVING ANY WEIGHT OF RISER: VOLUME OF RISER CONCRETE = CU-FT #2 4/16/18 PER COUNTY COMMENTS UNSUITABLE MATERIALS, THE TRENCH MAY BE FILLED WITH ADDITIONAL 12-INCH LIFTS OF FILTER 34.91 MATERIAL, FLOODED AND VIBRATED AS DESCRIBED ABOVE, UNTIL THE TOP OF ADJACENT FILL IS VOLUME OF OPENINGS = 1.11 CU-FT All, BAFFLE ' - w D REACHED. TOTAL VOLUME OF RISER = 33.8o CU-FT ��" �� 6) THE DIAPHRAGM SHOULD BE DISCHARGED AT THE DOWNSTREAM TOE OF THE EMBANKMENT. THE WEIGHT OF RISER = 507o LBS / `L ��\ / L2 36" INSIDE DIAMETER ORRUGATED OPENING SIZES FOR SLOTTED AND PERFORATED PIPES IN DRAINS MUST BE DESIGNED USING THE WEIGHT OF BASE: VOLUME OF BASE = 78.02 CU-FT , / FILTER CRITERIA. A SECOND FILTER LAYER MAY BE REQUIRED AROUND THE DRAIN PIPE IN ORDER TO METAL RISER WEIGHT OF BASE = 11,703 LBS L - L + L2 ALLEVIATE THE NEED FOR MANY VERY SMALL OPENINGS. FABRIC SHOULD NOT BE USED AROUND THE I PERFORATED PIPE AS IT MAY CLOG RENDERING THE PERFORATIONS IMPENETRABLE BY WATER. TOTAL DOWNWARD WEIGHT = 16,773 LBS NFLOW FACTOR OF SAFETY = 1.51 OF ♦• X 8• 1EXIEIiIOR L PLrw000 oR Ea)nrKENr 29NEET3 S ev18" CORRUGATED METAL BARREL 11 � �e c�FST �� FLOTATION CALCULATIONS FOR RISER BASE (SB2) j .• (SEE DESIGN SHEETS FOR ACTUAL GIVEN: I I Iu�� ASOUPM r LENGTH AND INVERT ELEVATIONS) WEIGHT OF WATER = 64.2o LBS/CU-FT LEAST 3P INTO THE CWWA e. WEIGHT OF CONCRETE = 150.00 LBS/CU-FT TOP INVERT OF RISER = 346.o FT, NAVD88 INVERT OF UNDERDRAIN = 344•o FT, NAVD88 NOTE: INSTALL BAFFLE IN SB12 AS SHOWN IN PLAN VIEW. SEE SEE VESCH H pF INVERT OF CULVERT = 340.o FT, NAVD88 STANDARD AND SPEC 3.14 FOR ADDITIONAL INFORMATION.BOTTOM �LT CLASS A-3 OF RISER = 340.o FT, NA88 HEIGHT OF RISER 6`o FT G' CONCRETE BASE RISER INSIDE DIAMETER = 2.5 FT WALL THICKNESS = 4 INCHES SCOTT C. BLOSSOM a RISER INSIDE AREA = 4.91 SF Lie. No. 40287 RISER OUTER AREA = 7.88 SF c>~ �p W RISER FOOTPRINT = XX SF ° a d d d d d d ° d d° d d ° d d RISER BASE: RISER BASE AREA =13.64 SF 5 DETAIL: TYPICAL SEDIMENT BASIN BAFFLE S S ° d ° d d V d d ONAL d ° d ° ° d d d � d ° BASE DEPTH = 3.o FT 19 ADOPTED FROM VESCH 3.14 NTs d d ° d d ° d ° ° d° d d ° ° RISER OPENINGS: C d° d ° m ° d d ° d A ° d ° 18" FILTER OR DRAINAGE DIAPHRAGM UNDERDRAIN ORIFICE (4" DIAMETER) = o.o9 SF ° ° d d d °d ° d d, d ° PER SPECIFICATIONS ABOVE. OUTFALL CULVERT (18" INNER DIAMETER) = 1.77 SF ° d ° d ° d ° ALTERNATIVE DESIGN INCLUDES TOTAL AREA = 1.85 SF d d d d d d ° ° d ° d d CONCRETE CRADLE AND DRAINAGE TOTAL VOLUME (AREA X 4") = o.62 CU-FT ° ° d dO d dO d BLANKET SEE DETAIL THIS SHEET) 3) WEIGHT OF DISPLACED WATER: Job No: 1005 Drawn By: BCE d d° d ° d d d` ° VOLUME OF RISER = 47.25 CU-FT Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. VOLUME OF BASE = 29.39 CU-FT E & S DETAILS (3) 72" CONCRETE BASE (2- D) TOTAL DISPLACED VOLUME = 76.64 CU-FT WEIGHT OF DISPLACED WATER = 4,782•34 LBS NOTE: SEE STORMWATER MANAGEMENT PLAN WEIGHT OF RISER: SHEETS FOR PERMANENT STORMWATER BMP VOLUME OF RISER CONCRETE = 17.8o CU-FT STRUCTURES DETAILS AND DESIGNS. VOLUME OF OPENINGS = o.62 CU-FT TOTAL VOLUME OF RISER =17.18 CU-FT WEIGHT OF RISER = 2,577 LBS 4 DETAIL: TEMPORARY SEDIMENT BASIN RISER (36" DIAMETER CMP) WITH ANTI -VORTEX DEVICE WEIGHT OF BASE: 1 g NITS VOLUME OF BASE = 29.39 CU-FT WEIGHT OF BASE = 4,4o8.5o LBS TOTAL DOWNWARD WEIGHT = 6,985.5o LBS FACTOR OF SAFETY = 1.5 ES 19 FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEW\Design and Analysis\CAD\005_RivannaPH2_ESC_REV2.dwglHilllApr 12, 2018 at 11:56ILayout: 19 ES 1 Details (3) ALBEMARLE COUNTY FINAL PLAN GENERAL CONSTRUCTION NOTES 1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. 3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED. 5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL:VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. 8. UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE - CLASS III. 9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY 1o. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:ooPM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 8oLBS/1ooSF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 9oLBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-2o-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 18oLBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 8oLBS/1ooSF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DIKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 3o DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. GENERAL CONSTRUCTION NOTES FOR STORMWATER MANAGEMENT PLANS 1. ALL DAMS AND CONSTRUCTED FILL TO BE WITHIN 95% OF MAXIMUM DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL TO BE APPROVED BY A GEOTECHNICAL ENGINEER. A GEOTECHNICAL ENGINEER IS TO BE PRESENT DURING CONSTRUCTION OF DAMS. 2. PIPE AND RISER JOINTS ARE TO BE WATERTIGHT WITHIN STORMWATER MANAGEMENT FACILITIES. 3. FOR TEMPORARY SEDIMENT TRAPS OR BASINS WHICH ARE TO BE CONVERTED TO PERMANENT STORMWATER MANAGEMENT FACILITIES; CONVERSION IS NOT TO TAKE PLACE UNTIL THE SITE IS STABILIZED, AND PERMISSION HAS BEEN OBTAINED FROM THE COUNTY EROSION CONTROL INSPECTOR. 4. SELECT E&S MEASURES MAY BE IMPLEMENTED DURING PHASE 1 STAGE 1 CONSTRUCTION AND THEN MODIFIED DURING STAGE 2.5. PROPOSED TEMPORARY STREAM CROSSINGS WILL BE DESIGNED AND IMPLEMENTED TO AVOID IMPACTS IN AREAS SHOWN AS PRESERVED ON THE PERMIT APPLICATION. TEMPORARY STABILIZATION/SEASONAL NURSE CROP) QUANTITY BOTANICAL NAME COMMON NAME SPECIFICATION SEEDING DATE RATE (LBS./ACRE) NOTES 100% SECALE CEREALS CEREAL RYE SEED NOVEMBER 1 - FEBRUARY 28 30 APPLY TEMPORARY STABILIZATION/SEASONAL NURSE CROP TO ALL DISTURBED AREAS IN ACCORDANCE WITH SEEDING DATES SHOWN. 100% LOLIUM MULTIFLORUM ANNUAL RYEGRASS SEED MARCH 1 - MAY 15 10 100% UROCHLOA RAMOSA BROWN TOP MILLET SEED MAY 16 - AUGUST 15 15 100% LOLIUM MULTIFLORUM ANNUAL RYEGRASS SEED AUGUST 16 - OCTOBER 31 10 PLAN VIEW approved dewatering device stream diversion pump discharge hoses P intake P dewatering pump hose i .. :A A / flow Z- intake hose flow sediment dike clean water dike -� sump -hole / r pool .(12" to 18" deep work area 2' dia.) pumps should discharge length not to exceed onto a stable velocity that which can be completed in one day dissipator made of rip rap orsandbags (See Outfall Protection detail this sheet) SECTION A -A impervious sheeting base flow + 1 foot work area (2 foot minimum) cross section of sandbag dike REVISED NOVEMBER 2000 PAGE 1.2-3 NOTES: 1. SET UP PUMP AND HOSE AS SHOWN, OR USE OTHER PRACTICAL ALTERNATIVES. PUMP SHOULD HAVE TWICE THE PUMPING CAPACITY OF ANTICIPATED FLOW. 2. ALL INTAKE HOSES WILL BE SCREENED. 3. DISMANTLE DOWNSTREAM DAM, THEN UPSTREAM DAM. KEEP PUMP RUNNING TO MAINTAIN STREAM FLOW. DETAIL: PUMP AROUND DIVERSION NTS BMP I1 DIVERSION NOTES �� IfIIIIIIIIIIIIIIIIIIIIII�I � _ ►qjr--f - r � 1. IN ORDER TO CONSTRUCT THE PROPOSED EMBANKMENT ASSOCIATED WITH THE LEVEL II WET POND IT WILL BE NECESSARY TO DIVERT AND/OR PUMP STREAM FLOW AROUND THE WORK AREA DURING SELECT PERIODS OF CONSTRUCTION. 2. THE STREAM CHANNEL CONTRIBUTING TO THE POINT OF DIVERSION IS APPROXIMATELY 4 FEET WIDE AND 1-2 FEET DEEP, WITH SEASONAL INTERMITTENT FLOW. 3. BASED ON POST DEVELOPMENT HYDROLOGIC ANALYSIS, THE to YEAR 24 HOUR PEAK DISCHARGE IS APPROXIMATELY 300 CFS, WHICH WOULD NECESSITATE A LINED DIVERSION CHANNEL (EC-3 MATTING) 20 FEET WIDE, 2 FT DEPTH WITH AN ASSOCIATED PEAK VELOCITY OF 8 FT/SEC. 4. GIVEN THE "RECEIVING" CHANNEL AT THE OUTFALL, AND THE REQUIRED OUTFALL PROTECTION ASSOCIATED WITH THE DIVERSION CHANNEL, A CHANNEL DESIGNED TO CONVEY THE 1-YEAR STORM EVENT (110 CFS) IS PROPOSED, THUS ALLOWING FOR LARGER EVENTS TO ACCESS THE FLOODPLAIN. 5. PROPOSED DIVERSION CHANNEL DIMENSIONS 5.1. 12 FT BOTTOM WIDTH 5.2. 2.3 FT DEPTH 5.3• 2:1 SIDE SLOPES 5.4• LINED WITH EC-3 MATTING 5.5• 1.5% SLOPE 6. THE PROPOSED DIVERSION CHANNEL SHALL OUTFALL INTO OUTFALL PROTECTION AT EITHER THE EMERGENCY SPILLWAY LOCATION (300 FT LENGTH) OR THE PRINCIPLE SPILLWAY OUTFALL (boo FT LENGTH) 6.1. OUTFALL PROTECTION DESIGN 6.1.1. APRON LENGTH = 4o FEET (MIN) 6.1.2. CLASS 2 RIP RAP 6.1.3. APRON WIDTH = 15 FEET 7. A PUMP AROUND DIVERSION (SEE DETAIL THIS SHEET) MAY BE USED IN LIEU OF OR IN ADDITION TO THE DIVERSION CHANNEL, AND MUST DISCHARGE INTO AN APPROVED SILT BAG AND INTO THE PROPOSED OUTFALL PROTECTION APRON AS NOTED IN #6. 344 343 342 341 DIVERSION CHANNEL (BMP 11) 20.0' DESIGN CHANNEL TOP WIDTH 3400 5 10 15 DISTANCE (FT.) DIVERSION CHANNEL CROSS-SECTION VERTICAL SCALE: 1 " = 2' HORIZONTAL SCALE: 1 " = 5 ALBEMARLE COUNTY FINAL PLAN GENERAL NOTES GENERAL CONSTRUCTION NOTES GENERAL CONSTRUCTION NOTES FOR STREETS (THIS LIST IS IN ADDITION TO THE GENERAL CONSTRUCTION NOTES) 1. CONSTRUCTION INSPECTION OF ALL PROPOSED ROADS WITHIN THE DEVELOPMENT WILL BE MADE BY THE COUNTY. THE CONTRACTOR MUST NOTIFY THE DEPARTMENT OF COMMUNITY DEVELOPMENT (296- 5832) 48 HOURS IN ADVANCE OF THE START OF CONSTRUCTION. 2. UPON COMPLETION OF FINE GRADING AND PREPARATION OF THE ROADBED SUBGRADE, THE CONTRACTOR SHALL HAVE CBR TESTS PERFORMED ON THE SUBGRADE SOIL. THREE (3) COPIES OF THE TEST RESULTS SHALL BE SUBMITTED TO THE COUNTY. IF A SUBGRADE SOIL CBR OF 10 OR GREATER IS NOT OBTAINABLE, A REVISED PAVEMENT DESIGN SHALL BE MADE BY THE DESIGN ENGINEER AND SUBMITTED WITH THE TEST RESULTS FOR APPROVAL. 3. SURFACE DRAINAGE AND PIPE DISCHARGE MUST BE RETAINED WITHIN THE PUBLIC RIGHT-OF-WAY OR WITHIN EASEMENTS PRIOR TO ACCEPTANCE BY THE COUNTY. ALL DRAINAGE OUTFALL EASEMENTS ARE TO BE EXTENDED TO A BOUNDARY LINE OR A NATURAL WATERCOURSE. 4. GUARDRAIL LOCATIONS ARE APPROXIMATE. EXACT LENGTH, LOCATION AND APPROPRIATE END TREATMENTS WILL BE FIELD VERIFIED AT THE TIME OF CONSTRUCTION. ADDITIONAL GUARDRAIL MAY BE REQUIRED AT LOCATIONS NOT SHOWN WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY. WHEN GUARDRAIL IS REQUIRED, IT SHALL BE INSTALLED FOUR (4) FEET OFFSET FROM THE EDGE OF PAVEMENT TO THE FACE OF GUARDRAIL, AND ROADWAY SHOULDER WIDTHS SHALL BE INCREASED TO SEVEN (7) FEET. 5. WHERE URBAN CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT CG-9(A, B OR C). 6. WHERE RURAL CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT STANDARD PE-1. 7. COMPLIANCE WITH THE MINIMUM PAVEMENT WIDTH, SHOULDER WIDTH AND DITCH SECTIONS, AS SHOWN ON THE TYPICAL PAVEMENT SECTION DETAIL, SHALL BE STRICTLY ADHERED TO. 8. ROAD PLAN APPROVAL FOR SUBDIVISIONS IS SUBJECT TO FINAL SUBDIVISION PLAT VALIDATION. SHOULD THE FINAL PLAT FOR THIS PROJECT EXPIRE PRIOR TO SIGNING AND RECORDATION, THEN APPROVAL OF THESE PLANS SHALL BE NULL AND VOID. 9. ALL SIGNS OR OTHER REGULATORY DEVICES SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES AND THE ALBEMARLE COUNTY ROAD NAMING AND PROPERTY NUMBERING ORDINANCE AND MANUAL. 1o. TRAFFIC CONTROL OR OTHER REGULATORY SIGNS OR BARRICADES SHALL BE INSTALLED BY THE DEVELOPER WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, THEY ARE DEEMED NECESSARY IN ORDER TO PROVIDE SAFE AND CONVENIENT ACCESS. 11. THE SPEED LIMITS TO BE POSTED ON SPEED LIMIT SIGNS ARE 5 MPH BELOW THE DESIGN SPEED, OR AS DETERMINED BY VDOT FOR PUBLIC ROADS. 12. VDOT STANDARD CD-1 OR CD-2 CROSS -DRAINS UNDER TO BE INSTALLED UNDER THE SUBBASE MATERIAL AT ALL CUT AND FILL TRANSITIONS AND GRADE SAG POINTS AS SHOWN ON THE ROAD PROFILES. 13. A VIDEO CAMERA INSPECTION IS REQUIRED FOR ALL STORM SEWERS AND CULVERTS THAT ARE DEEMED INACCESSIBLE TO VDOT OR COUNTY INSPECTIONS. THE VIDEO INSPECTION SHALL BE CONDUCTED IN ACCORDANCE WITH VDOT'S VIDEO CAMERA INSPECTION PROCEDURE AND WITH A VDOT OR COUNTY INSPECTOR PRESENT. 20 GEOTECHNICAL ENGINEERING NOTES 1. SEE REPORT OF GEOTECHNICAL INVESTIGATION PREPARED BY VIOLA ENGINEERING DATED 11/10/2016 FOR ADDITIONAL GEOTECHNICAL RECOMMENDATIONS. 2. PHASE 2 REPORT OF GEOTECHNICAL INVESTIGATION PROVIDED UNDER SEPARATE COVER 3. PHASE 1 AND PHASE 2 REPORT OF GEOTECHNICAL INVESTIGATIONS ARE INCORPORATED BY REFERENCE HEREIN. RUNOFF WATER CONCRETE � ��►�����. tt��Ir�•�.•y� A► .,,err GRAVEL FILTER* 12" SPECIFIC APPLICATION r 12" WIRE MESH r- FILTERED WATER o e a o _ 0 4 d n D A a r CURB INLET THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE DETAIL: CURB INLET SEDIMENT FILTER NTS RUNOFI WATER WITH SEDIME SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE AN OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING AROUND THE STRUCTURE. " GRAVEL SHALL BE VDOT #3. #357 OR #5 COARSE AGGREGATE. DETAIL: DROP INLET SEDIMENT FILTER NTS TEMPORARY SEEDING NOTES L TEMPORARY SEEDING SHALL CONFORM WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK STANDARD AND SPECIFICATIONS 3.31 2. ALL SEED MIXES ARE TO BE UNTREATED TESTED SEED OF GOOD QUALITY AND FREE OF NOXIOUS WEEDS. 3. ALL SEED SHALL BE DRY AND NOT MOLDY AND SHALL SHOW NO SIGN OF HAVING BEEN WET OR OTHERWISE DAMAGED. 4. EACH BAG OF SEED SHALL BE LABELED WITH THE NAME OF THE SEED MIX, PERCENTAGES OF EACH SPECIES IN THE MIX, AND THE SUPPLIER'S NAME, ADDRESS, AND PHONE NUMBER. 5. THE CONTRACTOR SHALL USE THE SEED MIXES AND APPLICATION RATES AS SHOWN ON THE PLANT SCHEDULE BELOW. NO SUBSTITUTIONS SHALL BE ACCEPTED WITHOUT PRIOR PERMISSION FROM THE ENGINEER OR LANDSCAPE ARCHITECT. 6. SEEDED AREAS SHALL BE INSPECTED BY THE ENGINEER OR LANDSCAPE ARCHITECT AT THE COMPLETION OF THE SEEDING OPERATIONS AND ACCEPTED SUBJECT TO COMPLIANCE WITH SPECIFIED MATERIALS AND INSTALLATION REQUIREMENTS. 7. TEMPORARY SEEDING SHALL BE APPLIED TO ALL DENUDED/DISTURBED AREAS AND ALL SOIL STOCKPILES THAT WILL NOT BE BROUGHT TO FINAL GRADE OR REMOVED FROM THE SITE WITHIN 14 DAYS. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ACTUAL AMOUNT OF STABILIZATION SEED MIXES REQUIRED. DETAIL: TEMP.SEEDING NOTES NTS RIVANNA VILLAGE: EROSION AND SEDIMENT CONTROL PLAN AMENDMENT 1 AND PHASE II ALBEMARLE COUNTY, VIRGINIA SCE Blossom Consulting and Engineering Inc. 1101 Professional Drive, Suite G Williamsburg VA 23185 p: 757-870-4825 KEY PLAN ISSUE REV # DATE DESCRIPTION #1 3/2/18 PER COUNTY COMMENTS #2 4/16/18 PER COUNTY COMMENTS �,tiT H OF � f� O Gl SCOTT C. BLOSSOM a Lic. No. 40287 �SSIONAL Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. E & S DETAILS (4) ES - 20 FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEW\Design and Analysis\CAD\005_RivannaPH2_ESC_ REV2.dwglHilllApr 12, 2018 at 11:561Layout: 20 ES 1 Details (4) RIVANNA VILLAGE: EROSION AND SEDIMENT CONTROL PLAN TYPICAL CONSTRUCTION SEQUENCE TYPICAL CONSTRUCTION SEQUENCE, (CONT.) BLOCK I AND G (AND STAGING AND STOCKPILE AREA) BLOCKS J WEST AND PARK AREAS 31. CLEARING AND GRUBBING FOR TRAILS IN PARK AREAS TO OCCUR ONLY AS NEEDED FOR ACCESS AND THEN CONCURRENTLY WITH 1. CONTRACTOR TO STAKE OUT LIMITS OF DISTURBANCE PRIOR TO START OF CONSTRUCTION. INSTALLATION OF SEDIMENT CONTROL PRACTICES. AMENDMENT 1 AND PHASE 11 ALBEMARLE COUNTY, VIRGIN IA 2. CONTRACTOR SHALL MAINTAIN PHASE 1 CE 1 AND CE 2 AS NEEDED TO INITIATE PHASE 2 CONSTRUCTION ACTIVITIES ACCORDING TO PLAN 32. DIVERSION CHANNELS, RIGHT OF WAY DIVERSIONS AND SEDIMENT TRAPS IN BLOCK J WEST TO BE INSTALLED AS DEPICTED IN DETAIL ON VIEW SHEET 3 AND PER THE PAVED WASH RACK DETAIL 7 ON SHEET 17. SHEETS 17 AND 18 AND AS SHOWN ON SHEETS 15-18 IN PLAN VIEW. TRAPS SHALL BE FUNCTIONAL PRIOR TO UPSTREAM GRADING ACTIVITIES, 3. CONTRACTOR TO INSTALL TEMPORARY STREAM CROSSINGS #3 TO ACCESS BLOCK G FROM EXTENDING PARK STREET AND TEMPORARY AND SHALL BE INCREMENTALLY ADJUSTED/RAISED AS SITE EARTHWORK OPERATIONS PROGRESS. STREAM CROSSING #4 (IN APPROVED PERMANENT STREAM IMPACT AREAS UPSTREAM OF PROPOSED POND EMBANKMENT) TO ACCESS 33. CONTRACTOR TO CLEAR AND GRUB BLOCKS J WEST AND PERFORM ROUGH UPON TEMPORARY STABILIZATION OF SEDIMENT TRAPPING BLOCK I AND PROPOSED STOCKPILE AREA. AND DIVERSION PRACTICES. 4. SILT FENCE TO BE INSTALLED ON THE DOWN SLOPE SIDE OF ACCESS ROADS AND STOCKPILE IN BLOCK I. TREE PROTECTION SHALL BE 34. CONTRACTOR TO INSTALL RETAINING WALLS AS ROAD GRADES ARE REACHED, AND ADJUST SEDIMENT TRAP GRADES IN STAGE 2 TO INSTALLED ALONG REMAINING STREAM BUFFER BOUNDARY IN BLOCK J AS SHOWN ON SHEET 3. REACH STAGE 2 SEDIMENT GRADES. ALL DENUDED OR DISTURBED AREAS TO BE PERMANENTLY STABILIZED IMMEDIATELY AFTER FINAL 5. INSTALL TRAPS IN BLOCK G AND SEDIMENT BASIN I1 PER DETAILS 1 AND 2 ON SHEET 17. SEDIMENT BASIN CS2 TO REMAIN ONLINE GRADE. THROUGHOUT PHASE 1 AND PHASE 2 CONSTRUCTION. INSTALL DIVERSION CHANNELS IN BLOCK I AND G PER DETAIL 8 ON SHEET 17. 35. SEDIMENT TRAPS SHALL NOT BE CONVERTED TO PERMANENT BMPS (AS SHOWN IN STAGE 3 STORMWATER PLANS) UNTIL THE UPSTREAM 6. CLEARING AND GRUBBING OPERATIONS TO OCCUR ONLY AS NEEDED FOR ACCESS ROADS AND CONCURRENTLY WITH THE INSTALLATION OF WATERSHED IS STABILIZED PERIMETER EROSION AND SEDIMENT CONTROL PRACTICES IN BLOCK I AND G. ACCESS ROADS TO BE CONSTRUCTED ALONG PROPOSED BLOCK G, I AND J (STAGE 2 EROSION AND SEDIMENT CONTROL) ALIGNMENT OF PARK STREET AND CAPITAL DRIVE, AROUND STAGING AND STOCKPILE AREAS. ALTERNATIVE ROUTES MAY BE RECOMMENDED BY COUNTY STAFF IN ORDER TO REDUCE EROSION AND DOWNSTREAM SEDIMENTATION. 36. ALL ACCESS ROADS TO BE PROTECTED IN A MANNER APPROVED BY PROJECT ENGINEER. MULCH, STONE, AND TIMBER MATS ARE BCE PREFERRED UNTIL PAVING OPERATIONS ARE COMPLETE. 7. CLEARING AND GRUBBING OF STAGING AND STOCK PILING AREA CAN OCCUR UPON TEMPORARY STABILIZATION OF SEDIMENT BASIN I1 AND I2, SEDIMENT TRAPS IN BLOCK G, ASSOCIATED DIVERSION CHANNELS, AND RIGHT OF WAY DIVERSION IN BLOCK G. 37. AS ROADS AND INFRASTRUCTURE ARE INSTALLED, IT WILL BE NECESSARY TO BEGIN CONVERSION OF TEMPORARY EROSION AND Blossom Consultingand Engineering Inc. 9 9 1101 Professional Drive, Suite G SEDIMENT CONTROL TRAPS AND BASINS TO STAGE 2 GRADES. SEDIMENT TRAPS AND BASINS SHALL BE ROUGH GRADED TO STAGE 2 8. STAGING AND STOCK PILING AREA TO BE TEMPORARY STABILIZED UPON COMPLETION OF TEMPORARY GRADING. ELEVATIONS AS SITE EARTHWORK OPERATIONS PROGRESS, BUT SHALL NOT BE COMPLETED UNTIL THE UPSTREAM WATERSHEDS ARE 9. ACCESS ROAD TO BE PROTECTED IN A MANNER APPROVED BY PROJECT ENGINEER. MULCH, STONE, AND TIMBER MATS ARE PREFERRED. STABILIZED. Williamsburg VA 23185 ACCESS ROAD STABILIZATION TO BE INSPECTED REGULARLY IN ORDER TO MAINTAIN EROSION CONTROL. 38. CONTRACTOR SHALL ADJUST SILT FENCE AS SHOWN ON STAGE 2 EROSION AND SEDIMENT CONTROL SHEETS AS NEEDED TO MAINTAIN p: 757-870-4825 BLOCK H AND BLOCK J WEST PERIMETER CONTROLS DOWNSTREAM OF STAGE 2 GRADING ACTIVITIES (INCLUDING DOWNSTREAM OF PROPOSED EMBANKMENT 10. SILT FENCE TO BE MAINTAINED ON THE DOWN SLOPE SIDE OF ACCESS ROAD IN BLOCK H AND INSTALLED IN BLOCK J WEST. ASSOCIATED WITH STAGE 2 SEDIMENT BASIN I2). 11. CLEARING AND GRUBBING (ANY REMAINING AFTER PHASE 1 ACTIVITIES) TO OCCUR ONLY AS NEEDED TO MAINTAIN ACCESS ROAD FROM 39• ALL DENUDED OR DISTURBED AREAS TO BE PERMANENTLY STABILIZED IMMEDIATELY AFTER FINAL GRADE. PROPOSED STEAMER DRIVE INTERSECTION ON PROPOSED PARK STREET AND TO CREATE ACCESS ROAD THROUGH BLOCK H AND TO BLOCK J BLOCK J (STAGE 2 SEDIMENT BASIN I2) WEST. EXISTING SEDIMENT TRAPS TO BE MAINTAINED PER VESCH STANDARDS AND SHALL BE FUNCTIONAL PRIOR TO UPSTREAM GRADING 40. CLEARING AND GRUBBING ALONG EXISTING DAM EMBANKMENT TO OCCUR ONLY AFTER UPSTREAM WATERSHED IS STABILIZED AND ACTIVITIES. GRADING ACTIVITIES ARE COMPLETE. STORM DRAINAGE INFRASTRUCTURE SHALL BE INSTALLED CONCURRENT WITH EARTHWORK 12. CONTRACTOR TO PERFORM ROUGH GRADING FOR BLOCK H AND CAN INITIATE GRADING ACTIVITIES FOR BLOCK J WEST ONLY AFTER ACTIVITIES AND DIRECTED TO PROPOSED OUTFALL LOCATIONS WITH OUTFALL PROTECTION INSTALLED. SEDIMENT TRAPS, DIVERSION DIKES AND RIGHT OF WAY DIVERSIONS IN BLOCK J WEST ARE IN PLACE AND STABILIZED. 41. CONTRACTOR TO INSTALL PUMP AROUND AND/OR DIVERSION CHANNEL WITHIN APPROVED IMPACT AREAS TO BY PASS OFF SITE STREAM 13. ALL DENUDED OR DISTURBED AREAS TO BE PERMANENTLY STABILIZED IMMEDIATELY AFTER FINAL GRADE. FLOW AROUND DISTURBED AREAS DURING CONSTRUCTION OF STAGE 2 SEDIMENT BASIN I1. BLOCK I 42. CONTRACTOR SHALL EXCAVATE STAGE 2 BASIN I2 TO PROPOSED GRADES AS DEPICTED ON SHEET 11 AND SHOWN IN THE STORMWATER 14. CONTRACTOR SHALL INSTALL CONSTRUCTION ENTRANCE CE3 (ONLY AT WHICH TIME ACCESS FROM ROUTE 250 IS NEEDED). ACCESS CAN PLANS AFTER BLOCKS C AND I ARE STABILIZED. CONSTRUCT EMBANKMENT AS DETAILED IN THE STORMWATER PLANS AND INSTALL CONTINUE THROUGH PHASE 1 AND THROUGH BLOCK I AND G AS LONG AS PRACTICABLE IN CONSIDERATION OF FINISHED LOTS. PRINCIPAL SPILLWAY AND EMERGENCY SPILLWAYS. 15. DIVERSION CHANNELS PARALLEL TO EXISTING FLOW PATHS AND CHANNELS ARE NECESSARY TO DIVERT RUNOFF FROM DISTURBED 43• STAGE 2 SEDIMENT BASIN I1 CAN BE CONVERTED TO PERMANENT BMP I1 WHEN THE CONTRIBUTING WATERSHED IS STABLE, AND INLET AREAS TO EROSION AND SEDIMENT CONTROL FACILITIES WHILE MAINTAINING BASE FLOW IN EXISTING STREAM CHANNELS. DIVERSIONS PROTECTION IS INSTALLED AT ALL UPSTREAM INLETS. REFER TO STORMWATER PLANS FOR FINAL CONVERSION SEQUENCE. IN BLOCK I (NORTH), DOWN SLOPE OF ROUTE 250 SHALL BE IN PLACE PRIOR TO MAIN CLEARING AND GRUBBING ACTIVITIES. 44. ALL DENUDED OR DISTURBED AREAS TO BE PERMANENTLY STABILIZED IMMEDIATELY AFTER FINAL GRADE IS REACHED.. 16. CLEARING AND GRUBBING TO OCCUR ONLY AS NEEDED FOR ACCESS ROAD, STOCKPILE, AND THE INSTALLATION OF EROSION AND SEDIMENT CONTROL PRACTICES ALONG BUTTERFIELD LANE AND TERRAPIN CIRCLE. 17. ACCESS ROAD TO BE PROTECTED IN A MANNER APPROVED BY PROJECT ENGINEER. MULCH, STONE, AND TIMBER MATS ARE PREFERRED. KEY PLAN 18. PERIMETER SEDIMENT CONTROLS SUCH AS SILT FENCE, DIVERSION CHANNELS, AND SEDIMENT TRAPS AND BASINS (AS NOTED ABOVE) TO BE INSTALLED AS DEPICTED IN DETAILS ON SHEETS 17 AND 18 AND AS SHOWN ON SHEET 5-9 IN PLAN VIEW. ALL PERIMETER EROSION AND SEDIMENT CONTROLS SHALL BE FUNCTIONAL PRIOR COMMENCEMENT OF GRADING OPERATIONS. 19. INSTALL TEMPORARY STREAM CROSSING #6 TO ACCESS BLOCK I EAST 20. INSTALL SEDIMENT BASIN I2 AND ASSOCIATED DIVERSION CHANNELS PRIOR TO CLEARING AND GRUBBING IN BLOCK I EAST. 21. CONTRACTOR TO CLEAR AND GRUB REMAINING AREAS IN BLOCK I (NORTH OF CAPITAL DRIVE) WHILE SEDIMENT TRAPS, DIVERSIONS AND SEDIMENT BASIN I1 REMAINS FUNCTIONAL. CONTRACTOR TO PERFORM ROUGH GRADING PER VESCH STANDARDS. 22. ALL DENUDED OR DISTURBED AREAS TO BE PERMANENTLY STABILIZED IMMEDIATELY AFTER FINAL GRADE. BLOCK I (ROUTE 25o ENTRANCE) AND BLOCK J EAST 23. CONTRACTOR SHALL INSTALL CONSTRUCTION ENTRANCE CE4 AND WASH RACK AT THE ROUTE 250 CONCURRENT WITH THE ENTRANCE PLAN CONSTRUCTION AS SHOWN ON ROUTE 25o ENTRANCE PLANS PREPARED BY ALAN FRANKLIN P.E. 24. CONTRACTOR TO INSTALL TEMPORARY STREAM CROSSING #7 TO ACCESS BLOCK J WEST. ISSUE 25. CLEARING AND GRUBBING TO OCCUR ONLY AS NEEDED FOR ACCESS ROAD AND CONCURRENTLY WITH INSTALLATION OF STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES. REV # DATE DESCRIPTION 26. ACCESS ROAD TO BE PROTECTED IN A MANNER APPROVED BY PROJECT ENGINEER. MULCH, STONE, AND/OR TIMBER MATS ARE #1 3/2/18 PER COUNTY COMMENTS PREFERRED. #2 4/16/18 PER COUNTY COMMENTS 27. SEDIMENT TRAPS, DIVERSION CHANNELS AND RIGHT OF WAY DIVERSIONS TO BE INSTALLED AS DEPICTED IN DETAIL ON SHEETS 10-14 PRIOR TO INITIATING GRADING ACTIVITIES IN BLOCK J EAST. RIGHT OF WAY DIVERSIONS UP SLOPE OF BLOCK J EAST GRADING SHALL BE IN PLACE TO DIRECT OFF SITE RUNOFF AROUND DISTURBED AREAS DURING CONSTRUCTION. ALL E&S MEASURES SHALL BE FUNCTIONAL PRIOR TO UPSTREAM AND DOWNSTREAM GRADING ACTIVITIES. 28. CONTRACTOR TO CLEAR AND GRUB BLOCK J EAST UPON TEMPORARY STABILIZATION OF SEDIMENT TRAPPING AND DIVERSION PRACTICES. 29. CONTRACTOR TO PERFORM ROUGH GRADING. 30. ALL DENUDED OR DISTURBED AREAS TO BE PERMANENTLY STABILIZED IMMEDIATELY AFTER FINAL GRADE. ����tiD o SCOTTLic.�SSI Job No: 1005 Drawn By: BCE Date: 12.04.2017 Checked By: Scott C. Blossom, P.E. E & S NOTES FILEPATH:C:\Users\Hill\Dropbox\Projects\005 RivannaNEW\Design and Analysis\CAD\005_RivannaPH2_ESC_REV2.dwglHilijApr 12, 2018 at 11:57jLayoA 21 ES SEQUENCE ES 21