Loading...
HomeMy WebLinkAboutWPO201900053 Other 2019-10-25ALBEMAR,LE COUNTY I VIRGINIA Is this a new submission or a re -submission? r New Submission r Re -submission The Community Development Department (CDD) now accepts the digital submission of development applications through a new web based form. This feature is being implemented in an effort to provide a user-friendly method to submit and resubmit Subdivision (SUB), Site Development Plan (SDP), Water Protection Ordinance (WPO) development applications only. To guide you through the digital submission process, we have provided Submittal Instructions on how to use this Submission Form and some General Submission Guidelines. Please review both of these documents before making your submission. Submittal Instructions General Submission Guidelines If you have questions about the correct submission method for your project, please or email us at cddsubmittal@albemarle.org or call us at (434) 296-5832. You have selected re -submission. If necessary, you will need to complete appropriate PDF application form(s). ■ For Site Development Plan re -submissions, no application or fee is required. ■ For Road Plan re -submissions, an application and fee are required and can be found here. ■ For all other Subdivision re -submissions, no application or fee is required. ■ For Water Protection Ordinance re -submissions, an application and fee are required and can be found here. Once you have finished filling out the application, save it to a location on your computer. Please enter your project's application number in the field provided below. Once completed, tab to the next field. The application number you entered will reference the project's application number in Albemarle County Community Development Department's development tracking system. Once referenced, the Project Name and Project Type fields will be auto -populated. Please confirm the information referenced in these fields is correct. After confirmation, please enter your name and email address for contact purposes, and attach any associated files for resubmittal through the File Upload button. Submission Fees are determined by application type, and are listed within each application. Full Name Ec:.lohn Doe Keane Rucker Email* Ex: johndoe@gnail.com keane@shimp-engineering.com Phone Number* Ec:434-973-9999 434-299-9843 Application Number* Ex:SDF201800005 WP0201900053 (Prefix +4 digit year + 5 digit number Project Name (f\b entry needed) ECO VILLAGE Project Type (f\b entry needed) WPO File Upload Only FDFand TIFFfiletypes accepted Eco Village WPO App signed.pdf 154.25KB Eco Village WPO 201900053 VSMP Comment Response 1 (19-10- 130.8KB 25).pdf 61-210B-VSMP PLANS 2ND SUB 10-25-19.pdf 21.49MB Eco Village SWPPP (10-25-2019).pdf 22.93MB Eco Village SWM Calculation Packet 10-25-19.pdf 29.25MB Nbxirrumsize per file: 25ON/B