Loading...
HomeMy WebLinkAboutARB201900064 Plan - Other (not approved) 2019-05-29ONEWWI 00, BMII- $is N ENLARGED FRONT ELEVATION IA201 A201� irr = r-0• MATERIAL LEGEND O BRICK O CLEAR ANODIZED ALUMINUM WINDOW FRAME 3O CLEAR ANODIZED ALUMINUM FLASHING ® CLEAR ANODIZED ALUMINUM CANOPY FASCIA O CAST STONE SILL thrive architecture No. Issue Date BMC HYDRAULIC OFFICE BUILDING CONCEPT ELEVATIONS Project Number _ Drawn By MG Checked By SD Date May 29, 2019 A201 Scale 1/2" = 1'-0" In archthri, i e C u re No. Issue Date BMC HYDRAULIC OFFICE BUILDING CONCEPT VIEWS Project Number _ Drawn By MG Checked By SD Date May 29, 2019 A202 Scale 45 LO LO L6 N rn N 1 ZI W' ml U. wi LU a. I al C-4 I o I �I 0 ---- -:,---------- t h ri'v e architecture BMC HYDRAULIC OFFICE BUILDING CONCEPT SITE SECTION Project Number Drawn By MG Checked By SD Date May - - 29, 2019 a A2030) 0 Scale 1/8" = 1'-0" N N f