Loading...
HomeMy WebLinkAboutZMA201700008 Correspondence 2017-09-29 Johnathan Newberry From: Elaine Echols Sent: Friday, September 29, 2017 5:14 PM To: Johnathan Newberry Subject: 0 FW:CCP201700002: SPCA Expansion A little late, but could be used for the SP/ZMA From:Alexander Morrison [mailto:amorrison@serviceauthority.org] Sent:Tuesday,September 26, 2017 9:29 AM To: Elaine Echols<EECHOLS@albemarle.org> Subject:CCP201700002: SPCA Expansion Elaine, I have reviewed the CCP and am recommending approval with the following conditions: • Any proposed buildings on separate parcels will require their own water meter. • If buildings from separate parcels flow into the same private sewer pump station, a maintenance agreement will be required. • Verification of capacity for the private pump station may be required by DEQ. • Existing water meter size verification will be required if plumbing fixtures are added behind the existing meter. Let me know if you have any questions. Alexander J. Morrison, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 EL to/M1 ,G . n e-e-i324.---8 1